1. PROFESSIONAL RESUME
Rev. Date Checked Approved “Confidentiality Class A – Property of Technip. VST0063
01/08/12 Unauthorized copying and disclosure are strictly prohibited.”
NAME : DUONG QUOC HUAN
NATIONALITY : Vietnamese
YEAR OF BIRTH : 1988
TERTIARY
EDUCATION
: National University of Civil Engineering
/ Institute of Construction for Offshore Engineering,
Year of graduate 2011
CAREER SUMMARY
I have been working at Technip since August 2010, in structural engineering for offshore oil and gas industry
carrying out various projects and task from feasibility study, concept selection, FEED, detailed design both
greenfield and brownfield.
Independently able to perform design of deep water fixed offshore platform (jacket and topsides) both in-service
analyses such as: In-place, dynamic, deterministic and spectral fatigue, load-out, lifting, transportation, on-bottom
stability, pile drivability analysis, develops miscellaneous calculation, MTO, WCR, drawing and vendor data review
and check by SACS, SESAM, GRLWEAP and USFOS.
I was seconding to Technip France - Abu Dhabi (UAE) since November 2014 to do vendor data review and check,
secondary design, and in 2012, I was seconded to Technip Malaysia two times, joined Ichthys FPSO project to do
in-place and lifting analysis for module 08B (misc process module) using SACS program.
After almost 5 years working at Technip, I looking for new challenging and make more experience for my career.
EMPLOYMENT SUMMARY
Period Company Name Position Held
11/2014 – present Technip France - Abu Dhabi Offshore Structural Engineer
08/2010 – 10/2014 Technip Vietnam Offshore Structural Engineer
2. DUONG QUOC HUAN
Page 2 of 6
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
WORKING EXPERIENCE
11/2014
–
Present
Client : Abu Dhabi Marine Operating Company (ADMA-OPCO)
Project title : Um Lulu project
Project size : 8 Platform, bridges and intermediate support structures
Project position : Offshore Structural Engineer
Project brief
description
:
EPC work for Umm Lulu phase II full field development project package
2 – Umm lulu super complex and subsea composite power cables.
Job description :
- Perform to do Topsides Secondary design for Gas Treatment Platform
(Like Equipment support, bridge crane, access platform...)
- Perform to do Vendor Data review
3/2014 –
10/2014
Client : Total E&P Borneo B.V
Project title : Maharaja Lela South Project
Project size : One Topsides of Wellhead Platform
Project position : Offshore Structural Engineer and Coordinator
Project brief
description
:
Green Field: Detail Design services for one (01) unmanned WHP
(topsides) for Maharaja Lela Jamalulalam (MLJ) Field with 63m water
depth and 12 wells
Job description :
- Perform to do Topsides Inplace Analysis
- Perform to do Topsides Lifting Analysis
- Perform to do Miscellaneous Report (Monorail, Foldable connection Calculation)
- Perform to check drawing
-
Perform to coordinator with another Dipcipline about Weight, Vendor data, Equipment
layout
1/2014 –
3/2014
Client : PETRONAS Carigali Sdn. Bhd.
Project title : Front End Engineering Design (FEED) For Sepat Gas Development
Project size : Two (02) Wellhead Platform
Project position : Offshore Structural Engineer
Project brief
description
:
Green Field: FEED services for two (02) WHP (topsides and
substructure) for Sepat Gas Development Project with 64m water
depth.
Job description :
- Perform to help to do Boat Impact analysis using USFOS
- Perform to check drawing and model in SACS
- Perform non steel MTO
5/2013 –
1/2014
Client : Cuu Long Joint Operating Company
Project title :
Su Tu Nau Field Development Provision Detailed Engineering Design
and Procurement Support
Project size : Two (02) Wellhead Platform and Re-Assessment 2 Wellhead Platform
Project position : Offshore Structural Engineer and Coordinator
3. DUONG QUOC HUAN
Page 3 of 6
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
Project brief
description
:
Green Field: Detail Design services for two (02) unmanned WHP
(topsides) for Su Tu Nau Field with 60m water depth and re-
assessment 2 wellhead platform when put new riser
Job description :
- Perform to deverlop model Topsides Su Tu Nau - South Wellhead Platform
-
Perform to check drawing and make it corresponding with analysis for Topsides Su
Tu Nau - South Wellhead Platform
- Perform In-place Analysis for Topsides Su Tu Nau South Wellhead Platform
- Perform Lifting Analysis for Topsides Su Tu Nau North Wellhead Platform
-
Perform In-place, Load-out, Lifting, Up-Ending, Fatigue Analysis for Flare Boom Su Tu
Nau South Wellhead Platform
-
Perform to Miscellaneous Report (Ring Connection, Joint Stiffener calculation,
Equipment Support)
- Perform to review and check vendor data for Equipment
10/2012
– 5/2013
Client : PETRONAS Carigali Sdn. Bhd.
Project title : Provision of FEED and EPCIC for SK316 Gas Development Project
Project size : Design two Wellhead Platforms
Project position : Offshore Structural Engineer and Coordinator
Project brief
description
:
Green Field: FEED services for two WHP (topsides and substructure)
for SK316 Gas Development Project with 64m water depth.
Job description :
-
Perform to study and deverlop model Topsides and Subtructure for NC3 Wellhead
Platform
- Perform In-place Analysis for Topsides NC3 Wellhead Platform
-
Coordinator Structural Engineer and Structural Designer to do Topsides and
Substructure NC3 Wellhead Platform
-
Perform Material Take-off Report for Topsides and Substructure NC3 Wellhead
Platform
- Perform Weight Control Report for Topsides and Subtructure NC3 Wellhead Platform
-
Coordinator Structural Engineer and Structural Designer to do Topsides and
Substructure NC3 Wellhead Platform
- Perform Material Take-off for Topsides and Substructure NC3 Wellhead Platform
- Perform to Miscellaneous Report (Ring Connection calculation only)
08/2012
–
10/2012
Client : INPEX Browse, Ltd.
Project title :
ICHTHYS Floating, Production, Storage and Offloading Unit - Detail
design
Project size : FPSO Project
Project position : Offshore Structural Engineer in Technip Malaysia
Project brief
description
:
Green Field: Ichthys FPSO is a non-propelled, ship shaped, turret
moored, Floating Production Offloading Storage Unit (FPSO). It has a
Lpp of 320m and is 58.8m across the beam and is designed for
operations offshore Western Australia at permit area WA-285-P, Ichthys
Field
Job description :
- Perform In-place Analysis for Primary beams of module 08B (Misc Process)
- Perform Lifting Analysis for Primary beams of module 08B (Misc Process)
-
Check drawing corressponding with analysis for Primary beams of module 08B (Misc
Process)
06/2012 Client : TNK VIETNAM B.V
4. DUONG QUOC HUAN
Page 4 of 6
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
–
08/2012 Project title :
Lan Tay Produced Water Handling Expansion Project – FEED and
Detailed Design
Project size :
Project position : Offshore Structural Engineer
Project brief
description
:
Brown Field: Design and Assessment of Lan Tay topsides due to the
additional loads of De-gasser vessel and a hydro-cyclone package.
Job description :
- Verify Documents received from TNK – Scope of Work and COMPANY requirements
- Perform site visit List, site visit Lan Tay platform.
-
Perform Structural Assessment of Lan Tay topside due to the additional loads of a De-
gasser vessel and a hydro-cyclone package, including Report for Company using
Sacs program and manual calculation prepared using spread sheets.
- Perform MTO report
04/2012
–
06/2012
Client : PETRONAS Carigali Overseas Sdn Bhd (PCOSB)
Project title :
Provision of conceptual and feed services for Thai Binh development
project, Block 102 & 106
Project size : One (01) Wellhead Platform
Project position : Offshore Structural Engineer
Project brief
description
:
Green Field: Conceptual and FEED Engineering services for one (01)
substructure WHP for Thai Binh project with a water depth of 25-30 m.
Job description :
- Perform Dynamic Analysis
- Perform Spectral Fatigue Analysis
- Perform Pile Drivability Analysis
- Perform Conductor Drivability Analysis
10/2011
–
04/2012
Client : Lam Son JOC
Project title : Thang Long - Dong Do Detail Design
Project size : Two (2) Wellhead Platform
Project position : Offshore Structural Engineer and Coordinator
Project brief
description
:
Green Field: Detail Engineering services for two WHP (topsides and
substructure) for Thang Long - Dong Do project with 64m water depth.
Job description :
- Review on Reports and Drawings received from FEED prepare the Report
-
Perform spreadsheets for Miscellaneous Report as Stabbing Guide, Drop Object,
Padeye, Hatch Cover, Boom Rest.
- Prepare Dong Do Substructure on-Bottom Stability Analysis
- Perform Dong Do Topsides In-place Analysis and prepare the Report.
- Perform Dong Do Topsides Lifting Analysis and prepare the Report.
- Perform Dong Do Topsides Seismic Analysis and prepare the Report.
- Perform Dong Do Topsides Miscellaneous and prepare the Report.
- Prepare Dong Do Topsides - Material Take Off Report.
02/2011
–
09/2011
Client : Vietsov Pertro
Project title : Thien Ung (TU) FDP FEED
Project size : One (1) Fixed Drilling Platform
Project position : Junior Offshore Structural Engineer
5. DUONG QUOC HUAN
Page 5 of 6
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
Project brief
description
:
Green Field: FEED Engineering services for one (01) FDP (topsides
and substructure) for Thien Ung project with 125m water depth.
Job description :
-
Perform 3D modelling of TU Fixed Drilling Platform (FDP) Topsides using Smart
Marine 3D
- Preparing and developing TU FDP Topside modelling using GENIE (SESAM)
- Perform TU FDP Topsides In- Place Analysis using GENIE (SESAM)
- Perform TU FDP FDP Topsides Load-Out Analysis using GENIE (SESAM)
- Perform TU FDP FDP Topsides Lifting Analysis using GENIE (SESAM)
-
Perform TU FDP FDP Topsides Miscellaneous Report such as Boom rest, Stringer
Beam, Plate, Drop Object, Padeye...
- Perform TU FDP Topsides Weight Control Report
- Perform TU FDP Topsides - Material Take Off Report
08/2010
–
01/2011
Name of company : Technip Vietnam Co. Ltd
Project title : Extend frame for KNOC Platform to put HP Cooler
Project size : One (1) External Deck
Project position : Internship and perform the graduation project
Project brief
description
:
Brown Field: Design the extend frame for KNOC Platform to put HP
Cooler
Job description :
- Perform In- Place Analysis using Sacs
- Perform Lifting Analysis using Sacs
- Perform Transportation Analysis using Sacs
- Site survey at fabrication yard
6. DUONG QUOC HUAN
Page 6 of 6
“Confidentiality Class A – Property of Technip. Unauthorized copying and disclosure are strictly prohibited.”
COURSE ATTENDED
03/2011 Smart Marine 3D Training Course
03/2011 Pulse For Manager & Supervisor Training Program
06/2012 Basic Offshore Safety Induction And Emergency Training
OTHERS
PROFESSIONAL
REGISTRATION
:
LANGUAGES : Written and spoken English
Written and spoken Vietnamese
EXPERIENCE IN
SOFTWARE
: SACS, SESAM, USFOS, Sap2000,GRLWEAP, AutoCAD, Smart marine 3D,
Microsoft Office Suite.
SYNOPSIS OF
PROFESSIONAL
EXPERIENCE
: With almost 5 years experience in offshore oil and gas platform projects. I
have capacity to do almost task of design for both topsides and substructure
analysis.