PROPOSAL ON THE BEST PROCUREMENT
METHOD, TENDERING METHOD and CONTRACT
ARRANGEMENT
[ QSB 60604 PROFESSIONAL PRACTICE 1 ]
Group Members:
KO BOU SIM (0325271)
KONG YE XIANG (0323886)
LAU MAO HUA (0320249)
LEE KAILYN (0320273)
LEE SHZE HWA (0320053)
Introduction
★ Development of a RM600 Million Hotel and Shopping Complex in the center of the
Golden Triangle, Kuala Lumpur
★ Meet client’s satisfaction
★ Fit client’s requirement
★ Ensure project’s successfulness
Proposed Procurement Method :
Management
Contracting
Procurement
Method
Management Contracting Procurement Method
★ Both design and construction process proceed in parallel.
★ Shorten the overall construction time.
★ Involvement of Management Contactor (MC) in the early design stage.
★ Responsibility of MC :
- Manage all the works package contractors.
- Coordinate all the construction activities.
- Act as advisor to improve the constructability of the design.
Management Contracting Procurement Method
Recommendation of Procurement Method
Time saving
★ The design and construction process overlapped.
★ Plan the work in sequence to allow the commencement of construction work while the building
still designing.
Flexibility in design
★ Can be effective to the uncertainty of project requirement.
★ Able to cope with any variation of the design.
Recommendation of Procurement Method
Better cost management
★ MC required to submit a contract cost plan based on contract prime cost of work packages at the
beginning stage.
★ Enable MC to monitor and control the cost against the actual prime cost .
Competitive price
★ Competition between the package subcontractor arise.
★ Able to obtain a cheaper price from several work package contractors.
Disadvantages of Management Contracting Method
★ Greater variation.
★ Uncertainty of final cost until the last work package has been signed.
★ Require an experienced and capable MC to manage all the work package
constructors.
Proposed Tendering Process :
Two-Stage
Selective
Tendering
★ Initial stage : pre-qualification
★ Second stage : negotiation between employer and contractor
★ Reasonably transparent.
★ Able to get rid of non-performing contractors.
Recommendation : Two-stage Selection tender
Advantages
★ Contractor’s knowledge of their previous experience on the similar scheme is available at the
early stage.
★ Relationship between contractor and their chosen team is more likely to have a better
understanding of the requirement through shared knowledge and good communication.
★ Eliminate the risks during implementation of the project.
★ Better monitoring and programming on costing process and pre construction design
development.
★ Lead to the introduce of value engineering in the project and also provide a better
understanding of financial commitment.
★ Cost certainty is improved and the risk to the employer is reduced.
Advantages
★ Contractor is able to suggest on practical issues and buildability issues at an earlier stage.
★ To identify and resolve any hurdles may occur during construction.
★ Enables client to have a clearer mind on the sustainability issues and environmental
restriction.
Advantages
Contract Arrangement :
Type of Contract
TYPE OF CONTRACT - COST PLUS FIXED FEE
★ Fixed service fee is derived from Contract Cost plan (estimated prime cost for various
subcontractor ) .
★ Works is awarded to work packages contractor on lump sum basis.
★ Estimated prime cost used to monitor against actual prime cost upon award.
★ Total Contract Sum= Prime cost of work packages + Fixed services fee for MC.
TYPE OF CONTRACT - COST PLUS FIXED FEE
BENEFIT FOR CLIENT
★ Service fee is fixed and it does not fluctuate with the actual cost.
★ Motivate to carry out work in faster way which shorten the completion time.
BENEFIT FOR CONTRACTOR
★ Conduct the work in diligent manner.
Contract Arrangement :
Form of Contract
FORM OF CONTRACT - PAM 2006 (WITHOUT QUANTITIES)
★ Amended provision to suits project setting-MC procurement.
Table above shows the organization chart of Management Contracting procurement method.
FORM OF CONTRACT - PAM 2006 (WITHOUT QUANTITIES)
★ Pre-tender stage: MC + Consultant team - Buildability and Feasibility of design.
★ Post-tender stage: Consultant team’s obligation transfer to MC - issuance of certificate
★ Example: Interim claim, Valuation of Variations.
THANK YOU

More Related Content

What's hot

Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement managementraymond_wan2005
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Michael Audu
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 AssignmentMelvin Lim
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-completeYong Sy
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 Pang Khai Shuen
 
Persons involved in tenders and contract
Persons involved in tenders and contractPersons involved in tenders and contract
Persons involved in tenders and contractshiva prakash
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8lohwenjun
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentHaziq1511
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A SeminarPang Khai Shuen
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 reportNgo Jia Haur
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
Professional practice 1
Professional practice 1Professional practice 1
Professional practice 1tfkc1212
 
Single stage design and build method & construction project management
Single stage design and build method & construction project managementSingle stage design and build method & construction project management
Single stage design and build method & construction project managementJohn Constance
 

What's hot (20)

Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management20080704 innovative approach in contracts and tender procurement management
20080704 innovative approach in contracts and tender procurement management
 
Strategies in building procurement (summarized)
Strategies in building procurement (summarized)Strategies in building procurement (summarized)
Strategies in building procurement (summarized)
 
Final pp1
Final pp1Final pp1
Final pp1
 
Professional Practice 1 Assignment
Professional Practice 1 AssignmentProfessional Practice 1 Assignment
Professional Practice 1 Assignment
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Pp 1-report-complete
Pp 1-report-completePp 1-report-complete
Pp 1-report-complete
 
A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1 A Report on Procurement Strategies - PP1
A Report on Procurement Strategies - PP1
 
Procurement system
Procurement systemProcurement system
Procurement system
 
Persons involved in tenders and contract
Persons involved in tenders and contractPersons involved in tenders and contract
Persons involved in tenders and contract
 
Pp1 assignment group 8
Pp1 assignment group 8Pp1 assignment group 8
Pp1 assignment group 8
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Professional Practice 1 Group Assignment
Professional Practice 1 Group AssignmentProfessional Practice 1 Group Assignment
Professional Practice 1 Group Assignment
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 
Professional practice 1 report
Professional practice 1 reportProfessional practice 1 report
Professional practice 1 report
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
Professional practice 1
Professional practice 1Professional practice 1
Professional practice 1
 
Single stage design and build method & construction project management
Single stage design and build method & construction project managementSingle stage design and build method & construction project management
Single stage design and build method & construction project management
 

Similar to PP1 presentation

Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management ContractingKai Yun Pang
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)tfkc1212
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lin Hui
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slidesashleyyeap
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practiceseenyeeyong
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignmentashleyyeap
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides Pang Khai Shuen
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 AClive Price
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Kai Yun Pang
 

Similar to PP1 presentation (20)

Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Professional practice 1 (1)
Professional practice 1 (1)Professional practice 1 (1)
Professional practice 1 (1)
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
Professional Practice I Assignment Slides
Professional Practice I Assignment SlidesProfessional Practice I Assignment Slides
Professional Practice I Assignment Slides
 
TOPIC1.pdf
TOPIC1.pdfTOPIC1.pdf
TOPIC1.pdf
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Professional Practice
Professional PracticeProfessional Practice
Professional Practice
 
Professional Practice I Assignment
Professional Practice I AssignmentProfessional Practice I Assignment
Professional Practice I Assignment
 
PP1 - Presentation Slides
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)Time cost trade off with primavera (real case)
Time cost trade off with primavera (real case)
 
TURNKEY PROJECT.pptx
TURNKEY PROJECT.pptxTURNKEY PROJECT.pptx
TURNKEY PROJECT.pptx
 
Mega project
Mega projectMega project
Mega project
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
CV Clive V2 180612 A
CV Clive V2 180612 ACV Clive V2 180612 A
CV Clive V2 180612 A
 
Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)Assignment - Management Contracting (Presentation Slide)
Assignment - Management Contracting (Presentation Slide)
 

More from Kailyn Lee

Software Application report
Software Application reportSoftware Application report
Software Application reportKailyn Lee
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentationKailyn Lee
 
Estimating various types of estimating
Estimating various types of estimatingEstimating various types of estimating
Estimating various types of estimatingKailyn Lee
 
Eca presentation
Eca presentationEca presentation
Eca presentationKailyn Lee
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation Kailyn Lee
 
Buildingservices2 bld60503
Buildingservices2 bld60503Buildingservices2 bld60503
Buildingservices2 bld60503Kailyn Lee
 
People's dynamic individual (autosaved)
People's dynamic individual (autosaved)People's dynamic individual (autosaved)
People's dynamic individual (autosaved)Kailyn Lee
 
Safety individual final
Safety individual finalSafety individual final
Safety individual finalKailyn Lee
 
Traffic management safety six key issues
Traffic management safety   six key issuesTraffic management safety   six key issues
Traffic management safety six key issuesKailyn Lee
 
Bs 2 individual
Bs 2 individualBs 2 individual
Bs 2 individualKailyn Lee
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
ManagementscienceassignmentKailyn Lee
 
Ss report-2-field-data-latest
Ss report-2-field-data-latestSs report-2-field-data-latest
Ss report-2-field-data-latestKailyn Lee
 
Bs1 final report_templaterecovered
Bs1 final report_templaterecoveredBs1 final report_templaterecovered
Bs1 final report_templaterecoveredKailyn Lee
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 
Psycho video-slides
Psycho video-slidesPsycho video-slides
Psycho video-slidesKailyn Lee
 
Psycho slides-1 (1)
Psycho slides-1 (1)Psycho slides-1 (1)
Psycho slides-1 (1)Kailyn Lee
 

More from Kailyn Lee (20)

Software
Software Software
Software
 
Software Application report
Software Application reportSoftware Application report
Software Application report
 
Estimating presentation
Estimating presentationEstimating presentation
Estimating presentation
 
Estimating various types of estimating
Estimating various types of estimatingEstimating various types of estimating
Estimating various types of estimating
 
PP1 report
PP1 reportPP1 report
PP1 report
 
Eca presentation
Eca presentationEca presentation
Eca presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Buildingservices2 bld60503
Buildingservices2 bld60503Buildingservices2 bld60503
Buildingservices2 bld60503
 
People's dynamic individual (autosaved)
People's dynamic individual (autosaved)People's dynamic individual (autosaved)
People's dynamic individual (autosaved)
 
Safety individual final
Safety individual finalSafety individual final
Safety individual final
 
Traffic management safety six key issues
Traffic management safety   six key issuesTraffic management safety   six key issues
Traffic management safety six key issues
 
Bs 2 individual
Bs 2 individualBs 2 individual
Bs 2 individual
 
Managementscienceassignment
ManagementscienceassignmentManagementscienceassignment
Managementscienceassignment
 
Ss report-2-field-data-latest
Ss report-2-field-data-latestSs report-2-field-data-latest
Ss report-2-field-data-latest
 
Ss field-data
Ss field-dataSs field-data
Ss field-data
 
Bs1 final report_templaterecovered
Bs1 final report_templaterecoveredBs1 final report_templaterecovered
Bs1 final report_templaterecovered
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Psycho video-slides
Psycho video-slidesPsycho video-slides
Psycho video-slides
 
Psycho slides-1 (1)
Psycho slides-1 (1)Psycho slides-1 (1)
Psycho slides-1 (1)
 
Psychologylor
PsychologylorPsychologylor
Psychologylor
 

Recently uploaded

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 

Recently uploaded (20)

Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

PP1 presentation

  • 1. PROPOSAL ON THE BEST PROCUREMENT METHOD, TENDERING METHOD and CONTRACT ARRANGEMENT [ QSB 60604 PROFESSIONAL PRACTICE 1 ]
  • 2. Group Members: KO BOU SIM (0325271) KONG YE XIANG (0323886) LAU MAO HUA (0320249) LEE KAILYN (0320273) LEE SHZE HWA (0320053)
  • 3. Introduction ★ Development of a RM600 Million Hotel and Shopping Complex in the center of the Golden Triangle, Kuala Lumpur ★ Meet client’s satisfaction ★ Fit client’s requirement ★ Ensure project’s successfulness
  • 4. Proposed Procurement Method : Management Contracting Procurement Method
  • 5. Management Contracting Procurement Method ★ Both design and construction process proceed in parallel. ★ Shorten the overall construction time. ★ Involvement of Management Contactor (MC) in the early design stage. ★ Responsibility of MC : - Manage all the works package contractors. - Coordinate all the construction activities. - Act as advisor to improve the constructability of the design.
  • 7. Recommendation of Procurement Method Time saving ★ The design and construction process overlapped. ★ Plan the work in sequence to allow the commencement of construction work while the building still designing. Flexibility in design ★ Can be effective to the uncertainty of project requirement. ★ Able to cope with any variation of the design.
  • 8. Recommendation of Procurement Method Better cost management ★ MC required to submit a contract cost plan based on contract prime cost of work packages at the beginning stage. ★ Enable MC to monitor and control the cost against the actual prime cost . Competitive price ★ Competition between the package subcontractor arise. ★ Able to obtain a cheaper price from several work package contractors.
  • 9. Disadvantages of Management Contracting Method ★ Greater variation. ★ Uncertainty of final cost until the last work package has been signed. ★ Require an experienced and capable MC to manage all the work package constructors.
  • 10. Proposed Tendering Process : Two-Stage Selective Tendering
  • 11. ★ Initial stage : pre-qualification ★ Second stage : negotiation between employer and contractor ★ Reasonably transparent. ★ Able to get rid of non-performing contractors. Recommendation : Two-stage Selection tender
  • 12. Advantages ★ Contractor’s knowledge of their previous experience on the similar scheme is available at the early stage. ★ Relationship between contractor and their chosen team is more likely to have a better understanding of the requirement through shared knowledge and good communication. ★ Eliminate the risks during implementation of the project.
  • 13. ★ Better monitoring and programming on costing process and pre construction design development. ★ Lead to the introduce of value engineering in the project and also provide a better understanding of financial commitment. ★ Cost certainty is improved and the risk to the employer is reduced. Advantages
  • 14. ★ Contractor is able to suggest on practical issues and buildability issues at an earlier stage. ★ To identify and resolve any hurdles may occur during construction. ★ Enables client to have a clearer mind on the sustainability issues and environmental restriction. Advantages
  • 16. TYPE OF CONTRACT - COST PLUS FIXED FEE ★ Fixed service fee is derived from Contract Cost plan (estimated prime cost for various subcontractor ) . ★ Works is awarded to work packages contractor on lump sum basis. ★ Estimated prime cost used to monitor against actual prime cost upon award. ★ Total Contract Sum= Prime cost of work packages + Fixed services fee for MC.
  • 17. TYPE OF CONTRACT - COST PLUS FIXED FEE BENEFIT FOR CLIENT ★ Service fee is fixed and it does not fluctuate with the actual cost. ★ Motivate to carry out work in faster way which shorten the completion time. BENEFIT FOR CONTRACTOR ★ Conduct the work in diligent manner.
  • 19. FORM OF CONTRACT - PAM 2006 (WITHOUT QUANTITIES) ★ Amended provision to suits project setting-MC procurement. Table above shows the organization chart of Management Contracting procurement method.
  • 20. FORM OF CONTRACT - PAM 2006 (WITHOUT QUANTITIES) ★ Pre-tender stage: MC + Consultant team - Buildability and Feasibility of design. ★ Post-tender stage: Consultant team’s obligation transfer to MC - issuance of certificate ★ Example: Interim claim, Valuation of Variations.