Saudi Aramco: Company General Use
SAEP-1151 AWARENESS.
.
Saudi Aramco: Company General Use
Documents For S.A Materials:
Outbound.
MTO (Material Take Off List).
Approved IFC drawing.
Saudi Aramco: Company General Use
Contractor Supply Materials.
Non Inspect able Materials.
Level zero.
Level 1.
Level 2.
Level3.
Level4.
Saudi Aramco: Company General Use
Required Documents For Non Inspect
able:
 MTA (Material Technical Approved from SAPMT which
Prove that this material is non inspect able).
 P.O (Purchase order) along with original copy for
verification or stamped as controlled copy.
 Delivery note along with original copy for
verification.
 MTC(Mill Test Certificate).
 Vendor approval, approved manufacturer is not
mandatory.
Saudi Aramco: Company General Use
Required Documents For Level. 0.
 Documentation requirements only; no vendor inspection required.
 M.R. (Material Requisition) and it shall be approved from SAIR.
 IAP is not required for Level 0.
 P.O (Purchase order) along with original copy for verification or
stamped as controlled copy.
 Delivery note along with original copy for verification.
 MTC(Mill Test Certificate).
 It shall be procured from approved manufacturer.
 Vendor approval.
Saudi Aramco: Company General Use
Required Documents For Level. 1.
 Only final inspection is required prior to shipping.
 M.R. (Material Requisition) and it shall be approved from SAIR.
 IAP (Inspection assignment package approved from SAIR).
 P.O (Purchase order) along with original copy for verification or
stamped as controlled copy.
 Delivery note along with original copy for verification.
 It shall be procured from approved manufacturer.
 Vendor approval.
 MTC(Mill Test Certificate),
Saudi Aramco: Company General Use
Required Documents For Level. 2.
 For VID:
Includes pre-inspection meetings, one or more unspecified “in progress” surveillance visit/s, all
witness and hold points.
 For PID:
1. M.R. (Material Requisition) and it shall be approved from SAIR.
2. IAP (Inspection assignment package approved from SAIR).
3. P.O (Purchase order) along with original copy for verification or stamped as controlled copy.
4. Delivery note along with original copy for verification.
5. Vendor approval.
6. MTC(Mill Test Certificate).
7. It shall be procured from approved manufacturer.
8. Inspection Report and Qc Documents from Contractor’s TPI (Third Party Inspector).
Saudi Aramco: Company General Use
Required Documents For Level. 3.
 For VID:
Includes pre-inspection meetings, one or more unspecified “in progress” surveillance visit/s, all witness and
hold points. Inspection by VID shall be in a regular basis.
 For PID:
1. M.R. (Material Requisition) and it shall be approved from SAIR.
2. IAP (Inspection assignment package approved from SAIR).
3. P.O (Purchase order) along with original copy for verification or stamped as controlled copy.
4. Delivery note along with original copy for verification.
5. Vendor approval.
6. MTC(Mill Test Certificate).
7. It shall be procured from approved manufacturer.
8. Inspection Release Certificate and Qc Documents from Contractor’s TPI.
9. COC if required for more verification.
Saudi Aramco: Company General Use
Required Documents For Level. 4.
 For VID:
Resident inspector continually monitoring the work.
 For PID:
1. M.R. (Material Requisition) and it shall be approved from SAIR.
2. IAP (Inspection assignment package approved from SAIR).
3. P.O (Purchase order) along with original copy for verification or stamped as controlled
copy.
4. Delivery note along with original copy for verification.
5. Vendor approval.
6. MTC(Mill Test Certificate).
7. It shall be procured from approved manufacturer.
8. Inspection Report, Inspection Release Certificate and Qc Documents from Contractor’s
TPI
Saudi Aramco: Company General Use
END
Open Discussion

More Related Content

What's hot

FORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdf
FORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdfFORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdf
FORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdf
hernuwaluyo
 
Presentation on Establishing Quality Objectives
Presentation on Establishing Quality ObjectivesPresentation on Establishing Quality Objectives
Presentation on Establishing Quality Objectives
Erum Farooqi
 
Safe Push back Procedure.
Safe Push back Procedure.Safe Push back Procedure.
Safe Push back Procedure.
Andrew Louis
 
Export procedure-and-documentation
Export procedure-and-documentationExport procedure-and-documentation
Export procedure-and-documentation
Bikramjit Singh
 
Icao sms m 04 – hazards (r013) 09 (e)
Icao sms m 04 – hazards (r013) 09 (e)Icao sms m 04 – hazards (r013) 09 (e)
Icao sms m 04 – hazards (r013) 09 (e)
Dino Jukić
 

What's hot (16)

Dangerous and Hazardous Goods
Dangerous and Hazardous GoodsDangerous and Hazardous Goods
Dangerous and Hazardous Goods
 
Export - Import Steps & Documents
Export - Import Steps & DocumentsExport - Import Steps & Documents
Export - Import Steps & Documents
 
FORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdf
FORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdfFORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdf
FORM-01-Formulir Pemeriksaan Bahan Baku Pangan dan Kemasan.pdf
 
Presentation on Establishing Quality Objectives
Presentation on Establishing Quality ObjectivesPresentation on Establishing Quality Objectives
Presentation on Establishing Quality Objectives
 
Transporting Lithium batteries by air: What you need to know
Transporting Lithium batteries by air: What you need to knowTransporting Lithium batteries by air: What you need to know
Transporting Lithium batteries by air: What you need to know
 
Safe Push back Procedure.
Safe Push back Procedure.Safe Push back Procedure.
Safe Push back Procedure.
 
Manajemen Rak dalam Pergudangan_Materi Pelatihan "WAREHOUSING MANAGEMENT"
Manajemen Rak dalam Pergudangan_Materi Pelatihan "WAREHOUSING MANAGEMENT"Manajemen Rak dalam Pergudangan_Materi Pelatihan "WAREHOUSING MANAGEMENT"
Manajemen Rak dalam Pergudangan_Materi Pelatihan "WAREHOUSING MANAGEMENT"
 
Auditing Principles
Auditing PrinciplesAuditing Principles
Auditing Principles
 
PECB Webinar: Overview of the PECB ISO 55001 Training and Certification course
PECB Webinar: Overview of the PECB ISO 55001 Training and Certification coursePECB Webinar: Overview of the PECB ISO 55001 Training and Certification course
PECB Webinar: Overview of the PECB ISO 55001 Training and Certification course
 
Safety Management System Manual
Safety Management System ManualSafety Management System Manual
Safety Management System Manual
 
Safety Management Systems (SMS) Fundamentals: Promotion
Safety Management Systems (SMS) Fundamentals: PromotionSafety Management Systems (SMS) Fundamentals: Promotion
Safety Management Systems (SMS) Fundamentals: Promotion
 
Api q1 9th edition training program
Api q1 9th edition training programApi q1 9th edition training program
Api q1 9th edition training program
 
Transport douments
Transport doumentsTransport douments
Transport douments
 
Export procedure-and-documentation
Export procedure-and-documentationExport procedure-and-documentation
Export procedure-and-documentation
 
Halal supply chain
Halal supply chainHalal supply chain
Halal supply chain
 
Icao sms m 04 – hazards (r013) 09 (e)
Icao sms m 04 – hazards (r013) 09 (e)Icao sms m 04 – hazards (r013) 09 (e)
Icao sms m 04 – hazards (r013) 09 (e)
 

Similar to SAEP-1151.pptx

Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviations
Ata Alvi
 
Seminar on LARGE - Session 9 Property Inspection (1).pptx
Seminar on LARGE - Session 9 Property Inspection (1).pptxSeminar on LARGE - Session 9 Property Inspection (1).pptx
Seminar on LARGE - Session 9 Property Inspection (1).pptx
janroots
 
Si quality manual
Si quality manualSi quality manual
Si quality manual
rusyare
 
presentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdf
presentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdfpresentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdf
presentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdf
RobinPsuedonymParen
 
Fuzzy conformity labeling need change -NEW
Fuzzy conformity labeling need change -NEWFuzzy conformity labeling need change -NEW
Fuzzy conformity labeling need change -NEW
cesafe
 

Similar to SAEP-1151.pptx (20)

RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
GMP-VENDORS SELECTION
GMP-VENDORS SELECTIONGMP-VENDORS SELECTION
GMP-VENDORS SELECTION
 
Terms defenations-abriviations
Terms defenations-abriviationsTerms defenations-abriviations
Terms defenations-abriviations
 
Vehicle Testing and Homologation
Vehicle Testing and Homologation  Vehicle Testing and Homologation
Vehicle Testing and Homologation
 
vendor validation by akshay kakde
vendor validation by akshay kakdevendor validation by akshay kakde
vendor validation by akshay kakde
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
5263 UPC CERTIFICATE
5263 UPC CERTIFICATE5263 UPC CERTIFICATE
5263 UPC CERTIFICATE
 
Seminar on LARGE - Session 9 Property Inspection (1).pptx
Seminar on LARGE - Session 9 Property Inspection (1).pptxSeminar on LARGE - Session 9 Property Inspection (1).pptx
Seminar on LARGE - Session 9 Property Inspection (1).pptx
 
Si quality manual
Si quality manualSi quality manual
Si quality manual
 
Bmr preperation
Bmr preperationBmr preperation
Bmr preperation
 
5264 UPC CERTIFICATE
5264 UPC CERTIFICATE5264 UPC CERTIFICATE
5264 UPC CERTIFICATE
 
presentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdf
presentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdfpresentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdf
presentation-gmp-clearance-requirements-medicines-manufactured-overseas.pdf
 
Presentation: GMP clearance requirements for medicines manufactured overseas
Presentation: GMP clearance requirements for medicines manufactured overseasPresentation: GMP clearance requirements for medicines manufactured overseas
Presentation: GMP clearance requirements for medicines manufactured overseas
 
Pre- shipment inspection during Export
Pre- shipment inspection during ExportPre- shipment inspection during Export
Pre- shipment inspection during Export
 
COPP.pptx
COPP.pptxCOPP.pptx
COPP.pptx
 
Procedure for getting the manufacturing license of notified IVDs Products in ...
Procedure for getting the manufacturing license of notified IVDs Products in ...Procedure for getting the manufacturing license of notified IVDs Products in ...
Procedure for getting the manufacturing license of notified IVDs Products in ...
 
What is COPPs? How to apply for COPPs (Certificate of Pharmaceutical Products)?
What is COPPs? How to apply for COPPs (Certificate of Pharmaceutical Products)?What is COPPs? How to apply for COPPs (Certificate of Pharmaceutical Products)?
What is COPPs? How to apply for COPPs (Certificate of Pharmaceutical Products)?
 
Fuzzy conformity labeling need change -NEW
Fuzzy conformity labeling need change -NEWFuzzy conformity labeling need change -NEW
Fuzzy conformity labeling need change -NEW
 
New drug approval
New drug approvalNew drug approval
New drug approval
 

Recently uploaded

School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
Kamal Acharya
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
Kamal Acharya
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
Kamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Lovely Professional University
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
Kamal Acharya
 

Recently uploaded (20)

School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
internship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOTinternship exam ppt.pptx on embedded system and IOT
internship exam ppt.pptx on embedded system and IOT
 
retail automation billing system ppt.pptx
retail automation billing system ppt.pptxretail automation billing system ppt.pptx
retail automation billing system ppt.pptx
 
Teachers record management system project report..pdf
Teachers record management system project report..pdfTeachers record management system project report..pdf
Teachers record management system project report..pdf
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
 
Construction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptxConstruction method of steel structure space frame .pptx
Construction method of steel structure space frame .pptx
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Lect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptxLect 2 - Design of slender column-2.pptx
Lect 2 - Design of slender column-2.pptx
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
An improvement in the safety of big data using blockchain technology
An improvement in the safety of big data using blockchain technologyAn improvement in the safety of big data using blockchain technology
An improvement in the safety of big data using blockchain technology
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 

SAEP-1151.pptx

  • 1. Saudi Aramco: Company General Use SAEP-1151 AWARENESS. .
  • 2. Saudi Aramco: Company General Use Documents For S.A Materials: Outbound. MTO (Material Take Off List). Approved IFC drawing.
  • 3. Saudi Aramco: Company General Use Contractor Supply Materials. Non Inspect able Materials. Level zero. Level 1. Level 2. Level3. Level4.
  • 4. Saudi Aramco: Company General Use Required Documents For Non Inspect able:  MTA (Material Technical Approved from SAPMT which Prove that this material is non inspect able).  P.O (Purchase order) along with original copy for verification or stamped as controlled copy.  Delivery note along with original copy for verification.  MTC(Mill Test Certificate).  Vendor approval, approved manufacturer is not mandatory.
  • 5. Saudi Aramco: Company General Use Required Documents For Level. 0.  Documentation requirements only; no vendor inspection required.  M.R. (Material Requisition) and it shall be approved from SAIR.  IAP is not required for Level 0.  P.O (Purchase order) along with original copy for verification or stamped as controlled copy.  Delivery note along with original copy for verification.  MTC(Mill Test Certificate).  It shall be procured from approved manufacturer.  Vendor approval.
  • 6. Saudi Aramco: Company General Use Required Documents For Level. 1.  Only final inspection is required prior to shipping.  M.R. (Material Requisition) and it shall be approved from SAIR.  IAP (Inspection assignment package approved from SAIR).  P.O (Purchase order) along with original copy for verification or stamped as controlled copy.  Delivery note along with original copy for verification.  It shall be procured from approved manufacturer.  Vendor approval.  MTC(Mill Test Certificate),
  • 7. Saudi Aramco: Company General Use Required Documents For Level. 2.  For VID: Includes pre-inspection meetings, one or more unspecified “in progress” surveillance visit/s, all witness and hold points.  For PID: 1. M.R. (Material Requisition) and it shall be approved from SAIR. 2. IAP (Inspection assignment package approved from SAIR). 3. P.O (Purchase order) along with original copy for verification or stamped as controlled copy. 4. Delivery note along with original copy for verification. 5. Vendor approval. 6. MTC(Mill Test Certificate). 7. It shall be procured from approved manufacturer. 8. Inspection Report and Qc Documents from Contractor’s TPI (Third Party Inspector).
  • 8. Saudi Aramco: Company General Use Required Documents For Level. 3.  For VID: Includes pre-inspection meetings, one or more unspecified “in progress” surveillance visit/s, all witness and hold points. Inspection by VID shall be in a regular basis.  For PID: 1. M.R. (Material Requisition) and it shall be approved from SAIR. 2. IAP (Inspection assignment package approved from SAIR). 3. P.O (Purchase order) along with original copy for verification or stamped as controlled copy. 4. Delivery note along with original copy for verification. 5. Vendor approval. 6. MTC(Mill Test Certificate). 7. It shall be procured from approved manufacturer. 8. Inspection Release Certificate and Qc Documents from Contractor’s TPI. 9. COC if required for more verification.
  • 9. Saudi Aramco: Company General Use Required Documents For Level. 4.  For VID: Resident inspector continually monitoring the work.  For PID: 1. M.R. (Material Requisition) and it shall be approved from SAIR. 2. IAP (Inspection assignment package approved from SAIR). 3. P.O (Purchase order) along with original copy for verification or stamped as controlled copy. 4. Delivery note along with original copy for verification. 5. Vendor approval. 6. MTC(Mill Test Certificate). 7. It shall be procured from approved manufacturer. 8. Inspection Report, Inspection Release Certificate and Qc Documents from Contractor’s TPI
  • 10. Saudi Aramco: Company General Use END Open Discussion