NACE IMPACT STUDY
Saudi Aramco Participant Heatmap
Assessment
www.apqc.org
©2014 APQC. ALL RIGHTS RESERVED.
SAUDI ARAMCO PARTICIPANT #1
Management System Element
Policy StakeholderIntegration Organization Accountability Resources Communication CMP Integration ContinuousImprovement Performance Measures
Entire
Lifecycle
4 Strategy 1.00 6
Plan
Linkage
0.50 12 Interactions 0.80 16
Roles &
Res.
Document.
0.30 23
Staff. Lvl
Budget
0.80 30
Vertical
Comm.
1.00 36
Process
Documente
d
1.00 41
Improveme
nt Funded
& Staffed
0.00 1a
Measure
Cost
0.25
9
Standards
Compliance
0.00 13
CM Group
Supporting
0.30 17
Roles &
Res.
Communic.
0.50 24
Competen.
Defined
1.00 31
Comm. b/n
Groups
1.00 37
Process
Communic.
0.00 42
Org. Mgmt
of Change
Process.
1.00 7
Perf.
Monitored
& Reported
0.50
10
Standards
Non-
Compliance
0.00 14
Managing
Supp./Vend
0.00 18
Roles &
Res.
Integrated
0.00 25
Assignment
of Prof.
1.00 32
Capturing
Lessons
Learned
1.00 38
Process
Aligned &
Embedded
1.00 43
Compliance
w/ Org
MOC
1.00 8
Perf. Metric
Integration
0.00
19
Org.
Understand
.
0.30 26
Competen. -
Work Proc.
0.00 33 KPIs 0.50 39
Process
Incl. Risk
Mgmt
1.00 44
Perf.
Measure
Tracking
0.38
20
Lead. Eng.
& Owner.
1.50 27 CM Training 1.00 34
Comm. Ext.
Stakehold.
0.00
21
P.O.C for
Ext. Stake.
0.00 28
Mech.
Transfer
Know.
0.84
Design
45
Strategy
Addresses
0.38 46
CM Plan
Design
0.50 48
Prof.
Interaction
0.30 49
Prof. Involv.
Supp/Vend
1.00 52
CM Plan
Address Ext.
Stakehold.
0.00 53
Design
System &
Solutions
1.00
47
CM Plan
Integration
0.30 50
Prof.
Supp/Vend
Ovrsight
0.00 54
Supp/Vend.
Reviewed
1.00
51
Design
Approval
Acct.
0.00 55
Econ. / Cost
Effect.
Design
1.00
Manufacturing
/ Construction
56
Strategy
Addresses
0.38 57
CM Plan
Manufact.
0.00 59
Prof.
Interaction
0.30 60
Commiss.
Approval
Acct.
0.00 61
CC Practices
Awareness
0.50
Operations/
Maintenance
62
Strategy
Addresses
0.50 63
CM Plan
Operations
0.50 65
Prof.
Interaction
0.30 66 Maint. Acct. 0.30 67
CC Practices
Applied
0.50 69
Reliance on
Indus.
Stand.
1.00
64
CM Plan
Integration
0.30 68
Supp/Vend
Audit
0.50
ADM
70
Strategy
Addresses
0.50 71
CM Plan
Abandon.
0.00 73
Prof.
Interaction
0.60 74
ADM Prep
Acct.
0.50 75
CC Practices
Applied
0.50
72
CM Plan
Integration
0.30 76
Supp/Vend
Audit
0.00
www.apqc.org
©2014 APQC. ALL RIGHTS RESERVED.
SAUDI ARAMCO PARTICIPANT #2
Management System Element
Policy StakeholderIntegration Organization Accountability Resources Communication CMP Integration ContinuousImprovement Performance Measures
Entire
Lifecycle
4 Strategy 0.50 6
Plan
Linkage
0.50 12 Interactions 0.30 16
Roles &
Res.
Document.
0.30 23
Staff. Lvl
Budget
1.00 30
Vertical
Comm.
0.00 36
Process
Documente
d
0.00 41
Improveme
nt Funded
& Staffed
0.50 1a
Measure
Cost
0.25
9
Standards
Compliance
0.70 13
CM Group
Supporting
0.50 17
Roles &
Res.
Communic.
0.50 24
Competen.
Defined
1.00 31
Comm. b/n
Groups
1.00 37
Process
Communic.
0.00 42
Org. Mgmt
of Change
Process.
1.00 7
Perf.
Monitored
& Reported
0.50
10
Standards
Non-
Compliance
0.50 14
Managing
Supp./Vend
1.00 18
Roles &
Res.
Integrated
0.00 25
Assignment
of Prof.
0.30 32
Capturing
Lessons
Learned
0.00 38
Process
Aligned &
Embedded
0.00 43
Compliance
w/ Org
MOC
0.50 8
Perf. Metric
Integration
0.00
19
Org.
Understand
.
0.60 26
Competen. -
Work Proc.
0.00 33 KPIs 0.50 39
Process
Incl. Risk
Mgmt
1.00 44
Perf.
Measure
Tracking
0.50
20
Lead. Eng.
& Owner.
0.80 27 CM Training 1.00 34
Comm. Ext.
Stakehold.
1.00
21
P.O.C for
Ext. Stake.
0.50 28
Mech.
Transfer
Know.
0.67
Design
45
Strategy
Addresses
0.50 46
CM Plan
Design
1.00 48
Prof.
Interaction
0.30 49
Prof. Involv.
Supp/Vend
1.00 52
CM Plan
Address Ext.
Stakehold.
0.50 53
Design
System &
Solutions
1.00
47
CM Plan
Integration
0.30 50
Prof.
Supp/Vend
Ovrsight
1.00 54
Supp/Vend.
Reviewed
1.00
51
Design
Approval
Acct.
1.00 55
Econ. / Cost
Effect.
Design
0.50
Manufacturing
/ Construction
56
Strategy
Addresses
0.38 57
CM Plan
Manufact.
1.00 59
Prof.
Interaction
0.30 60
Commiss.
Approval
Acct.
0.00 61
CC Practices
Awareness
1.00
Operations/
Maintenance
62
Strategy
Addresses
0.38 63
CM Plan
Operations
1.00 65
Prof.
Interaction
1.00 66 Maint. Acct. 0.30 67
CC Practices
Applied
0.50 69
Reliance on
Indus.
Stand.
1.00
64
CM Plan
Integration
0.30 68
Supp/Vend
Audit
0.50
ADM
70
Strategy
Addresses
0.17 71
CM Plan
Abandon.
0.00 73
Prof.
Interaction
0.00 74
ADM Prep
Acct.
0.00 75
CC Practices
Applied
0.50
72
CM Plan
Integration
0.00 76
Supp/Vend
Audit
0.00

Saudi Aramco Heatmap

  • 1.
    NACE IMPACT STUDY SaudiAramco Participant Heatmap Assessment
  • 2.
    www.apqc.org ©2014 APQC. ALLRIGHTS RESERVED. SAUDI ARAMCO PARTICIPANT #1 Management System Element Policy StakeholderIntegration Organization Accountability Resources Communication CMP Integration ContinuousImprovement Performance Measures Entire Lifecycle 4 Strategy 1.00 6 Plan Linkage 0.50 12 Interactions 0.80 16 Roles & Res. Document. 0.30 23 Staff. Lvl Budget 0.80 30 Vertical Comm. 1.00 36 Process Documente d 1.00 41 Improveme nt Funded & Staffed 0.00 1a Measure Cost 0.25 9 Standards Compliance 0.00 13 CM Group Supporting 0.30 17 Roles & Res. Communic. 0.50 24 Competen. Defined 1.00 31 Comm. b/n Groups 1.00 37 Process Communic. 0.00 42 Org. Mgmt of Change Process. 1.00 7 Perf. Monitored & Reported 0.50 10 Standards Non- Compliance 0.00 14 Managing Supp./Vend 0.00 18 Roles & Res. Integrated 0.00 25 Assignment of Prof. 1.00 32 Capturing Lessons Learned 1.00 38 Process Aligned & Embedded 1.00 43 Compliance w/ Org MOC 1.00 8 Perf. Metric Integration 0.00 19 Org. Understand . 0.30 26 Competen. - Work Proc. 0.00 33 KPIs 0.50 39 Process Incl. Risk Mgmt 1.00 44 Perf. Measure Tracking 0.38 20 Lead. Eng. & Owner. 1.50 27 CM Training 1.00 34 Comm. Ext. Stakehold. 0.00 21 P.O.C for Ext. Stake. 0.00 28 Mech. Transfer Know. 0.84 Design 45 Strategy Addresses 0.38 46 CM Plan Design 0.50 48 Prof. Interaction 0.30 49 Prof. Involv. Supp/Vend 1.00 52 CM Plan Address Ext. Stakehold. 0.00 53 Design System & Solutions 1.00 47 CM Plan Integration 0.30 50 Prof. Supp/Vend Ovrsight 0.00 54 Supp/Vend. Reviewed 1.00 51 Design Approval Acct. 0.00 55 Econ. / Cost Effect. Design 1.00 Manufacturing / Construction 56 Strategy Addresses 0.38 57 CM Plan Manufact. 0.00 59 Prof. Interaction 0.30 60 Commiss. Approval Acct. 0.00 61 CC Practices Awareness 0.50 Operations/ Maintenance 62 Strategy Addresses 0.50 63 CM Plan Operations 0.50 65 Prof. Interaction 0.30 66 Maint. Acct. 0.30 67 CC Practices Applied 0.50 69 Reliance on Indus. Stand. 1.00 64 CM Plan Integration 0.30 68 Supp/Vend Audit 0.50 ADM 70 Strategy Addresses 0.50 71 CM Plan Abandon. 0.00 73 Prof. Interaction 0.60 74 ADM Prep Acct. 0.50 75 CC Practices Applied 0.50 72 CM Plan Integration 0.30 76 Supp/Vend Audit 0.00
  • 3.
    www.apqc.org ©2014 APQC. ALLRIGHTS RESERVED. SAUDI ARAMCO PARTICIPANT #2 Management System Element Policy StakeholderIntegration Organization Accountability Resources Communication CMP Integration ContinuousImprovement Performance Measures Entire Lifecycle 4 Strategy 0.50 6 Plan Linkage 0.50 12 Interactions 0.30 16 Roles & Res. Document. 0.30 23 Staff. Lvl Budget 1.00 30 Vertical Comm. 0.00 36 Process Documente d 0.00 41 Improveme nt Funded & Staffed 0.50 1a Measure Cost 0.25 9 Standards Compliance 0.70 13 CM Group Supporting 0.50 17 Roles & Res. Communic. 0.50 24 Competen. Defined 1.00 31 Comm. b/n Groups 1.00 37 Process Communic. 0.00 42 Org. Mgmt of Change Process. 1.00 7 Perf. Monitored & Reported 0.50 10 Standards Non- Compliance 0.50 14 Managing Supp./Vend 1.00 18 Roles & Res. Integrated 0.00 25 Assignment of Prof. 0.30 32 Capturing Lessons Learned 0.00 38 Process Aligned & Embedded 0.00 43 Compliance w/ Org MOC 0.50 8 Perf. Metric Integration 0.00 19 Org. Understand . 0.60 26 Competen. - Work Proc. 0.00 33 KPIs 0.50 39 Process Incl. Risk Mgmt 1.00 44 Perf. Measure Tracking 0.50 20 Lead. Eng. & Owner. 0.80 27 CM Training 1.00 34 Comm. Ext. Stakehold. 1.00 21 P.O.C for Ext. Stake. 0.50 28 Mech. Transfer Know. 0.67 Design 45 Strategy Addresses 0.50 46 CM Plan Design 1.00 48 Prof. Interaction 0.30 49 Prof. Involv. Supp/Vend 1.00 52 CM Plan Address Ext. Stakehold. 0.50 53 Design System & Solutions 1.00 47 CM Plan Integration 0.30 50 Prof. Supp/Vend Ovrsight 1.00 54 Supp/Vend. Reviewed 1.00 51 Design Approval Acct. 1.00 55 Econ. / Cost Effect. Design 0.50 Manufacturing / Construction 56 Strategy Addresses 0.38 57 CM Plan Manufact. 1.00 59 Prof. Interaction 0.30 60 Commiss. Approval Acct. 0.00 61 CC Practices Awareness 1.00 Operations/ Maintenance 62 Strategy Addresses 0.38 63 CM Plan Operations 1.00 65 Prof. Interaction 1.00 66 Maint. Acct. 0.30 67 CC Practices Applied 0.50 69 Reliance on Indus. Stand. 1.00 64 CM Plan Integration 0.30 68 Supp/Vend Audit 0.50 ADM 70 Strategy Addresses 0.17 71 CM Plan Abandon. 0.00 73 Prof. Interaction 0.00 74 ADM Prep Acct. 0.00 75 CC Practices Applied 0.50 72 CM Plan Integration 0.00 76 Supp/Vend Audit 0.00