1. NORVEL M. MARASIGAN
Abrahan Street. Aplaya
Bauan, Batangas
Philippines
Email Ad : norvelmarasigan67@yahoo.com
PERSONAL PROFILE:
POSITION DESIRED : PIPING SUPERVISOR
Place of Birth : Abrahan St. Aplaya
Bauan, Batangas
Date of Birth : March 06, 1967
Age : 49 y/o
Civil Status : Married
Height : 5’5”
Weight : 150 lbs.
Religion : Roman Catholic
Nationality : Filipino
Name of Wife : Divirose C. Marasigan
Number of Children : Three (3)
Language Spoken/Written : Tagalog and English
Skills : Computer Literate
Cell Phone Number : +639163666999
Passport Number : EC2366850
EDUCATIONAL ATTAINMENT
TERTIARY LEVEL : Lyceum of Batangas
(4th Year Undergraduate- BS Marine
Transportation)
SECONDARY LEVEL : Bauan High School
1980-1984
PRIMARY LEVEL : West Bauan Central School
1974-1980
WORK EXPERIENCES:
2. Company : SK Engineering & Construction Co.ltd
Position : Piping Supervisor
Project : WASIT GAS PROJECT
Khursaniya,Saudi Arabia
Inclusive Date : January 12, 2014 – August 11, 2014
Reason of Leaving : Resigned
Duties and Responsibilities:
Assigned for construction and monitoring of UG-C/S pipings of
TEG/SULM for chemical drain lines. In-charge also in AG piperack,co-ordination
activities for prefabrication, erection of pipe spools, preparation of planning of equipment
and resources in order to meet contractual schedule, in charge of fabricationmerection
priority activities, able to punch list for completion of erection, In charge to manage the
progress evaluation in consultation with the Client representative.
Company : GS ENGINEERING & CONSTRUCTION
CORPORATION ( GS E & C )
Position : Piping Supervisor
Project : RRE-2 EXPANSION PROJECT
( RUWAIS, UAE )
Inclusive Date : March 29,2011 – May 07, 2013
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Assigned for construction and monitoring of UG-GRE pipings at the
trench.Secure for the lamination and alignment of pipe line as per required RECIPE of
the pipe. Making punchlist and assigned for witness of Hydro Testing of pipe line.
Supervised the AG piping of GRE,GRV,Carbon Steel,Stainless Steeel and Alloy Steel
at the pipe rack.
Company : GS ENGINEERING & CONSTRUCTION
CORPORATION ( GS E & C )
Position : Piping Supervisor
Project : SALALAH METHANOL PROJECT
: ( Sultanate of Oman )
Inclusive Date : June 14, 2008 – December 20, 2009
Reason of Leaving : Finished Project
Duties and Responsibilities:
3. Assigned for construction and supervise of all utility lines prior for hydro
testing. Monitored and checked actual situation on site of some modified drawings to be
changed by field engineers. Assigned also for line checking by test packages, issued
punch lists and punch clearings before allowed to offer to clients for testing. Witnessed
also for pneumatic and hydro – testing offered to the clients.
Company : A.M.C. INDUSTRIAL
CONSTRUCTION CO. Ltd.
(M.H.I. MITSUBISHI)
Position : Piping Supervisor
Project : AR- RAZI PLANT- V METHANOL
PROJECT
Inclusive Date : November 02, 2007-
January 31, 2008
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Assigned in the field woks for preparation in hydro and pneumatic testing
as per test packages. Supervise and witness for internal testing of line as per test pack and
supervision on punch killing works before allowed the line for test. Supervise also for
line checking as per test package and coordinate with the ENGINEERING
DEPARTMENT based on the drawing conflict.
Company : SAUDI TECHINT LTD.
Position : Piping Supervisor
Project : HARADH GOSP III PROJECT
Inclusive Date : April 1,2005- April 11, 2006
Reason of Leaving : Finished Project
Duties and Responsibilities:
Supervision of the area handled together with the workers. Responsible
the job assignment to be given to all FOREMAN. Given instruction regarding the job to
be done daily. Supervisor, foreman, workers must have coordination that is one thing
needed. Supervisor must be responsible to the area he handled and must be strict to
workers.
Company : DAEWOO ENGINEERING &
4. CONSTRUCTION CO. LTD
Position : Piping Supervisor
Project : WAFA LIBYAN GAS PLANT
Inclusive Date : Sept. 17, 2003- Sept. 02, 2004
Reason of Leaving : Finished Project
Duties and Responsibilities:
Assigned in field works both erection and installation of pipe spools and
valves. Checking the proper job for the workers. Erection must be done carefully to
prevent accident. Must have coordination with the FOREMEN and workers. Coordinate
with the Engineering Department based on the drawing that has conflict. Coordination
with existing job on the area. Given immediate action on what area needed. Supervision
on the daily job assignment to be issued to all FOREMAN. Calculation of the job when it
is supposed to be done. Always advanced to the target date.
Company : DESCON ENGINEERING CO. LTD
Position : Piping Supervisor
Project : QATAR GAS DEBOTTLE-
NECKLING PRO. (QATAR
SHUTDOWN PROJ.)
Inclusive Date : February 10, 2003- June 09, 2003
Reason of Leaving : Completion of Project
Duties and Responsibilities:
Responsible to get and return the permit to work before and after starting
any work assignments. Assign and supervise in hot tapping and boring. Install, erect and
fit-up the split-tee flanges with reinforcing pad, split-nozzle at operating and live line.
Plan for giving work assignment for their respective groups at all times, conduct and
advise to the workers for their safety and perform everyday the toolbox meeting.
Company : SUNG CHANG CO. LTD
Position : Piping Supervisor
Project : ABU DHABI WATER AND ELECTRIC
AUTHORITY (ADWEA)
Inclusive Date : May 29, 2001 – August 14, 2001
Reason of Leaving : Emergency Leave
Duties and Responsibilities:
5. Responsible for giving work assignment at all times to respective groups.
Responsible for maintaining the behavior of workers and advising the safety, rules and
regulations of the company. Assign for the fabricating, installing and erecting the fire
protection line in above and underground level with regards to the drawings.
Company : DAELIM SAUDI ARABIA CO.LTD
Position : Piping Supervisor
Project : PETROKEMYA OLEFINS III
EXPANSION PROJECT
Inclusive Date : May 24, 2000- November 09, 2000
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Handled erection and installation of pipes spools and valves. Responsible
on the daily job assignment of the workers. Given instruction to all workers on the area
handled. Immediate action regarding the job that has problems and conflict. Coordinate
with the Engineering Department Workers must be given the coordinates of the plan to
easily find out where the location of their job to be done. Responsible for the job
assignment to be issued to all FOREMEN assigned in the area. Checking on the workers
are doing. Supervised the job or the area handled.
Company : DAELIM TAIWAN, R.O.C.
Position : Piping Supervisor
Project : FORMOSA REFINERY PROJECT
MAI-LIAO TAIWAN R.O.C.
Inclusive Date : January 13, 1999- Jan. 14, 2000
Reason of Leaving : Finished Contract
Duties and Responsibilities:
Responsible for maintaining the behavior workers and advice always the
safety rules and regulations of the company. Prepare always the job assignment of their
respective groups. Assign in the fabrication shop for fabricating spools, as per required in
the drawings. Assigned also in the site area for constructing the lines of alloy pipes and
stainless steels on the pipe rack, as per required in the drawings.
Company : DAELIM MALAYSIA SDN.BHD
6. Position : Piping Supervisor
Project : GPP 5 & 6 GAS PROCESSING
PLANT, KM 8, P.O. BOX 63,24300
KERTEH, TERENGGANU
DARUL IMAN, MALAYSIA
Inclusive Date : June 21, 1997- Dec. 20, 1998
Reason of Leaving : Finish Contract and Project
Duties and Responsibilities:
Assigned for preparing and making test packages. Assign for inspections
of test documents with regards to piping system. Assign also for preparing some
documents with regards the comments for mechanical completions.
Company : DAELIM SAUDI ARABIA CO.LTD.
Position : Piping Foreman
Project : EXPANSION OF BERRI GAS
PLANT AL-JUBAIL, K.S.A.
Inclusive Date : March 27, 1996- March 27, 1997
Reason of Leaving : Finish Contract
Duties and Responsibilities:
Responsible for maintaining the behavior of workers and advice always
the safety rules and regulations of the company. Perform for the job distributions to the
workers at all times. Assigned at the fabrication shop for fabricating pipes and fittings as
spool.
Company : SAUDI DEVELOPMENT
MAINTENANCE CO.
Position : Pipe Fitter- LEADMAN
Project : AIR BASE FACILITIES AND
HARD BOMB DHAHRAN AIR
BATIN, SAUDI ARABIA
Inclusive Date : July 19, 1993 – Sept. 19, 1994
Reason of Leaving : Completion of Project
Duties and Responsibilities:
7. Installing and fabricating of all utility lines regarding the isometric
drawings, lay-outing and installing of pumps equipment in their designated location.
Installing of firehouse protection of their wall location.
Company : PNOC DOCKYARD AND
ENGINEERING CORPORATION
: San Roque, Bauan, Batangas
Position : Ship Fitter
Inclusive Date Nov. 18, 1989 – Dec.16, 1990
Reason of Leaving : Completion of Project
Duties and Responsibilities:
Repairing parts of barge, fittings and installing required plates. Installing of
all utility line inside the barge.
Company : AG&P
: San Roque, Bauan, Batangas
Position : Pipe Fitter
Inclusive Date : Nov. 07, 1987 – March 20, 1989
Reason of Leaving : Reduction
Duties and Responsibilities:
Cutting , grinding and fitting of pipes for the required in the drawing.
Installing and fabricating of girders, box, columns stiffeners, etc.
I hereby certify that the above information is true and correct to the best of my
knowledge and belief.
____________________________________
NORVEL M. MARASIGAN