1. VINOTH KUMAR CIVIL ENGINEER
SUMMARY
Experienced professional with 8 Years of experience &
Vast knowledge in Construction of Underground Metro
Stations with Top Down / Cut & cover methodologies.
PROFESSIONAL TRAITS
CIVIL
Station Construction – Pilling, Diaphragm wall,
structural members, Deep excavations, Slabs, walls &
Columns, Steel Structure fabrication & erections,
Concrete, Waterproofing & injection grouting, Shotcrete &
Rock Bolting, Anchoring, Geo-technical Instrumentation.
Utility & Road Work – Trail Trench, Station water supply,
Sewer and storm water Drainage system, Manhole
construction, Backfilling and Landscaping.
EMPLOYMENT HISTORY
CONSTRUCTION OF RESIDENTIAL AND
COMMERCIAL BUILDING PROJECTS.
Employer : MSK Builders Pvt Ltd. – Sirkazhi, India.
Designation : Senior site Engineer.
Duration : Since Sep 2018.
Work Responsibilities
Executing and monitoring of all structural and Non-
structural activities of Residential, apartments and
commercial buildings.
Planning, Arrangement & follow up of construction
work resources for project requirements.
Co-ordination with contractors and client for project
specification, quality and safety work.
Giving solutions for continuous progress, Ensure
projects within budget & finish the work on time.
Phone: +974 33419113
+91 6383143358
E-Mail: gvinoth288@gmail.com
Marital Status: Married
Nationality : Indian
Qatar Driving License No.28735642410
EDUCATION
B.E., Civil [2008-2011]-70%
Easwari Engineering college
Anna University, Chennai,
TN, India
D.C.E Diploma[2006-2008]-91.4%
AVC Polytechnic college,
Mannampandhal.
TN, India
Higher school certificate[2006]-72%
State Board Of Tamil nadu
Secondary School Leaving
Certificate [2006]-85.6%
State Board Of Tamil nadu
2. DESIGN AND BUILD OF ALKHOR EXPRESSWAY
PROJECT
Employer : ALJABER ENGINEERING WLL-QATAR.
Designation : Site Engineer.
Duration : Since 1 Feb 2018 – Aug 2018.
Work Responsibilities
Executing work for foul sewer line, culvert, swale
excavation
Structural activities for Manholes, Catch Basin,
Treated sewer effluent chambers (isolated valve
chambers, Air valve chambers, Air valve chambers,
washout valve Chambers & flow meter chambers).
Execution of Precast work for Manholes, catch Basin
and Rectangular Channel
Daily progress report and status of above mentioned
structural activities.
QATAR INTEGRATED RAIL PROJECT
Doha Metro – Gold Line Under Ground Metro Project
Employer : ALYSJ –JV Qatar
Designation : Site Engineer
Duration : Since 14 Jun 2014 - Nov 2017
Work Responsibilities
Executing work for the construction of under ground
structural building – Station & stabling yard (Bottom-
up Method)
Executing water proofing works on the base slab,
External wall & Backfill activities
ELS – Earth lateral support activities
Finishing works
Erection of pilling activities
ACCOMPLISHMENTS
Honors & Awards
R2- Good Performer
AFCONS Infrastructure Ltd.
2013
Student Secretary
National level symposium
EEC 2010
National Service Scheme(NSS)
Team Leader 2005
Certifications
Formwork system & Scaffold training-
PERI & TMS
Temporary work supervisor
Health & Safety in the workplace
Charted Institute of Environmental Health
OHSA-Occupational Safety and Health
Administration
General Industry Safety and Health
3. CHENNAI METRO RAIL PROJECT,
Contract UAA-01, Phase 1, India
Employer : AFCONS Infrastructure Limited
Designation : Engineer Execution
Duration : Since June 2011 – June 2014
Work Responsibilities
Executing the construction of diaphragm wall for the length of
2000m (2km) & Plunge column in grade 1 rock.
Executing top down excavation for the construction of roof
slab concourse slab and base slab
Executing water proofing works on the roof slab and base
slab
Executing strut erection work for the construction of base
slab
execution of diaphragm wall repair works (TAM grouting,
Slurry work)
Construction of internal rooms, block work inside concourse
slab
Construction of confinement wall and blind wall for TBM in
and out
Execution of all instrument installation work at strait (GSM,
BSM, Inclinometer, Tilt meter, Crack meter, Vibrating wire
piezometer)
UTILITY IDENTIFICATION- Identification of all underground
utilities i.e., TNEB (HT, LT&SC cables), Sewerage pipe line
metro water line and communication cables.
Utility mapping and Diversion Works
Construction of storm water pipeline and gravity sewer
pipeline
SKILLS
Personal
Proactive, Team Player, Optimist,
Listener & Leader
Good proficiency in MS-Office Tools
Able to work independently with minimal
supervision
Good communicating and Reporting skill
Able to work in challenging environment
and strive for excellence
Software
MS Office
Auto CADD-2D & 3D
Revit
Linguistic
English
Tamil
Hindi