1. CURRICULUM VITAE
PERSONAL INFORMATION
Engr. SalahRamadan Abdul Razek Ali
+971 50 5537 371(Dubai), 00966582268575 (KSA)
Salah_ra32@yahoo.com
Name SALAH RAMADAN ABDUL RAZEK ALI
Date of Birth 6 April 1954
Nationality Egyptian
Passport No. A00433549– valid till 03/10/2015
Marital Status Married
3 children (University Students)
Education Qualification B.Sc. Civil Engineering (1978)
Cairo University, Egypt.
Professional Affiliation 1. Member of Egypt Engineers Syndicate.
2. Approved Resident Engineer from Public works and Housing
Ministry (Dubai) & TECOM
3. Approved Resident Engineer from Al Ain
Municipality
4. Approved Sr. Construction Engineer from AMANA-Jeddah (
KSA )
Computer Knowledge MS Project, Windows Excel & Word.
Countries worked in Egypt, Saudi Arabia, UAE and Qatar
Years of Experience 32Years
Present Position Senior Construction Engineer
Branch Office Parsons –Jeddah
Driving License Valid Qatari and UAE Driving Licenses
Languages Known Arabic & English.
Professional Experience See attached.
2. K.S.A Experience
Project Name CMS& OM Projects Jeddah Municipality
Period From 16 April 2012 till present
Company Name Saudi Arabia Parsons Limited (www.parsons.com)
Position Senior Construction Engineer
Project Value 500 million SAR
Client Jeddah Municipality
Consultant Parsons
Project Description Supervising of all activities for Construction Management
Supervision (CMS) & Operation and Maintenance (O&M)
Projects for Jeddah Municipality, Roads Department.
Tasks include:
Ensure that projects contracts are constructed
according to the plans and specifications.
Maintain records, progress meetings and meetings
with other agencies as required.
Respond to RFI’s
Review submittals
Supervise work inspection
Check job orders (JO), inspection requests(IR), job
order completion
Liaison among projects Managers, Inspectors and
Contractors for all project activities
Perform field visits to project site
Arrange with the owner and the contractor for site
handing over to the contractor
Study the drawings, conditions of the contract,
general & particular specifications and all other
contract documents
Control site preparation works, site inspection,
storage of materials, batching plants, etc.
Study the levels of plot and agree the benchmark of
3. the site that is to say to agree to the architectural
zero level of the site as specified in the drawings
Study the details of the subcontractors proposed by
the main contractor and send appropriate
recommendations to the consultant’s main office
and to the owner
Study the shop drawings submitted by the
contractor and approve the shop drawings after
making necessary revisions by the main contractor
and in cooperation with the consultant’s main office
and the owner
Continuous supervision of the project with other
consultant’s staff, from the soil investigation,
excavations, foundation works and superstructure
works including finishers. Besides, controlling
other works such as electromechanical works
supervised by other consultant’s staff under R.E’s
command and up to site handing over
Arrange periodical weekly or monthly site or traffic
meetings with consultant’s staff and the contractor
to sort out any problems that arise at site.
Moreover, to follow up work progress at site as per
the approved work program. At any time, if the
work progress is behind schedule, R.E. has to
investigate the reasons and give necessary
instructions asking the contractor to increase the
labour and material supply to catch up with the
programmed schedule
4. U.A.E. Experience
Project No: 1 (UAE)
Project Name Upgrading of Northern Ring Road of AL-AIN City and
Improvement of Its Intersections.
Period From 1 November 2009 till 31-05-2011
Company Name Engineering Associates
Position Resident Engineer
Project Value AED 650 million
Client Al Ain Municipality
Consultant Engineering Associates
Project Description 18.2 KM (6+6 lane) Expressway, 4 Interchanges, 3 Bridges,
Underpasses & Culverts and TRANSCO, AADC Utilities etc.
Job Responsibilities Complete site supervision of projects, coordination with utility
departments, monitoring the quality of materials and works with
the help of Govt. and approved private labs via field and
laboratory tests, supervisory work directing the city –wide storm
water system, drainage system, irrigation system, STPs, and
ground water and all water related maintenance, cleaning and of
open and piped drains ,pits ,treatment devices, detention basins
and outfall structure Experienced and identification pollutant,
inspection programe preparation, desalting &pollutant removal
operations, vegetation maintenance ,weed control etc
Project No: 2 (UAE)
Project Name P-122 – TECOM ROADS IMPROVEMENTS
Period From 16 March 2008 till 31 October 2009
Company Name PARSONS
5. Position Resident Engineer
Project Value AED 105 million
Client TECOM
Consultant PARSONS
Project Description IMPROVEMENT OF ROADS AND CONSTRUCTION OF
BRIDGE
Qatar Experience
Project No : 1
Project Name ERC0638/C2A – DUKHAN HIGHWAY–WEST CONTRACT
Period From 21 March 2006 15 March 2008
Company Name WS Atkins & Partners Overseas
Position Resident Engineer – Roads
Project Value QR 750 million
Client Public Works Authority
Consultant WS Atkins & Partners Overseas
Project Description Construction of Express Highway from Shahaniyah to
Zekreet(42KM)
Job Responsibilities Complete site supervision of projects, coordination with utility
departments, monitoring the quality of materials and works with
the help of Govt. and approved private labs via field and
laboratory tests , creating and delivery of service stations including
electric –generators- heaters – water treatment units and the work
of sanitation and fuel drainage system, administrative housing and
attachments. Make septic water treatment tanks
Project No. 2
6. Project Name ERC 0659/C2 Road Improvement Works in Central Rayyan.
Cost. Qrs. 24 Million.
Period From 3rd January 2005 to 20 March 2006
Position Resident Engineer withCONSER Consultant Engineers,
Doha - Qatar
Project No. 3
Project Name ERC 0684/C3 – Link Road Between Central Market R/A to
Al Waab Road
Period From 2nd November 2003 up to 30th December 2004
Position Resident Engineer withArabian Engineers Consultant,
Doha- Qatar
Project No. 4
Project Name ERC 0387 & 0388 Road Improvement works Zone 3 to 39.
Period From September 2001 to November 2003
Company Name Arabian Engineers Consultants, Doha Qatar
Position Resident Engineer (for both projects 1 & 2)
Project Value ERC 0387/C1 = 10.488 Million QR.
Client Roads Departments, MMAA, Qatar
7. Project Description Construction of Carriageways, Roundabouts, Parking bays
Footways, Installation of Soakaaway and Gullies, Laying
different services ducts such as Electricity, Water, Street
lights, Q-Tel etc.
Job Responsibilities Complete site supervision of projects, coordination with utility
departments, monitoring the quality of materials and works with
the help of Govt. and approved private labs via field and
laboratory tests.
U.A.E. Experience (FROM 1994 UP TO 2001)
Project No. 1
Project name Construction, maintenance, Rehabilitation of Roads / Bridges
Period From Oct. 2000 to Sept. 2001
Company Name ADMAK General Contracting Co.
Position Site Manager
Project Value 70 Million Dh.
Client Abu Dhabi Municipality
Consultant Conceco & DCIL
Project Description Maintenance of Interlock, Asphalt, Rip-rap and utilities, repair of
damaged joints of bridge slabs and car & camel under passes,
repair of road and sign boards.
Job Responsibilities Supervision of all road works. Barrier. Rip-rap and utilities.
Coordination with different utilities departments.
Quality control for all the works.
Project No. 2
Project Name Internal Roads and Service (Al Heelia)
Period From Oct. 1999 to Oct. 2000
Company Name ADMAK General Contracting Co.
8. Position Site Manager
Project Value 67 Million Dh.
Client Public Works Department, Abu Dhabi.
Consultant ITAL CONSULT
Project Duration 15 months
Project Description Unclassified excavation and embankment, sub grade, sub base and
Asphalt, sewerage & drainage works and services.
Job Responsibilities Responsible for construction of carriageway and various utility works,
associated utility works, coordination with above utility departments,
monitoring the quality of materials and works
Project No. 3
Project Name Upgrading and reconstructionof Abu Dhabi – Al Ain Road to
International Expressway, contract No. 4
Period From 8th 19978 to Oct. 1999
Company Name ADMAK General Contracting Co.
Position Site Manager
Project Value 269 Million Dhs.
Client Public works Department, Abu Dhabi.
Consultant ITAL CONSULT
Project Duration 22 months
Project Description Project includes 22km Main Carriageway, 30km service road,
Camel underpasses, Interchange and Pedestrian underpasses.
Job Responsibilities In charge of road construction, improvements, barrier, rip-raps and
utilities. Coordination with Engineers of utility Dept.
Project No. 4
Project Name Construction of Asphalt Roads & Parking for Al Sheikh Places
Period From July 1998 to Oct. 1998
9. Company Name Arab Office for Planning & Architecture Consulting
(Dr. A.Makhluf)
Position Resident Engineer
Project Value 11 Million Dhs.
Client Al Ain Municipality
Project Description Construction of Asphalt roads, Parking Interlocking tiles, Kerbstones,
future service ducts, civil works for electricityworks, road markings,
signboards & surface water drainage.
Job Responsibilities Supervision of road construction & improvement of utility works
Coordination with Municipality Engineer & various Dept.
Project No. 5
Project Name Construction of Asphalt Roads & Parking at Mosque in Al Ain
Period From July 1996 to July 1998
Company Name MISR Consulting Engineers
Position Resident Engineer
Project Value 22 Million Dhs.
Client Al Ain Municipality
Project Description Construction of road works, include unclassified Excavation and
embankment, sub grade, sub base, kerbstone and interlock tiles, future
service ducts and water and drainage services.
Job Responsibilities Supervision of all the construction and asphalt works liaising and
coordinate with various Dept. Engineers & Quality Control
Project No. 6
Project Name Construction of Different Villas and School in Al Ain and Abu
Dhabi.
Period From June 1994 to July 1996
Company Name Engineering Enterprises Establishment
Position Technical Manager
Project Value 80 Million Dhs.
Client Public Works Department, Al Ain.
Project Description Construction of all items such as footings, columns, RCC slabs
and finishing besides civil works for fence, Split air slabs and
finishing besides civil works for fence, split air conditions,
Elevators, Asphalt parking and interlock.
Job Responsibilities Supervision of all sub contractors, submittal for materials,
preparing running and final payments and Quality control for all
10. Saudi Arabia Experience
Project No. 1
Project Name Improvement of ARAR-AL WAKELA Expressway
Period 1990 –1993
Company Name Arabian Roads Establishment
Position Project Manager
Project Value 30 Million Saudi Riyals.
Client Ministry of Communications
Project Description Earthwork, asphalt, road marking, road sign, box/pipe culverts,
guardrail, slope protection, road furniture, rip-rap & barrier.
Job Responsibilities Supervision of all road works, improvements, management of
work for barrier, riprap, utility and coordination with client's
engineer, preparing progress program & quality control.
Project No. 2
Project Name 4th Stage of Sakaka City, Saudi Arabia.
Period 1988 –1990
Company Name Arabian Roads Establishment
Position Project Manager
Project Value 25 Million Saudi Riyals.
Client Sakaka Municipality
Project Description Earthwork, asphalt, tiles, box & pipe culverts, sewerage and
drainage construction.
Job Responsibilities Quality control and management of all works preparing
monthly valuation and program.
Project No. 3
Project Name 1st Stage of Domet Al Gandal City, Saudi Arabia.
Period 1985–1988
Company Name Arabian Roads Establishment
Position Project Engineer
11. Project Value 35 Million Saudi Riyals.
Client Domet Al Gandal Municipality
Project Description Earthwork, asphalt, road marking, road sign, box/pipe culverts,
guard Rail, road furniture, riprap, barrier and street light
works.
Job Responsibilities Supervision of all road works & improvements, management
of work of barrier, rip-rap and utility.
Project No. 4
Project Name Temporary Road works for Kara Road City, Saudi Arabia
Period 1983–1985
Company Name Arabian Roads Establishment
Position Site Engineer
Project Value 15 Million Saudi Riyals.
Client Sakaka Municipality
Project Duration 2 Years
Project Description Earthwork, asphalt, road signs, road marking sewerage and
drainage works.
Job Responsibilities Responsible for construction of earth works and asphalt.
Follow-up of test results.
Dealing with various sub contractors.
Checking all the survey works.
Egypt Experience
Project Name Construction of Temporary Road works in
AL Wafaa WL AL Amal Town.
Period 1980–1983
Company Name Arab Contractors Company
Position Site Engineer
Project Value 5 Million L.E.
Client Arab Consultant Engineers (ACE) Firm
Project Duration 3 Years
Project Description Earthwork, asphalt, road marking, road signs, box & pipe
12. culverts, guardrail, road furniture, rip-rap, barrier and street
light works.
Job Responsibilities Supervision of all works & improvements, Management of
works of barrier, riprap and utility.