SlideShare a Scribd company logo
1 of 3
Download to read offline
Gary Davis
Maintenance Supervisor - Tennessee Valley Authority
Work Experience
Maintenance Supervisor
Tennessee Valley Authority
January 2011 to Present
Supervision of various craft disciplines including pipefitter, machinist and boilermakers in the performance
of plant maintenance to a 9 unit fossil fired generating station.
Assure work orders are properly addressed in a T-8 week Premavera P-6/ Maximo planning process and
all work is performed to meet schedule compliance. Managing all work with safety as the first priority.
Walked down all corrective maintenance work orders to assure material, clearance and other work related
requirements are met.
Sr. Project Manager
Demark, Inc
October 2010 to November 2010
Responsibilities included management of work activities on the Feedwater Heater Replacement Project.
Responsible for the report out on the project to the OCC meeting daily, coordinated various contractors
including Shaw Group, Weld Tech, Mammoet USA and various Exelon support groups including
maintenance, HP. Updated schedules, coordinated with operations and managed safety, radiological and
human performance activities. Held daily schedule update and issue resolution meetings with contractors.
K & D Professional Services
January 2008 to September 2010
K&D Professional Services) which included development of a business plan, web site, incorporation,
obtaining appropriate business insurance policies and state tax accounts for various states.
Site Manager
Day Zimmermann NPS Corporation
December 2007 to December 2008
My assignment was to the Susquehanna Steam Electric Station for PPL Inc. (client) as Site Manager.
Responsibilities included overall management of a nuclear plant maintenance contract. This included the
recruiting, and management of 47 staff personnel, consisting of craft supervisors, scheduling personnel,
safety representatives, accounting and time keeping personnel, and 586 craft of various disciplines. I
managed various modifications to plant systems including Recirculation Pump replacements, electrical
modifications and maintenance activities including various piping replacements.
Site Manager
Day Zimmermann NPS Corporation
August 2007 to November 2007
I was assigned to the Saint Lucie Nuclear Power Station. Duties encompassed staffing, labor relations,
client relations, and cost control initiatives, all being executed in a world class safety culture. I interfaced
vertically through levels of customer management team, from the field assigned personnel through senior
management. I provided an ability to cohesively manage our site team allowing for the "sharing" of best
practices and continuous improvement practices. Mods included Turbine piping fabrication and
replacement of over 2400 feet of the ESW system, condenser repairs and support for Steam Gen.
changeout activities and Drywell Sump mods.
Site Manager
The Shaw Group, Inc
June 2005 to July 2007
Managed all maintenance/modification projects for South Texas Project, Nuclear Generating Station
(client). Modifications included replacement of Feedwater Heat Exchangers which included removal of
electrical and mechanical interferences, providing openings in the side of the building for rigging the
equipment out. I provided management of pipe weld over lays and replacements of Turbine Building
cooling water pipe. Also managed various plant systems and security modifications.
Site Manager
The Shaw Group, Inc
December 2001 to June 2005
Managed all maintenance/modification projects at the Grand Gulf Nuclear Station for the Entergy Nuclear
Group (client). Maintained and developed Union and Client relationships, and met all performance
indicators as required. Timely recruited and staffed for plant outages. Projects included construction of an
auxiliary Marley Cooling Tower with the associated underground piping installations and tie in to the Main
Cooling Tower piping. Security Mod.s consisting of relocation of security fence and razor wire installation,
erection of Bullet Resistant Enclosure (BREs) and Dry Fuel Storage Project.
Project Manager
The Offenhauser Company
-
Houston, TX
July 2000 to November 2001
My responsibilities included overall management of fabrication and installation activities for architectural
metals on various projects including two museums in Fort Worth, TX and an expansion to the Bush
Intercontinental Airport in Houston TX.
Manager
Houston Steel Equipment Co
-
Houston, TX
August 1999 to June 2000
Managed sales and installation of equipment handling and storage equipment.
Construction Superintendent
Synchro Building Corporation
-
Houston, TX
July 1998 to July 1999
Managed the daily construction activities of all subcontractors on a warehouse/office complex for an oil
exploration client. Duties included coordination of all subcontractor work and schedule performance as
required.
Piping Superintendent
Day Zimmermann NPS
January 1997 to June 1998
My assignment was at the Shawnee Power Plant for Tennessee Valley Authority (client), where I
supervised pipe fitters on a three unit coal fired power plant. I supervising modifications and maintenance
to mechanical systems to support plant turnarounds and during operations.
Stone and Webster Construction Co.
Site Manager/Chief Construction Superintendent
As Chief Construction Superintendent at the Brownsferry Nuclear Station, I started as a Drywell
Coordinator with responsibility for the coordination of all work in the Drywell. This included schedule
variation and prioritization approvals for work performed in the drywell which included Reactor
Recirculation Piping replacement activities, structural modifications, RCS pump change outs and all other
work activities. Later assignments included managing three supervisors over various craft. Craft included
pipefitters, ironworkers and electricians performing various construction activities.
I was promoted to Site Manager at the Limerick Nuclear Generating Station where I was responsible for
all maintenance activities. This included modifications such as replacement of the main steam lines to the
turbine, replacement of the RHR spargers in the suppression pool and various maintenance activities.
Plant Technical Services
Outage Coordinator
Originally assigned to the Limerick Generating Station, responsibilities included working with the planning
and scheduling group to develop the outage schedule based on input from the operations group, various
maintenance groups and engineering organizations. During the outage I prioritized all work activities and
testing to assure scheduled work met all expectations.
Project Manager/Welding Engineer
Gulf States Utilities
June 1980 to June 1990
Senior Area Coordinator with Gulf States Utilities, including management of underwater weld repairs to in
vessel feedwater header components during one outage and Project Manager over Condenser Mods. I
also served in the Outage Management group as a Shift Outage Coordinator during outages (10 yrs.). I
was a Field Welding Engineer, Welding Foreman and welder with Brown and Root Construction Co. (7
yrs). I performed work supporting a subcontractor for the installation of HDPE piping on a Petroleum
Refinery water system in Old Ocean, Texas.
Education
Management Solutions
University of Alabama

More Related Content

What's hot

Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 ResumeJohn Hartman
 
Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017ERNIE BOJORQUEZ
 
Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015Terry Barwick
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resumeDerek Dhonau
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhil Karow
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone ResumeLagrone Andy
 
John Stefanick 2015 resume 5
John Stefanick 2015 resume 5John Stefanick 2015 resume 5
John Stefanick 2015 resume 5john stefanick
 
Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1Thomas Mucha
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 

What's hot (20)

James Hoove1 (1)
James Hoove1 (1)James Hoove1 (1)
James Hoove1 (1)
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Hartman, John - 2016 Resume
Hartman, John - 2016 ResumeHartman, John - 2016 Resume
Hartman, John - 2016 Resume
 
Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017Ernesto Bojorquez Resume Jan. 07 2017
Ernesto Bojorquez Resume Jan. 07 2017
 
Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16
 
TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015TerryBarwickResume20thJan2015
TerryBarwickResume20thJan2015
 
Project Experience
Project ExperienceProject Experience
Project Experience
 
Derek Dhonau resume
Derek Dhonau resumeDerek Dhonau resume
Derek Dhonau resume
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Cantrell Steve H
Cantrell Steve HCantrell Steve H
Cantrell Steve H
 
Resume_Bobby_Horan
Resume_Bobby_HoranResume_Bobby_Horan
Resume_Bobby_Horan
 
Andrew LaGrone Resume
Andrew LaGrone ResumeAndrew LaGrone Resume
Andrew LaGrone Resume
 
WHETTONMarkResume
WHETTONMarkResumeWHETTONMarkResume
WHETTONMarkResume
 
John Stefanick 2015 resume 5
John Stefanick 2015 resume 5John Stefanick 2015 resume 5
John Stefanick 2015 resume 5
 
Trvl Tech
Trvl TechTrvl Tech
Trvl Tech
 
RCS Project Profiles
RCS Project ProfilesRCS Project Profiles
RCS Project Profiles
 
Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1Revised Tom Nuc. Res. #1
Revised Tom Nuc. Res. #1
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 

Viewers also liked

Warehousing & storage NVQ level 3
Warehousing & storage NVQ level 3Warehousing & storage NVQ level 3
Warehousing & storage NVQ level 3The Pathway Group
 
Stalin_resumedoc1
Stalin_resumedoc1Stalin_resumedoc1
Stalin_resumedoc1stalin B
 
Thornton Transcript
Thornton TranscriptThornton Transcript
Thornton TranscriptJim Thornton
 
Northampton PD Training certificate 1985
Northampton PD Training certificate 1985Northampton PD Training certificate 1985
Northampton PD Training certificate 1985Scott Bellesfield
 
Que es un wiki
Que es un wikiQue es un wiki
Que es un wikiBenja2013
 
Портфолио
ПортфолиоПортфолио
ПортфолиоCreativeowl
 
Teaching vs learning
Teaching vs learningTeaching vs learning
Teaching vs learningCésar Chóez
 
Olga hitcher presentation
Olga hitcher presentationOlga hitcher presentation
Olga hitcher presentationOlga_Savelieva
 
Caderno do aluno biologia 3 ano vol 2 2014 2017
Caderno do aluno biologia 3 ano vol 2 2014 2017Caderno do aluno biologia 3 ano vol 2 2014 2017
Caderno do aluno biologia 3 ano vol 2 2014 2017professora de geografia
 
Brincadeiras antigas e novas
Brincadeiras antigas e novasBrincadeiras antigas e novas
Brincadeiras antigas e novasLizsantos_vitoria
 
Brinquedos e brincadeiras na educação infantil
Brinquedos e brincadeiras na educação infantilBrinquedos e brincadeiras na educação infantil
Brinquedos e brincadeiras na educação infantilSimoneHelenDrumond
 

Viewers also liked (13)

Warehousing & storage NVQ level 3
Warehousing & storage NVQ level 3Warehousing & storage NVQ level 3
Warehousing & storage NVQ level 3
 
Stalin_resumedoc1
Stalin_resumedoc1Stalin_resumedoc1
Stalin_resumedoc1
 
Thornton Transcript
Thornton TranscriptThornton Transcript
Thornton Transcript
 
RLAGBAS CV_sctnp
RLAGBAS CV_sctnpRLAGBAS CV_sctnp
RLAGBAS CV_sctnp
 
Northampton PD Training certificate 1985
Northampton PD Training certificate 1985Northampton PD Training certificate 1985
Northampton PD Training certificate 1985
 
Que es un wiki
Que es un wikiQue es un wiki
Que es un wiki
 
RAJESH_RESUME
RAJESH_RESUMERAJESH_RESUME
RAJESH_RESUME
 
Портфолио
ПортфолиоПортфолио
Портфолио
 
Teaching vs learning
Teaching vs learningTeaching vs learning
Teaching vs learning
 
Olga hitcher presentation
Olga hitcher presentationOlga hitcher presentation
Olga hitcher presentation
 
Caderno do aluno biologia 3 ano vol 2 2014 2017
Caderno do aluno biologia 3 ano vol 2 2014 2017Caderno do aluno biologia 3 ano vol 2 2014 2017
Caderno do aluno biologia 3 ano vol 2 2014 2017
 
Brincadeiras antigas e novas
Brincadeiras antigas e novasBrincadeiras antigas e novas
Brincadeiras antigas e novas
 
Brinquedos e brincadeiras na educação infantil
Brinquedos e brincadeiras na educação infantilBrinquedos e brincadeiras na educação infantil
Brinquedos e brincadeiras na educação infantil
 

Similar to Davis Gary 0415 PM-LIR

AlbertiResume Updated
AlbertiResume UpdatedAlbertiResume Updated
AlbertiResume UpdatedJason Alberti
 
Michael C Brieck Resume
Michael C Brieck ResumeMichael C Brieck Resume
Michael C Brieck ResumeMichael Brieck
 
Resume Maint Mngmt 2016
Resume Maint Mngmt  2016Resume Maint Mngmt  2016
Resume Maint Mngmt 2016Thomas Brown
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public ResumeLee Riopel
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Randy Seperak
 
Bruce Drake Resume and Certifications
Bruce Drake Resume and CertificationsBruce Drake Resume and Certifications
Bruce Drake Resume and CertificationsBruce Drake
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016Pedro Rosario
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4Jeff Lyman
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4Jeff Lyman
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPaul Newby
 
West.Robert.resume.2016-02
West.Robert.resume.2016-02West.Robert.resume.2016-02
West.Robert.resume.2016-02Robert West
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume Michael Craig
 

Similar to Davis Gary 0415 PM-LIR (20)

Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
AlbertiResume Updated
AlbertiResume UpdatedAlbertiResume Updated
AlbertiResume Updated
 
Michael C Brieck Resume
Michael C Brieck ResumeMichael C Brieck Resume
Michael C Brieck Resume
 
Resume Maint Mngmt 2016
Resume Maint Mngmt  2016Resume Maint Mngmt  2016
Resume Maint Mngmt 2016
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
Current Public Resume
Current Public ResumeCurrent Public Resume
Current Public Resume
 
Newest
NewestNewest
Newest
 
Resume
ResumeResume
Resume
 
Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16Seperak, R_CSA_07044.DOC16
Seperak, R_CSA_07044.DOC16
 
SteveGobleCV
SteveGobleCVSteveGobleCV
SteveGobleCV
 
fpbcurrent1
fpbcurrent1fpbcurrent1
fpbcurrent1
 
Bruce Drake Resume and Certifications
Bruce Drake Resume and CertificationsBruce Drake Resume and Certifications
Bruce Drake Resume and Certifications
 
kshirleyresume1
kshirleyresume1kshirleyresume1
kshirleyresume1
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4
 
Jeff word resume.doc 4
Jeff word resume.doc 4Jeff word resume.doc 4
Jeff word resume.doc 4
 
Jasper Resume
Jasper ResumeJasper Resume
Jasper Resume
 
PAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 MayPAUL NEWBY RESUME 2015 May
PAUL NEWBY RESUME 2015 May
 
West.Robert.resume.2016-02
West.Robert.resume.2016-02West.Robert.resume.2016-02
West.Robert.resume.2016-02
 
Michael Craig company resume
Michael Craig company resume Michael Craig company resume
Michael Craig company resume
 

Davis Gary 0415 PM-LIR

  • 1. Gary Davis Maintenance Supervisor - Tennessee Valley Authority Work Experience Maintenance Supervisor Tennessee Valley Authority January 2011 to Present Supervision of various craft disciplines including pipefitter, machinist and boilermakers in the performance of plant maintenance to a 9 unit fossil fired generating station. Assure work orders are properly addressed in a T-8 week Premavera P-6/ Maximo planning process and all work is performed to meet schedule compliance. Managing all work with safety as the first priority. Walked down all corrective maintenance work orders to assure material, clearance and other work related requirements are met. Sr. Project Manager Demark, Inc October 2010 to November 2010 Responsibilities included management of work activities on the Feedwater Heater Replacement Project. Responsible for the report out on the project to the OCC meeting daily, coordinated various contractors including Shaw Group, Weld Tech, Mammoet USA and various Exelon support groups including maintenance, HP. Updated schedules, coordinated with operations and managed safety, radiological and human performance activities. Held daily schedule update and issue resolution meetings with contractors. K & D Professional Services January 2008 to September 2010 K&D Professional Services) which included development of a business plan, web site, incorporation, obtaining appropriate business insurance policies and state tax accounts for various states. Site Manager Day Zimmermann NPS Corporation December 2007 to December 2008 My assignment was to the Susquehanna Steam Electric Station for PPL Inc. (client) as Site Manager. Responsibilities included overall management of a nuclear plant maintenance contract. This included the recruiting, and management of 47 staff personnel, consisting of craft supervisors, scheduling personnel, safety representatives, accounting and time keeping personnel, and 586 craft of various disciplines. I managed various modifications to plant systems including Recirculation Pump replacements, electrical modifications and maintenance activities including various piping replacements. Site Manager Day Zimmermann NPS Corporation August 2007 to November 2007 I was assigned to the Saint Lucie Nuclear Power Station. Duties encompassed staffing, labor relations, client relations, and cost control initiatives, all being executed in a world class safety culture. I interfaced
  • 2. vertically through levels of customer management team, from the field assigned personnel through senior management. I provided an ability to cohesively manage our site team allowing for the "sharing" of best practices and continuous improvement practices. Mods included Turbine piping fabrication and replacement of over 2400 feet of the ESW system, condenser repairs and support for Steam Gen. changeout activities and Drywell Sump mods. Site Manager The Shaw Group, Inc June 2005 to July 2007 Managed all maintenance/modification projects for South Texas Project, Nuclear Generating Station (client). Modifications included replacement of Feedwater Heat Exchangers which included removal of electrical and mechanical interferences, providing openings in the side of the building for rigging the equipment out. I provided management of pipe weld over lays and replacements of Turbine Building cooling water pipe. Also managed various plant systems and security modifications. Site Manager The Shaw Group, Inc December 2001 to June 2005 Managed all maintenance/modification projects at the Grand Gulf Nuclear Station for the Entergy Nuclear Group (client). Maintained and developed Union and Client relationships, and met all performance indicators as required. Timely recruited and staffed for plant outages. Projects included construction of an auxiliary Marley Cooling Tower with the associated underground piping installations and tie in to the Main Cooling Tower piping. Security Mod.s consisting of relocation of security fence and razor wire installation, erection of Bullet Resistant Enclosure (BREs) and Dry Fuel Storage Project. Project Manager The Offenhauser Company - Houston, TX July 2000 to November 2001 My responsibilities included overall management of fabrication and installation activities for architectural metals on various projects including two museums in Fort Worth, TX and an expansion to the Bush Intercontinental Airport in Houston TX. Manager Houston Steel Equipment Co - Houston, TX August 1999 to June 2000 Managed sales and installation of equipment handling and storage equipment. Construction Superintendent Synchro Building Corporation - Houston, TX July 1998 to July 1999
  • 3. Managed the daily construction activities of all subcontractors on a warehouse/office complex for an oil exploration client. Duties included coordination of all subcontractor work and schedule performance as required. Piping Superintendent Day Zimmermann NPS January 1997 to June 1998 My assignment was at the Shawnee Power Plant for Tennessee Valley Authority (client), where I supervised pipe fitters on a three unit coal fired power plant. I supervising modifications and maintenance to mechanical systems to support plant turnarounds and during operations. Stone and Webster Construction Co. Site Manager/Chief Construction Superintendent As Chief Construction Superintendent at the Brownsferry Nuclear Station, I started as a Drywell Coordinator with responsibility for the coordination of all work in the Drywell. This included schedule variation and prioritization approvals for work performed in the drywell which included Reactor Recirculation Piping replacement activities, structural modifications, RCS pump change outs and all other work activities. Later assignments included managing three supervisors over various craft. Craft included pipefitters, ironworkers and electricians performing various construction activities. I was promoted to Site Manager at the Limerick Nuclear Generating Station where I was responsible for all maintenance activities. This included modifications such as replacement of the main steam lines to the turbine, replacement of the RHR spargers in the suppression pool and various maintenance activities. Plant Technical Services Outage Coordinator Originally assigned to the Limerick Generating Station, responsibilities included working with the planning and scheduling group to develop the outage schedule based on input from the operations group, various maintenance groups and engineering organizations. During the outage I prioritized all work activities and testing to assure scheduled work met all expectations. Project Manager/Welding Engineer Gulf States Utilities June 1980 to June 1990 Senior Area Coordinator with Gulf States Utilities, including management of underwater weld repairs to in vessel feedwater header components during one outage and Project Manager over Condenser Mods. I also served in the Outage Management group as a Shift Outage Coordinator during outages (10 yrs.). I was a Field Welding Engineer, Welding Foreman and welder with Brown and Root Construction Co. (7 yrs). I performed work supporting a subcontractor for the installation of HDPE piping on a Petroleum Refinery water system in Old Ocean, Texas. Education Management Solutions University of Alabama