SlideShare a Scribd company logo
1 of 4
U N MALHOTRA
Mobile: +971 506664271
E-mail: unmal@eim.ae
SYNOPSIS
 A competent professional with almost 33 years of accomplished career in Maintenance
Planning, Project Planning, Scheduling, Monitoring, Cost-estimation and Control, risk
analysis, Earned Value Analysis, in the Oil and Gas Sector
 Presently working with National Drilling Company, Abu Dhabi, UAE, as Head of
Performance Management & Improvements in the Maintenance Division
 A proven performer who moves easily from vision to strategy to implementation and follow
through.
 Excellent management, communication, interpersonal, learning Attitude and team building
skills with the ability to work in a fast paced environment.
ACADEMIA
1986 Post Graduate Diplomain ManagementfromIGNOU
1982 B.E. Electrical fromMaharaja Sayaji RaoUniversityof Barodasecuring1st
Classwith
Distinction
PROFESSIONAL EXPERIENCE
Period : Nov.1995 to date
Name ofthe Company : National DrillingCompany,AbuDhabi,UAE
PresentPosition : Headof Performance Management&ImprovementinMaintenanceDivision
As Head of Performance Management & Improvements, I am responsible for the Preventive &
Predictive maintenance Effort, developing yearly Maintenance Division Performance contracts,
identifying Key performance indicators for the Head office functions and the workshop, reviewing
existing Business processes and carrying out improvements. Providing reports of all Key indicators on a
monthly basis, for review of Executive Management. Am directly responsible for creating a framework
for Reliability centered maintenance and carry out implementation of RCM as a key maintenance
strategy of the company. I am also involved in providing support for carrying out major maintenance of
the rigs byway of Planningandmonitoring.
Brief employmenthistoryinNDC:
Joined National Drilling Company in Nov. 1995 as Electrical Engineer and was posted in the head office.
Was responsible for all Electrical issues related to Drilling rigs, including trouble shooting of major
problems on rig site, preparing detailed scope of work for repair of electrical equipment, entering into
service contracts with qualified third party workshops in the UAE, providing PMS work schedules to rigs
and monitoring the completions, carrying out inspections of ongoing works at third party workshops and
Technical auditsonrig sites.
In the year 2002, promoted to the position of Team Leader and was given the additional responsibility to
implement SAP PM & PS modules. Was also responsible for the providing support to the rigs with
regardsto specializedthirdpartyrepairs,servicesandrequiredcertifications.
From the year 2004 was given additional responsibility to manage Major Maintenance ( Shut down)
projects. The job involved detailed project planning for 7 to 8 such projects in a year each costing 10 to
15 million Dhs. Each (depending upon the scope, upgrade required etc.), starting from rough cut scope
to issuance of Close out report. The jobs requires meticulous planning, both cost and schedule and
managing resources to ensure delivery of projects within cost, time with the required quality and with
an excellentHSErecord.
In the year 2013 promoted as Head of Performance Management and Improvement, a position that I
continue tooccupypresently.
A few of the major jobs done/initiatives taken during my employment with National Drilling company
are as under:
1) SAPimplementation
Was Team leaderforimplementationof PM& PS ( Partial) module of SAP. Producedcomplete blueprint
document,roadmap,detailedbusinessflow charts,andconductedworkshopswithidentifiedteamsto
complete the implementationwithinthe scheduled time inOctober2002. A lotof add-onshave been
introducedinthe systemwithlessonslearntoveraperiodof time tomake the systemrobust,user
friendlyandreliable.
2) ISO9001
Carriedoutimplementationof ISO9001: 2008 bothin Maintenance Division HOandthe Workshopand
succesedtoobtainISO9001:2008 certificationfromABS. Prepared NDCWorkshopQMSmanual
complete withall Mandatoryandrequiredworkinstructions.
3) ProjectPlanningguidelines - Preparation
Establishedprojectplanninginthe company,bycreatinga projectplanningguidelines foraproject,
Creatednumeroustemplatesformonitoring,control andstandardization usingthe ProjectSystem
Module withinSAP &MS Projects.
4) ProjectExecution –7 to 8 shutdownprojectseveryyear
As Teamleaderwasdirectlyresponsible for planning&executionof projects. Withateam of Sr. Project
Engineers,ProjectEngineers,Material coordinators,PlanningEngineersand Documentationcontrollers
managedprojects frompreparationof roughcut scope till the final close outreport.
5) Maintenance Manual
Wrote the maintenance manual of the Division.The manual ismade intwovolumeswiththe first
volume containingthe Maintenance Policy,Strategyanddetailedworkprocessandthe 2nd
volume
containingPMroutines,specificworkinstructionsandAssembly&disassemblychecklist.
6) Total reliabilitymaintenance –RCM
Developedamodel of Total reliabilitymaintenance that integratesreliabilityof equipmentduring
operations,Internal repairsonrigsite andcompany’sWorkshopandthirdparty workshops.
7) Maintenance KPI’sbasedonthe score card concept
DevelopingKeyperformance indicatorsbasedonKaplan’sscore cardmodel. IdentifiedKey
maintenance objectivesthataddressthe company’sstrategicobjectives andestablishedKPI’swiththeir
formulastohelpmonitoralignmentwiththe company’svision.
8) Performance Reports
Developedanumberof Reportsthat indicate the healthof the equipment, efficiencyof processand
workforce & HSE indicators. These reportsare releasedforthe informationandactiontothe
Managementandotherwork groups.
9) Excellence inProjectsprogram
DevelopedExcellence inProjectsmodel tocarryoutprojectsmaintainingintegrityof equipment,HSE,
Qualityandefficiencyof workforce.
10) LessonsLearnt Framework
Developedframe workforcapturinglessonslearntfromMaintenance activity,Projects,Operations.
WorkedwithIT to create an easyuserinterface forenteringandretrievingLessonslearnt.
11) PreventiveMaintenance System: AutomatedPMSandbuiltina numberof controlsto make it
more robust,reliable andtamperproof.
12) Budgeting : Responsible forpreparingthe Division’sbudgetforbothOPEXandCAPEXworksfor the
comingyearand preparingestimatesforthe 5year BusinessPlan.
Period : Dec.1982 till Nov.1995
Name ofthe Company : Oil & Natural Gas Commission,India( In variousworksites)
Position : Last position,DeputySuptd.Engineer –Electrical
Joined the company in 1982 as Asst. Executive Engineer and got the opportunity to work on both
Onshore & Offshore rigs as Chief Electrician for a period of almost 8 years. Was posted to the Gas
processing facility in Hazira and then to the Oil & Gas processing facility in Uran, Mumbai. Was
responsible formaintenance of variousplants,Electrical substationanddistributionfacilities.
I.T SKILLS
Packages: Well versedin
a) SAPPM & PS module
b) MicrosoftOffice &Projects
c) Visio
Strengths
Strengthsinclude beingaKeenlearner,goodaptitude,positive attitude,verygoodinterpersonal and
communicationskills,takinginitiatives,abilitytoworkunderpressure,goodteamworkingabilityand
abilitytoworkindependently.
PERSONAL DETAILS
Date of Birth : 12th
July1961
Nationality : Indian
Languages Known : English,Hindi
Marital Status : Married
Passport Number : K4629563 validup to 21-May-2022
Mobile No : +971 506664271
Email ID : unmal@eim.ae
PermanentAddress : 47/1, StreetNo.9 RajendraNagar,DehradunUttrakhand 248001
PresentAddress : Flat no 031, ShaikhaAyeshabuilding,SalamSt.AbuDhabi.UAE. POBox 4017

More Related Content

What's hot

Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEfren Eito
 
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...shiv1609
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDahmedlajhar
 
Project planner jobs based in warwickshire ref 1209 42
Project planner jobs based in warwickshire ref 1209 42Project planner jobs based in warwickshire ref 1209 42
Project planner jobs based in warwickshire ref 1209 42Sean Durrant
 
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVHIMANSHU DUBEY
 
Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)Terry Lin
 
Ghafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran Tariq
 

What's hot (20)

Resume 80115docx
Resume 80115docxResume 80115docx
Resume 80115docx
 
C.V. William 15
C.V. William 15C.V. William 15
C.V. William 15
 
Cv uppili
Cv uppili Cv uppili
Cv uppili
 
ADARSH kUMAR
ADARSH kUMARADARSH kUMAR
ADARSH kUMAR
 
QUINTIN GATEWOO2
QUINTIN GATEWOO2QUINTIN GATEWOO2
QUINTIN GATEWOO2
 
Jaydevsing Thakor Resume
Jaydevsing Thakor ResumeJaydevsing Thakor Resume
Jaydevsing Thakor Resume
 
Engr.Efren_ CV_Updated
Engr.Efren_ CV_UpdatedEngr.Efren_ CV_Updated
Engr.Efren_ CV_Updated
 
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
Mechanical Engineer with more than 2 yrs of experience in New Product Develop...
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATED
 
Ahmed Kurdi-CV
Ahmed Kurdi-CVAhmed Kurdi-CV
Ahmed Kurdi-CV
 
Browning.Stuart F1
Browning.Stuart F1Browning.Stuart F1
Browning.Stuart F1
 
Project planner jobs based in warwickshire ref 1209 42
Project planner jobs based in warwickshire ref 1209 42Project planner jobs based in warwickshire ref 1209 42
Project planner jobs based in warwickshire ref 1209 42
 
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CVDGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
DGM ELECTRICAL, PROJECTS HIMANSHU DUBEY CV
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
Vijay Profile
Vijay ProfileVijay Profile
Vijay Profile
 
Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)Resume_Terry201526(English&Chinese)
Resume_Terry201526(English&Chinese)
 
12
1212
12
 
Ghafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran-Electrical Engineer final
Ghafran-Electrical Engineer final
 
Saif HV
Saif HVSaif HV
Saif HV
 

Viewers also liked

Back to schoolnight
Back to schoolnightBack to schoolnight
Back to schoolnightmwt424
 
Windows Phone 7を使った業務アプリの作り方
Windows Phone 7を使った業務アプリの作り方Windows Phone 7を使った業務アプリの作り方
Windows Phone 7を使った業務アプリの作り方fukuoka-t
 
5 Ways To Start A Conversation To Get Business Using Twitter
5 Ways To Start A Conversation To Get Business Using Twitter5 Ways To Start A Conversation To Get Business Using Twitter
5 Ways To Start A Conversation To Get Business Using TwitterHannah Tighe
 
Earth's hydrosphere SanDiego
Earth's hydrosphere SanDiegoEarth's hydrosphere SanDiego
Earth's hydrosphere SanDiegoEmz Sandiego
 
Amor pelea limpio
Amor pelea limpioAmor pelea limpio
Amor pelea limpioMarina TMaz
 
How to Diagnose Problems Quickly on Linux Servers
How to Diagnose Problems Quickly on Linux ServersHow to Diagnose Problems Quickly on Linux Servers
How to Diagnose Problems Quickly on Linux ServersRichard Cunningham
 
Komputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri Sendiri
Komputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri SendiriKomputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri Sendiri
Komputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri SendiriDondy Bappedyanto
 
John Straw The anatomy of a successful SEO campaign
John Straw   The anatomy of a successful SEO campaignJohn Straw   The anatomy of a successful SEO campaign
John Straw The anatomy of a successful SEO campaignhitmeoptimiseyoursearch
 
History of meteorology and invention of weather instruments by lota joy
History of meteorology and invention of weather instruments by lota joyHistory of meteorology and invention of weather instruments by lota joy
History of meteorology and invention of weather instruments by lota joyLotz Malaluan
 

Viewers also liked (16)

Back to schoolnight
Back to schoolnightBack to schoolnight
Back to schoolnight
 
Making MySQL Fast
Making MySQL FastMaking MySQL Fast
Making MySQL Fast
 
Nick James Fresh content
Nick James   Fresh contentNick James   Fresh content
Nick James Fresh content
 
Hit mesummit cedricchambaz_microsoft
Hit mesummit cedricchambaz_microsoftHit mesummit cedricchambaz_microsoft
Hit mesummit cedricchambaz_microsoft
 
Nick james fresh content
Nick james   fresh contentNick james   fresh content
Nick james fresh content
 
Windows Phone 7を使った業務アプリの作り方
Windows Phone 7を使った業務アプリの作り方Windows Phone 7を使った業務アプリの作り方
Windows Phone 7を使った業務アプリの作り方
 
5 Ways To Start A Conversation To Get Business Using Twitter
5 Ways To Start A Conversation To Get Business Using Twitter5 Ways To Start A Conversation To Get Business Using Twitter
5 Ways To Start A Conversation To Get Business Using Twitter
 
Earth's hydrosphere SanDiego
Earth's hydrosphere SanDiegoEarth's hydrosphere SanDiego
Earth's hydrosphere SanDiego
 
Amor pelea limpio
Amor pelea limpioAmor pelea limpio
Amor pelea limpio
 
Treaties
TreatiesTreaties
Treaties
 
Rob shaw ppc to twitter
Rob shaw   ppc to twitterRob shaw   ppc to twitter
Rob shaw ppc to twitter
 
Colm Bracken Search and Targeting
Colm Bracken   Search and TargetingColm Bracken   Search and Targeting
Colm Bracken Search and Targeting
 
How to Diagnose Problems Quickly on Linux Servers
How to Diagnose Problems Quickly on Linux ServersHow to Diagnose Problems Quickly on Linux Servers
How to Diagnose Problems Quickly on Linux Servers
 
Komputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri Sendiri
Komputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri SendiriKomputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri Sendiri
Komputasi Awan di Indonesia - Menjadi Tuan Rumah di Negeri Sendiri
 
John Straw The anatomy of a successful SEO campaign
John Straw   The anatomy of a successful SEO campaignJohn Straw   The anatomy of a successful SEO campaign
John Straw The anatomy of a successful SEO campaign
 
History of meteorology and invention of weather instruments by lota joy
History of meteorology and invention of weather instruments by lota joyHistory of meteorology and invention of weather instruments by lota joy
History of meteorology and invention of weather instruments by lota joy
 

Similar to UAE Oil & Gas Veteran Seeks New Opportunities

Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resumeUtpal BOSE
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Al Obaidi Abdullah
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Al Obaidi Abdullah
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar Khan
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-Adel Alqontar
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThirumurugan B
 
Mohammad Alfaraj CV 2015
Mohammad Alfaraj CV 2015Mohammad Alfaraj CV 2015
Mohammad Alfaraj CV 2015farajma2020
 

Similar to UAE Oil & Gas Veteran Seeks New Opportunities (20)

Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
 
Ahmed Abdelaziz CV
Ahmed Abdelaziz CVAhmed Abdelaziz CV
Ahmed Abdelaziz CV
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Neelesh Thakare CV.
Neelesh Thakare CV.Neelesh Thakare CV.
Neelesh Thakare CV.
 
Ganesh B Gawali
Ganesh B GawaliGanesh B Gawali
Ganesh B Gawali
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
Resume
ResumeResume
Resume
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016Rebecca Taylor CV - January 2016
Rebecca Taylor CV - January 2016
 
CV ABHI 06-09 - Copy
CV ABHI 06-09 - CopyCV ABHI 06-09 - Copy
CV ABHI 06-09 - Copy
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-PM - CV - MEP Project Manager-
PM - CV - MEP Project Manager-
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRP
 
Mohammad Alfaraj CV 2015
Mohammad Alfaraj CV 2015Mohammad Alfaraj CV 2015
Mohammad Alfaraj CV 2015
 

UAE Oil & Gas Veteran Seeks New Opportunities

  • 1. U N MALHOTRA Mobile: +971 506664271 E-mail: unmal@eim.ae SYNOPSIS  A competent professional with almost 33 years of accomplished career in Maintenance Planning, Project Planning, Scheduling, Monitoring, Cost-estimation and Control, risk analysis, Earned Value Analysis, in the Oil and Gas Sector  Presently working with National Drilling Company, Abu Dhabi, UAE, as Head of Performance Management & Improvements in the Maintenance Division  A proven performer who moves easily from vision to strategy to implementation and follow through.  Excellent management, communication, interpersonal, learning Attitude and team building skills with the ability to work in a fast paced environment. ACADEMIA 1986 Post Graduate Diplomain ManagementfromIGNOU 1982 B.E. Electrical fromMaharaja Sayaji RaoUniversityof Barodasecuring1st Classwith Distinction PROFESSIONAL EXPERIENCE Period : Nov.1995 to date Name ofthe Company : National DrillingCompany,AbuDhabi,UAE PresentPosition : Headof Performance Management&ImprovementinMaintenanceDivision As Head of Performance Management & Improvements, I am responsible for the Preventive & Predictive maintenance Effort, developing yearly Maintenance Division Performance contracts, identifying Key performance indicators for the Head office functions and the workshop, reviewing existing Business processes and carrying out improvements. Providing reports of all Key indicators on a monthly basis, for review of Executive Management. Am directly responsible for creating a framework for Reliability centered maintenance and carry out implementation of RCM as a key maintenance strategy of the company. I am also involved in providing support for carrying out major maintenance of the rigs byway of Planningandmonitoring. Brief employmenthistoryinNDC: Joined National Drilling Company in Nov. 1995 as Electrical Engineer and was posted in the head office. Was responsible for all Electrical issues related to Drilling rigs, including trouble shooting of major problems on rig site, preparing detailed scope of work for repair of electrical equipment, entering into service contracts with qualified third party workshops in the UAE, providing PMS work schedules to rigs
  • 2. and monitoring the completions, carrying out inspections of ongoing works at third party workshops and Technical auditsonrig sites. In the year 2002, promoted to the position of Team Leader and was given the additional responsibility to implement SAP PM & PS modules. Was also responsible for the providing support to the rigs with regardsto specializedthirdpartyrepairs,servicesandrequiredcertifications. From the year 2004 was given additional responsibility to manage Major Maintenance ( Shut down) projects. The job involved detailed project planning for 7 to 8 such projects in a year each costing 10 to 15 million Dhs. Each (depending upon the scope, upgrade required etc.), starting from rough cut scope to issuance of Close out report. The jobs requires meticulous planning, both cost and schedule and managing resources to ensure delivery of projects within cost, time with the required quality and with an excellentHSErecord. In the year 2013 promoted as Head of Performance Management and Improvement, a position that I continue tooccupypresently. A few of the major jobs done/initiatives taken during my employment with National Drilling company are as under: 1) SAPimplementation Was Team leaderforimplementationof PM& PS ( Partial) module of SAP. Producedcomplete blueprint document,roadmap,detailedbusinessflow charts,andconductedworkshopswithidentifiedteamsto complete the implementationwithinthe scheduled time inOctober2002. A lotof add-onshave been introducedinthe systemwithlessonslearntoveraperiodof time tomake the systemrobust,user friendlyandreliable. 2) ISO9001 Carriedoutimplementationof ISO9001: 2008 bothin Maintenance Division HOandthe Workshopand succesedtoobtainISO9001:2008 certificationfromABS. Prepared NDCWorkshopQMSmanual complete withall Mandatoryandrequiredworkinstructions. 3) ProjectPlanningguidelines - Preparation Establishedprojectplanninginthe company,bycreatinga projectplanningguidelines foraproject, Creatednumeroustemplatesformonitoring,control andstandardization usingthe ProjectSystem Module withinSAP &MS Projects. 4) ProjectExecution –7 to 8 shutdownprojectseveryyear As Teamleaderwasdirectlyresponsible for planning&executionof projects. Withateam of Sr. Project Engineers,ProjectEngineers,Material coordinators,PlanningEngineersand Documentationcontrollers managedprojects frompreparationof roughcut scope till the final close outreport.
  • 3. 5) Maintenance Manual Wrote the maintenance manual of the Division.The manual ismade intwovolumeswiththe first volume containingthe Maintenance Policy,Strategyanddetailedworkprocessandthe 2nd volume containingPMroutines,specificworkinstructionsandAssembly&disassemblychecklist. 6) Total reliabilitymaintenance –RCM Developedamodel of Total reliabilitymaintenance that integratesreliabilityof equipmentduring operations,Internal repairsonrigsite andcompany’sWorkshopandthirdparty workshops. 7) Maintenance KPI’sbasedonthe score card concept DevelopingKeyperformance indicatorsbasedonKaplan’sscore cardmodel. IdentifiedKey maintenance objectivesthataddressthe company’sstrategicobjectives andestablishedKPI’swiththeir formulastohelpmonitoralignmentwiththe company’svision. 8) Performance Reports Developedanumberof Reportsthat indicate the healthof the equipment, efficiencyof processand workforce & HSE indicators. These reportsare releasedforthe informationandactiontothe Managementandotherwork groups. 9) Excellence inProjectsprogram DevelopedExcellence inProjectsmodel tocarryoutprojectsmaintainingintegrityof equipment,HSE, Qualityandefficiencyof workforce. 10) LessonsLearnt Framework Developedframe workforcapturinglessonslearntfromMaintenance activity,Projects,Operations. WorkedwithIT to create an easyuserinterface forenteringandretrievingLessonslearnt. 11) PreventiveMaintenance System: AutomatedPMSandbuiltina numberof controlsto make it more robust,reliable andtamperproof. 12) Budgeting : Responsible forpreparingthe Division’sbudgetforbothOPEXandCAPEXworksfor the comingyearand preparingestimatesforthe 5year BusinessPlan. Period : Dec.1982 till Nov.1995 Name ofthe Company : Oil & Natural Gas Commission,India( In variousworksites) Position : Last position,DeputySuptd.Engineer –Electrical
  • 4. Joined the company in 1982 as Asst. Executive Engineer and got the opportunity to work on both Onshore & Offshore rigs as Chief Electrician for a period of almost 8 years. Was posted to the Gas processing facility in Hazira and then to the Oil & Gas processing facility in Uran, Mumbai. Was responsible formaintenance of variousplants,Electrical substationanddistributionfacilities. I.T SKILLS Packages: Well versedin a) SAPPM & PS module b) MicrosoftOffice &Projects c) Visio Strengths Strengthsinclude beingaKeenlearner,goodaptitude,positive attitude,verygoodinterpersonal and communicationskills,takinginitiatives,abilitytoworkunderpressure,goodteamworkingabilityand abilitytoworkindependently. PERSONAL DETAILS Date of Birth : 12th July1961 Nationality : Indian Languages Known : English,Hindi Marital Status : Married Passport Number : K4629563 validup to 21-May-2022 Mobile No : +971 506664271 Email ID : unmal@eim.ae PermanentAddress : 47/1, StreetNo.9 RajendraNagar,DehradunUttrakhand 248001 PresentAddress : Flat no 031, ShaikhaAyeshabuilding,SalamSt.AbuDhabi.UAE. POBox 4017