SlideShare a Scribd company logo
1 of 7
MARKFEL S. LAMBAN
La Hacienda, Alicia, Bohol, Philippines
Contact nos. : +639276424196 (Phil.)
+96898587454 (S. of Oman)
+96893271687 (S. of Oman)
+96896259038 (S. of Oman)
E – Mail address: marklamban@yahoo.com
markfellamban6380@gmail.com
Position Desired: CIVIL ENGINEER
SUMMARIZED PROFESSIONAL EXPERIENCED:
A registered Civil Engineer from the Philippines, over 12 years of working experience in the Philippines, United Arab Emirates and
Sultanate of Oman handling different positions such as Civil Engineer, Site Inspector, Office Engineer. Possess strong analytical and
problem solving skills with the ability of thought out decisions, resourceful and effective at multitasking during tenure.
WORK EXPERIENCE:
April 2015– Present RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN
CONSULTING ENGINEERS - BONIFICA GROUP
Construction and Improvement of the Water Distribution Networks of the Towns of Daba, Lima and Ar Rawdah in Musandam
Governorate
Project Cost = 7.5 Million Omani Riyal (19.5 million USD)
CONTRACTOR : TARGET L.L.C. OMAN
DESIGNER : RENARDET S.A. & PARTNERS
October 2014– April 2015 RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN
CONSULTING ENGINEERS - BONIFICA GROUP
Dualization of Bid Bid – Sur Road Project, Section 2 – Part 1 in Ash Sharqiyah Region
Project Cost = 100 Million Omani Riyal (259 million USD)
CONTRACTOR : LARSEN & TOUBRO (OMAN) L.L.C.
DESIGNER : COWI & PARTNERS L.L.C.
September 2013 – October 2014 RENARDET S.A. & PARTNERS Muscat, Sultanate of
OMAN
CONSULTING ENGINEERS - BONIFICA GROUP
Construction of Storm Water Drainage Channels in Hamriyah, Phase 1
Project Cost = 5 Million Omani Riyal (13 Million USD)
CONTRACTOR : HASSAN JUMA BACKER CONSTRUCTION COMPANY
DESIGNER : PARSONS INTERNATIONAL
June 2010 – September 2013 RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN
CONSULTING ENGINEERS - BONIFICA GROUP
Construction of HASIK – ASH SHUWAYMIYAH ASPHALT ROAD PROJECT (100 kms.) Dhofar Region
Project cost = 108 Million Omani Riyal R.O. (280 million USD)
CONTRACTOR : GALFAR ENGINEERING AND CONSTRUCTION COMPANY S.A.O.G.
DESIGNER : RENARDET S.A. & PARTNERS
Position: Civil Engineer/Site Inspector
- Review of Inspectors daily reports.
- Preparation of engineer’s daily diary.
- General oversight of inspector’s daily activities including work assignments, on-site performance, and
guidance on the supervision of the contractor’s operations.
- Review of the contractor’s joint measurement, testing requests and subsequent completed reports.
- Monitoring the performance of the survey party.
- Coordination of the contractor’s supervisory personnel regarding schedule, sequence and method of works.
- Continuous field inspection of the work in progress.
- Preparation of written and oral reports to the Resident Engineer on contractual and procedural matters.
- In-charge for the monthly accomplishment report which to be submit to the client.
- Review & approved the shop drawings to be implemented for construction.
- Review & certified the back-up claimed quantities for the Interim Payment Certificate (IPC) of contractor.
- Review and approved as-built drawings in coordination with inspectors and surveyors.
- In-charge for the inspection of multi-span bridges, multi-cell reinforced concrete box culvert & open drain
structures.
- In-charge for the inspection of reinforcing bars of bridges, box culverts & open drain structures.
- In-charge for the inspection of formworks & shuttering of Bridges, box culverts & open drain structures.
- In-charge for the inspection of concreting works of bridges, box culverts & open drain structures.
- In-charge for the inspection of stressing of tendons in all girders of bridges.
- In-charge for the inspection of grouting works after stressing of tendons in girders.
- In-charge for the inspection of retaining walls which includes Tensar MSE Wall using modular blocks & geo-
grid reinforcement and reinforced concrete retaining wall structures.
- In-charge for the inspection of earthworks (rockfilling, embankment filling, sub-grade filling, sub-base filling &
aggregate base course filling layer by layer.
- In-charge for the inspection of excavation & cutting works.
- In-charge for the inspection of asphalting works (bituminous base course & wearing course).
- In-charge for the inspection of slope protection works which includes shotcreting with wire mesh
reinforcement, rock fall barriers, simple & reinforced wire mesh for slope protection of benches, mortared &
loose rip-rap for culverts & bridges slope protection works.
- In-charge for the inspection of pipeline works which includes transmission lines and distribution lines,
construction of ground tank elevated reservoir and pumping station for the Water Distribution Network
Project.
- In-charge for the inspection of initial and final Hydro Pressure Testing of HDPE and D.I. pipelines in Water
Distribution Network Project.
June 2007 – January 2010 JTMJV ( Japan – Turkey Metro Joint Venture ) Deira, Dubai, U. A. E.
DURL ( Dubai Rapid Link Consortium )
Construction of Dubai Metro Project
Redline & Greenline Contract
Project cost = 20 Billion AED
MAIN CONTRACTOR : JTMJV
SUB-CONTRACTOR : VFR ( VSL-FRESINNET-RIZANNI ) JOINT VENTURE
CONSULTANT : SYSTRA-PARSON JOINT VENTURE
DESIGNER : ATKINS
Position: Civil Engineer (VIADUCT SUPERSTRUCTURE)
- Direct supervision at pre-casting yard for segmental girder production of balanced cantilever bridge using 3
different types of mould as a main contractor.
- Coordinate both subcontractors and consultants all the works with accordance to specifications and approved
method of statement of the project.
- Do the internal inspection for the rebar cage at the jig before shifting to the mould.
- Checked the dimension of the mould in preparation prior to casting.
- Checked the reinforcing bars, embedded items (PT system, Casting Anchor Heads & Inserts), formworks &
shuttering prior to casting of segmental viaduct bridge.
- Counter check the design elevation and horizontal profile of the segment in the mould prior to final
fixing/tightening of moulds.
- Checked the pre-stressing duct alignment before and after casting.
- Monitor the concreting works of pre-cast viaduct segments.
- Monitor the stripping strength and lifting strength of the casted segmental viaduct bridge.
- Ensure a good quality of the viaduct segments prior to delivery to site for erection.
- In-charge and controlling the type of bearings to be used for the erection of segmental bridge.
- In-charge for the remedial works of pre-cast segmental viaduct.
- In-charge for the repair of Pre-Stressing cables of Viaduct segmental bridge.
- In-charge for the Restoration works of Frisseynol Retaining wall (MSE WALL) for the Interchange Bridges.
- In-charge for the Restoration of Landscaping & Softscafing works for the Interchange Bridges.
- Over all in-charge for the miscellaneous works & restoration works.
- In-charge for the crack monitoring of viaduct segments & piers during & after the Pile Load Test of pier.
August 2004 – May 2007 Hanjin Heavy Industries & Construction Co., Ltd. Ubay, Bohol, Philippines
Bohol Irrigation Project Phase II, Irrigation Component
Construction of Irrigation Canals and Appurtenant Structures (BHIP 2-C-2)
Project Cost = Php 2.384 Billion
Position: Office/Site Engineer
- Prepares design & shop drawings on structures necessary for dam & its canals.
- Prepares cross sections, plan and profile drawings for dams & canals.
- Prepares detailed drawings, and methodology for actual implementation.
- Prepares detailed design for bar bending and quantifies reinforcement necessary for structures.
- Prepares detailed estimates and quantities in support for billing and material procurements.
- Supervise at one lead man and sixty manpower for manual works.
- Supervise for earthworks as earth dam in Bayongan Dam.
- Supervise for structure works such as road crossing, cart crossing and torn-out.
- Checking and testing of freshly mixed concrete whether it conform to the specification.
- Dispatch of heavy equipment for the daily schedule activity of works.
- Estimates in actual and theoretical concrete and materials used.
- Supervise for Canal Lining and Masonry Riprap.
- Supervise for Waterway and Gabions at Diversion Canal.
- Supervise for Leveling for rice field with heavy equipment.
- Prepare of daily accomplishment report and week accomplishment.
- Prepare of schedule of works and timeline.
October 2003 – August 2004 DN Steel Marketing Incorporated Cebu City, Philippines
Roofing (Color roof, Tile roof)
Ceiling (Acoustic, Fashion toll, Laminated Gypsum Board)
Cladding (Aluminum Composite Panel)
Position: Office Engineer
- Prepares shop drawing for Roofing, Ceiling and Cladding.
- Prepares detailed drawings, methodology for implementations.
- Prepares detailed Quotations for costumers
February 2003 – July 2003 SCP Construction Tagbilaran City, Bohol, Philippines
Asphalt Overlay Component
Loay – Loboc – Bilar – Batuan – Carmen Mun. road (67 Kms.)
Province of Bohol, Philippines
Position: Office Engineer
- Prepares cross sections, plan and profile drawings for road.
- Prepares detailed estimates and quantities in support for billing and material procurement.
April 2002 – June 2002 Municipality of Corella Corella, Bohol, Philippines
Office of the Municipal Engineer
Local Municipal Engieering Project
Construction of Municipal Public Market Block – Tienda Building
Position: Field Engineer
- Supervise the Construction of Local Public Market Block – Tienda Building.
- Prepares daily accomplishment report.
TRAINING EXPERIENCES:
February 2009 Construction Railway Operation (CRO) – Personal Safety Induction
Dubai Rapid Link Consortium (DURL)
Dubai, UAE
March 2008 Testing & Commissioning, Operation & Maintenance Procedure (TCOMP LEVEL 3)
Mitsubishi Heavy Industries & Construction Co., Ltd
Dubai, UAE
June 2007 Safety Induction Course
Dubai Rapid Link Consortium (DURL)
Dubai, UAE
December 2002 – February 2003 Department of Public Works and Highways ( DPWH )
Materials Quality Control Section ( MQC )
Tagbilaran City, Bohol, Philippines
COMPUTER FLEXIBILITY:
Microsoft Windows application
AutoCad
Microsoft Word
Microsoft Excel
Power Point
Adobe Photoshop
PROFFESIONAL ATTAINMENT:
Licensure Examination for Civil Engineer Remark: Passed November 2002
Professional Regulation Commission (PRC)
PRC Region 7, Cebu City, Philippines
Registration no. 0095464
Licensure Examination for Driving Remark: Passed September 2015
Royal Oman Police (ROP)
Sultanate of Oman
License No. 83338209
PROFFESIONAL GROUP MEMBER:
Philippines Institute of Civil Engineers (PICE) Remark: Regular Member October, 2011
Sultanate of Oman Chapter
I.D. 062
EDUCATIONAL ATTAINMENT:
Bachelor of Science in Civil Engineering Remark: Graduated March 2002
Holy Name University
Tagbilaran City, Bohol, Philippines
Secondary Education Remark: Graduated March 1997
Corella National High School
Corella, Bohol, Philippines
Elementary Education Remark: Graduated March 1993
Corella Central Elementary School
Corella, Bohol, Philippines
PERSONAL INFORMATION:
Date of Birth : March 6, 1980
Place of Birth : Corella, Bohol, Philippines
Age : 35
Status : Married
Weight : 70 Kgs.
Height : 5’ 5”
Health : Excellent
REFERENCES:
Mr. Lorenzo Nicolai
Regional Manager (GCC)
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
Mr. Roberto Benigni
Operation Manager (Head of Supervision)
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
Mr. Roberto Maputi
Resident Engineer
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
Mr. Exequiel Madrinan
Resident Engineer
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
I hereby acknowledge that the above given information is true to the best of my knowledge and belief.
Markfel S. Lamban
Applicant
Mr. Roberto Benigni
Operation Manager (Head of Supervision)
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
Mr. Roberto Maputi
Resident Engineer
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
Mr. Exequiel Madrinan
Resident Engineer
RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS
BONIFICA GROUP
Muscat, Sultanate of Oman
I hereby acknowledge that the above given information is true to the best of my knowledge and belief.
Markfel S. Lamban
Applicant

More Related Content

What's hot

JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016Juan Carlos Bagnod
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume robbert1806
 
CV Structral Cad Designer_Sree Kumar
CV Structral Cad Designer_Sree KumarCV Structral Cad Designer_Sree Kumar
CV Structral Cad Designer_Sree KumarSreekumar Gopalan
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016brian brophy
 
Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)Ken Pelletier
 
Rashid mehmood up dated cv november 2016
Rashid mehmood up dated cv november 2016Rashid mehmood up dated cv november 2016
Rashid mehmood up dated cv november 2016rashid mehmood
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16wasim nasir
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)James Herrmann
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)Bashir Chakar
 

What's hot (20)

resume frfcf murgi
resume frfcf murgiresume frfcf murgi
resume frfcf murgi
 
JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016JCBagnodResumeEnglish March 2016
JCBagnodResumeEnglish March 2016
 
cv nour
cv nourcv nour
cv nour
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
VCS Resume_May 2015
VCS Resume_May 2015VCS Resume_May 2015
VCS Resume_May 2015
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
UPDATED RESUME
UPDATED RESUMEUPDATED RESUME
UPDATED RESUME
 
CV Structral Cad Designer_Sree Kumar
CV Structral Cad Designer_Sree KumarCV Structral Cad Designer_Sree Kumar
CV Structral Cad Designer_Sree Kumar
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
 
JAGMOC RESUME
JAGMOC RESUMEJAGMOC RESUME
JAGMOC RESUME
 
Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)Resume - Ken Pelletier - 2015-10-10 (1)
Resume - Ken Pelletier - 2015-10-10 (1)
 
Rashid mehmood up dated cv november 2016
Rashid mehmood up dated cv november 2016Rashid mehmood up dated cv november 2016
Rashid mehmood up dated cv november 2016
 
updated generally 04apr16
updated generally 04apr16updated generally 04apr16
updated generally 04apr16
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
CM Resume
CM Resume CM Resume
CM Resume
 
Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015Mahmoud Al Khouli_CV2015
Mahmoud Al Khouli_CV2015
 
BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)BACHIR CHAKAR CV (7-4-2015)
BACHIR CHAKAR CV (7-4-2015)
 
CV 2015 Christo Van Jaarsveld
CV 2015 Christo Van JaarsveldCV 2015 Christo Van Jaarsveld
CV 2015 Christo Van Jaarsveld
 
CV_MPS_Elango_Vadiveloo
CV_MPS_Elango_VadivelooCV_MPS_Elango_Vadiveloo
CV_MPS_Elango_Vadiveloo
 

Viewers also liked (18)

S.Shrikanth - CV
S.Shrikanth - CVS.Shrikanth - CV
S.Shrikanth - CV
 
Hisham Resume ( CV )
Hisham Resume ( CV )Hisham Resume ( CV )
Hisham Resume ( CV )
 
Karim Mohsen Resume's (1)
Karim Mohsen Resume's (1)Karim Mohsen Resume's (1)
Karim Mohsen Resume's (1)
 
New Doc_1
New Doc_1New Doc_1
New Doc_1
 
MUHAMMAD CV-1
MUHAMMAD CV-1MUHAMMAD CV-1
MUHAMMAD CV-1
 
Irfan Ashraf CV
Irfan Ashraf CVIrfan Ashraf CV
Irfan Ashraf CV
 
RESUME .ENGLISH 2525
RESUME .ENGLISH 2525RESUME .ENGLISH 2525
RESUME .ENGLISH 2525
 
GRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CVGRANT GREEN OFFSHORE CV
GRANT GREEN OFFSHORE CV
 
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
CV KONAIN ALAM ANSARI (Rigging Supervisor) 2015
 
Shabeeb rigging supervisor c.v.
Shabeeb  rigging supervisor c.v.Shabeeb  rigging supervisor c.v.
Shabeeb rigging supervisor c.v.
 
Yousef Abu Alwafa Resume
Yousef Abu Alwafa ResumeYousef Abu Alwafa Resume
Yousef Abu Alwafa Resume
 
Rigging supervisor / Rigging and Lifting Trainer
Rigging supervisor / Rigging and Lifting TrainerRigging supervisor / Rigging and Lifting Trainer
Rigging supervisor / Rigging and Lifting Trainer
 
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
\\Coe Ori R01\Users$\Ori Www\My Documents\Ratheesh Cv
 
CV Shahzad Ahmed
CV Shahzad AhmedCV Shahzad Ahmed
CV Shahzad Ahmed
 
Experience Certificate Atif (By PM).PDF
Experience Certificate Atif (By PM).PDFExperience Certificate Atif (By PM).PDF
Experience Certificate Atif (By PM).PDF
 
Allan Dick - rigging foreman
Allan Dick - rigging foremanAllan Dick - rigging foreman
Allan Dick - rigging foreman
 
Bader CV
Bader CVBader CV
Bader CV
 
My Resume
My ResumeMy Resume
My Resume
 

Similar to Civil Engineer Mark Lamban resume

Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)atiq amin
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumarrakesh kumar
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-NewManish Sabane
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -linkTahrer Abu Yousef
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Naveed Gohar
 

Similar to Civil Engineer Mark Lamban resume (20)

hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
M.s. resume 290817
M.s. resume 290817M.s. resume 290817
M.s. resume 290817
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
M.s. resume 150316
M.s. resume 150316M.s. resume 150316
M.s. resume 150316
 
Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)Atiq Amin C.V civil inspector (2)
Atiq Amin C.V civil inspector (2)
 
final resume Rakesh kumar
final resume Rakesh kumarfinal resume Rakesh kumar
final resume Rakesh kumar
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
CV (2)
CV (2)CV (2)
CV (2)
 

Civil Engineer Mark Lamban resume

  • 1. MARKFEL S. LAMBAN La Hacienda, Alicia, Bohol, Philippines Contact nos. : +639276424196 (Phil.) +96898587454 (S. of Oman) +96893271687 (S. of Oman) +96896259038 (S. of Oman) E – Mail address: marklamban@yahoo.com markfellamban6380@gmail.com Position Desired: CIVIL ENGINEER SUMMARIZED PROFESSIONAL EXPERIENCED: A registered Civil Engineer from the Philippines, over 12 years of working experience in the Philippines, United Arab Emirates and Sultanate of Oman handling different positions such as Civil Engineer, Site Inspector, Office Engineer. Possess strong analytical and problem solving skills with the ability of thought out decisions, resourceful and effective at multitasking during tenure. WORK EXPERIENCE: April 2015– Present RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN CONSULTING ENGINEERS - BONIFICA GROUP Construction and Improvement of the Water Distribution Networks of the Towns of Daba, Lima and Ar Rawdah in Musandam Governorate Project Cost = 7.5 Million Omani Riyal (19.5 million USD) CONTRACTOR : TARGET L.L.C. OMAN DESIGNER : RENARDET S.A. & PARTNERS October 2014– April 2015 RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN CONSULTING ENGINEERS - BONIFICA GROUP Dualization of Bid Bid – Sur Road Project, Section 2 – Part 1 in Ash Sharqiyah Region Project Cost = 100 Million Omani Riyal (259 million USD) CONTRACTOR : LARSEN & TOUBRO (OMAN) L.L.C. DESIGNER : COWI & PARTNERS L.L.C. September 2013 – October 2014 RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN CONSULTING ENGINEERS - BONIFICA GROUP Construction of Storm Water Drainage Channels in Hamriyah, Phase 1 Project Cost = 5 Million Omani Riyal (13 Million USD)
  • 2. CONTRACTOR : HASSAN JUMA BACKER CONSTRUCTION COMPANY DESIGNER : PARSONS INTERNATIONAL June 2010 – September 2013 RENARDET S.A. & PARTNERS Muscat, Sultanate of OMAN CONSULTING ENGINEERS - BONIFICA GROUP Construction of HASIK – ASH SHUWAYMIYAH ASPHALT ROAD PROJECT (100 kms.) Dhofar Region Project cost = 108 Million Omani Riyal R.O. (280 million USD) CONTRACTOR : GALFAR ENGINEERING AND CONSTRUCTION COMPANY S.A.O.G. DESIGNER : RENARDET S.A. & PARTNERS Position: Civil Engineer/Site Inspector - Review of Inspectors daily reports. - Preparation of engineer’s daily diary. - General oversight of inspector’s daily activities including work assignments, on-site performance, and guidance on the supervision of the contractor’s operations. - Review of the contractor’s joint measurement, testing requests and subsequent completed reports. - Monitoring the performance of the survey party. - Coordination of the contractor’s supervisory personnel regarding schedule, sequence and method of works. - Continuous field inspection of the work in progress. - Preparation of written and oral reports to the Resident Engineer on contractual and procedural matters. - In-charge for the monthly accomplishment report which to be submit to the client. - Review & approved the shop drawings to be implemented for construction. - Review & certified the back-up claimed quantities for the Interim Payment Certificate (IPC) of contractor. - Review and approved as-built drawings in coordination with inspectors and surveyors. - In-charge for the inspection of multi-span bridges, multi-cell reinforced concrete box culvert & open drain structures. - In-charge for the inspection of reinforcing bars of bridges, box culverts & open drain structures. - In-charge for the inspection of formworks & shuttering of Bridges, box culverts & open drain structures. - In-charge for the inspection of concreting works of bridges, box culverts & open drain structures. - In-charge for the inspection of stressing of tendons in all girders of bridges. - In-charge for the inspection of grouting works after stressing of tendons in girders. - In-charge for the inspection of retaining walls which includes Tensar MSE Wall using modular blocks & geo- grid reinforcement and reinforced concrete retaining wall structures. - In-charge for the inspection of earthworks (rockfilling, embankment filling, sub-grade filling, sub-base filling & aggregate base course filling layer by layer. - In-charge for the inspection of excavation & cutting works. - In-charge for the inspection of asphalting works (bituminous base course & wearing course). - In-charge for the inspection of slope protection works which includes shotcreting with wire mesh reinforcement, rock fall barriers, simple & reinforced wire mesh for slope protection of benches, mortared & loose rip-rap for culverts & bridges slope protection works. - In-charge for the inspection of pipeline works which includes transmission lines and distribution lines, construction of ground tank elevated reservoir and pumping station for the Water Distribution Network Project. - In-charge for the inspection of initial and final Hydro Pressure Testing of HDPE and D.I. pipelines in Water Distribution Network Project. June 2007 – January 2010 JTMJV ( Japan – Turkey Metro Joint Venture ) Deira, Dubai, U. A. E. DURL ( Dubai Rapid Link Consortium ) Construction of Dubai Metro Project Redline & Greenline Contract Project cost = 20 Billion AED
  • 3. MAIN CONTRACTOR : JTMJV SUB-CONTRACTOR : VFR ( VSL-FRESINNET-RIZANNI ) JOINT VENTURE CONSULTANT : SYSTRA-PARSON JOINT VENTURE DESIGNER : ATKINS Position: Civil Engineer (VIADUCT SUPERSTRUCTURE) - Direct supervision at pre-casting yard for segmental girder production of balanced cantilever bridge using 3 different types of mould as a main contractor. - Coordinate both subcontractors and consultants all the works with accordance to specifications and approved method of statement of the project. - Do the internal inspection for the rebar cage at the jig before shifting to the mould. - Checked the dimension of the mould in preparation prior to casting. - Checked the reinforcing bars, embedded items (PT system, Casting Anchor Heads & Inserts), formworks & shuttering prior to casting of segmental viaduct bridge. - Counter check the design elevation and horizontal profile of the segment in the mould prior to final fixing/tightening of moulds. - Checked the pre-stressing duct alignment before and after casting. - Monitor the concreting works of pre-cast viaduct segments. - Monitor the stripping strength and lifting strength of the casted segmental viaduct bridge. - Ensure a good quality of the viaduct segments prior to delivery to site for erection. - In-charge and controlling the type of bearings to be used for the erection of segmental bridge. - In-charge for the remedial works of pre-cast segmental viaduct. - In-charge for the repair of Pre-Stressing cables of Viaduct segmental bridge. - In-charge for the Restoration works of Frisseynol Retaining wall (MSE WALL) for the Interchange Bridges. - In-charge for the Restoration of Landscaping & Softscafing works for the Interchange Bridges. - Over all in-charge for the miscellaneous works & restoration works. - In-charge for the crack monitoring of viaduct segments & piers during & after the Pile Load Test of pier. August 2004 – May 2007 Hanjin Heavy Industries & Construction Co., Ltd. Ubay, Bohol, Philippines Bohol Irrigation Project Phase II, Irrigation Component Construction of Irrigation Canals and Appurtenant Structures (BHIP 2-C-2) Project Cost = Php 2.384 Billion Position: Office/Site Engineer - Prepares design & shop drawings on structures necessary for dam & its canals. - Prepares cross sections, plan and profile drawings for dams & canals. - Prepares detailed drawings, and methodology for actual implementation. - Prepares detailed design for bar bending and quantifies reinforcement necessary for structures. - Prepares detailed estimates and quantities in support for billing and material procurements. - Supervise at one lead man and sixty manpower for manual works. - Supervise for earthworks as earth dam in Bayongan Dam. - Supervise for structure works such as road crossing, cart crossing and torn-out. - Checking and testing of freshly mixed concrete whether it conform to the specification. - Dispatch of heavy equipment for the daily schedule activity of works. - Estimates in actual and theoretical concrete and materials used. - Supervise for Canal Lining and Masonry Riprap. - Supervise for Waterway and Gabions at Diversion Canal. - Supervise for Leveling for rice field with heavy equipment. - Prepare of daily accomplishment report and week accomplishment. - Prepare of schedule of works and timeline. October 2003 – August 2004 DN Steel Marketing Incorporated Cebu City, Philippines Roofing (Color roof, Tile roof) Ceiling (Acoustic, Fashion toll, Laminated Gypsum Board) Cladding (Aluminum Composite Panel)
  • 4. Position: Office Engineer - Prepares shop drawing for Roofing, Ceiling and Cladding. - Prepares detailed drawings, methodology for implementations. - Prepares detailed Quotations for costumers February 2003 – July 2003 SCP Construction Tagbilaran City, Bohol, Philippines Asphalt Overlay Component Loay – Loboc – Bilar – Batuan – Carmen Mun. road (67 Kms.) Province of Bohol, Philippines Position: Office Engineer - Prepares cross sections, plan and profile drawings for road. - Prepares detailed estimates and quantities in support for billing and material procurement. April 2002 – June 2002 Municipality of Corella Corella, Bohol, Philippines Office of the Municipal Engineer Local Municipal Engieering Project Construction of Municipal Public Market Block – Tienda Building Position: Field Engineer - Supervise the Construction of Local Public Market Block – Tienda Building. - Prepares daily accomplishment report. TRAINING EXPERIENCES: February 2009 Construction Railway Operation (CRO) – Personal Safety Induction Dubai Rapid Link Consortium (DURL) Dubai, UAE March 2008 Testing & Commissioning, Operation & Maintenance Procedure (TCOMP LEVEL 3) Mitsubishi Heavy Industries & Construction Co., Ltd Dubai, UAE June 2007 Safety Induction Course Dubai Rapid Link Consortium (DURL) Dubai, UAE December 2002 – February 2003 Department of Public Works and Highways ( DPWH ) Materials Quality Control Section ( MQC ) Tagbilaran City, Bohol, Philippines COMPUTER FLEXIBILITY: Microsoft Windows application AutoCad Microsoft Word Microsoft Excel Power Point Adobe Photoshop
  • 5. PROFFESIONAL ATTAINMENT: Licensure Examination for Civil Engineer Remark: Passed November 2002 Professional Regulation Commission (PRC) PRC Region 7, Cebu City, Philippines Registration no. 0095464 Licensure Examination for Driving Remark: Passed September 2015 Royal Oman Police (ROP) Sultanate of Oman License No. 83338209 PROFFESIONAL GROUP MEMBER: Philippines Institute of Civil Engineers (PICE) Remark: Regular Member October, 2011 Sultanate of Oman Chapter I.D. 062 EDUCATIONAL ATTAINMENT: Bachelor of Science in Civil Engineering Remark: Graduated March 2002 Holy Name University Tagbilaran City, Bohol, Philippines Secondary Education Remark: Graduated March 1997 Corella National High School Corella, Bohol, Philippines Elementary Education Remark: Graduated March 1993 Corella Central Elementary School Corella, Bohol, Philippines PERSONAL INFORMATION: Date of Birth : March 6, 1980 Place of Birth : Corella, Bohol, Philippines Age : 35 Status : Married Weight : 70 Kgs. Height : 5’ 5” Health : Excellent REFERENCES: Mr. Lorenzo Nicolai Regional Manager (GCC) RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman
  • 6. Mr. Roberto Benigni Operation Manager (Head of Supervision) RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman Mr. Roberto Maputi Resident Engineer RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman Mr. Exequiel Madrinan Resident Engineer RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman I hereby acknowledge that the above given information is true to the best of my knowledge and belief. Markfel S. Lamban Applicant
  • 7. Mr. Roberto Benigni Operation Manager (Head of Supervision) RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman Mr. Roberto Maputi Resident Engineer RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman Mr. Exequiel Madrinan Resident Engineer RENARDET S.A. & PARTNERS – CONSULTING ENGINEERS BONIFICA GROUP Muscat, Sultanate of Oman I hereby acknowledge that the above given information is true to the best of my knowledge and belief. Markfel S. Lamban Applicant