1. Gary Davis
Maintenance Supervisor - Tennessee Valley Authority
Work Experience
Maintenance Supervisor
Tennessee Valley Authority
January 2011 to Present
Supervision of various craft disciplines including pipefitter, machinist and boilermakers in the performance
of plant maintenance to a 9 unit fossil fired generating station.
Assure work orders are properly addressed in a T-8 week Premavera P-6/ Maximo planning process and
all work is performed to meet schedule compliance. Managing all work with safety as the first priority.
Walked down all corrective maintenance work orders to assure material, clearance and other work related
requirements are met.
Sr. Project Manager
Demark, Inc
October 2010 to November 2010
Responsibilities included management of work activities on the Feedwater Heater Replacement Project.
Responsible for the report out on the project to the OCC meeting daily, coordinated various contractors
including Shaw Group, Weld Tech, Mammoet USA and various Exelon support groups including
maintenance, HP. Updated schedules, coordinated with operations and managed safety, radiological and
human performance activities. Held daily schedule update and issue resolution meetings with contractors.
K & D Professional Services
January 2008 to September 2010
K&D Professional Services) which included development of a business plan, web site, incorporation,
obtaining appropriate business insurance policies and state tax accounts for various states.
Site Manager
Day Zimmermann NPS Corporation
December 2007 to December 2008
My assignment was to the Susquehanna Steam Electric Station for PPL Inc. (client) as Site Manager.
Responsibilities included overall management of a nuclear plant maintenance contract. This included the
recruiting, and management of 47 staff personnel, consisting of craft supervisors, scheduling personnel,
safety representatives, accounting and time keeping personnel, and 586 craft of various disciplines. I
managed various modifications to plant systems including Recirculation Pump replacements, electrical
modifications and maintenance activities including various piping replacements.
Site Manager
Day Zimmermann NPS Corporation
August 2007 to November 2007
I was assigned to the Saint Lucie Nuclear Power Station. Duties encompassed staffing, labor relations,
client relations, and cost control initiatives, all being executed in a world class safety culture. I interfaced
2. vertically through levels of customer management team, from the field assigned personnel through senior
management. I provided an ability to cohesively manage our site team allowing for the "sharing" of best
practices and continuous improvement practices. Mods included Turbine piping fabrication and
replacement of over 2400 feet of the ESW system, condenser repairs and support for Steam Gen.
changeout activities and Drywell Sump mods.
Site Manager
The Shaw Group, Inc
June 2005 to July 2007
Managed all maintenance/modification projects for South Texas Project, Nuclear Generating Station
(client). Modifications included replacement of Feedwater Heat Exchangers which included removal of
electrical and mechanical interferences, providing openings in the side of the building for rigging the
equipment out. I provided management of pipe weld over lays and replacements of Turbine Building
cooling water pipe. Also managed various plant systems and security modifications.
Site Manager
The Shaw Group, Inc
December 2001 to June 2005
Managed all maintenance/modification projects at the Grand Gulf Nuclear Station for the Entergy Nuclear
Group (client). Maintained and developed Union and Client relationships, and met all performance
indicators as required. Timely recruited and staffed for plant outages. Projects included construction of an
auxiliary Marley Cooling Tower with the associated underground piping installations and tie in to the Main
Cooling Tower piping. Security Mod.s consisting of relocation of security fence and razor wire installation,
erection of Bullet Resistant Enclosure (BREs) and Dry Fuel Storage Project.
Project Manager
The Offenhauser Company
-
Houston, TX
July 2000 to November 2001
My responsibilities included overall management of fabrication and installation activities for architectural
metals on various projects including two museums in Fort Worth, TX and an expansion to the Bush
Intercontinental Airport in Houston TX.
Manager
Houston Steel Equipment Co
-
Houston, TX
August 1999 to June 2000
Managed sales and installation of equipment handling and storage equipment.
Construction Superintendent
Synchro Building Corporation
-
Houston, TX
July 1998 to July 1999
3. Managed the daily construction activities of all subcontractors on a warehouse/office complex for an oil
exploration client. Duties included coordination of all subcontractor work and schedule performance as
required.
Piping Superintendent
Day Zimmermann NPS
January 1997 to June 1998
My assignment was at the Shawnee Power Plant for Tennessee Valley Authority (client), where I
supervised pipe fitters on a three unit coal fired power plant. I supervising modifications and maintenance
to mechanical systems to support plant turnarounds and during operations.
Stone and Webster Construction Co.
Site Manager/Chief Construction Superintendent
As Chief Construction Superintendent at the Brownsferry Nuclear Station, I started as a Drywell
Coordinator with responsibility for the coordination of all work in the Drywell. This included schedule
variation and prioritization approvals for work performed in the drywell which included Reactor
Recirculation Piping replacement activities, structural modifications, RCS pump change outs and all other
work activities. Later assignments included managing three supervisors over various craft. Craft included
pipefitters, ironworkers and electricians performing various construction activities.
I was promoted to Site Manager at the Limerick Nuclear Generating Station where I was responsible for
all maintenance activities. This included modifications such as replacement of the main steam lines to the
turbine, replacement of the RHR spargers in the suppression pool and various maintenance activities.
Plant Technical Services
Outage Coordinator
Originally assigned to the Limerick Generating Station, responsibilities included working with the planning
and scheduling group to develop the outage schedule based on input from the operations group, various
maintenance groups and engineering organizations. During the outage I prioritized all work activities and
testing to assure scheduled work met all expectations.
Project Manager/Welding Engineer
Gulf States Utilities
June 1980 to June 1990
Senior Area Coordinator with Gulf States Utilities, including management of underwater weld repairs to in
vessel feedwater header components during one outage and Project Manager over Condenser Mods. I
also served in the Outage Management group as a Shift Outage Coordinator during outages (10 yrs.). I
was a Field Welding Engineer, Welding Foreman and welder with Brown and Root Construction Co. (7
yrs). I performed work supporting a subcontractor for the installation of HDPE piping on a Petroleum
Refinery water system in Old Ocean, Texas.
Education
Management Solutions
University of Alabama