8. Detailed Tasks Assigned on the Project:
Preparation of bidding document, Basic Design of Structures and related works,
drawings and cost estimates.
10. Key Qualification:
Mr. Sikandar Khan has more than 45 years experience, in the field of civil engineering with
specialization in structure engineering, and management experience in hydropower project. At
present, he is Team leader/Project Manager on 40.8 MW (EPC) KOTO HPP in KPK. He has
prepared Bidding Documents, post selected Contractor, carried out technical and financial
evaluation of Bidders. He has worked, as team leader on four low head hydropower projects
(EPC) Punjab Energy Department, funded by ADB. Also, prepared Bidding Documents, post
selected Bidders, carried out technical and financial evaluation of Bidders and prepared
Contract Documents. Worked, as Chief Resident Engineer on Neelum Jhelum Hydropower
Project, where he supervised the construction of two Adits for main tunnel. He remained Advisor
to Nespak on Dams, Irrigation and Hydropower Projects. Worked as Project Manager on the
construction of Satpara Dam Project with DESCON, He has performed, as Chief Resident
Engineer on Malakand-III Hydropower Project, and Resident Engineer Pehur High Level Canal
(PHLC) Project. He possesses vast experience in the field of hydro power projects, wherein he
remained involved in the design and planning of Basha Dam and Malakand-III Hydropower
Projects. He also possesses international experience having worked with Al-Huseini ADA King
Khalid Military City Saudi Arabia, as Chief Project Engineer, and with Liechman and Lincer N.Y.
Manhattan USA on the Construction supervision of hi-rise buildings in USA.
11. Education:
 Major Courses in Structural Engineering from Polytechnic Institute Brooklyn, N.Y.
USA in 1974.
 B.E. Civil from University of Engineering & Technology, Peshawar Pakistan in 1965.
12. Employment Record:
 PERIOD : Nov 2013 to date
POSITION HELD : Team Leader / Project Manager
EMPLOYER : Electra Consultants
PROJECT : Construction Supervision of 40.8MW KOTO,
Hydropower Project KPK Energy Department
Working, as Team leader/ Project Manager hydropower projects on preparation of
bidding documents/Contract documents (EPC). Evaluations of technical and financial
Bids of EPC bidders were carried out and selected the responsive lowest bidder. Notice
to proceed was issued and the geo technical/ survey investigation work is in progress.
 PERIOD : Jan 2011 to Sep 2013
Page 1 of 5
ELECTRA CONSULTANTS
Management, Consulting Engineers, Planners and Technical Advisors Sikandar Khan
POSITION HELD : Team Leader / Project Manager
EMPLOYER : JV of HPE-Electra-TEAM and TRS Consultants
PROJECT : 5 HPP Project in Punjab
DESCRIPTION OF DUTIES :
Working as Team leader/ Project manager for five small hydropower projects on
Evaluation of technical and financial Bids of EPC bidders on the following project funded
by ADB:
 All Contact document completed except Okara
 Upper Chenab Canal , Marala HPP, 7.8MW, work in progress
 Pakpattan Canal HPP,2.82 MW, work in progress
 Deg out fall hydro power 4.04 MW, work in progress
 Okara fall of Upper Chenab Canal (Technical evaluation, financially not feasible)
 Chianwali canal HPP, 5.38 MW, work in progress
The duties as Team leader / Project Manager for implementation stage were to:
Review/approve all documents of specification, Design Criteria, Quality Assurance O&M
manual and Environmental for two project two projects completed, for deg out fall HPP
and Chianwali is in progress. Review/ Approval of Design and Constructions Drawings of
Civil and E&M of power house of two projects completed for deg out fall HPP and
Chianwali is in progress. Supervise all works according to Employer requirements and
Certification of Payment and recommendation to Client PMU Punjab Energy Department.
 PERIOD : Jan 2010 to May 2011
POSITION HELD : Project Manager
EMPLOYER : Associates in development (PVT) Ltd Consultant
(Peshawar)
DESCRIPTION OF DUTIES :
 Preparation of inception and “As Is” Report.
 Preparation of scope of work, work plan and Monitoring and Evaluation indicators.
 Preparation of templates for QA/QC and non compliance.
 Prepared formats for physical and financial progress report,
 Site visit were made to DIK for coordination meeting with FWO and NESPAK and
PA.
 Coordination meeting with Chief Secretary, DG projects. PD FATA.
 Meeting at Islamabad with FWO, NESPAK, on planning, design, mobilization and
execution of project of Dams and Irrigation System.
 PERIOD : 31st October 2009 till 31st Jan, 2010
POSITION HELD : Team Leader/Project Manger
EMPLOYER : JV of HPE-Electra-TEAM Consultants
DESCRIPTION OF DUTIES :
Worked as Team leader/ Project Manager for the following five small hydropower
projects, review of design irrigation Canals, diversion canals and related civil works,
Preparation of Contract Documents on ADB guide line.
 Deg out fall of Upper Chenab Cana HPP l
 Okara fall of Upper Chenab Canal HPP
 Chianwali of Upper Chenab Canal HPP
 Marala of Upper Chenab Canal HPP
 Pakpattan HPP
 PERIOD : Jun 2009 to Jan 2010
Page 2 of 5
ELECTRA CONSULTANTS
Management, Consulting Engineers, Planners and Technical Advisors Sikandar Khan
POSITION HELD : Chief Resident Engineer
EMPLOYER : Neelum Jehlum Consultant
Muzzafar abad
DESCRIPTION OF DUTIES :
Supervision and design (NATAM) of three Adits of 6 km length of tunnels Construction
with NJC ( Neelum Jehlum Consultant)As CRE has supervised staff for Tunnel
Construction of Adits with NATAM Checked all Drawings, bill of Quantities and cost of
the Project including Roads, Buildings and Tunnels.
 PERIOD : April 2008 to March 2009
POSITION HELD : Advisor
EMPLOYER : National Engineering Services Pakistan (Pvt.)
Limited – NESPAK, Lahore
DESCRIPTION OF DUTIES :
Advisor to NESPAK Geotechnical Division for review of feasibility studies, planning, and
detail design of:
 Bara Dam Multi purpose Project NWFP
 Nai Gaj Dam Multi purpose Project Sindh
 Review of Suki Kinar hydropower project Neelum River
 Review of Naltar hydropower project Gilgit
 Master Planning level Design of Dams, Tunnels penstocks, and powerhouses of
Chitral River
 Design of dams and hydraulic structures, Dargai Pal SWA
 PERIOD : November 2005 to March 2008
POSITION HELD : Project Manager
EMPLOYER : DESCON Engineering Limited Lahore
DESCRIPTION OF DUTIES :
As Project Manager, Construction of Satpara Dam Project responsible for the following:
 Construction of Main Dam and Power House Design review
 Construction of colony buildings and infra structures
 Construction of 8 MW Hydropower Project
 Design review, and Construction of cofferdam cutoff wall, Main Dam and Spillway,
headrace channel Penstock and Power Houses including electrical and mechanical
components.
 Commissioning of powerhouses
 PERIOD : September 2002 to October 2005
POSITION HELD : Chief Resident Engineer/Deputy Project Manager
Malakand – III Hydropower Project
EMPLOYER : BAK Consulting Engineers Peshawar
DESCRIPTION OF DUTIES :
Design and supervision of 81 MW civil, and hydropower structures including 2.5 km
tunnel, headrace channels, and spillway. Supervision of staff, Contract administration
monitoring of progress, and certification of payment
 PERIOD : May 2001 to June 2002
POSITION HELD : Principal Structure Engineer
EMPLOYER : NEAC Basha Diamer Dam Joint Venture of BAK,
NESPAK, NDC and ACE Lahore
DESCRIPTION OF DUTIES :
 Feasibility level design of Basha Diamer Dam Project. Main Dam, Underground
Power House and Diversion Tunnels and planning of altenatives.
 Preparation of Contract Documents, specification and cost.
Page 3 of 5
ELECTRA CONSULTANTS
Management, Consulting Engineers, Planners and Technical Advisors Sikandar Khan
 Preparation of Construction Schedule.
 PERIOD : May 1994 to June 2000
POSITION HELD : Resident Engineer (Swabi SCARP Consultants)
EMPLOYER : BAK, Consulting Engineers Peshawar (Bennie and
Partners and Lahmer of Germany)
DESCRIPTION OF DUTIES :
Design and supervision of:
 Lined distributaries of Ballar Irrigation System including hydraulic structures
 Monitoring of physical, and financial activities of the project and progress reports.
 Quality Control and internal Payment Certificate
 Manage the staff and training WAPDA Staff on Site
 Attend the meeting with client, other Agencies and ADB Representative
 PERIOD : Mar 1986 to September 1994
POSITION HELD : Project Engineer
EMPLOYER : USAID Mission to Pakistan. Peshawar
DESCRIPTION OF DUTIES :
As Project Manager responsible for supervision of all water sectors project, Water supply
and schools buildings in Tribal areas (TADP). All Water development Schemes In
Kurrum Agency, including surface water, and development of Springs for irrigation, and
drinking water supply schemes. Monitored the progress with quality objectives with Time
Line, the following schemes:
 Kot kai irrigation scheme with community participation and O&M responsibilities
shifted to beneficiaries.
 Ali sheri irrigation scheme including drinking water supply with community
participation and O&M responsibilities shifted to beneficiaries.
 Piala irrigation scheme including drinking water supply with community participation
and O&M responsibilities shifted to beneficiaries.
 Zam zam irrigation scheme water supply scheme
 Malana irrigation scheme including drinking water supply and roads involving the
beneficiaries
 Marghan irrigation schemes(F.R. Kurram) , School and BHU with community
participation
 8 Nos tube wells completed for 3000 acres with community participation and O&M
responsibilities shifted to beneficiaries.
 20 tubwells and irrigation schemes completed in Bajur Agency with FATA Dc and
community participation.
 4 test wells drilled in Kalia tehsil of Orakzai Agency for ground water potential
 PERIOD : June 1979 to March 1986
POSITION HELD : Chief Project Engineer
EMPLOYER : Al-huseini ADA King Khalid Military City Saudi
Arabia
DESCRIPTION OF DUTIES :
Construction of 1734 two story apartment buildings for Army (MODA) and complete
infrastructures including hospitals, water supply, and Roads at King Khalid Military city,
Saudi Arabia. Monitoring of all activities with Time Line Schedule. Given brief
presentation to U.S.Corp of Engineers and Ministry of Defense and Aviation,
Government of the Saudi Arabia.
 PERIOD : June 1974 to April 1979
Page 4 of 5
ELECTRA CONSULTANTS
Management, Consulting Engineers, Planners and Technical Advisors Sikandar Khan
POSITION HELD : Senior Engineer Planning & Design
EMPLOYER : Water & Power Development Authority, Pakistan –
WAPDA
DESCRIPTION OF DUTIES :
Planning of all water sector projects and feasibility studies of:
 Pabbi SCARP, Bannu SCARP, Pehure High Level Canal
 Preparation of Feasibility Reports and PC- 11 and PC-1 Performa
 PERIOD : March 1971 to May 1974
POSITION HELD : Site Engineer
EMPLOYER : Liechman and Lincer N.Y. Manhattan USA
DESCRIPTION OF DUTIES :
Carried out quality control of concrete of 5 Nos. hi-rise buildings (30 Story), in New York
City. These included Inspection of reinforcements, and Concrete works construction ,
and managed compliance to quality control standards. Assisted in, the design of RCC
structures of footing, column, and slab as per ACI code. The designs were based on
ultimate strength design procedures for reinforced concrete structures.
 PERIOD : January 1965 to February 1971
POSITION HELD : Junior Engineer
EMPLOYER : WAPDA on Deputation to TAMS, Bennie and
Partners
DESCRIPTION OF DUTIES :
Construction supervision was carried out at Spillway of Mangla Dam, and bridge at
Tarbela Dam Projects. Checking of reinforcement and placement of concrete in different
construction stages of as per drawings and specifications.
13. Languages:
Speaking Reading Writing
English Excellent Excellent Excellent
Urdu
Pashto
Excellent
Excellent
Excellent
Excellent
Excellent
Excellent
14. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these bio-data correctly
describe me, my qualifications and my experience.
___________________________________________________ Date: _______________
[Signature of Staff Member] [Day/Month/Year]
Page 5 of 5
ELECTRA CONSULTANTS
Management, Consulting Engineers, Planners and Technical Advisors Sikandar Khan
POSITION HELD : Senior Engineer Planning & Design
EMPLOYER : Water & Power Development Authority, Pakistan –
WAPDA
DESCRIPTION OF DUTIES :
Planning of all water sector projects and feasibility studies of:
 Pabbi SCARP, Bannu SCARP, Pehure High Level Canal
 Preparation of Feasibility Reports and PC- 11 and PC-1 Performa
 PERIOD : March 1971 to May 1974
POSITION HELD : Site Engineer
EMPLOYER : Liechman and Lincer N.Y. Manhattan USA
DESCRIPTION OF DUTIES :
Carried out quality control of concrete of 5 Nos. hi-rise buildings (30 Story), in New York
City. These included Inspection of reinforcements, and Concrete works construction ,
and managed compliance to quality control standards. Assisted in, the design of RCC
structures of footing, column, and slab as per ACI code. The designs were based on
ultimate strength design procedures for reinforced concrete structures.
 PERIOD : January 1965 to February 1971
POSITION HELD : Junior Engineer
EMPLOYER : WAPDA on Deputation to TAMS, Bennie and
Partners
DESCRIPTION OF DUTIES :
Construction supervision was carried out at Spillway of Mangla Dam, and bridge at
Tarbela Dam Projects. Checking of reinforcement and placement of concrete in different
construction stages of as per drawings and specifications.
13. Languages:
Speaking Reading Writing
English Excellent Excellent Excellent
Urdu
Pashto
Excellent
Excellent
Excellent
Excellent
Excellent
Excellent
14. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these bio-data correctly
describe me, my qualifications and my experience.
___________________________________________________ Date: _______________
[Signature of Staff Member] [Day/Month/Year]
Page 5 of 5

CV Engr. Sikandar Khan

  • 1.
    ELECTRA CONSULTANTS Management, ConsultingEngineers, Planners and Technical Advisors Sikandar Khan CURRICULUM VITAE 1. Present Position : Team Leader 2. Name of Firm : Electra Consultants 3. Name of Staff : Sikandar Khan 4. Profession : Civil Engineering 5. Date of Birth : May 16th , 1942 6 Nationality : Pakistani 7. Membership in Professional Societies : Pakistan Engineering Council (CIV-1614) 8. Detailed Tasks Assigned on the Project: Preparation of bidding document, Basic Design of Structures and related works, drawings and cost estimates. 10. Key Qualification: Mr. Sikandar Khan has more than 45 years experience, in the field of civil engineering with specialization in structure engineering, and management experience in hydropower project. At present, he is Team leader/Project Manager on 40.8 MW (EPC) KOTO HPP in KPK. He has prepared Bidding Documents, post selected Contractor, carried out technical and financial evaluation of Bidders. He has worked, as team leader on four low head hydropower projects (EPC) Punjab Energy Department, funded by ADB. Also, prepared Bidding Documents, post selected Bidders, carried out technical and financial evaluation of Bidders and prepared Contract Documents. Worked, as Chief Resident Engineer on Neelum Jhelum Hydropower Project, where he supervised the construction of two Adits for main tunnel. He remained Advisor to Nespak on Dams, Irrigation and Hydropower Projects. Worked as Project Manager on the construction of Satpara Dam Project with DESCON, He has performed, as Chief Resident Engineer on Malakand-III Hydropower Project, and Resident Engineer Pehur High Level Canal (PHLC) Project. He possesses vast experience in the field of hydro power projects, wherein he remained involved in the design and planning of Basha Dam and Malakand-III Hydropower Projects. He also possesses international experience having worked with Al-Huseini ADA King Khalid Military City Saudi Arabia, as Chief Project Engineer, and with Liechman and Lincer N.Y. Manhattan USA on the Construction supervision of hi-rise buildings in USA. 11. Education:  Major Courses in Structural Engineering from Polytechnic Institute Brooklyn, N.Y. USA in 1974.  B.E. Civil from University of Engineering & Technology, Peshawar Pakistan in 1965. 12. Employment Record:  PERIOD : Nov 2013 to date POSITION HELD : Team Leader / Project Manager EMPLOYER : Electra Consultants PROJECT : Construction Supervision of 40.8MW KOTO, Hydropower Project KPK Energy Department Working, as Team leader/ Project Manager hydropower projects on preparation of bidding documents/Contract documents (EPC). Evaluations of technical and financial Bids of EPC bidders were carried out and selected the responsive lowest bidder. Notice to proceed was issued and the geo technical/ survey investigation work is in progress.  PERIOD : Jan 2011 to Sep 2013 Page 1 of 5
  • 2.
    ELECTRA CONSULTANTS Management, ConsultingEngineers, Planners and Technical Advisors Sikandar Khan POSITION HELD : Team Leader / Project Manager EMPLOYER : JV of HPE-Electra-TEAM and TRS Consultants PROJECT : 5 HPP Project in Punjab DESCRIPTION OF DUTIES : Working as Team leader/ Project manager for five small hydropower projects on Evaluation of technical and financial Bids of EPC bidders on the following project funded by ADB:  All Contact document completed except Okara  Upper Chenab Canal , Marala HPP, 7.8MW, work in progress  Pakpattan Canal HPP,2.82 MW, work in progress  Deg out fall hydro power 4.04 MW, work in progress  Okara fall of Upper Chenab Canal (Technical evaluation, financially not feasible)  Chianwali canal HPP, 5.38 MW, work in progress The duties as Team leader / Project Manager for implementation stage were to: Review/approve all documents of specification, Design Criteria, Quality Assurance O&M manual and Environmental for two project two projects completed, for deg out fall HPP and Chianwali is in progress. Review/ Approval of Design and Constructions Drawings of Civil and E&M of power house of two projects completed for deg out fall HPP and Chianwali is in progress. Supervise all works according to Employer requirements and Certification of Payment and recommendation to Client PMU Punjab Energy Department.  PERIOD : Jan 2010 to May 2011 POSITION HELD : Project Manager EMPLOYER : Associates in development (PVT) Ltd Consultant (Peshawar) DESCRIPTION OF DUTIES :  Preparation of inception and “As Is” Report.  Preparation of scope of work, work plan and Monitoring and Evaluation indicators.  Preparation of templates for QA/QC and non compliance.  Prepared formats for physical and financial progress report,  Site visit were made to DIK for coordination meeting with FWO and NESPAK and PA.  Coordination meeting with Chief Secretary, DG projects. PD FATA.  Meeting at Islamabad with FWO, NESPAK, on planning, design, mobilization and execution of project of Dams and Irrigation System.  PERIOD : 31st October 2009 till 31st Jan, 2010 POSITION HELD : Team Leader/Project Manger EMPLOYER : JV of HPE-Electra-TEAM Consultants DESCRIPTION OF DUTIES : Worked as Team leader/ Project Manager for the following five small hydropower projects, review of design irrigation Canals, diversion canals and related civil works, Preparation of Contract Documents on ADB guide line.  Deg out fall of Upper Chenab Cana HPP l  Okara fall of Upper Chenab Canal HPP  Chianwali of Upper Chenab Canal HPP  Marala of Upper Chenab Canal HPP  Pakpattan HPP  PERIOD : Jun 2009 to Jan 2010 Page 2 of 5
  • 3.
    ELECTRA CONSULTANTS Management, ConsultingEngineers, Planners and Technical Advisors Sikandar Khan POSITION HELD : Chief Resident Engineer EMPLOYER : Neelum Jehlum Consultant Muzzafar abad DESCRIPTION OF DUTIES : Supervision and design (NATAM) of three Adits of 6 km length of tunnels Construction with NJC ( Neelum Jehlum Consultant)As CRE has supervised staff for Tunnel Construction of Adits with NATAM Checked all Drawings, bill of Quantities and cost of the Project including Roads, Buildings and Tunnels.  PERIOD : April 2008 to March 2009 POSITION HELD : Advisor EMPLOYER : National Engineering Services Pakistan (Pvt.) Limited – NESPAK, Lahore DESCRIPTION OF DUTIES : Advisor to NESPAK Geotechnical Division for review of feasibility studies, planning, and detail design of:  Bara Dam Multi purpose Project NWFP  Nai Gaj Dam Multi purpose Project Sindh  Review of Suki Kinar hydropower project Neelum River  Review of Naltar hydropower project Gilgit  Master Planning level Design of Dams, Tunnels penstocks, and powerhouses of Chitral River  Design of dams and hydraulic structures, Dargai Pal SWA  PERIOD : November 2005 to March 2008 POSITION HELD : Project Manager EMPLOYER : DESCON Engineering Limited Lahore DESCRIPTION OF DUTIES : As Project Manager, Construction of Satpara Dam Project responsible for the following:  Construction of Main Dam and Power House Design review  Construction of colony buildings and infra structures  Construction of 8 MW Hydropower Project  Design review, and Construction of cofferdam cutoff wall, Main Dam and Spillway, headrace channel Penstock and Power Houses including electrical and mechanical components.  Commissioning of powerhouses  PERIOD : September 2002 to October 2005 POSITION HELD : Chief Resident Engineer/Deputy Project Manager Malakand – III Hydropower Project EMPLOYER : BAK Consulting Engineers Peshawar DESCRIPTION OF DUTIES : Design and supervision of 81 MW civil, and hydropower structures including 2.5 km tunnel, headrace channels, and spillway. Supervision of staff, Contract administration monitoring of progress, and certification of payment  PERIOD : May 2001 to June 2002 POSITION HELD : Principal Structure Engineer EMPLOYER : NEAC Basha Diamer Dam Joint Venture of BAK, NESPAK, NDC and ACE Lahore DESCRIPTION OF DUTIES :  Feasibility level design of Basha Diamer Dam Project. Main Dam, Underground Power House and Diversion Tunnels and planning of altenatives.  Preparation of Contract Documents, specification and cost. Page 3 of 5
  • 4.
    ELECTRA CONSULTANTS Management, ConsultingEngineers, Planners and Technical Advisors Sikandar Khan  Preparation of Construction Schedule.  PERIOD : May 1994 to June 2000 POSITION HELD : Resident Engineer (Swabi SCARP Consultants) EMPLOYER : BAK, Consulting Engineers Peshawar (Bennie and Partners and Lahmer of Germany) DESCRIPTION OF DUTIES : Design and supervision of:  Lined distributaries of Ballar Irrigation System including hydraulic structures  Monitoring of physical, and financial activities of the project and progress reports.  Quality Control and internal Payment Certificate  Manage the staff and training WAPDA Staff on Site  Attend the meeting with client, other Agencies and ADB Representative  PERIOD : Mar 1986 to September 1994 POSITION HELD : Project Engineer EMPLOYER : USAID Mission to Pakistan. Peshawar DESCRIPTION OF DUTIES : As Project Manager responsible for supervision of all water sectors project, Water supply and schools buildings in Tribal areas (TADP). All Water development Schemes In Kurrum Agency, including surface water, and development of Springs for irrigation, and drinking water supply schemes. Monitored the progress with quality objectives with Time Line, the following schemes:  Kot kai irrigation scheme with community participation and O&M responsibilities shifted to beneficiaries.  Ali sheri irrigation scheme including drinking water supply with community participation and O&M responsibilities shifted to beneficiaries.  Piala irrigation scheme including drinking water supply with community participation and O&M responsibilities shifted to beneficiaries.  Zam zam irrigation scheme water supply scheme  Malana irrigation scheme including drinking water supply and roads involving the beneficiaries  Marghan irrigation schemes(F.R. Kurram) , School and BHU with community participation  8 Nos tube wells completed for 3000 acres with community participation and O&M responsibilities shifted to beneficiaries.  20 tubwells and irrigation schemes completed in Bajur Agency with FATA Dc and community participation.  4 test wells drilled in Kalia tehsil of Orakzai Agency for ground water potential  PERIOD : June 1979 to March 1986 POSITION HELD : Chief Project Engineer EMPLOYER : Al-huseini ADA King Khalid Military City Saudi Arabia DESCRIPTION OF DUTIES : Construction of 1734 two story apartment buildings for Army (MODA) and complete infrastructures including hospitals, water supply, and Roads at King Khalid Military city, Saudi Arabia. Monitoring of all activities with Time Line Schedule. Given brief presentation to U.S.Corp of Engineers and Ministry of Defense and Aviation, Government of the Saudi Arabia.  PERIOD : June 1974 to April 1979 Page 4 of 5
  • 5.
    ELECTRA CONSULTANTS Management, ConsultingEngineers, Planners and Technical Advisors Sikandar Khan POSITION HELD : Senior Engineer Planning & Design EMPLOYER : Water & Power Development Authority, Pakistan – WAPDA DESCRIPTION OF DUTIES : Planning of all water sector projects and feasibility studies of:  Pabbi SCARP, Bannu SCARP, Pehure High Level Canal  Preparation of Feasibility Reports and PC- 11 and PC-1 Performa  PERIOD : March 1971 to May 1974 POSITION HELD : Site Engineer EMPLOYER : Liechman and Lincer N.Y. Manhattan USA DESCRIPTION OF DUTIES : Carried out quality control of concrete of 5 Nos. hi-rise buildings (30 Story), in New York City. These included Inspection of reinforcements, and Concrete works construction , and managed compliance to quality control standards. Assisted in, the design of RCC structures of footing, column, and slab as per ACI code. The designs were based on ultimate strength design procedures for reinforced concrete structures.  PERIOD : January 1965 to February 1971 POSITION HELD : Junior Engineer EMPLOYER : WAPDA on Deputation to TAMS, Bennie and Partners DESCRIPTION OF DUTIES : Construction supervision was carried out at Spillway of Mangla Dam, and bridge at Tarbela Dam Projects. Checking of reinforcement and placement of concrete in different construction stages of as per drawings and specifications. 13. Languages: Speaking Reading Writing English Excellent Excellent Excellent Urdu Pashto Excellent Excellent Excellent Excellent Excellent Excellent 14. Certification: I, the undersigned, certify that to the best of my knowledge and belief, these bio-data correctly describe me, my qualifications and my experience. ___________________________________________________ Date: _______________ [Signature of Staff Member] [Day/Month/Year] Page 5 of 5
  • 6.
    ELECTRA CONSULTANTS Management, ConsultingEngineers, Planners and Technical Advisors Sikandar Khan POSITION HELD : Senior Engineer Planning & Design EMPLOYER : Water & Power Development Authority, Pakistan – WAPDA DESCRIPTION OF DUTIES : Planning of all water sector projects and feasibility studies of:  Pabbi SCARP, Bannu SCARP, Pehure High Level Canal  Preparation of Feasibility Reports and PC- 11 and PC-1 Performa  PERIOD : March 1971 to May 1974 POSITION HELD : Site Engineer EMPLOYER : Liechman and Lincer N.Y. Manhattan USA DESCRIPTION OF DUTIES : Carried out quality control of concrete of 5 Nos. hi-rise buildings (30 Story), in New York City. These included Inspection of reinforcements, and Concrete works construction , and managed compliance to quality control standards. Assisted in, the design of RCC structures of footing, column, and slab as per ACI code. The designs were based on ultimate strength design procedures for reinforced concrete structures.  PERIOD : January 1965 to February 1971 POSITION HELD : Junior Engineer EMPLOYER : WAPDA on Deputation to TAMS, Bennie and Partners DESCRIPTION OF DUTIES : Construction supervision was carried out at Spillway of Mangla Dam, and bridge at Tarbela Dam Projects. Checking of reinforcement and placement of concrete in different construction stages of as per drawings and specifications. 13. Languages: Speaking Reading Writing English Excellent Excellent Excellent Urdu Pashto Excellent Excellent Excellent Excellent Excellent Excellent 14. Certification: I, the undersigned, certify that to the best of my knowledge and belief, these bio-data correctly describe me, my qualifications and my experience. ___________________________________________________ Date: _______________ [Signature of Staff Member] [Day/Month/Year] Page 5 of 5