SlideShare a Scribd company logo
1 of 12
CURRICULUM VITAE
PERSONAL INFORMATION
Engr. SalahRamadan Abdul Razek Ali
+971 50 5537 371(Dubai), 00966582268575 (KSA)
Salah_ra32@yahoo.com
Name SALAH RAMADAN ABDUL RAZEK ALI
Date of Birth 6 April 1954
Nationality Egyptian
Passport No. A00433549– valid till 03/10/2015
Marital Status Married
3 children (University Students)
Education Qualification B.Sc. Civil Engineering (1978)
Cairo University, Egypt.
Professional Affiliation 1. Member of Egypt Engineers Syndicate.
2. Approved Resident Engineer from Public works and Housing
Ministry (Dubai) & TECOM
3. Approved Resident Engineer from Al Ain
Municipality
4. Approved Sr. Construction Engineer from AMANA-Jeddah (
KSA )
Computer Knowledge MS Project, Windows Excel & Word.
Countries worked in Egypt, Saudi Arabia, UAE and Qatar
Years of Experience 32Years
Present Position Senior Construction Engineer
Branch Office Parsons –Jeddah
Driving License Valid Qatari and UAE Driving Licenses
Languages Known Arabic & English.
Professional Experience See attached.
K.S.A Experience
Project Name CMS& OM Projects Jeddah Municipality
Period From 16 April 2012 till present
Company Name Saudi Arabia Parsons Limited (www.parsons.com)
Position Senior Construction Engineer
Project Value 500 million SAR
Client Jeddah Municipality
Consultant Parsons
Project Description Supervising of all activities for Construction Management
Supervision (CMS) & Operation and Maintenance (O&M)
Projects for Jeddah Municipality, Roads Department.
Tasks include:
 Ensure that projects contracts are constructed
according to the plans and specifications.
 Maintain records, progress meetings and meetings
with other agencies as required.
 Respond to RFI’s
 Review submittals
 Supervise work inspection
 Check job orders (JO), inspection requests(IR), job
order completion
 Liaison among projects Managers, Inspectors and
Contractors for all project activities
 Perform field visits to project site
 Arrange with the owner and the contractor for site
handing over to the contractor
 Study the drawings, conditions of the contract,
general & particular specifications and all other
contract documents
 Control site preparation works, site inspection,
storage of materials, batching plants, etc.
 Study the levels of plot and agree the benchmark of
the site that is to say to agree to the architectural
zero level of the site as specified in the drawings
 Study the details of the subcontractors proposed by
the main contractor and send appropriate
recommendations to the consultant’s main office
and to the owner
 Study the shop drawings submitted by the
contractor and approve the shop drawings after
making necessary revisions by the main contractor
and in cooperation with the consultant’s main office
and the owner
 Continuous supervision of the project with other
consultant’s staff, from the soil investigation,
excavations, foundation works and superstructure
works including finishers. Besides, controlling
other works such as electromechanical works
supervised by other consultant’s staff under R.E’s
command and up to site handing over
 Arrange periodical weekly or monthly site or traffic
meetings with consultant’s staff and the contractor
to sort out any problems that arise at site.
Moreover, to follow up work progress at site as per
the approved work program. At any time, if the
work progress is behind schedule, R.E. has to
investigate the reasons and give necessary
instructions asking the contractor to increase the
labour and material supply to catch up with the
programmed schedule
U.A.E. Experience
Project No: 1 (UAE)
Project Name Upgrading of Northern Ring Road of AL-AIN City and
Improvement of Its Intersections.
Period From 1 November 2009 till 31-05-2011
Company Name Engineering Associates
Position Resident Engineer
Project Value AED 650 million
Client Al Ain Municipality
Consultant Engineering Associates
Project Description 18.2 KM (6+6 lane) Expressway, 4 Interchanges, 3 Bridges,
Underpasses & Culverts and TRANSCO, AADC Utilities etc.
Job Responsibilities Complete site supervision of projects, coordination with utility
departments, monitoring the quality of materials and works with
the help of Govt. and approved private labs via field and
laboratory tests, supervisory work directing the city –wide storm
water system, drainage system, irrigation system, STPs, and
ground water and all water related maintenance, cleaning and of
open and piped drains ,pits ,treatment devices, detention basins
and outfall structure Experienced and identification pollutant,
inspection programe preparation, desalting &pollutant removal
operations, vegetation maintenance ,weed control etc
Project No: 2 (UAE)
Project Name P-122 – TECOM ROADS IMPROVEMENTS
Period From 16 March 2008 till 31 October 2009
Company Name PARSONS
Position Resident Engineer
Project Value AED 105 million
Client TECOM
Consultant PARSONS
Project Description IMPROVEMENT OF ROADS AND CONSTRUCTION OF
BRIDGE
Qatar Experience
Project No : 1
Project Name ERC0638/C2A – DUKHAN HIGHWAY–WEST CONTRACT
Period From 21 March 2006 15 March 2008
Company Name WS Atkins & Partners Overseas
Position Resident Engineer – Roads
Project Value QR 750 million
Client Public Works Authority
Consultant WS Atkins & Partners Overseas
Project Description Construction of Express Highway from Shahaniyah to
Zekreet(42KM)
Job Responsibilities Complete site supervision of projects, coordination with utility
departments, monitoring the quality of materials and works with
the help of Govt. and approved private labs via field and
laboratory tests , creating and delivery of service stations including
electric –generators- heaters – water treatment units and the work
of sanitation and fuel drainage system, administrative housing and
attachments. Make septic water treatment tanks
Project No. 2
Project Name ERC 0659/C2 Road Improvement Works in Central Rayyan.
Cost. Qrs. 24 Million.
Period From 3rd January 2005 to 20 March 2006
Position Resident Engineer withCONSER Consultant Engineers,
Doha - Qatar
Project No. 3
Project Name ERC 0684/C3 – Link Road Between Central Market R/A to
Al Waab Road
Period From 2nd November 2003 up to 30th December 2004
Position Resident Engineer withArabian Engineers Consultant,
Doha- Qatar
Project No. 4
Project Name ERC 0387 & 0388 Road Improvement works Zone 3 to 39.
Period From September 2001 to November 2003
Company Name Arabian Engineers Consultants, Doha Qatar
Position Resident Engineer (for both projects 1 & 2)
Project Value ERC 0387/C1 = 10.488 Million QR.
Client Roads Departments, MMAA, Qatar
Project Description Construction of Carriageways, Roundabouts, Parking bays
Footways, Installation of Soakaaway and Gullies, Laying
different services ducts such as Electricity, Water, Street
lights, Q-Tel etc.
Job Responsibilities Complete site supervision of projects, coordination with utility
departments, monitoring the quality of materials and works with
the help of Govt. and approved private labs via field and
laboratory tests.
U.A.E. Experience (FROM 1994 UP TO 2001)
Project No. 1
Project name Construction, maintenance, Rehabilitation of Roads / Bridges
Period From Oct. 2000 to Sept. 2001
Company Name ADMAK General Contracting Co.
Position Site Manager
Project Value 70 Million Dh.
Client Abu Dhabi Municipality
Consultant Conceco & DCIL
Project Description Maintenance of Interlock, Asphalt, Rip-rap and utilities, repair of
damaged joints of bridge slabs and car & camel under passes,
repair of road and sign boards.
Job Responsibilities Supervision of all road works. Barrier. Rip-rap and utilities.
Coordination with different utilities departments.
Quality control for all the works.
Project No. 2
Project Name Internal Roads and Service (Al Heelia)
Period From Oct. 1999 to Oct. 2000
Company Name ADMAK General Contracting Co.
Position Site Manager
Project Value 67 Million Dh.
Client Public Works Department, Abu Dhabi.
Consultant ITAL CONSULT
Project Duration 15 months
Project Description Unclassified excavation and embankment, sub grade, sub base and
Asphalt, sewerage & drainage works and services.
Job Responsibilities Responsible for construction of carriageway and various utility works,
associated utility works, coordination with above utility departments,
monitoring the quality of materials and works
Project No. 3
Project Name Upgrading and reconstructionof Abu Dhabi – Al Ain Road to
International Expressway, contract No. 4
Period From 8th 19978 to Oct. 1999
Company Name ADMAK General Contracting Co.
Position Site Manager
Project Value 269 Million Dhs.
Client Public works Department, Abu Dhabi.
Consultant ITAL CONSULT
Project Duration 22 months
Project Description Project includes 22km Main Carriageway, 30km service road,
Camel underpasses, Interchange and Pedestrian underpasses.
Job Responsibilities In charge of road construction, improvements, barrier, rip-raps and
utilities. Coordination with Engineers of utility Dept.
Project No. 4
Project Name Construction of Asphalt Roads & Parking for Al Sheikh Places
Period From July 1998 to Oct. 1998
Company Name Arab Office for Planning & Architecture Consulting
(Dr. A.Makhluf)
Position Resident Engineer
Project Value 11 Million Dhs.
Client Al Ain Municipality
Project Description Construction of Asphalt roads, Parking Interlocking tiles, Kerbstones,
future service ducts, civil works for electricityworks, road markings,
signboards & surface water drainage.
Job Responsibilities Supervision of road construction & improvement of utility works
Coordination with Municipality Engineer & various Dept.
Project No. 5
Project Name Construction of Asphalt Roads & Parking at Mosque in Al Ain
Period From July 1996 to July 1998
Company Name MISR Consulting Engineers
Position Resident Engineer
Project Value 22 Million Dhs.
Client Al Ain Municipality
Project Description Construction of road works, include unclassified Excavation and
embankment, sub grade, sub base, kerbstone and interlock tiles, future
service ducts and water and drainage services.
Job Responsibilities Supervision of all the construction and asphalt works liaising and
coordinate with various Dept. Engineers & Quality Control
Project No. 6
Project Name Construction of Different Villas and School in Al Ain and Abu
Dhabi.
Period From June 1994 to July 1996
Company Name Engineering Enterprises Establishment
Position Technical Manager
Project Value 80 Million Dhs.
Client Public Works Department, Al Ain.
Project Description Construction of all items such as footings, columns, RCC slabs
and finishing besides civil works for fence, Split air slabs and
finishing besides civil works for fence, split air conditions,
Elevators, Asphalt parking and interlock.
Job Responsibilities Supervision of all sub contractors, submittal for materials,
preparing running and final payments and Quality control for all
Saudi Arabia Experience
Project No. 1
Project Name Improvement of ARAR-AL WAKELA Expressway
Period 1990 –1993
Company Name Arabian Roads Establishment
Position Project Manager
Project Value 30 Million Saudi Riyals.
Client Ministry of Communications
Project Description Earthwork, asphalt, road marking, road sign, box/pipe culverts,
guardrail, slope protection, road furniture, rip-rap & barrier.
Job Responsibilities Supervision of all road works, improvements, management of
work for barrier, riprap, utility and coordination with client's
engineer, preparing progress program & quality control.
Project No. 2
Project Name 4th Stage of Sakaka City, Saudi Arabia.
Period 1988 –1990
Company Name Arabian Roads Establishment
Position Project Manager
Project Value 25 Million Saudi Riyals.
Client Sakaka Municipality
Project Description Earthwork, asphalt, tiles, box & pipe culverts, sewerage and
drainage construction.
Job Responsibilities Quality control and management of all works preparing
monthly valuation and program.
Project No. 3
Project Name 1st Stage of Domet Al Gandal City, Saudi Arabia.
Period 1985–1988
Company Name Arabian Roads Establishment
Position Project Engineer
Project Value 35 Million Saudi Riyals.
Client Domet Al Gandal Municipality
Project Description Earthwork, asphalt, road marking, road sign, box/pipe culverts,
guard Rail, road furniture, riprap, barrier and street light
works.
Job Responsibilities Supervision of all road works & improvements, management
of work of barrier, rip-rap and utility.
Project No. 4
Project Name Temporary Road works for Kara Road City, Saudi Arabia
Period 1983–1985
Company Name Arabian Roads Establishment
Position Site Engineer
Project Value 15 Million Saudi Riyals.
Client Sakaka Municipality
Project Duration 2 Years
Project Description Earthwork, asphalt, road signs, road marking sewerage and
drainage works.
Job Responsibilities Responsible for construction of earth works and asphalt.
Follow-up of test results.
Dealing with various sub contractors.
Checking all the survey works.
Egypt Experience
Project Name Construction of Temporary Road works in
AL Wafaa WL AL Amal Town.
Period 1980–1983
Company Name Arab Contractors Company
Position Site Engineer
Project Value 5 Million L.E.
Client Arab Consultant Engineers (ACE) Firm
Project Duration 3 Years
Project Description Earthwork, asphalt, road marking, road signs, box & pipe
culverts, guardrail, road furniture, rip-rap, barrier and street
light works.
Job Responsibilities Supervision of all works & improvements, Management of
works of barrier, riprap and utility.

More Related Content

What's hot (20)

new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
PALANI CIVIL & STRUCTURAL ENGINEER
PALANI CIVIL & STRUCTURAL ENGINEERPALANI CIVIL & STRUCTURAL ENGINEER
PALANI CIVIL & STRUCTURAL ENGINEER
 
Cv 01
Cv 01Cv 01
Cv 01
 
Arshad Jan CV
Arshad Jan CVArshad Jan CV
Arshad Jan CV
 
shoukat buildings and Roads -
shoukat buildings and Roads -shoukat buildings and Roads -
shoukat buildings and Roads -
 
En c.v
En c.v En c.v
En c.v
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Jayasankar_CV_for QA Manager
Jayasankar_CV_for QA ManagerJayasankar_CV_for QA Manager
Jayasankar_CV_for QA Manager
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Leandro CV
Leandro CVLeandro CV
Leandro CV
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Syed mohammed project manager civil
Syed mohammed project manager civilSyed mohammed project manager civil
Syed mohammed project manager civil
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
CV_Anas Mohammad
CV_Anas MohammadCV_Anas Mohammad
CV_Anas Mohammad
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
Mechanical_Draftsmen_
Mechanical_Draftsmen_Mechanical_Draftsmen_
Mechanical_Draftsmen_
 
Foad Zahedi-CV-EN
Foad Zahedi-CV-ENFoad Zahedi-CV-EN
Foad Zahedi-CV-EN
 
jainco
jaincojainco
jainco
 
Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 

Viewers also liked

Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif
 
Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1hany amer
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 
Rami Hani Resume April 2016
Rami Hani Resume April 2016Rami Hani Resume April 2016
Rami Hani Resume April 2016rami qashta
 
Detailed (C.V) 8814
Detailed (C.V) 8814 Detailed (C.V) 8814
Detailed (C.V) 8814 loai hany
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumarankumaraguru paran
 
Hani Farraj CV Final
Hani Farraj CV FinalHani Farraj CV Final
Hani Farraj CV FinalHANI FARRAJ
 
mohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed awad
 
irshad cv updated..
irshad cv updated..irshad cv updated..
irshad cv updated..irshad khan
 
WAQAS ALI HASHMI new cv
WAQAS ALI HASHMI new cvWAQAS ALI HASHMI new cv
WAQAS ALI HASHMI new cvWaqas Hashmi
 

Viewers also liked (19)

Hani Nasif Resume 2014
Hani Nasif Resume 2014Hani Nasif Resume 2014
Hani Nasif Resume 2014
 
Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1Hany Mohammed mahmoud Amer new1
Hany Mohammed mahmoud Amer new1
 
Maya Assaf CV
Maya Assaf CVMaya Assaf CV
Maya Assaf CV
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Rami Hani Resume April 2016
Rami Hani Resume April 2016Rami Hani Resume April 2016
Rami Hani Resume April 2016
 
CV hany
CV hanyCV hany
CV hany
 
Detailed (C.V) 8814
Detailed (C.V) 8814 Detailed (C.V) 8814
Detailed (C.V) 8814
 
M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015M. Darwish CV 30-11-2015
M. Darwish CV 30-11-2015
 
CV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-KumaranCV For OSP Planning & Design-Kumaran
CV For OSP Planning & Design-Kumaran
 
Hani Farraj CV Final
Hani Farraj CV FinalHani Farraj CV Final
Hani Farraj CV Final
 
mohamed AWAD SHERIF CV
mohamed AWAD SHERIF CVmohamed AWAD SHERIF CV
mohamed AWAD SHERIF CV
 
Kahlid Abdul Aziz CV
Kahlid Abdul Aziz CVKahlid Abdul Aziz CV
Kahlid Abdul Aziz CV
 
Najam cv
Najam cvNajam cv
Najam cv
 
mohammed altamimi(c.v)
mohammed altamimi(c.v)mohammed altamimi(c.v)
mohammed altamimi(c.v)
 
HUSSAIN KHAROUF CV (1)
HUSSAIN KHAROUF CV (1)HUSSAIN KHAROUF CV (1)
HUSSAIN KHAROUF CV (1)
 
Muhammad Naseer Cv
Muhammad Naseer CvMuhammad Naseer Cv
Muhammad Naseer Cv
 
irshad cv updated..
irshad cv updated..irshad cv updated..
irshad cv updated..
 
My C.V
My C.VMy C.V
My C.V
 
WAQAS ALI HASHMI new cv
WAQAS ALI HASHMI new cvWAQAS ALI HASHMI new cv
WAQAS ALI HASHMI new cv
 

Similar to CV Salah Ramadan (20)

JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
Basil Resume
Basil Resume Basil Resume
Basil Resume
 
MOHAMED CV - Civil Engineer
MOHAMED CV - Civil EngineerMOHAMED CV - Civil Engineer
MOHAMED CV - Civil Engineer
 
CV1
CV1CV1
CV1
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
RANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CLRANGANATHAN SHANKAR RESUME WITH CL
RANGANATHAN SHANKAR RESUME WITH CL
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
CV Kamran Haider
CV Kamran HaiderCV Kamran Haider
CV Kamran Haider
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 
Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cv
 
Pandiarajan CV 2015.1
Pandiarajan CV 2015.1Pandiarajan CV 2015.1
Pandiarajan CV 2015.1
 
amr
amramr
amr
 
Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01Maged Fawzy CV (pm) rev 01
Maged Fawzy CV (pm) rev 01
 
Mohamed Abdelaal cv
Mohamed Abdelaal cvMohamed Abdelaal cv
Mohamed Abdelaal cv
 
CV - Fakruddin R01
CV - Fakruddin  R01CV - Fakruddin  R01
CV - Fakruddin R01
 
ayman y7ia
ayman y7iaayman y7ia
ayman y7ia
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
CV - Mohammed El Sayed
CV - Mohammed El SayedCV - Mohammed El Sayed
CV - Mohammed El Sayed
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 

CV Salah Ramadan

  • 1. CURRICULUM VITAE PERSONAL INFORMATION Engr. SalahRamadan Abdul Razek Ali +971 50 5537 371(Dubai), 00966582268575 (KSA) Salah_ra32@yahoo.com Name SALAH RAMADAN ABDUL RAZEK ALI Date of Birth 6 April 1954 Nationality Egyptian Passport No. A00433549– valid till 03/10/2015 Marital Status Married 3 children (University Students) Education Qualification B.Sc. Civil Engineering (1978) Cairo University, Egypt. Professional Affiliation 1. Member of Egypt Engineers Syndicate. 2. Approved Resident Engineer from Public works and Housing Ministry (Dubai) & TECOM 3. Approved Resident Engineer from Al Ain Municipality 4. Approved Sr. Construction Engineer from AMANA-Jeddah ( KSA ) Computer Knowledge MS Project, Windows Excel & Word. Countries worked in Egypt, Saudi Arabia, UAE and Qatar Years of Experience 32Years Present Position Senior Construction Engineer Branch Office Parsons –Jeddah Driving License Valid Qatari and UAE Driving Licenses Languages Known Arabic & English. Professional Experience See attached.
  • 2. K.S.A Experience Project Name CMS& OM Projects Jeddah Municipality Period From 16 April 2012 till present Company Name Saudi Arabia Parsons Limited (www.parsons.com) Position Senior Construction Engineer Project Value 500 million SAR Client Jeddah Municipality Consultant Parsons Project Description Supervising of all activities for Construction Management Supervision (CMS) & Operation and Maintenance (O&M) Projects for Jeddah Municipality, Roads Department. Tasks include:  Ensure that projects contracts are constructed according to the plans and specifications.  Maintain records, progress meetings and meetings with other agencies as required.  Respond to RFI’s  Review submittals  Supervise work inspection  Check job orders (JO), inspection requests(IR), job order completion  Liaison among projects Managers, Inspectors and Contractors for all project activities  Perform field visits to project site  Arrange with the owner and the contractor for site handing over to the contractor  Study the drawings, conditions of the contract, general & particular specifications and all other contract documents  Control site preparation works, site inspection, storage of materials, batching plants, etc.  Study the levels of plot and agree the benchmark of
  • 3. the site that is to say to agree to the architectural zero level of the site as specified in the drawings  Study the details of the subcontractors proposed by the main contractor and send appropriate recommendations to the consultant’s main office and to the owner  Study the shop drawings submitted by the contractor and approve the shop drawings after making necessary revisions by the main contractor and in cooperation with the consultant’s main office and the owner  Continuous supervision of the project with other consultant’s staff, from the soil investigation, excavations, foundation works and superstructure works including finishers. Besides, controlling other works such as electromechanical works supervised by other consultant’s staff under R.E’s command and up to site handing over  Arrange periodical weekly or monthly site or traffic meetings with consultant’s staff and the contractor to sort out any problems that arise at site. Moreover, to follow up work progress at site as per the approved work program. At any time, if the work progress is behind schedule, R.E. has to investigate the reasons and give necessary instructions asking the contractor to increase the labour and material supply to catch up with the programmed schedule
  • 4. U.A.E. Experience Project No: 1 (UAE) Project Name Upgrading of Northern Ring Road of AL-AIN City and Improvement of Its Intersections. Period From 1 November 2009 till 31-05-2011 Company Name Engineering Associates Position Resident Engineer Project Value AED 650 million Client Al Ain Municipality Consultant Engineering Associates Project Description 18.2 KM (6+6 lane) Expressway, 4 Interchanges, 3 Bridges, Underpasses & Culverts and TRANSCO, AADC Utilities etc. Job Responsibilities Complete site supervision of projects, coordination with utility departments, monitoring the quality of materials and works with the help of Govt. and approved private labs via field and laboratory tests, supervisory work directing the city –wide storm water system, drainage system, irrigation system, STPs, and ground water and all water related maintenance, cleaning and of open and piped drains ,pits ,treatment devices, detention basins and outfall structure Experienced and identification pollutant, inspection programe preparation, desalting &pollutant removal operations, vegetation maintenance ,weed control etc Project No: 2 (UAE) Project Name P-122 – TECOM ROADS IMPROVEMENTS Period From 16 March 2008 till 31 October 2009 Company Name PARSONS
  • 5. Position Resident Engineer Project Value AED 105 million Client TECOM Consultant PARSONS Project Description IMPROVEMENT OF ROADS AND CONSTRUCTION OF BRIDGE Qatar Experience Project No : 1 Project Name ERC0638/C2A – DUKHAN HIGHWAY–WEST CONTRACT Period From 21 March 2006 15 March 2008 Company Name WS Atkins & Partners Overseas Position Resident Engineer – Roads Project Value QR 750 million Client Public Works Authority Consultant WS Atkins & Partners Overseas Project Description Construction of Express Highway from Shahaniyah to Zekreet(42KM) Job Responsibilities Complete site supervision of projects, coordination with utility departments, monitoring the quality of materials and works with the help of Govt. and approved private labs via field and laboratory tests , creating and delivery of service stations including electric –generators- heaters – water treatment units and the work of sanitation and fuel drainage system, administrative housing and attachments. Make septic water treatment tanks Project No. 2
  • 6. Project Name ERC 0659/C2 Road Improvement Works in Central Rayyan. Cost. Qrs. 24 Million. Period From 3rd January 2005 to 20 March 2006 Position Resident Engineer withCONSER Consultant Engineers, Doha - Qatar Project No. 3 Project Name ERC 0684/C3 – Link Road Between Central Market R/A to Al Waab Road Period From 2nd November 2003 up to 30th December 2004 Position Resident Engineer withArabian Engineers Consultant, Doha- Qatar Project No. 4 Project Name ERC 0387 & 0388 Road Improvement works Zone 3 to 39. Period From September 2001 to November 2003 Company Name Arabian Engineers Consultants, Doha Qatar Position Resident Engineer (for both projects 1 & 2) Project Value ERC 0387/C1 = 10.488 Million QR. Client Roads Departments, MMAA, Qatar
  • 7. Project Description Construction of Carriageways, Roundabouts, Parking bays Footways, Installation of Soakaaway and Gullies, Laying different services ducts such as Electricity, Water, Street lights, Q-Tel etc. Job Responsibilities Complete site supervision of projects, coordination with utility departments, monitoring the quality of materials and works with the help of Govt. and approved private labs via field and laboratory tests. U.A.E. Experience (FROM 1994 UP TO 2001) Project No. 1 Project name Construction, maintenance, Rehabilitation of Roads / Bridges Period From Oct. 2000 to Sept. 2001 Company Name ADMAK General Contracting Co. Position Site Manager Project Value 70 Million Dh. Client Abu Dhabi Municipality Consultant Conceco & DCIL Project Description Maintenance of Interlock, Asphalt, Rip-rap and utilities, repair of damaged joints of bridge slabs and car & camel under passes, repair of road and sign boards. Job Responsibilities Supervision of all road works. Barrier. Rip-rap and utilities. Coordination with different utilities departments. Quality control for all the works. Project No. 2 Project Name Internal Roads and Service (Al Heelia) Period From Oct. 1999 to Oct. 2000 Company Name ADMAK General Contracting Co.
  • 8. Position Site Manager Project Value 67 Million Dh. Client Public Works Department, Abu Dhabi. Consultant ITAL CONSULT Project Duration 15 months Project Description Unclassified excavation and embankment, sub grade, sub base and Asphalt, sewerage & drainage works and services. Job Responsibilities Responsible for construction of carriageway and various utility works, associated utility works, coordination with above utility departments, monitoring the quality of materials and works Project No. 3 Project Name Upgrading and reconstructionof Abu Dhabi – Al Ain Road to International Expressway, contract No. 4 Period From 8th 19978 to Oct. 1999 Company Name ADMAK General Contracting Co. Position Site Manager Project Value 269 Million Dhs. Client Public works Department, Abu Dhabi. Consultant ITAL CONSULT Project Duration 22 months Project Description Project includes 22km Main Carriageway, 30km service road, Camel underpasses, Interchange and Pedestrian underpasses. Job Responsibilities In charge of road construction, improvements, barrier, rip-raps and utilities. Coordination with Engineers of utility Dept. Project No. 4 Project Name Construction of Asphalt Roads & Parking for Al Sheikh Places Period From July 1998 to Oct. 1998
  • 9. Company Name Arab Office for Planning & Architecture Consulting (Dr. A.Makhluf) Position Resident Engineer Project Value 11 Million Dhs. Client Al Ain Municipality Project Description Construction of Asphalt roads, Parking Interlocking tiles, Kerbstones, future service ducts, civil works for electricityworks, road markings, signboards & surface water drainage. Job Responsibilities Supervision of road construction & improvement of utility works Coordination with Municipality Engineer & various Dept. Project No. 5 Project Name Construction of Asphalt Roads & Parking at Mosque in Al Ain Period From July 1996 to July 1998 Company Name MISR Consulting Engineers Position Resident Engineer Project Value 22 Million Dhs. Client Al Ain Municipality Project Description Construction of road works, include unclassified Excavation and embankment, sub grade, sub base, kerbstone and interlock tiles, future service ducts and water and drainage services. Job Responsibilities Supervision of all the construction and asphalt works liaising and coordinate with various Dept. Engineers & Quality Control Project No. 6 Project Name Construction of Different Villas and School in Al Ain and Abu Dhabi. Period From June 1994 to July 1996 Company Name Engineering Enterprises Establishment Position Technical Manager Project Value 80 Million Dhs. Client Public Works Department, Al Ain. Project Description Construction of all items such as footings, columns, RCC slabs and finishing besides civil works for fence, Split air slabs and finishing besides civil works for fence, split air conditions, Elevators, Asphalt parking and interlock. Job Responsibilities Supervision of all sub contractors, submittal for materials, preparing running and final payments and Quality control for all
  • 10. Saudi Arabia Experience Project No. 1 Project Name Improvement of ARAR-AL WAKELA Expressway Period 1990 –1993 Company Name Arabian Roads Establishment Position Project Manager Project Value 30 Million Saudi Riyals. Client Ministry of Communications Project Description Earthwork, asphalt, road marking, road sign, box/pipe culverts, guardrail, slope protection, road furniture, rip-rap & barrier. Job Responsibilities Supervision of all road works, improvements, management of work for barrier, riprap, utility and coordination with client's engineer, preparing progress program & quality control. Project No. 2 Project Name 4th Stage of Sakaka City, Saudi Arabia. Period 1988 –1990 Company Name Arabian Roads Establishment Position Project Manager Project Value 25 Million Saudi Riyals. Client Sakaka Municipality Project Description Earthwork, asphalt, tiles, box & pipe culverts, sewerage and drainage construction. Job Responsibilities Quality control and management of all works preparing monthly valuation and program. Project No. 3 Project Name 1st Stage of Domet Al Gandal City, Saudi Arabia. Period 1985–1988 Company Name Arabian Roads Establishment Position Project Engineer
  • 11. Project Value 35 Million Saudi Riyals. Client Domet Al Gandal Municipality Project Description Earthwork, asphalt, road marking, road sign, box/pipe culverts, guard Rail, road furniture, riprap, barrier and street light works. Job Responsibilities Supervision of all road works & improvements, management of work of barrier, rip-rap and utility. Project No. 4 Project Name Temporary Road works for Kara Road City, Saudi Arabia Period 1983–1985 Company Name Arabian Roads Establishment Position Site Engineer Project Value 15 Million Saudi Riyals. Client Sakaka Municipality Project Duration 2 Years Project Description Earthwork, asphalt, road signs, road marking sewerage and drainage works. Job Responsibilities Responsible for construction of earth works and asphalt. Follow-up of test results. Dealing with various sub contractors. Checking all the survey works. Egypt Experience Project Name Construction of Temporary Road works in AL Wafaa WL AL Amal Town. Period 1980–1983 Company Name Arab Contractors Company Position Site Engineer Project Value 5 Million L.E. Client Arab Consultant Engineers (ACE) Firm Project Duration 3 Years Project Description Earthwork, asphalt, road marking, road signs, box & pipe
  • 12. culverts, guardrail, road furniture, rip-rap, barrier and street light works. Job Responsibilities Supervision of all works & improvements, Management of works of barrier, riprap and utility.