1. 1
Curriculum Vitae
Name : AHMED ABDEL AZIZ SENOSY
Position : Project Manager (CIVIL ENGINEER) .
Nationality : Egyptian
Religion : Muslim
Date of Birth : 05 September 1969
Marital Status : Married
Address : Al Mora, House No.19 st.957 Zone 55 -Doha -Qatar.
Mobile : +97477181481
Name of firm : E C G (Engineering Consultant Group ) Qatar Branch
Years with firms : 23.
E-Mail : senosy2@gmail.com --- Ahmed.senosy@ecgsa.com
Qualification:
B.Sc. Degree in Civil Engineering, faculty of engineering
Egypt - Assuit University, 1993
Computer skills:
• Experienced with AutoCAD.
• Experienced with MS Office (word, excel and power point).
Languages :
• Arabic - Mother Tongue
• English - Excellent reading, writing and speaking.
Membership in
Professional
Societies : Member of the Egyptian Syndicate of Engineers.
Engineering & Consulting Offices Accrediting Committee.
U P D A NO. 7485 ( Qatar State ).
2. 2
Professional Experience:
A -- July. 2013 up to Present :--
Project :-- Design Review & Supervision of Construction of The Package Treatment
Plant ( P T P ) Upgrades at Existing Al Shamal , Al Dakera , Al Khour City - DOHA –
Qatar State .
Client : Ashghal - Public Works Authority – Qatar State .
Infrastructure Affairs - Drainage Section .
Employer :-- E C G (Engineering Consultant Group Office ) Qatar Branch.
Duties : --
- Responsible for overall checking Civil Construction Inspections in site for all project
- Prepare, review and monitor project construction schedules and work progress to
ensure that site installation, and construction activities Design are on Drawings
schedule as planned.
- monitor the job progress against the plan, study scope changes, preparation of
modified Drawings schedules as per revised plan and to generate weekly / monthly
project status reports to the management.
Project Cost: -- $44,000,000 .
B -- May. 2013 up to Jully2013 :--
Project :-- Design and Supervision of Construction of The Pearl Fire Station At The
Pearl Zone -DOHA –Qatar State .
Client : The Civil Defince –Ministry Of Interior – Qatar State ( U D C ) .
Employer :-- E C G (Engineering Consultant Group ) Qatar Branch.
Duties : --
- Responsible for overall checking Civil Construction Inspections in site for all project
- Prepare, review and monitor project construction schedules and work progress to
ensure that site installation, and construction activities Design are on Drawings
schedule as planned.
- monitor the job progress against the plan, study scope changes, preparation of
modified Drawings schedules as per revised plan and to generate weekly / monthly
project status reports to the management.
Project Cost: -- $35,000,000 .
C -- Oct. 2012 up to June 2013 :--
Project :-- Construction of residential villas (4villa at Ain Khalid –5villa at Al Seeliea
-DOHA –Qatar ).
Position:-- Construction Manager – Contracting Company.
3. 3
Duties :--
- Responsible for checking overall construction site of all project..
- Prepare, review and monitor project construction schedules and work
progress to ensure that site installation, and construction activities are
on schedule as planned.
- monitor the job progress against the plan, job delay analysis, study
scope changes, preparation of modified schedules as per revised plan
and to generate weekly / monthly project status reports to the
management.
Project Cost :-- $14,000,000 .
D -- Janury 2000 to September 2012 :--
Employer :-- Nasr Company for utilities and Erection Structures – Egypt.
Client Name :-- National Authority for Potable Water and Sanitary Drainage
Sohag Region and many governmental institutes .
Projects :-- (1 – The National Project to Supply The Potable Water for 240 Villages at
upper Egypt Project Cost - $1500,000,000 .
The Project includes the following:--
Upgrading the existing water supply network and supplementing it with new water
supply network .
Diameters varying from 100mm up to 1000mm (UPVC,HDPE .) pipes
Construction of tree elevated potable water reservoir one of them with capacity
300m³ and two with capacity 1000m³,
Construction of three Iron and Manganese Removal Units.
2 – Drainage project to MAlly City ELMINIA government Project Cost -$144,000,000 .
3 – 4 station plant production potable water quantity 120 litre / second - QENA
government Project Cost :-- $13,000,000 .
4 – The infrastructure for BANEE SWIEEF GOVERNMENT .
Project Cost: -- $142,000,000 .
5 – The left station no. 3 and Expulsion pipe dia. 900 mm ELWADY ELGADEED
government Project Cost :-- $28,000,000 .
6 -Construction of Tahta and Villages of Juhayna Sewerage in
Sohag city .
Include networking and expulsion lines, pumping stations and treatment
plant Oxidation Ponds system.
The project includes the following:--
Construction of approximately 150 km of Foul Sewer (VC pipe) network by open
cut trench with diameters varying from 150mm to 900mm.
Construction of approximately 4 km of Trunk Sewer (jacking pipe) by Micro
tunneling for pipe diameters varying from 600 mm and 1000mm.
Construction of approximately 3200 concrete manholes,
Construction of approximately 5400 house connections of 150mm vitrified clay
pipeline
lines expulsion ( Ductile Iron ,GRP Pipes ) diameters varying from 400 mm to
900mm
Construction of 12 Pumping stations.
Construction of treatment plant system pools Oxidation area of 430 acres.
Position:-- Construction Manager .
Responsible for overall construction site of all project..
4. 4
Prepare, review and monitor project construction schedules and work progress to
ensure that site installation, and construction activities are on
schedule as planned.
monitor the job progress against the plan, job delay analysis, study scope changes,
preparation of modified schedules as per revised plan and to
generate weekly / monthly project status reports to the
management.
E -- July. 1998 up to May 2008 :--
Employer :-- The Arabian Group For Artucture and constructional Designs ,
Materials tests , Geotechnical Researches Reports .
Client :-- Assuite University
Project:-- Residential Town Project Cost :-- $21,000,000 .
position:-- Residential Construction Engineer.
Duties : - Responsible for overall construction designs on site of all projects of the
office.
F -- July 1993 to Decemper 1997:--
Employer :-- EL Nasr GENERAL Company for CONTRACTING –
HASSEN ALHAM PRIEVIOUSLY - Egypt.
Client :-- National Authority for Potable Water and Sanitary Drainage
Position:-- Residential Construction Engineer.
Sohag AND ASSUIT Region and many governmental institutes
Project:-- A Residential Town at the beach of red sea Project Cost :-- $42,000,000 .
2 – Factory of bricks at Asswan government Project Cost :-- $5,000,000 .
3 – The construction of the highway of red sea government . Project Cost :-- $4,000,000
.
4 – the construction of 20 primary school in Bany Swieef government Project Cost :--
$15,000,000 .
5 – The high technology college for computer Sohage government .
6 – El Amery Massged construction Sohage government .
Position: Residential Construction Engineer .
- Responsible for overall construction site of all project .
- Prepare, review and monitor project construction schedules and work progress to
ensure that site installation, and construction activities are on
schedule as planned.
- monitor the job progress against the plan, job delay analysis, study scope changes,
preparation of modified schedules as per revised plan and to
generate weekly / monthly project status reports to the
management .