SlideShare a Scribd company logo
1 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
1, PROPOSED POSITION : Senior Project Manager
2. NAME : Mohamed Soliman El-Ghazawi
3. Birth Date : 13/02/1950
4. NATIONALITY : Egyptian
5. CIVIL STATUS : Married
6. EDUCATION:
Institutions: Cairo University, Egypt
Date: July 1972
Degree Obtained: B.Sc. Civil Engineer
7. LANGUAGE SKILLS (1 = excellent, 5 = basic):
Language Reading Speaking Writing
Arabic 1 1 1
English 1 1 1
8. MEMBERSHIP OF PROFESSIONAL BODIES:
 Egyptian Syndicate of Professional Engineers
 The Arbitration Chamber at the regional centre of FEIIC (Federation of Engineering
Institution Islamic Countries
9. OTHER SKILLS/EDUCATION &TRAINING COURSES:
 General Management Skills for Middle Managers (September 1997)
 Administration of Arbitration Court (July 2000) (September 2000)
 PIL Quality Management System Introduction & ISO 9001 Awareness (May 2011)
10. PRESENT POSITION: Project Manager, Parsons International Limited
.
11. CONTACTS: Tel: +974 55897600 E-Mail: msghazawi1950@hotmail.com
12. KEY QUALIFICATIONS:
More than 42 years [10-years in GCC] total experience in design/construction supervision of civil works,
and twenty nine consecutive years in the management and construction supervision of large scale
infrastructure & Real Estate projects for provincial towns, cities, and roads with contracting /
engineering firms, with special experience in Pump Stations, Waste Water Treatment Plants,
Roads and [Mini, Micro & TBM] Tunnelling Works. For the past five years, Engr. El- Ghazawi has
been working with Parsons International Limited, as a Project Manager leading a team of 57
number of Parsons Staff for one of the largest infrastructure program in Qatar. Before joining Parsons
he was working for iproplan Planner Co. Ltd as a Project Manager in Al Azizia Area Drainage and
Outfall in Doha for Surface, Storm & Ground Water Drainage System Project.
Eng. El- Ghazawi assumed the responsibilities of SAC / EAC Technical / Projects Operations
Manager, including: Review and study all the original tender documents / addendums, questions &
answers, attend pre-bid meetings with the Client & its consultant, Prepare queries, send to the Client,
and follow up replies, Bid price estimation of SAC / EAC scope of work as per the agreed Pricing
Matrix, in association with other Parties, Attend the JV pricing meetings with other parties, and propose
and discuss design alternatives , identify, analyze the risk, and suggest solutions, value of engineering
for those solutions , compare and select the best solution of the logistics plan, through different
alternatives, Supervise the preparation of the Commercial Bid Offer, Technical, and all other Tender
Submittals, Reply to the Client clarifications after awarding and participate in negotiations, Prepare
price analysis and price adjustment for the Client, review and resubmit, and Prepare time schedule,
resources histogram and cash flow diagrams. He has professional experience on Primavera and MS
Project as Project Manager.
Parsons International Ltd. Page 1 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
As well as he has professional experience on safety in tunnelling in the construction industry based on
the British Standard. He was a Project Manager for several Roads, Infrastructure, Micro-Tunnelling,
and Real Estate constructions in different countries.
13. PROFESSIONAL EXPERIENCE:
Date: 01 April 2011 – To date
Location: Qatar
Company: Parsons International Limited [5 years] to date
Position: Project Manager
Description: Job description:
- Establish communication, reporting and authorization procedures for the project.
- Review Contractor’s submittals (for design temporary works, documentation,
materials submittals, permit applications, method statements, shop drawings,
commissioning plans, and others outlined in the Contractors contract) provide
additional comments where applicable.
- Schedule and chair various meetings related to the project.
- Review Contractor’s interim / final payment applications and make
recommendation to PWA.
- Review change order/claim request from consultant and Contractor and make
recommendation to PWA.
- Coordinate with other client consultants on Project Management issues
- All other Project Management functions as per the contract.
- Inspect/monitor Contractor’s works.
- Coordinate activities of the Contractors.
- Assist as required the Contractor in coordinating easements, right-of-ways,
utilities and other statutory agencies.
- Monitor and coordinate the construction procurement process.
- Prepare monthly reports.
- All other Construction Management & Supervision functions as per the contract.
Project description:
Project Management, Professional Services and On-Site Supervision for
Refurbishing and Upgrading Works for Various Pumping Stations with a total
budget cost of: QR 985,100,000.00.
The work includes 4 packages as follows:
a) Refurbishing and Upgrading Works for Various Pumping Stations (Phase
7) Civil Project 725:
• Refurbishment and Upgrading of 5 Pumping Stations
• 13.8 km of 500mm ø – 710mm ø rising main including appurtenance
structures
• 1.4 km of twin 800mm ø rising main including appurtenance structures
b) Refurbishing and Upgrading Works for Various Pumping Stations (Phase
8) Civil Project 729/1:
• Refurbishment and Upgrading of 7 Pumping Stations
• 1.6 km of 150mm ø – 500mm ø rising main including appurtenance
structures
• 6.2 km of 600mm ø rising main, 0.1 km. of which is to be done by
micro tunnel including appurtenance structures
c) Refurbishing and Upgrading Works for Various Pumping Stations (Phase
8) Civil Project 729/2:
• Refurbishment and Upgrading of 7 Pumping Stations
• 2.0 km of 450mm ø rising main including appurtenance structures
• 10.9 km of twin 500mm ø rising main including appurtenance
structures
d) Pumping Stations Refurbishment (Phase 6) Civil Project 208/5:
• Refurbishment and Upgrading of 6 Pumping Stations
• 8 Series Trunk Sewer
Parsons International Ltd. Page 2 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
Date: 01 March 2008 – 31 Mar 2011
Location: Qatar
Company: iproplan Planner Co. Ltd [3 years & 0ne month]
Position: Senior Project Manager
Description: Job description:
- General Planning and coordinating all administrative and physical aspects of the
Project.
- Monitor all site activities, deployed resources, and actual work progress.
- Review all technical, shop drawings, and material submittals.
- Leading and assigning the Supervision Team to control all site activities.
- Review, Analyze and Evaluate Technical proposals, Laboratory, Technical
Reports and solve technical problems.
- Prepare Weekly and Monthly Reports.
- Ensure compliance with the Quality, and environmental Policies, and application
of safety measures.
- Prepare Cost Estimate, Site Instructions, and Variation Orders.
- Holding, Tracking and reporting to all contractual correspondence with the
Client, Contractor and any other Third Party.
- Study all claims and counter claims to/from the Contractor and the Client, and
any other Third Party.
- Prepare Engineer Decision as per FEDICS
- Advise the Client for dispute resolutions through: Amicable Agreement and
Arbitration.
Project description:
CP 693, Construction Supervision of Al Azizia Area Drainage and Outfall in Doha
for Surface, Storm & Ground Water Drainage System of an amount of: QR
185,500,000.00.
The work include the following:
e) Construction of the following surface and ground water drainage pipes and
fittings by open trench:
• 21.3 km of road surface drainage VC gully connections of 150 mm
diameter with average depth of 1.5 m.
• 4.5 km of half perforated VC land drains of 300 mm diameter in
common trench with main carrier and average diameter depths
between 3.0-3.5 m.
• 10.1 km of half perforated VC pipes of 300-600 mm diameters with
average depths between 1.5-6.5 m.
• 11.8 km of non-perforated VC pipes of 300-800 mm diameters with
average depths between 1.5-6.0 m.
• 3.3 km of RC PVC lined pipes of 800-1400 mm diameters with average
depths between 3.0-8.0 m.
f) Construction of the following road gullies and manholes:
• Approximately 1440 Nos. gullies with polypropylene removable
baskets.
• 164 Nos. manholes of 1200 mm internal diameter with average depths
between 1.5-4.0 m.
• 8 Nos. manholes of 1500 mm internal diameter with average depths
between 4.0-5.5 m.
• 152 Nos. manholes of 1800 mm internal diameter with average depths
between 1.5-8.0 m.
Parsons International Ltd. Page 3 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
• 50 Nos. manholes of 2100 mm internal diameter with average depths
between 3.0-8.5 m.
g) Road reinstatement:
• Temporary Road Reinstatement (Phase 1) = 43,000 m.
• Permanent Road Reinstatement (Phase 2) = 203,000 m²
h) Construction of approximately 3.8 km RC PVC lined or GRP concrete
encased surface drainage pipes and fittings by micro-tunnelling of 1000-
1400 mm diameters with average depths between 7.5-12.5 m.
i) Construction of 21 Nos. RC tunnel access shafts with approximate clear
dimensions (4x2.5m) and average depths between 7.5-12.5 m.
j) Construction of reinforced concrete storm water storage tank of
approximately 60x28x10 m with maximum storage capacity of 10,500 m³
including inlet and outlet control penstocks.
k) Construction of approximately 265 m concrete boundary wall around
attenuation tank including wrought iron railing, entrance gates and site
works.
l) Supply of 1 No. portable electrical actuator and 1 No. portable generator
for the operation of penstock including associated spare parts, tools and
lubricants.
Date: 06 Dec 2006 – 29 Feb 2008
Location: Egypt
Company: AAW Consulting Engineers
Position: Senior Projects Manager
Description: Job description:
- Review Design of the different disciplines.
- Check BOQ’s including multiplication of quantities by price and adding up total
amount for each bill to calculate the accurate total price of each tender.
- Review and evaluate contractors' reservations and conditions which might affect
prices and/or quality of tenders.
- Ranking of tenders according to their prices and responsiveness to the tender
document and make necessary recommendation for awarding contracts.
- Attending negotiations and prepare final contract between the Clients and the
nominated contractor.
- General Planning and coordinating all administrative and technical aspects..
- Leading and assigning the Supervision Team to control all site activities
- Holding, Tracking and reporting to all contractual correspondence with the
Client, Contractor and any other Third Party.
- Study all claims and counter claims to/from the Contractor and the Client, and
any other Third Party.
- Prepare Variation Order, and Engineer Decisions as per FIDIC.
-. Prepare agenda, attend and lead Weekly and Monthly Meetings.
- Prepare weekly and monthly reports.
Projects description:
The Project financed by Al Futtaim Group as a private investment in one of mega
Real Estate Development Project in New Cairo City, on an area of 700 Acers,@
3million M2, includes: Backfill, levelling and compaction of the sub grade, all
infrastructure [potable water, surface water, storm water, sewerage drainage
networks, W.W. Pump Station, electrical power supply, district cooling system,
data and telephone cabling distribution system ], internal roads, construction of
500 villas, commercial & residential & mix use buildings, hotel, mosque, school,
library, show rooms, land escape, and all other services required for a five stars
living community. The budget of the project is: US$ 650 MILLION.
Parsons International Ltd. Page 4 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
Date: 07 Dec 2005 – 06 Dec 2006
Location: Kuwait
Company: Shaheen Al Ghanim Roads & Bridges Contracting Co. SAC [ one year ]
Position: Engineering Operations Manager
Description: Job description:
- Review and study all the original tender documents and addendums, questions
& answers, and attend pre-bid meetings with the Client & its consultant.
- Prepare queries, send to the Client, and follow up replies.
- Bid price estimation of SAC scope of work as per the agreed Pricing Matrix, in
association with other Parties[CHEC & GDC]
- Attend the JV pricing meetings with its Design Consultant in Kuwait and
overseas, and propose and discuss design alternatives for soil improvement and
construction elements
- Identify, analyze the risk, and suggest solutions, and cost estimate those
solutions.
- Prepare, cost estimate, compare and select the best solution of the Logistics
Plan of SAC scope of work, through different alternatives.
- Supervise the preparation of the Commercial Bid Offer, Technical, and all other
Tender Submittals.
- Reply to the Client clarifications after awarding and participate in negotiations.
- Prepare price analysis and price adjustment for the Client, review and resubmit.
- Prepare time schedule, resources histogram and cash flow diagram of SAC
scope.
Other Duties:
-Present and introduce Shaheen Al-Ghanim Co. to International Specialist
Companies and Consultants in order to create Joint Venture for Pre-Qualification
requirements of BOT, DBO, and DBOT & BOOT Projects inside and outside
Kuwait.
- Supervise the preparation of Prequalification Documents for the following.
⋅ Failaka Desalination & Power Supply Plant.
⋅ Subiya Motor Way - Package III.
⋅ Public Authority for Housing Welfare - New Housing Projects.
⋅ Some Road Projects in Jordan, Yemen, Qatar, and Iraq.
- Supervise all the activities of [Tendering, Pricing and Projects Cost Control]
Department.
- Participate in qualifying SAC to get ISO 9000-2000 certificate: internal & external
auditing, prepare, review procedure of engineering department and training of
personnel.
Projects description:
The project consists of Road works, Bridge, and Soil Treatment in, Kuwait
Boubyan. Investment amount is US $ 420 Million
Parsons International Ltd. Page 5 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
Date: 15 Nov 2002 – 15 Aug 2005
Location: Egypt
Company: Contrack – Orascom J.V
Position: Contracting and Procurement Department Manager
Description: Job description:
- Control of contract correspondence (writing & replying letters) to sub contractors
and suppliers, according to their performance in view of the project time schedule.
- Co-ordinate with sub-contractors and suppliers, in general, and with NSF in
particular, for site visits, testing commissioning, O&M, spare parts, training, and
fulfil sub-contract &PO conditions and obligations.
- Supervise NSF [subcontractor] scope of work :
- Elevated water tank, 1500 cu. m capacity, 75 m. high.
- Construction of Portable W.W.T.P and Pump Station[15L/S]
- Roof trusses of B03&B06, Maintenance Hanger and Full Cell
Maintenance Facility Buildings
- Two ground water tanks, 1000 m³ for Fire Pump House B05
- Sun-shades for 25 buildings
- Doors of 32 shelters, two elevations, each 15.50*8.30m.(1780 ton total
weight)
- Miscellaneous steel: hand & guard rails, trellises, ladders, bar
gratings, and trench covers in all buildings, 25 guard towers and two
main gates at the boundary fence.
- Pilot Residential Villas, Living Compounds including playing yards,
swimming poles, land escaping,...etc
- Review & certify payments and back charge additional costs for sub-contractors
and suppliers (down payments, progress payments, and final accounts)
- Material quality control:
- Review Over, Short & Damage inspection (OS&D) reports.
- Review Additional Material Requests (AMR)
- Review & following up delivery's documents: PO, Notice of
availability(NOA), Shipping Documents(SD), Packing Lists, Bill of
Lading, …etc.
- Inform vendors and insurance company with short& damage reports
and claim for it.
- Warehouse control: Administrative, guards, security, and safety wise.
- Inventory report's control, in & out, quantity distribution over buildings
against take off BOQ, waste control.
- Procure missing, short, and damaged materials, locally:
- Contact suppliers, receive offers, and negotiate prices & payment
terms.
- Issue purchase orders (PO) and notice to proceed (NTP) to suppliers.
- Follow up procurement stages: down payment, progress payment,
final account as per PO terms, fabric, assemble, deliver, install or
erect applying inventory and material quality control systems as
described above.
Projects description:
Upgrade Fayed Air Base (Value is $ 130 million), was a complex project of air
force base including construction of shelters, runways, apron taxiways, roads, fire
defence infrastructure, general underground utilities of different types and sizes,
W.W.T.P, and Pilot Residential Villas, Living Compounds including playing yards,
swimming poles, land escaping,...etc
Parsons International Ltd. Page 6 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
Date: 01 Aug 1985 – 31 Oct 2002
Location: Cairo, Egypt
Company: Egyptian Arab Contracting EAC
Position: Senior Project Manager
Description: 1- Project Duration: 18.04.2000 to 31.10.2002
Job description:
- Reviewing Design, cost estimates and budget for new bids and negotiations with
Clients after award
- Reviewing time schedules, procurements, equipment & manpower histograms,
and cash flow diagrams ( in and out )
- Selecting management and construction teams.
- Cost control, Health &Safety and QA/QC control.
- Preparing Business Plan.
- Procurement of Equipment, labour, materials and sub-contractors.
- Meeting with Clients, consultants & project staffs.
- Preparations of claims, its negotiations & its settlement.
- Reviewing interim statements with Clients & subcontractor's payment and cash
flow following up
- Preparation with high management levels, the company plans: Future plans
executive plans, following up programs, cost and quality control plans, and
development plans.
Projects description:
Construction of a new Real Estate Development in 6-October City, Al Nada
Community consists of: [Project cost 180 Million L.E]
 150 Residential Villas, Foot print 200 m2 each, duplex.
 Mix use commercial &residential multi story buildings
 Mosque & Lad Escape
 Ground & Elevated Water Tanks
 Water Pump Station(Poster)
 Gate House & Boundary Wall (Fence)
 Internal Roads & underground utilities ( Water, Surface Water & Foul
Sewerage Drainage, Electricity, and Telephone networks)
 House connections of all services
2- Project Duration: 01.10.1996 to 17.04.2000
Job description:
Overall administration, supervision of construction operations and reviewing
technical office outputs, interim statements, material laboratory tests, quality
control reports, study sub-contracts, preparing claims, correspondence with owner
and consultant including but not limited to:
- Preparing Business Plan.
- Reviewing time schedules – Cash flow – follow-up reports.
- Procurement of Equipment, labour, materials and sub-contractors.
- Meetings with Clients, consultants, projects staffs
Projects description:
Construction of 15–Stories Building [Administrative offices for the Electrical –
Water Energy Projects] of Ministry of Electricity, Egypt, Cairo, includes:
- Excavation, R.C Secant Piles Exc. Sides Protection,
- Piles & Raft Foundation
- Concrete Structure,[3-story basement+ 12 story super structure]
Parsons International Ltd. Page 7 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
- External & Internal Finishes, Curtain Wall, Claddings, Partitions,
- HVAC, chillers, Shield Water Cooling System,
3- Project Duration: 01.12.1990 to 30.09.1996
Job description:
Overall administration, supervision of construction operations and reviewing
technical office outputs, material laboratory tests, quality control reports, study
Contracts, preparing Claims, correspondences with owner and consultant
Projects description:
. Contracts 24-N, 24-T, 24-W. 24-X, 34A, 34-J-34-L Great Cairo Waste Water
Network Project (Nile West Bank), Consultant: AMBRIC: [Budget LE
160Million]
Brief Description:
- 70,379 LM of Vitrified Clay Pipes with Diameters ranges from 175 - 600 mm
- 4,489 LM Collectors of R.C. pipes, there from 1300 m Micro Tunnelling,
Diameters ranges from 800 -1200 mm
- 3,768 NO Pre-Caste Manholes with Diameters ranges from 1200 - 1800mm
- 8,350 NO Inspection Chambers
- 56,700 LM UPVC House connections
- The project included all the ancillary works of excavate, side support, gravel bed,
- Backfill, etc. Lagging system technique was used for supporting trench sides.
4- Project Duration: 01.08.1988 to 30.11.1990
Job description:
Overall Design Review, Contract administration, supervision of construction
operations and reviewing technical office outputs, interim statements, material
laboratory tests, quality control reports, study sub-contracts, preparing claims,
correspondence with owner and consultant.
Projects description:
Construction of the project with total Investment of L.E. 45 millions:
(Contract 24-F) Great Cairo W.W. Network Project (Nile West Bank),
Consultant: AMBRIC:
Brief Description:
- Renovation of W.W. Pump Station
- Rehabilitation of 1500LM Force Main, 400mm, D.C.I
- Supply and install Waste Water gravity sewer network
- 1,460 LM R.C. pipes Dia. 1000 and 800mm[ 600 LM - Micro Tunnelling]
- Supply and install 446 NO pre-cast Manholes Depths from 1.20 to 8.00 m,
Diameter 1200 - 1800 mm.
- 9,515 LM Vitrified Clay Pipes dia 175-600mm
Parsons International Ltd. Page 8 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
- 12,000 LM PVC pipes Dia. 150mm, connections
5- Project Duration: 01.08.1985 to July.1988
Job description:
Design Review, Construction Supervision, contract administration, Review of time
schedules, procurement schedules, monthly progress reports and payment, quality
control and follow-up reports, and correspondences with Client and the Contractor
Projects description:
Construction Supervision of the project with total Investment of L.E.160
millions. Waste water network & Pump Station rehabilitation (Contract No.18)
Damanhur and Kafr El-Dawar Cities
Brief Description:
- Renovation of W.W. Pump Station, 350 L/S
- Rehabilitation of 2300LM Force Main, 500mm, D.C.I
- Rehabilitation of 120 km and replacement of 20 Km of sewer lines VC, RC,
Pipes, Dia 1200-300mm [500 m Micro Tunnelling]
- Cast in place 225 NO Manholes Depths from 1.20 to 8.00 m, Diameter 1200 -
1800 mm.
- 500,000 m² Reinstatement of Asphalt pavements.
Date: 01 July 1981 – 30 Jun 1985
Location: Libya
Company: National Co. For Municipal Works
Position: Project Manager
Description: Job description:
Design Review, Supervision of Civil Construction, and Electro-Mechanical
Installation. Contract administration, Co-ordination between Contractors, program
scheduling, directing design teams, allocating resources for timely completion and
budget control, Preparation of Tender Evaluation Reports, and Analysis in
accordance with the provisions of tenders.
Projects description:
Design and Construction Supervision of Waste Water Treatment Plant,
Pumping station, and Rising Mains at Derna City- Libya, of total value US $
220 million.
Brief Description:
- Underground watertight concrete tanks, circular and rectangular [Concrete
Volume 6500 m³] as follow: 6 NO, Circular Sedimentation Tanks[Primer & Final], 2
NO-Rectangular Aeration Tanks, 2NO Digestion Tanks, 4 NO Drying Beds.
- 1100 LM Interconnecting pipelines [DCI, 250-600mm]
- 6500 LM Rising Mains [DCI, 600mm]
- Micro-Tunnelling of 1500 m R.C.
- Gravity collector 1000mm Diameter, 150 meter average long Drives and R.C
shafts of depths between 8.00 & 12.00 meters.
Parsons International Ltd. Page 9 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
- 2 NO Pumping Stations, Sump 12m deep, Pumps 350L/S
Date: 01 Nov 1978 – 30 June 1981
Location: Benghazi, Libya
Company: Israa Contracting Company
Position: Project Manager
Description: Job description:
Overall administration and technical and financial supervision.
Projects description:
Construction of the project (Al-Magroon- Karkoura- Al-Rakta) High Way with a total
Investment of USD 12 million:
Brief Description:
- First class road, work includes: excavation in rock, backfill, concrete structures.
- Heavy duty equipment and explosion [blasting] was used in earth moving.
- Construction of all utilities: Water supply, surface drainage, power supply, etc.
Date: 14 Apr 1974 – 31 Oct 1978
Location: Libya
Company: Canal Harbour Works Company
Position: Resident Engineer
Description: Job description:
Supervision of Building Construction, Q.C. Material Laboratory, technical office.
Projects description:
Construction of the project with total Investment of USD 16.50 million:
- Derna Port (Consultant: Rehndle, Palmer & Tritton)
Brief Description:
- Breakwaters 2.50 Km, stone core, stone armour blocks 1.0 million cubic meters,
excavation and dredging 1.50 million cubic meters to a depth of 10 meters.
- Service buildings: Administrative, Sheds, Guard house, stores, sub- stations…etc
- 600 LM quays (concrete blocks& sheet piles), stock yards backfill 2 million m³,
and 25 Km Roads inside and outside the port were constructed.
Date: 25 Mar 1973 – 14 Apr 1974
Location: Egypt
Company: Canal Harbour Works Company
Position: Resident Site Engineer
Description: Job description:
Supervision of construction, Q.C. Material Laboratory, technical office.
Projects description:
-1st
stage of Sankouria Agricultural Drain, Samalout - Menya
- Construction of a 25 km drain with a 50 m² water cross-section area.
- Embankments – Roads – over-crossings (Siphons, Bridges, Pedals)
Date: 12 Oct 1972 – 25 Mar 1973
Location: Egypt
Company: Arab Contractors (Othman A. Othman)
Position: Site Engineer
Description: Job description:
- Quantity Surveying – Preparation of sub-contractors monthly certificates
- Follow-up project schedules, Q.C. reporting.
Projects description:
Participated in the project with total value of L.E. 12.50 millions:
Parsons International Ltd. Page 10 of 11
CURRICULUM VITAE
Mohammed Soliman El Ghazawi
- Construction of Residential Buildings
- 2nd
stage of textile factory – Damietta
Parsons International Ltd. Page 11 of 11

More Related Content

What's hot

What's hot (20)

CV Template mohamed1
CV Template mohamed1CV Template mohamed1
CV Template mohamed1
 
CV1
CV1CV1
CV1
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
jainco
jaincojainco
jainco
 
Revised Resume
Revised ResumeRevised Resume
Revised Resume
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)Khalid Khan-Geo (5-10-16)
Khalid Khan-Geo (5-10-16)
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
CV Elmar (1)
CV Elmar (1)CV Elmar (1)
CV Elmar (1)
 
mohammad fathi cv2017
mohammad fathi cv2017mohammad fathi cv2017
mohammad fathi cv2017
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
Cv 01
Cv 01Cv 01
Cv 01
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 

Viewers also liked

Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...
Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...
Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...lakesidebhs
 
Helping Clients Discover the “WOW” Factor in Woundings
Helping Clients Discover the “WOW” Factor in WoundingsHelping Clients Discover the “WOW” Factor in Woundings
Helping Clients Discover the “WOW” Factor in Woundingslakesidebhs
 
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606Angkana Potha
 
TOWN HOUSE FINAL PROJECT
TOWN HOUSE FINAL PROJECTTOWN HOUSE FINAL PROJECT
TOWN HOUSE FINAL PROJECTLymarie Santana
 
A Primer On Animal Husbandry PDF
A Primer On Animal Husbandry PDFA Primer On Animal Husbandry PDF
A Primer On Animal Husbandry PDFflorence tamid-ay
 
Oferta hotelera barcelona semana 11
Oferta hotelera barcelona  semana 11Oferta hotelera barcelona  semana 11
Oferta hotelera barcelona semana 11Daniel Mesa Vargas
 
Ibs bangalore presents ninth international conference on economics and finance
Ibs bangalore presents ninth international conference on economics and financeIbs bangalore presents ninth international conference on economics and finance
Ibs bangalore presents ninth international conference on economics and financeIBS_Business_School
 
Ibs mumbai presents international conference on finance and economics
Ibs mumbai presents international conference on finance and economicsIbs mumbai presents international conference on finance and economics
Ibs mumbai presents international conference on finance and economicsIBS_Business_School
 
โครงร่างโครงงาน606
โครงร่างโครงงาน606โครงร่างโครงงาน606
โครงร่างโครงงาน606Angkana Potha
 
Oferta hotelera barcelona semana 11
Oferta hotelera barcelona  semana 11Oferta hotelera barcelona  semana 11
Oferta hotelera barcelona semana 11Daniel Mesa Vargas
 
v+f Dossier presentation ENG
v+f Dossier presentation ENGv+f Dossier presentation ENG
v+f Dossier presentation ENGMariona Soler
 
Travels Through South Africa
Travels Through South AfricaTravels Through South Africa
Travels Through South AfricaLuc van Hecke
 

Viewers also liked (20)

Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...
Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...
Minding Our Business: Contemplative Practices for Meeting Suffering, Comfort ...
 
Green india
Green indiaGreen india
Green india
 
Operaciones de Manufacturas
Operaciones de ManufacturasOperaciones de Manufacturas
Operaciones de Manufacturas
 
Fundicion y moldeo
Fundicion y moldeoFundicion y moldeo
Fundicion y moldeo
 
Helping Clients Discover the “WOW” Factor in Woundings
Helping Clients Discover the “WOW” Factor in WoundingsHelping Clients Discover the “WOW” Factor in Woundings
Helping Clients Discover the “WOW” Factor in Woundings
 
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606
แบบเสนอโครงร่างโครงงานคอมพิวเตอร์606
 
TOWN HOUSE FINAL PROJECT
TOWN HOUSE FINAL PROJECTTOWN HOUSE FINAL PROJECT
TOWN HOUSE FINAL PROJECT
 
Resum Of Kawser.New
Resum Of Kawser.NewResum Of Kawser.New
Resum Of Kawser.New
 
A Primer On Animal Husbandry PDF
A Primer On Animal Husbandry PDFA Primer On Animal Husbandry PDF
A Primer On Animal Husbandry PDF
 
Oferta hotelera barcelona semana 11
Oferta hotelera barcelona  semana 11Oferta hotelera barcelona  semana 11
Oferta hotelera barcelona semana 11
 
Ibs bangalore presents ninth international conference on economics and finance
Ibs bangalore presents ninth international conference on economics and financeIbs bangalore presents ninth international conference on economics and finance
Ibs bangalore presents ninth international conference on economics and finance
 
Ibs mumbai presents international conference on finance and economics
Ibs mumbai presents international conference on finance and economicsIbs mumbai presents international conference on finance and economics
Ibs mumbai presents international conference on finance and economics
 
โครงร่างโครงงาน606
โครงร่างโครงงาน606โครงร่างโครงงาน606
โครงร่างโครงงาน606
 
Oferta hotelera barcelona semana 11
Oferta hotelera barcelona  semana 11Oferta hotelera barcelona  semana 11
Oferta hotelera barcelona semana 11
 
Good_Storage_Practice
Good_Storage_PracticeGood_Storage_Practice
Good_Storage_Practice
 
Módulo 2
Módulo 2Módulo 2
Módulo 2
 
v+f Dossier presentation ENG
v+f Dossier presentation ENGv+f Dossier presentation ENG
v+f Dossier presentation ENG
 
Travels Through South Africa
Travels Through South AfricaTravels Through South Africa
Travels Through South Africa
 
Biowalk
BiowalkBiowalk
Biowalk
 
Resume
ResumeResume
Resume
 

Similar to Ghazawi-CV updat - April 2016

Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CVTawfig Adham
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Ayman Mitkees
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلصMohamed Hablas
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDFKarim Ashry
 
updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015Hossam Lotfi
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWAhmed Senosy
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.updateEslam Elsnosy
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateEslam Elsnosy
 

Similar to Ghazawi-CV updat - April 2016 (20)

Tawfig Khidir - CV
Tawfig Khidir - CVTawfig Khidir - CV
Tawfig Khidir - CV
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
En c.v
En c.v En c.v
En c.v
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
CV
CVCV
CV
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
My cv 9-2015 scan PDF
My cv  9-2015 scan PDFMy cv  9-2015 scan PDF
My cv 9-2015 scan PDF
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015updated cv hossam lotfy 30-12-2015
updated cv hossam lotfy 30-12-2015
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Delhi metro presention
Delhi   metro presentionDelhi   metro presention
Delhi metro presention
 
Engr. Abo ElSoud CV-2017
Engr.  Abo ElSoud CV-2017Engr.  Abo ElSoud CV-2017
Engr. Abo ElSoud CV-2017
 
Cv.eslam elsnosy.update
Cv.eslam elsnosy.updateCv.eslam elsnosy.update
Cv.eslam elsnosy.update
 
CV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.updateCV.Eslam-ELSNOSY.update
CV.Eslam-ELSNOSY.update
 

Ghazawi-CV updat - April 2016

  • 1. CURRICULUM VITAE Mohammed Soliman El Ghazawi 1, PROPOSED POSITION : Senior Project Manager 2. NAME : Mohamed Soliman El-Ghazawi 3. Birth Date : 13/02/1950 4. NATIONALITY : Egyptian 5. CIVIL STATUS : Married 6. EDUCATION: Institutions: Cairo University, Egypt Date: July 1972 Degree Obtained: B.Sc. Civil Engineer 7. LANGUAGE SKILLS (1 = excellent, 5 = basic): Language Reading Speaking Writing Arabic 1 1 1 English 1 1 1 8. MEMBERSHIP OF PROFESSIONAL BODIES:  Egyptian Syndicate of Professional Engineers  The Arbitration Chamber at the regional centre of FEIIC (Federation of Engineering Institution Islamic Countries 9. OTHER SKILLS/EDUCATION &TRAINING COURSES:  General Management Skills for Middle Managers (September 1997)  Administration of Arbitration Court (July 2000) (September 2000)  PIL Quality Management System Introduction & ISO 9001 Awareness (May 2011) 10. PRESENT POSITION: Project Manager, Parsons International Limited . 11. CONTACTS: Tel: +974 55897600 E-Mail: msghazawi1950@hotmail.com 12. KEY QUALIFICATIONS: More than 42 years [10-years in GCC] total experience in design/construction supervision of civil works, and twenty nine consecutive years in the management and construction supervision of large scale infrastructure & Real Estate projects for provincial towns, cities, and roads with contracting / engineering firms, with special experience in Pump Stations, Waste Water Treatment Plants, Roads and [Mini, Micro & TBM] Tunnelling Works. For the past five years, Engr. El- Ghazawi has been working with Parsons International Limited, as a Project Manager leading a team of 57 number of Parsons Staff for one of the largest infrastructure program in Qatar. Before joining Parsons he was working for iproplan Planner Co. Ltd as a Project Manager in Al Azizia Area Drainage and Outfall in Doha for Surface, Storm & Ground Water Drainage System Project. Eng. El- Ghazawi assumed the responsibilities of SAC / EAC Technical / Projects Operations Manager, including: Review and study all the original tender documents / addendums, questions & answers, attend pre-bid meetings with the Client & its consultant, Prepare queries, send to the Client, and follow up replies, Bid price estimation of SAC / EAC scope of work as per the agreed Pricing Matrix, in association with other Parties, Attend the JV pricing meetings with other parties, and propose and discuss design alternatives , identify, analyze the risk, and suggest solutions, value of engineering for those solutions , compare and select the best solution of the logistics plan, through different alternatives, Supervise the preparation of the Commercial Bid Offer, Technical, and all other Tender Submittals, Reply to the Client clarifications after awarding and participate in negotiations, Prepare price analysis and price adjustment for the Client, review and resubmit, and Prepare time schedule, resources histogram and cash flow diagrams. He has professional experience on Primavera and MS Project as Project Manager. Parsons International Ltd. Page 1 of 11
  • 2. CURRICULUM VITAE Mohammed Soliman El Ghazawi As well as he has professional experience on safety in tunnelling in the construction industry based on the British Standard. He was a Project Manager for several Roads, Infrastructure, Micro-Tunnelling, and Real Estate constructions in different countries. 13. PROFESSIONAL EXPERIENCE: Date: 01 April 2011 – To date Location: Qatar Company: Parsons International Limited [5 years] to date Position: Project Manager Description: Job description: - Establish communication, reporting and authorization procedures for the project. - Review Contractor’s submittals (for design temporary works, documentation, materials submittals, permit applications, method statements, shop drawings, commissioning plans, and others outlined in the Contractors contract) provide additional comments where applicable. - Schedule and chair various meetings related to the project. - Review Contractor’s interim / final payment applications and make recommendation to PWA. - Review change order/claim request from consultant and Contractor and make recommendation to PWA. - Coordinate with other client consultants on Project Management issues - All other Project Management functions as per the contract. - Inspect/monitor Contractor’s works. - Coordinate activities of the Contractors. - Assist as required the Contractor in coordinating easements, right-of-ways, utilities and other statutory agencies. - Monitor and coordinate the construction procurement process. - Prepare monthly reports. - All other Construction Management & Supervision functions as per the contract. Project description: Project Management, Professional Services and On-Site Supervision for Refurbishing and Upgrading Works for Various Pumping Stations with a total budget cost of: QR 985,100,000.00. The work includes 4 packages as follows: a) Refurbishing and Upgrading Works for Various Pumping Stations (Phase 7) Civil Project 725: • Refurbishment and Upgrading of 5 Pumping Stations • 13.8 km of 500mm ø – 710mm ø rising main including appurtenance structures • 1.4 km of twin 800mm ø rising main including appurtenance structures b) Refurbishing and Upgrading Works for Various Pumping Stations (Phase 8) Civil Project 729/1: • Refurbishment and Upgrading of 7 Pumping Stations • 1.6 km of 150mm ø – 500mm ø rising main including appurtenance structures • 6.2 km of 600mm ø rising main, 0.1 km. of which is to be done by micro tunnel including appurtenance structures c) Refurbishing and Upgrading Works for Various Pumping Stations (Phase 8) Civil Project 729/2: • Refurbishment and Upgrading of 7 Pumping Stations • 2.0 km of 450mm ø rising main including appurtenance structures • 10.9 km of twin 500mm ø rising main including appurtenance structures d) Pumping Stations Refurbishment (Phase 6) Civil Project 208/5: • Refurbishment and Upgrading of 6 Pumping Stations • 8 Series Trunk Sewer Parsons International Ltd. Page 2 of 11
  • 3. CURRICULUM VITAE Mohammed Soliman El Ghazawi Date: 01 March 2008 – 31 Mar 2011 Location: Qatar Company: iproplan Planner Co. Ltd [3 years & 0ne month] Position: Senior Project Manager Description: Job description: - General Planning and coordinating all administrative and physical aspects of the Project. - Monitor all site activities, deployed resources, and actual work progress. - Review all technical, shop drawings, and material submittals. - Leading and assigning the Supervision Team to control all site activities. - Review, Analyze and Evaluate Technical proposals, Laboratory, Technical Reports and solve technical problems. - Prepare Weekly and Monthly Reports. - Ensure compliance with the Quality, and environmental Policies, and application of safety measures. - Prepare Cost Estimate, Site Instructions, and Variation Orders. - Holding, Tracking and reporting to all contractual correspondence with the Client, Contractor and any other Third Party. - Study all claims and counter claims to/from the Contractor and the Client, and any other Third Party. - Prepare Engineer Decision as per FEDICS - Advise the Client for dispute resolutions through: Amicable Agreement and Arbitration. Project description: CP 693, Construction Supervision of Al Azizia Area Drainage and Outfall in Doha for Surface, Storm & Ground Water Drainage System of an amount of: QR 185,500,000.00. The work include the following: e) Construction of the following surface and ground water drainage pipes and fittings by open trench: • 21.3 km of road surface drainage VC gully connections of 150 mm diameter with average depth of 1.5 m. • 4.5 km of half perforated VC land drains of 300 mm diameter in common trench with main carrier and average diameter depths between 3.0-3.5 m. • 10.1 km of half perforated VC pipes of 300-600 mm diameters with average depths between 1.5-6.5 m. • 11.8 km of non-perforated VC pipes of 300-800 mm diameters with average depths between 1.5-6.0 m. • 3.3 km of RC PVC lined pipes of 800-1400 mm diameters with average depths between 3.0-8.0 m. f) Construction of the following road gullies and manholes: • Approximately 1440 Nos. gullies with polypropylene removable baskets. • 164 Nos. manholes of 1200 mm internal diameter with average depths between 1.5-4.0 m. • 8 Nos. manholes of 1500 mm internal diameter with average depths between 4.0-5.5 m. • 152 Nos. manholes of 1800 mm internal diameter with average depths between 1.5-8.0 m. Parsons International Ltd. Page 3 of 11
  • 4. CURRICULUM VITAE Mohammed Soliman El Ghazawi • 50 Nos. manholes of 2100 mm internal diameter with average depths between 3.0-8.5 m. g) Road reinstatement: • Temporary Road Reinstatement (Phase 1) = 43,000 m. • Permanent Road Reinstatement (Phase 2) = 203,000 m² h) Construction of approximately 3.8 km RC PVC lined or GRP concrete encased surface drainage pipes and fittings by micro-tunnelling of 1000- 1400 mm diameters with average depths between 7.5-12.5 m. i) Construction of 21 Nos. RC tunnel access shafts with approximate clear dimensions (4x2.5m) and average depths between 7.5-12.5 m. j) Construction of reinforced concrete storm water storage tank of approximately 60x28x10 m with maximum storage capacity of 10,500 m³ including inlet and outlet control penstocks. k) Construction of approximately 265 m concrete boundary wall around attenuation tank including wrought iron railing, entrance gates and site works. l) Supply of 1 No. portable electrical actuator and 1 No. portable generator for the operation of penstock including associated spare parts, tools and lubricants. Date: 06 Dec 2006 – 29 Feb 2008 Location: Egypt Company: AAW Consulting Engineers Position: Senior Projects Manager Description: Job description: - Review Design of the different disciplines. - Check BOQ’s including multiplication of quantities by price and adding up total amount for each bill to calculate the accurate total price of each tender. - Review and evaluate contractors' reservations and conditions which might affect prices and/or quality of tenders. - Ranking of tenders according to their prices and responsiveness to the tender document and make necessary recommendation for awarding contracts. - Attending negotiations and prepare final contract between the Clients and the nominated contractor. - General Planning and coordinating all administrative and technical aspects.. - Leading and assigning the Supervision Team to control all site activities - Holding, Tracking and reporting to all contractual correspondence with the Client, Contractor and any other Third Party. - Study all claims and counter claims to/from the Contractor and the Client, and any other Third Party. - Prepare Variation Order, and Engineer Decisions as per FIDIC. -. Prepare agenda, attend and lead Weekly and Monthly Meetings. - Prepare weekly and monthly reports. Projects description: The Project financed by Al Futtaim Group as a private investment in one of mega Real Estate Development Project in New Cairo City, on an area of 700 Acers,@ 3million M2, includes: Backfill, levelling and compaction of the sub grade, all infrastructure [potable water, surface water, storm water, sewerage drainage networks, W.W. Pump Station, electrical power supply, district cooling system, data and telephone cabling distribution system ], internal roads, construction of 500 villas, commercial & residential & mix use buildings, hotel, mosque, school, library, show rooms, land escape, and all other services required for a five stars living community. The budget of the project is: US$ 650 MILLION. Parsons International Ltd. Page 4 of 11
  • 5. CURRICULUM VITAE Mohammed Soliman El Ghazawi Date: 07 Dec 2005 – 06 Dec 2006 Location: Kuwait Company: Shaheen Al Ghanim Roads & Bridges Contracting Co. SAC [ one year ] Position: Engineering Operations Manager Description: Job description: - Review and study all the original tender documents and addendums, questions & answers, and attend pre-bid meetings with the Client & its consultant. - Prepare queries, send to the Client, and follow up replies. - Bid price estimation of SAC scope of work as per the agreed Pricing Matrix, in association with other Parties[CHEC & GDC] - Attend the JV pricing meetings with its Design Consultant in Kuwait and overseas, and propose and discuss design alternatives for soil improvement and construction elements - Identify, analyze the risk, and suggest solutions, and cost estimate those solutions. - Prepare, cost estimate, compare and select the best solution of the Logistics Plan of SAC scope of work, through different alternatives. - Supervise the preparation of the Commercial Bid Offer, Technical, and all other Tender Submittals. - Reply to the Client clarifications after awarding and participate in negotiations. - Prepare price analysis and price adjustment for the Client, review and resubmit. - Prepare time schedule, resources histogram and cash flow diagram of SAC scope. Other Duties: -Present and introduce Shaheen Al-Ghanim Co. to International Specialist Companies and Consultants in order to create Joint Venture for Pre-Qualification requirements of BOT, DBO, and DBOT & BOOT Projects inside and outside Kuwait. - Supervise the preparation of Prequalification Documents for the following. ⋅ Failaka Desalination & Power Supply Plant. ⋅ Subiya Motor Way - Package III. ⋅ Public Authority for Housing Welfare - New Housing Projects. ⋅ Some Road Projects in Jordan, Yemen, Qatar, and Iraq. - Supervise all the activities of [Tendering, Pricing and Projects Cost Control] Department. - Participate in qualifying SAC to get ISO 9000-2000 certificate: internal & external auditing, prepare, review procedure of engineering department and training of personnel. Projects description: The project consists of Road works, Bridge, and Soil Treatment in, Kuwait Boubyan. Investment amount is US $ 420 Million Parsons International Ltd. Page 5 of 11
  • 6. CURRICULUM VITAE Mohammed Soliman El Ghazawi Date: 15 Nov 2002 – 15 Aug 2005 Location: Egypt Company: Contrack – Orascom J.V Position: Contracting and Procurement Department Manager Description: Job description: - Control of contract correspondence (writing & replying letters) to sub contractors and suppliers, according to their performance in view of the project time schedule. - Co-ordinate with sub-contractors and suppliers, in general, and with NSF in particular, for site visits, testing commissioning, O&M, spare parts, training, and fulfil sub-contract &PO conditions and obligations. - Supervise NSF [subcontractor] scope of work : - Elevated water tank, 1500 cu. m capacity, 75 m. high. - Construction of Portable W.W.T.P and Pump Station[15L/S] - Roof trusses of B03&B06, Maintenance Hanger and Full Cell Maintenance Facility Buildings - Two ground water tanks, 1000 m³ for Fire Pump House B05 - Sun-shades for 25 buildings - Doors of 32 shelters, two elevations, each 15.50*8.30m.(1780 ton total weight) - Miscellaneous steel: hand & guard rails, trellises, ladders, bar gratings, and trench covers in all buildings, 25 guard towers and two main gates at the boundary fence. - Pilot Residential Villas, Living Compounds including playing yards, swimming poles, land escaping,...etc - Review & certify payments and back charge additional costs for sub-contractors and suppliers (down payments, progress payments, and final accounts) - Material quality control: - Review Over, Short & Damage inspection (OS&D) reports. - Review Additional Material Requests (AMR) - Review & following up delivery's documents: PO, Notice of availability(NOA), Shipping Documents(SD), Packing Lists, Bill of Lading, …etc. - Inform vendors and insurance company with short& damage reports and claim for it. - Warehouse control: Administrative, guards, security, and safety wise. - Inventory report's control, in & out, quantity distribution over buildings against take off BOQ, waste control. - Procure missing, short, and damaged materials, locally: - Contact suppliers, receive offers, and negotiate prices & payment terms. - Issue purchase orders (PO) and notice to proceed (NTP) to suppliers. - Follow up procurement stages: down payment, progress payment, final account as per PO terms, fabric, assemble, deliver, install or erect applying inventory and material quality control systems as described above. Projects description: Upgrade Fayed Air Base (Value is $ 130 million), was a complex project of air force base including construction of shelters, runways, apron taxiways, roads, fire defence infrastructure, general underground utilities of different types and sizes, W.W.T.P, and Pilot Residential Villas, Living Compounds including playing yards, swimming poles, land escaping,...etc Parsons International Ltd. Page 6 of 11
  • 7. CURRICULUM VITAE Mohammed Soliman El Ghazawi Date: 01 Aug 1985 – 31 Oct 2002 Location: Cairo, Egypt Company: Egyptian Arab Contracting EAC Position: Senior Project Manager Description: 1- Project Duration: 18.04.2000 to 31.10.2002 Job description: - Reviewing Design, cost estimates and budget for new bids and negotiations with Clients after award - Reviewing time schedules, procurements, equipment & manpower histograms, and cash flow diagrams ( in and out ) - Selecting management and construction teams. - Cost control, Health &Safety and QA/QC control. - Preparing Business Plan. - Procurement of Equipment, labour, materials and sub-contractors. - Meeting with Clients, consultants & project staffs. - Preparations of claims, its negotiations & its settlement. - Reviewing interim statements with Clients & subcontractor's payment and cash flow following up - Preparation with high management levels, the company plans: Future plans executive plans, following up programs, cost and quality control plans, and development plans. Projects description: Construction of a new Real Estate Development in 6-October City, Al Nada Community consists of: [Project cost 180 Million L.E]  150 Residential Villas, Foot print 200 m2 each, duplex.  Mix use commercial &residential multi story buildings  Mosque & Lad Escape  Ground & Elevated Water Tanks  Water Pump Station(Poster)  Gate House & Boundary Wall (Fence)  Internal Roads & underground utilities ( Water, Surface Water & Foul Sewerage Drainage, Electricity, and Telephone networks)  House connections of all services 2- Project Duration: 01.10.1996 to 17.04.2000 Job description: Overall administration, supervision of construction operations and reviewing technical office outputs, interim statements, material laboratory tests, quality control reports, study sub-contracts, preparing claims, correspondence with owner and consultant including but not limited to: - Preparing Business Plan. - Reviewing time schedules – Cash flow – follow-up reports. - Procurement of Equipment, labour, materials and sub-contractors. - Meetings with Clients, consultants, projects staffs Projects description: Construction of 15–Stories Building [Administrative offices for the Electrical – Water Energy Projects] of Ministry of Electricity, Egypt, Cairo, includes: - Excavation, R.C Secant Piles Exc. Sides Protection, - Piles & Raft Foundation - Concrete Structure,[3-story basement+ 12 story super structure] Parsons International Ltd. Page 7 of 11
  • 8. CURRICULUM VITAE Mohammed Soliman El Ghazawi - External & Internal Finishes, Curtain Wall, Claddings, Partitions, - HVAC, chillers, Shield Water Cooling System, 3- Project Duration: 01.12.1990 to 30.09.1996 Job description: Overall administration, supervision of construction operations and reviewing technical office outputs, material laboratory tests, quality control reports, study Contracts, preparing Claims, correspondences with owner and consultant Projects description: . Contracts 24-N, 24-T, 24-W. 24-X, 34A, 34-J-34-L Great Cairo Waste Water Network Project (Nile West Bank), Consultant: AMBRIC: [Budget LE 160Million] Brief Description: - 70,379 LM of Vitrified Clay Pipes with Diameters ranges from 175 - 600 mm - 4,489 LM Collectors of R.C. pipes, there from 1300 m Micro Tunnelling, Diameters ranges from 800 -1200 mm - 3,768 NO Pre-Caste Manholes with Diameters ranges from 1200 - 1800mm - 8,350 NO Inspection Chambers - 56,700 LM UPVC House connections - The project included all the ancillary works of excavate, side support, gravel bed, - Backfill, etc. Lagging system technique was used for supporting trench sides. 4- Project Duration: 01.08.1988 to 30.11.1990 Job description: Overall Design Review, Contract administration, supervision of construction operations and reviewing technical office outputs, interim statements, material laboratory tests, quality control reports, study sub-contracts, preparing claims, correspondence with owner and consultant. Projects description: Construction of the project with total Investment of L.E. 45 millions: (Contract 24-F) Great Cairo W.W. Network Project (Nile West Bank), Consultant: AMBRIC: Brief Description: - Renovation of W.W. Pump Station - Rehabilitation of 1500LM Force Main, 400mm, D.C.I - Supply and install Waste Water gravity sewer network - 1,460 LM R.C. pipes Dia. 1000 and 800mm[ 600 LM - Micro Tunnelling] - Supply and install 446 NO pre-cast Manholes Depths from 1.20 to 8.00 m, Diameter 1200 - 1800 mm. - 9,515 LM Vitrified Clay Pipes dia 175-600mm Parsons International Ltd. Page 8 of 11
  • 9. CURRICULUM VITAE Mohammed Soliman El Ghazawi - 12,000 LM PVC pipes Dia. 150mm, connections 5- Project Duration: 01.08.1985 to July.1988 Job description: Design Review, Construction Supervision, contract administration, Review of time schedules, procurement schedules, monthly progress reports and payment, quality control and follow-up reports, and correspondences with Client and the Contractor Projects description: Construction Supervision of the project with total Investment of L.E.160 millions. Waste water network & Pump Station rehabilitation (Contract No.18) Damanhur and Kafr El-Dawar Cities Brief Description: - Renovation of W.W. Pump Station, 350 L/S - Rehabilitation of 2300LM Force Main, 500mm, D.C.I - Rehabilitation of 120 km and replacement of 20 Km of sewer lines VC, RC, Pipes, Dia 1200-300mm [500 m Micro Tunnelling] - Cast in place 225 NO Manholes Depths from 1.20 to 8.00 m, Diameter 1200 - 1800 mm. - 500,000 m² Reinstatement of Asphalt pavements. Date: 01 July 1981 – 30 Jun 1985 Location: Libya Company: National Co. For Municipal Works Position: Project Manager Description: Job description: Design Review, Supervision of Civil Construction, and Electro-Mechanical Installation. Contract administration, Co-ordination between Contractors, program scheduling, directing design teams, allocating resources for timely completion and budget control, Preparation of Tender Evaluation Reports, and Analysis in accordance with the provisions of tenders. Projects description: Design and Construction Supervision of Waste Water Treatment Plant, Pumping station, and Rising Mains at Derna City- Libya, of total value US $ 220 million. Brief Description: - Underground watertight concrete tanks, circular and rectangular [Concrete Volume 6500 m³] as follow: 6 NO, Circular Sedimentation Tanks[Primer & Final], 2 NO-Rectangular Aeration Tanks, 2NO Digestion Tanks, 4 NO Drying Beds. - 1100 LM Interconnecting pipelines [DCI, 250-600mm] - 6500 LM Rising Mains [DCI, 600mm] - Micro-Tunnelling of 1500 m R.C. - Gravity collector 1000mm Diameter, 150 meter average long Drives and R.C shafts of depths between 8.00 & 12.00 meters. Parsons International Ltd. Page 9 of 11
  • 10. CURRICULUM VITAE Mohammed Soliman El Ghazawi - 2 NO Pumping Stations, Sump 12m deep, Pumps 350L/S Date: 01 Nov 1978 – 30 June 1981 Location: Benghazi, Libya Company: Israa Contracting Company Position: Project Manager Description: Job description: Overall administration and technical and financial supervision. Projects description: Construction of the project (Al-Magroon- Karkoura- Al-Rakta) High Way with a total Investment of USD 12 million: Brief Description: - First class road, work includes: excavation in rock, backfill, concrete structures. - Heavy duty equipment and explosion [blasting] was used in earth moving. - Construction of all utilities: Water supply, surface drainage, power supply, etc. Date: 14 Apr 1974 – 31 Oct 1978 Location: Libya Company: Canal Harbour Works Company Position: Resident Engineer Description: Job description: Supervision of Building Construction, Q.C. Material Laboratory, technical office. Projects description: Construction of the project with total Investment of USD 16.50 million: - Derna Port (Consultant: Rehndle, Palmer & Tritton) Brief Description: - Breakwaters 2.50 Km, stone core, stone armour blocks 1.0 million cubic meters, excavation and dredging 1.50 million cubic meters to a depth of 10 meters. - Service buildings: Administrative, Sheds, Guard house, stores, sub- stations…etc - 600 LM quays (concrete blocks& sheet piles), stock yards backfill 2 million m³, and 25 Km Roads inside and outside the port were constructed. Date: 25 Mar 1973 – 14 Apr 1974 Location: Egypt Company: Canal Harbour Works Company Position: Resident Site Engineer Description: Job description: Supervision of construction, Q.C. Material Laboratory, technical office. Projects description: -1st stage of Sankouria Agricultural Drain, Samalout - Menya - Construction of a 25 km drain with a 50 m² water cross-section area. - Embankments – Roads – over-crossings (Siphons, Bridges, Pedals) Date: 12 Oct 1972 – 25 Mar 1973 Location: Egypt Company: Arab Contractors (Othman A. Othman) Position: Site Engineer Description: Job description: - Quantity Surveying – Preparation of sub-contractors monthly certificates - Follow-up project schedules, Q.C. reporting. Projects description: Participated in the project with total value of L.E. 12.50 millions: Parsons International Ltd. Page 10 of 11
  • 11. CURRICULUM VITAE Mohammed Soliman El Ghazawi - Construction of Residential Buildings - 2nd stage of textile factory – Damietta Parsons International Ltd. Page 11 of 11