SlideShare a Scribd company logo
1 of 13
Download to read offline
RESUME MUHAMMAD AFI BIN HASSAN
1
MUHAMMAD AFI BIN HASSAN
No 14, Jalan Asli 8,
Taman Pasir Putih,
81700 Pasir Gudang.
Johor Darul Ta’azim
Email :muhdafi_88@yahoo.com
OBJECTIVE
A mechanical position with diploma in Mechanical Engineering in Manufacturing. As a
QC Inspector to make quality is the BEST in the part of your live!. And to gain more
experience and learn a new skills.
PERSONAL PARTICULARS
Gender : Male
I/C No : 880910-23-5617
Date of birth : 10 September 1988
Age : 27 years old
Place of birthday : Hospital Sultanah Aminah Johor Bharu
Marital Status : Married
Health : Good Health
Nationality : Malaysia
Interest : Adventure Game
Phone : 017-7685696
EDUCATION
1) Jan 2006 - Dis 2009
Politeknik Johor Bahru, Diploma in Mechanical Engineering
Pasir Gudang, Johor (Manufacturing).
2) 2004 – 2005
Sek. Men. Teknik Muar, Grade in Sijil Pelajaran Malaysia
Muar,Johor (SPM).
RESUME MUHAMMAD AFI BIN HASSAN
2
ATTENDED COURSE
1) June 2012
Johor Skill Development Center Welding Inspector (CSWIP 3.1)
(PUSPATRI)
2) April 2010
Johor Skill Development Center Welding Inspector (PCN Level 2)
(PUSPATRI)
WORK EXPERIENCE
1) Company Name : Flextronics (Penang) Sdn Bhd
Position Title : QA Asst Engineer (Assembly)
Industry : Manufacturing
Date Joined : June 2014 ~ Present
DUTIES AND RESPONSIBILITIES
• To ensure and monitor Qc Inspector (IPQC & OQA) carry out activity during and
after assembly
• Ensure production follow spec as a client requirement
• Prepare release package for each new model including result for each testing.
• Prepare checklist for Qc Inspector (IPQC & OQA) for their inspections referenced.
• Prepare QSI (Quality Standard Inspection) for each models including Sub-Assembly
and Main Assembly.
• Ensure incoming part in spec and no reject issues (painting and molding)
• Prepare Quality Alert for reference Trainer and Production especially operator to
follow the sequence that Engineer Process provided.
• Ensure jig or tools for testing are in good condition and inspect as follow
requirement from client.
• Prepare documentation for all finding either from client or internal and come out
with a methods.
• Ensure zero market claims.
RESUME MUHAMMAD AFI BIN HASSAN
3
2) Company Name : Seagull Engineering Sdn Bhd.
Position Title : QA/QC Inspector (WELDING)
Industry : Oil & Gas Fabrication
Date Joined : August 2010 ~ Febuary 2014
DUTIES AND RESPONSIBILITIES
• To carry out all QC Inspection in welding activities as directed by QC Head or
Manager in accordance with company’s QA/QC procedures.
• To carry out all inspection receiving material before production.
• To ensure and monitor welding activity during fabrication and visual after welding.
• To ensure and follow up the welding sequence.
• To perform all QC/Welding inspection of the works at site / shop as required.
• To coordinate with NDT team or subcontractor to perform NDT timely and as per
specification.
• To ensure that all fabrications work are performed to the quality as per specification.
• To ensure that all QC activities are performed timely with no delay to production.
• To perform any other duties that may be assigned to you by your superior /
management from time to time.
JOB RESPONSIBILITIES ( IN SEQUENCE )
• To interpreted fabrication drawing. (G.A., nozzle, internal, external detail).
• Perform material receiving inspection such as plate, flanges, forging, fitting, pipe,
tube sheet (heat exchanger), baffle plate (heat exchanger).
• Ensure all the material appearance such as width, length, thickness, stamping @
marking and heat number are available and comply with drawing
• Prepare line summary check list such as marking date, fit up inspection, visual after
welding date and clarify the joint number in order to monitor the progress in
workshop.
• Perform fit up inspection during pre-fabrication especially for longitude seam,
circumference seam, flange to nozzle neck joint, pipe joint, nozzle to shell and
attachment to pressure part joint. Ensure the alignment (hi-low), bevel preparation
and gap as per drawing fabrication.
• Monitor welding activity during fabrication and make sure all the document is
available and approved such as WPS and weld map before start the inspection.
• To monitor welding process such as SMAW, GTAW, FCAW, SAW and control the
welder, To ensure that only qualified welder to perform welding work during
production activity.
• Perform visual inspection after completed weld. Ensure that the reinforcement weld
is achieved as per fabrication drawing. Also determine defect such as spatter,
undercut, under fill and mark clearly so that remedial action can be taken.
• Coordinate with NDT department to perform examination such as PT, MT, and RT
after welding completed and visual inspection satisfactory. In accordance to ITP to
ensure the examination had performed to the specified joint.
• To understand the method of NDT and make sure it is done correctly.
• Review the NDT report and ensure it is tally with request and compile to the MDR.
RESUME MUHAMMAD AFI BIN HASSAN
4
• Perform final inspection and final dimensional as a final inspection for QC inspector
before proceed to PWHT or hydrostatic test.
• To coordinate with:
• QA engineer (in order to implement all the related procedures).
• Design Engineer (Technical wise, drawing).
• Production (material, schedule).
• Purchasing (mill certificate, P.O and D.O).
PROJECT INVOLVED
1. Year : September 2013 to Febuary 2014
Job Number : 7.13M004
Client : TNB / Andritz / MMHE-ATB
Project Involved : Ulu Jelai Hydroelectric (Steel Liner) Project
Project in MMHE-ATB Snd Bhd
2. Year : August 2013 to December 2013
Job Number : 7.13S002
Client : PETRONAS / PROCESS GROUP / MMHE-ATB
Project Involved : Petronas Skid Piping FLNG Project
A-42-101- Producer Water Treatment Package
A-42-102- Desanding Package
Project in MMHE-ATB Snd Bhd
3. Year : April 2013 to December 2013
Job Number : 7.12S052
Client : PETRONAS / MHI / MMHE-ATB
Project Involved : Sabah Ammonia Urea (SAMUR) Project
C-58-41- Demi Waste Water Stripping Tower
Project in MMHE-ATB Snd Bhd
4. Year : December 2012 to December 2013
Job Number : 7.12M049
Client : PETRONAS / MHI / MMHE-ATB
Project Involved : Sabah Ammonia Urea (SAMUR) Project
C-20-01- HP Scubber
C-20-02- LP Scubber
C-20-04- Stripper
C-21-01- Process Condensate
C-37-01- Stripping Tower
Project in MMHE-ATB Snd Bhd
RESUME MUHAMMAD AFI BIN HASSAN
5
5. Year : December 2012 to December 2013
Job Number : 7.12M050
Client : PETRONAS / MHI / MMHE-ATB
Project Involved : Sabah Ammonia Urea (SAMUR) Project
V-16-02- Syn 2nd
Intercooler Separator
V-16-03- Syn Gas After Separator
V-18-01- Ammonia Separator
V-18-04- Purge Gas Separator
Project in MMHE-ATB Snd Bhd
6. Year : June 2012 to December 2012
Job Number : 7.12M039Q
Client : PETROFAC / MMHE-ATB
Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC
V4101-Hot Oil Expansion Vessel
V4102-Hot Oil Drain Down Vessel
V4301-Fuel Gas Discharge Scrubber
A2001/2002-V01- 1st stage Suction Scrubber Train 1
A2001/2002-V02- 2nd stage Suction Scrubber Train 2
Project in MMHE-ATB Snd Bhd
7. Year : July 2012 to November 2012
Job Number : 7.11M035L
Client : PETROFAC / MMHE-ATB
Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC
E1001-Inlet Heater
E1002-Interstage Heater
Project in MMHE-ATB Snd Bhd
8. Year : Sept 2012 to November 2012
Job Number : 7.12M041S
Client : PETROFAC / MMHE-ATB
Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC
LP FWS Pig Receiver – 4 set
(V1004, V1005, V1006 & V1007)
Project in MMHE-ATB Snd Bhd
9. Year : July 2012 to October 2012
Job Number : 7.12S042T
Client : PETROFAC / MMHE-ATB
Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC
81-V5505- DryAir Receiver
Project in MMHE-ATB Snd Bhd
RESUME MUHAMMAD AFI BIN HASSAN
6
10. Year : March2012 to July 2012
Job Number : 7.11S032I
Client : EXXON / MMHE-ATB
Project Involved : TAPIS EOR and Rejuvenation Project &
TELOK GAS Development Project.
Launcher & Receiver
(V370, V371, V372, V373, V374, V375, V376, V377,
V378, V382)
Project in MMHE-ATB Snd Bhd=
11. Year : February 2012 to June 2012
Job Number : 7.11M030G
Client : PETROFAC / MMHE-ATB
Project Involved : Block PM304 Cendor Phase-2 Development Project for
PETROFAC ( Vessel )
V1001- HP Production Separator
V1002- LP Production Separator
V3101-Crude Degasser
V4601-HP Flare Knock-out Drum
V4701-LP Flare Knock-out Drum
Project in MMHE-ATB Sdn Bhd
12. Year : August 2010 to February 2012
Job Number : 7.10M023Z
Project Involved : Tocoma Water Gate
CTA-2002, 2003, 2004, 2008
CMA-2001, 2002, 2003, 2004, 2005
Project in MMHE-ATB Sdn Bhd
13. Year : March 2011 to July 2011
Job Number : 7.10M026C
Project Involved : Spillway Radial Gate
30062-D-0704, 0705, 0706_rb1, 0708, 0709, 0721
Project in MMHE-ATB Sdn Bhd.
14. Year : November 2010 to March 2011
Job Number : 7.10S025B / S.10S025B
Project Involved : Theun Hinboun Expansion Project ( Steel Liner )
30062-D-1503, 1518, 1519, 1520, 1521, 1522, 1604, 1609
Project in MMHE-ATB Sdn Bhd.
RESUME MUHAMMAD AFI BIN HASSAN
7
OTHER SKILL
 Proficient in computer Microsoft Word, Power Point and Excel.
 Familiar in AutoCAD drawing.
 Proficient in engineering mechanical.
 Knowledge in welding and welding procedure
 Knowledge in Visual Inspection and type of defects
 Basic knowledge in NDT
 Full clean driving licence (B2 & D)
 Ability to handle all inspection material like Welding Gauge, Thickness Gauge
(UT), Clamp Meter, Laser Distance and Hi-Low Gauge
PERSONEL CHARACTERISTIC
 High social engineering skill; able to deal with various levels of people.
 Adaptable to new environment in a short period of time and are able to work extra time
when necessary.
 Dedicated work ethic – flexible in schedule – goal oriented – self-guided.
 Have the flexibility of either working indoor or outdoor (out station when required).
 Work effectively, independently or as a part of a team.
LANGUAGE PROFICIENCY
SPOKEN
1. Language : Malay Overall : Excellent
2. Language : English Overall : Intermediate
WRITTEN
1. Language : Malay Overall : Excellent
2. Language : English Overall : Intermediate
REFERENCE
 Mr. Mohd Abdul Gani Bin Harun
Coordinator QC Inspector SEAGULL ENGINEERING Sdn. Bhd.
Tel : 016-7828468
 Mr. Md Najib HJ. Razali
QA/QC Inspector SAPURA KENCANA PETROLEUM
Tel : 019-6088478
 Mr. Wan Haziman
NDT Inspector MMHE-ATB Sdn. Bhd.
Tel : 017-6850150
RESUME MUHAMMAD AFI BIN HASSAN
8
RESUME MUHAMMAD AFI BIN HASSAN
9
RESUME MUHAMMAD AFI BIN HASSAN
10
RESUME MUHAMMAD AFI BIN HASSAN
11
RESUME MUHAMMAD AFI BIN HASSAN
12
RESUME MUHAMMAD AFI BIN HASSAN
13

More Related Content

What's hot

Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)JOHN PRINCE
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16Udhaya Kumar
 
Nasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNaseem Ansari
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineerHashim Vayalilakath
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical TechnicianRashid Minhas
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experienceSachin Patil
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingjaison varkey
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Techniciansubbu manian
 
Resume technician
Resume technicianResume technician
Resume technicianRaja paul
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorandi dipayadnya
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspectorLatchanna Akula
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisorJames Ct
 

What's hot (20)

cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)Resume of John Prince (Rotating Equipment Technician)
Resume of John Prince (Rotating Equipment Technician)
 
mechanical technician (1)
mechanical technician (1)mechanical technician (1)
mechanical technician (1)
 
resume for panel or field operation.
resume for panel or field operation.resume for panel or field operation.
resume for panel or field operation.
 
Civil engineer Resume 24.2.16
Civil engineer Resume  24.2.16Civil engineer Resume  24.2.16
Civil engineer Resume 24.2.16
 
Nasheem CV- Commissioning Technician
Nasheem CV- Commissioning TechnicianNasheem CV- Commissioning Technician
Nasheem CV- Commissioning Technician
 
my CV Hashim project/Site engineer
my CV   Hashim project/Site engineermy CV   Hashim project/Site engineer
my CV Hashim project/Site engineer
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 
Resume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coatingResume of jaison varkey QA/QC Inspector welding,coating
Resume of jaison varkey QA/QC Inspector welding,coating
 
resume piping
resume pipingresume piping
resume piping
 
Mechanical Technician
Mechanical TechnicianMechanical Technician
Mechanical Technician
 
Resume technician
Resume technicianResume technician
Resume technician
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Resume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisorResume gede andi- construction piping supervisor
Resume gede andi- construction piping supervisor
 
M.Saravanan - Resume
M.Saravanan - ResumeM.Saravanan - Resume
M.Saravanan - Resume
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
Ganesan Plant Inspector_CV
Ganesan Plant Inspector_CVGanesan Plant Inspector_CV
Ganesan Plant Inspector_CV
 
Cv mechanical supervisor
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
 

Viewers also liked

Viewers also liked (20)

Resume othman sulaiman
Resume othman sulaimanResume othman sulaiman
Resume othman sulaiman
 
CV 2016
CV 2016CV 2016
CV 2016
 
CV( Affendy Ali )040515new
CV( Affendy Ali )040515newCV( Affendy Ali )040515new
CV( Affendy Ali )040515new
 
900524016243-CV2-MOHDAKMAR
900524016243-CV2-MOHDAKMAR900524016243-CV2-MOHDAKMAR
900524016243-CV2-MOHDAKMAR
 
Cv mohd syahril awth
Cv mohd syahril awthCv mohd syahril awth
Cv mohd syahril awth
 
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]
 
RESUME Latest 2015
RESUME Latest 2015RESUME Latest 2015
RESUME Latest 2015
 
RESUME SITI AISHAH BINTI ZOLKANAIN
RESUME SITI AISHAH BINTI ZOLKANAINRESUME SITI AISHAH BINTI ZOLKANAIN
RESUME SITI AISHAH BINTI ZOLKANAIN
 
CV_Noor Izzati Binti Mohd Radzi
CV_Noor Izzati Binti Mohd RadziCV_Noor Izzati Binti Mohd Radzi
CV_Noor Izzati Binti Mohd Radzi
 
CV Sari Dana
CV Sari DanaCV Sari Dana
CV Sari Dana
 
CV Kartika Ratna Sari
CV Kartika Ratna SariCV Kartika Ratna Sari
CV Kartika Ratna Sari
 
Suzan_CV..
Suzan_CV..Suzan_CV..
Suzan_CV..
 
transcipt_Bachelor
transcipt_Bachelortranscipt_Bachelor
transcipt_Bachelor
 
CV Firman M. Nur
CV Firman M. NurCV Firman M. Nur
CV Firman M. Nur
 
Resume_Shahida_New
Resume_Shahida_NewResume_Shahida_New
Resume_Shahida_New
 
CV Afrina (1)
CV Afrina (1)CV Afrina (1)
CV Afrina (1)
 
layan cv
layan cvlayan cv
layan cv
 
Yasmine Mohamed Saeed Elkomy
Yasmine Mohamed Saeed ElkomyYasmine Mohamed Saeed Elkomy
Yasmine Mohamed Saeed Elkomy
 
Sample - Nabilah's E-portfolio
Sample - Nabilah's E-portfolioSample - Nabilah's E-portfolio
Sample - Nabilah's E-portfolio
 
CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)CV ZULKIFLI OMAR (April 2015)
CV ZULKIFLI OMAR (April 2015)
 

Similar to CV Muhammad Afi Hassan 2015

Similar to CV Muhammad Afi Hassan 2015 (20)

CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
MOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUMEMOHAMAD FAIZ BIN ABDULLAH - RESUME
MOHAMAD FAIZ BIN ABDULLAH - RESUME
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
CV Hasrul Maswandy
CV Hasrul MaswandyCV Hasrul Maswandy
CV Hasrul Maswandy
 
CV_Sa-nga Last Revision
CV_Sa-nga Last RevisionCV_Sa-nga Last Revision
CV_Sa-nga Last Revision
 
CV Siriwan J.
CV Siriwan J.CV Siriwan J.
CV Siriwan J.
 
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
 
CV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & weldingCV-QC Engg Mech- piping & welding
CV-QC Engg Mech- piping & welding
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
 
1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam1.CV Phung Duc Phuong Nam
1.CV Phung Duc Phuong Nam
 
01. cv qc civil structur & wi
01. cv qc civil structur & wi01. cv qc civil structur & wi
01. cv qc civil structur & wi
 
M SUBBA RAO CV latest
M SUBBA RAO CV latestM SUBBA RAO CV latest
M SUBBA RAO CV latest
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
Piping Welding Engineer
Piping Welding EngineerPiping Welding Engineer
Piping Welding Engineer
 
resume muhamadsyawal2017
resume muhamadsyawal2017resume muhamadsyawal2017
resume muhamadsyawal2017
 
HOSS. C.V.
HOSS.  C.V.HOSS.  C.V.
HOSS. C.V.
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
Resume_rev.3
Resume_rev.3Resume_rev.3
Resume_rev.3
 

CV Muhammad Afi Hassan 2015

  • 1. RESUME MUHAMMAD AFI BIN HASSAN 1 MUHAMMAD AFI BIN HASSAN No 14, Jalan Asli 8, Taman Pasir Putih, 81700 Pasir Gudang. Johor Darul Ta’azim Email :muhdafi_88@yahoo.com OBJECTIVE A mechanical position with diploma in Mechanical Engineering in Manufacturing. As a QC Inspector to make quality is the BEST in the part of your live!. And to gain more experience and learn a new skills. PERSONAL PARTICULARS Gender : Male I/C No : 880910-23-5617 Date of birth : 10 September 1988 Age : 27 years old Place of birthday : Hospital Sultanah Aminah Johor Bharu Marital Status : Married Health : Good Health Nationality : Malaysia Interest : Adventure Game Phone : 017-7685696 EDUCATION 1) Jan 2006 - Dis 2009 Politeknik Johor Bahru, Diploma in Mechanical Engineering Pasir Gudang, Johor (Manufacturing). 2) 2004 – 2005 Sek. Men. Teknik Muar, Grade in Sijil Pelajaran Malaysia Muar,Johor (SPM).
  • 2. RESUME MUHAMMAD AFI BIN HASSAN 2 ATTENDED COURSE 1) June 2012 Johor Skill Development Center Welding Inspector (CSWIP 3.1) (PUSPATRI) 2) April 2010 Johor Skill Development Center Welding Inspector (PCN Level 2) (PUSPATRI) WORK EXPERIENCE 1) Company Name : Flextronics (Penang) Sdn Bhd Position Title : QA Asst Engineer (Assembly) Industry : Manufacturing Date Joined : June 2014 ~ Present DUTIES AND RESPONSIBILITIES • To ensure and monitor Qc Inspector (IPQC & OQA) carry out activity during and after assembly • Ensure production follow spec as a client requirement • Prepare release package for each new model including result for each testing. • Prepare checklist for Qc Inspector (IPQC & OQA) for their inspections referenced. • Prepare QSI (Quality Standard Inspection) for each models including Sub-Assembly and Main Assembly. • Ensure incoming part in spec and no reject issues (painting and molding) • Prepare Quality Alert for reference Trainer and Production especially operator to follow the sequence that Engineer Process provided. • Ensure jig or tools for testing are in good condition and inspect as follow requirement from client. • Prepare documentation for all finding either from client or internal and come out with a methods. • Ensure zero market claims.
  • 3. RESUME MUHAMMAD AFI BIN HASSAN 3 2) Company Name : Seagull Engineering Sdn Bhd. Position Title : QA/QC Inspector (WELDING) Industry : Oil & Gas Fabrication Date Joined : August 2010 ~ Febuary 2014 DUTIES AND RESPONSIBILITIES • To carry out all QC Inspection in welding activities as directed by QC Head or Manager in accordance with company’s QA/QC procedures. • To carry out all inspection receiving material before production. • To ensure and monitor welding activity during fabrication and visual after welding. • To ensure and follow up the welding sequence. • To perform all QC/Welding inspection of the works at site / shop as required. • To coordinate with NDT team or subcontractor to perform NDT timely and as per specification. • To ensure that all fabrications work are performed to the quality as per specification. • To ensure that all QC activities are performed timely with no delay to production. • To perform any other duties that may be assigned to you by your superior / management from time to time. JOB RESPONSIBILITIES ( IN SEQUENCE ) • To interpreted fabrication drawing. (G.A., nozzle, internal, external detail). • Perform material receiving inspection such as plate, flanges, forging, fitting, pipe, tube sheet (heat exchanger), baffle plate (heat exchanger). • Ensure all the material appearance such as width, length, thickness, stamping @ marking and heat number are available and comply with drawing • Prepare line summary check list such as marking date, fit up inspection, visual after welding date and clarify the joint number in order to monitor the progress in workshop. • Perform fit up inspection during pre-fabrication especially for longitude seam, circumference seam, flange to nozzle neck joint, pipe joint, nozzle to shell and attachment to pressure part joint. Ensure the alignment (hi-low), bevel preparation and gap as per drawing fabrication. • Monitor welding activity during fabrication and make sure all the document is available and approved such as WPS and weld map before start the inspection. • To monitor welding process such as SMAW, GTAW, FCAW, SAW and control the welder, To ensure that only qualified welder to perform welding work during production activity. • Perform visual inspection after completed weld. Ensure that the reinforcement weld is achieved as per fabrication drawing. Also determine defect such as spatter, undercut, under fill and mark clearly so that remedial action can be taken. • Coordinate with NDT department to perform examination such as PT, MT, and RT after welding completed and visual inspection satisfactory. In accordance to ITP to ensure the examination had performed to the specified joint. • To understand the method of NDT and make sure it is done correctly. • Review the NDT report and ensure it is tally with request and compile to the MDR.
  • 4. RESUME MUHAMMAD AFI BIN HASSAN 4 • Perform final inspection and final dimensional as a final inspection for QC inspector before proceed to PWHT or hydrostatic test. • To coordinate with: • QA engineer (in order to implement all the related procedures). • Design Engineer (Technical wise, drawing). • Production (material, schedule). • Purchasing (mill certificate, P.O and D.O). PROJECT INVOLVED 1. Year : September 2013 to Febuary 2014 Job Number : 7.13M004 Client : TNB / Andritz / MMHE-ATB Project Involved : Ulu Jelai Hydroelectric (Steel Liner) Project Project in MMHE-ATB Snd Bhd 2. Year : August 2013 to December 2013 Job Number : 7.13S002 Client : PETRONAS / PROCESS GROUP / MMHE-ATB Project Involved : Petronas Skid Piping FLNG Project A-42-101- Producer Water Treatment Package A-42-102- Desanding Package Project in MMHE-ATB Snd Bhd 3. Year : April 2013 to December 2013 Job Number : 7.12S052 Client : PETRONAS / MHI / MMHE-ATB Project Involved : Sabah Ammonia Urea (SAMUR) Project C-58-41- Demi Waste Water Stripping Tower Project in MMHE-ATB Snd Bhd 4. Year : December 2012 to December 2013 Job Number : 7.12M049 Client : PETRONAS / MHI / MMHE-ATB Project Involved : Sabah Ammonia Urea (SAMUR) Project C-20-01- HP Scubber C-20-02- LP Scubber C-20-04- Stripper C-21-01- Process Condensate C-37-01- Stripping Tower Project in MMHE-ATB Snd Bhd
  • 5. RESUME MUHAMMAD AFI BIN HASSAN 5 5. Year : December 2012 to December 2013 Job Number : 7.12M050 Client : PETRONAS / MHI / MMHE-ATB Project Involved : Sabah Ammonia Urea (SAMUR) Project V-16-02- Syn 2nd Intercooler Separator V-16-03- Syn Gas After Separator V-18-01- Ammonia Separator V-18-04- Purge Gas Separator Project in MMHE-ATB Snd Bhd 6. Year : June 2012 to December 2012 Job Number : 7.12M039Q Client : PETROFAC / MMHE-ATB Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC V4101-Hot Oil Expansion Vessel V4102-Hot Oil Drain Down Vessel V4301-Fuel Gas Discharge Scrubber A2001/2002-V01- 1st stage Suction Scrubber Train 1 A2001/2002-V02- 2nd stage Suction Scrubber Train 2 Project in MMHE-ATB Snd Bhd 7. Year : July 2012 to November 2012 Job Number : 7.11M035L Client : PETROFAC / MMHE-ATB Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC E1001-Inlet Heater E1002-Interstage Heater Project in MMHE-ATB Snd Bhd 8. Year : Sept 2012 to November 2012 Job Number : 7.12M041S Client : PETROFAC / MMHE-ATB Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC LP FWS Pig Receiver – 4 set (V1004, V1005, V1006 & V1007) Project in MMHE-ATB Snd Bhd 9. Year : July 2012 to October 2012 Job Number : 7.12S042T Client : PETROFAC / MMHE-ATB Project Involved : Cendor Phase 2 – FPSO Project for PETROFAC 81-V5505- DryAir Receiver Project in MMHE-ATB Snd Bhd
  • 6. RESUME MUHAMMAD AFI BIN HASSAN 6 10. Year : March2012 to July 2012 Job Number : 7.11S032I Client : EXXON / MMHE-ATB Project Involved : TAPIS EOR and Rejuvenation Project & TELOK GAS Development Project. Launcher & Receiver (V370, V371, V372, V373, V374, V375, V376, V377, V378, V382) Project in MMHE-ATB Snd Bhd= 11. Year : February 2012 to June 2012 Job Number : 7.11M030G Client : PETROFAC / MMHE-ATB Project Involved : Block PM304 Cendor Phase-2 Development Project for PETROFAC ( Vessel ) V1001- HP Production Separator V1002- LP Production Separator V3101-Crude Degasser V4601-HP Flare Knock-out Drum V4701-LP Flare Knock-out Drum Project in MMHE-ATB Sdn Bhd 12. Year : August 2010 to February 2012 Job Number : 7.10M023Z Project Involved : Tocoma Water Gate CTA-2002, 2003, 2004, 2008 CMA-2001, 2002, 2003, 2004, 2005 Project in MMHE-ATB Sdn Bhd 13. Year : March 2011 to July 2011 Job Number : 7.10M026C Project Involved : Spillway Radial Gate 30062-D-0704, 0705, 0706_rb1, 0708, 0709, 0721 Project in MMHE-ATB Sdn Bhd. 14. Year : November 2010 to March 2011 Job Number : 7.10S025B / S.10S025B Project Involved : Theun Hinboun Expansion Project ( Steel Liner ) 30062-D-1503, 1518, 1519, 1520, 1521, 1522, 1604, 1609 Project in MMHE-ATB Sdn Bhd.
  • 7. RESUME MUHAMMAD AFI BIN HASSAN 7 OTHER SKILL  Proficient in computer Microsoft Word, Power Point and Excel.  Familiar in AutoCAD drawing.  Proficient in engineering mechanical.  Knowledge in welding and welding procedure  Knowledge in Visual Inspection and type of defects  Basic knowledge in NDT  Full clean driving licence (B2 & D)  Ability to handle all inspection material like Welding Gauge, Thickness Gauge (UT), Clamp Meter, Laser Distance and Hi-Low Gauge PERSONEL CHARACTERISTIC  High social engineering skill; able to deal with various levels of people.  Adaptable to new environment in a short period of time and are able to work extra time when necessary.  Dedicated work ethic – flexible in schedule – goal oriented – self-guided.  Have the flexibility of either working indoor or outdoor (out station when required).  Work effectively, independently or as a part of a team. LANGUAGE PROFICIENCY SPOKEN 1. Language : Malay Overall : Excellent 2. Language : English Overall : Intermediate WRITTEN 1. Language : Malay Overall : Excellent 2. Language : English Overall : Intermediate REFERENCE  Mr. Mohd Abdul Gani Bin Harun Coordinator QC Inspector SEAGULL ENGINEERING Sdn. Bhd. Tel : 016-7828468  Mr. Md Najib HJ. Razali QA/QC Inspector SAPURA KENCANA PETROLEUM Tel : 019-6088478  Mr. Wan Haziman NDT Inspector MMHE-ATB Sdn. Bhd. Tel : 017-6850150
  • 8. RESUME MUHAMMAD AFI BIN HASSAN 8
  • 9. RESUME MUHAMMAD AFI BIN HASSAN 9
  • 10. RESUME MUHAMMAD AFI BIN HASSAN 10
  • 11. RESUME MUHAMMAD AFI BIN HASSAN 11
  • 12. RESUME MUHAMMAD AFI BIN HASSAN 12
  • 13. RESUME MUHAMMAD AFI BIN HASSAN 13