I have been employed mainly in the Petrochemical Contracting industry for 37 years, most recently as a
Senior Document Control Supervisor.
I have supervised document control activities on a wide variety of projects, including a Fused Silica Facility in
Holland, a Refinery Project in Yanbu, several BP refineries in Hull and a pharmaceutical facility in Dublin. In
addition to being based in the Home Office, I have also spent periods abroad working in site document control
and in contractor and client offices, most recently performing PMC duties in an integrated client team in a
contractor’s office in Seoul.
I enjoy working as part of a team and thrive under pressure, particularly enjoying the work carried out in
remote locations.
Employment History
Amec Foster Wheeler Energy Limited – Senior Document Control Supervisor - 2002 – May 2016
Senior Document Control Supervisor, Chemaweyaat Tacaamol Project (2014 – present)
My current role consists of supervising the document control activities on a PMC project with a client team,
processing documentation issued by the project team and various contractors. Assisting in the bid evaluation
process for EPC contractors
Senior Document control supervisor, KNPC Clean Fuels Project (2013)
Supervising the document control activities of a PMC team working with Samsung SC&T in their Seoul office
on behalf of KNPC. Quality checking and distribution of all Samsung documentation and managing all
correspondence and associated logs.
Senior Document Control Supervisor, Statoil Snohvit FDP (2011 – 2012)
Issuing documents to project personnel. Uploading document files into DocStore and into the Statoil ERoom
system for project review. Preparation of handover packages to client. Set-up of distribution matrix.
Samref 2013 Turnaround Project (2010 – 2011)
Issuing documents to project personnel as per the distribution matrix. Uploading document files into DocStore.
Compiling handover packages to client. Distribution Matrix set-up and maintenance, Maintenance of WebDMS
progress measurement data. Generating project progress/document/ transmittal reports for management use.
Woodside Pluto 2/3 LNG FEED (2009 – 2010)
Issue of documents to the project team. Distribution Matrix set-up. Maintenance of WebDMS progress
measurement data. Production of weekly reports. Compilation and issue of handover packages to client.
Ngi Son Refinery Petrochemical (NSRP) Pre-FEED & FEED (2008 – 2009)
Responsible for the set-up and supervision of Document Control activities including initialising WebDMS to
meet FEED requirements. Bulk loading of deliverable details in the system. Produced reports for management
use. Issued hard copy and electronic ITB and FEED packages for handover to client. Handover comprised
144 volumes with 13 copies of each required for hard copy handover plus corresponding PDF copies.
Malaysian Refinery Company PSR2 Revamp EPCm (2007 – 2008)
Responsible for the setting up of systems, operation of both WebDMS Design and Vendor documentation
systems input and output of planning/scheduling data, day to day running of this project. Input of progress
data and extraction of reports.
SHARQ U&O 3rd Expansion Project (2005 – 2007)
Responsible for the start-up and supervision of this project, dealing with all day to day issues of documents to
client and site. Worked long hours to meet all deadlines during the project. In addition to working as Project
2 of 2 CV for T.Fox
document control supervisor on this project, I worked evenings as client document controller doing onward
distribution to the client team.
TAKEDA API Plant Project (2002 – 2005)
Responsible for the start-up and supervision of this project, involving much use of electronic data transfers
and close liaison with the clients’ representatives, IHI. Compiled end of project documentation comprising over
300 volumes and successfully closed out project.
Amec Foster Wheeler Energy Limited - 1989 – 2002 (Highlights)
Responsible for setting up and supervising document control teams on various projects including CHEVRON
EGTL Project (2001 – 2002), BP Amoco Geel Paraxylenes Project(1999-2001), BP Amoco VAM & ETAC
Project (1997-1999), GE Silicones Fused Silica Facility (1995-1997) Samref (Yanbu) AES Turnaround Project
(1993-1995).
Was assigned to the new Foster Wheeler Sriracha office in 1993 to assist with support to site and to train local
document control personnel. In 1991-1992, I was loaned to ADNOC as a document control specialist tasked
with consolidating that companies procedures, assisting in developing a new document management system
and onward implementation across various ongoing ADNOC projects and training staff. Liased closely with
ADNOC Projects division management to ensure development was in line with client aims and philosophies.
Over this period made visits to various sites and spent a year in Geel, Belgium in a site document control
supervisor role
Previous employment
BP Chemicals, A5 Project, Hull (1988-1989)
Senior Document Controller
Tasked with taking over the running of the document handling group from the managing contractor Davy
McKee and setting up a new centre at a management office in Hull. This involved all services such as
telephones, printers, office equipment and organising document control staff and outside printing services.
The centre provided a complete technical back up to the site including the receipt and issue of all vendor and
design documentation, the setting up of a record retrieval system and the compilation and handover of
dossiers to site.
UK Construction LTD, BP Southern North Sea Project, Easington (1987-1988)
Planning Assistant
Duties included production of S Curves and four week lookaheads, monitoring of progress and collation of
figures for productivity rates. Later joined the test department where I marked up P&ID’s to show the extent of
hydro testing.
British Gas PLC, Rough Storage Project, Stallinborough (1986-1987)
Document Controller
Responsible for the registration and distribution of vendor documentation and for maintaining document
registers and issuing weekly status reports. Liason with engineers and vendors.
Fairey Construction LTD, Torness Power Station, East Lothian (1985)
Technical Clerk
Responsible for producing inspection check sheets on core build contract. Final check of erection pckages
prior to quality audit by clients representative, National Nuclear Corporation Ltd.
Laing IE&C LTD, Rough Storage Onshore Terminal, Easington (1983-1985)
Senior Technical Clerk
Employed in QA Department on piping/mechanical contract. Responsible for producing weld inspection record
sheets and for the coordination of all PWHT and radiography. Also responsible for final documentation check
before handover of packages to client.
Lummus Company LTD, BP Chemicals A4 Project, Hull (1978-1982)
Technical Clerk
Responsible for setting up and maintaining a site office documentation system providing a complete service to
site personnel. At a later stage I was responsible for handing over all piping, mechanical and NDT records to
the client.

More Related Content

What's hot

CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017Charlemagne Celo
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiBùi Minh Hải
 
Sami resume new
Sami resume newSami resume new
Sami resume newsamiuae
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie Casinillo
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6Rajshekharan M
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny Daigrepont
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Khalid Tamur , PMP®
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015Ricky Dasal
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015Mark Maudsley
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 NewAustin Mattson II
 

What's hot (20)

CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017CV of Charlemagne Cartel Celo_2017
CV of Charlemagne Cartel Celo_2017
 
Tyrone Bluck CV
Tyrone Bluck CVTyrone Bluck CV
Tyrone Bluck CV
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Ariel Pantaleon - CV
Ariel Pantaleon - CVAriel Pantaleon - CV
Ariel Pantaleon - CV
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
Gerald L. Adarlo CV
Gerald L. Adarlo CVGerald L. Adarlo CV
Gerald L. Adarlo CV
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
Sami resume new
Sami resume newSami resume new
Sami resume new
 
MUHAMMAD ZEESHAN
MUHAMMAD ZEESHANMUHAMMAD ZEESHAN
MUHAMMAD ZEESHAN
 
FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014FREDERIC FUENTES_ 2014
FREDERIC FUENTES_ 2014
 
Renie CV Mechanical and Piping
Renie CV Mechanical and PipingRenie CV Mechanical and Piping
Renie CV Mechanical and Piping
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)Sonny james daigrepont_resume' (6)
Sonny james daigrepont_resume' (6)
 
Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)Civil QC Inspector (Aramco Approved)
Civil QC Inspector (Aramco Approved)
 
ronald coventry cv n5
ronald coventry cv n5ronald coventry cv n5
ronald coventry cv n5
 
RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015RICKY - CV- 01-Apr-2015
RICKY - CV- 01-Apr-2015
 
Bill resume
Bill resumeBill resume
Bill resume
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 

Similar to Tony Fox CV latest 06 May 2016

Manzur c v_document_controller
Manzur c v_document_controllerManzur c v_document_controller
Manzur c v_document_controllermanzurjob
 
Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay P
 
JC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMCJC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMCJ.C. Lago
 
Mohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdfMohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdfmohammedattique
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar
 
CV- NARESH KUMAR JHA-Document Controller
CV- NARESH  KUMAR JHA-Document ControllerCV- NARESH  KUMAR JHA-Document Controller
CV- NARESH KUMAR JHA-Document ControllerNaresh Jha
 
Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)Steven Poulter
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)Benjan Amtipuesto
 
my_resume Updatea (4 (3)
my_resume Updatea (4 (3)my_resume Updatea (4 (3)
my_resume Updatea (4 (3)Ike (Lagos)
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose Antonio de Jesus
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Mostafa Sayed
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016NITIN VAIDYA
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelPaul Snyder
 

Similar to Tony Fox CV latest 06 May 2016 (20)

Manzur c v_document_controller
Manzur c v_document_controllerManzur c v_document_controller
Manzur c v_document_controller
 
Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015Vijay resume _rev dc.aug. 2015
Vijay resume _rev dc.aug. 2015
 
JC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMCJC_Lago _ CV_2016_TMC
JC_Lago _ CV_2016_TMC
 
Mohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdfMohammed_Attique - CV.pdf
Mohammed_Attique - CV.pdf
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Anil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document ControllerAnil Parmar - Resume - Document Controller
Anil Parmar - Resume - Document Controller
 
CV- NARESH KUMAR JHA-Document Controller
CV- NARESH  KUMAR JHA-Document ControllerCV- NARESH  KUMAR JHA-Document Controller
CV- NARESH KUMAR JHA-Document Controller
 
Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016Stephen Vianelli CV 23 Dec 2016
Stephen Vianelli CV 23 Dec 2016
 
Anthony_M._Antigulas
Anthony_M._AntigulasAnthony_M._Antigulas
Anthony_M._Antigulas
 
Resume - Kamarudheen Parayirikkal
Resume - Kamarudheen ParayirikkalResume - Kamarudheen Parayirikkal
Resume - Kamarudheen Parayirikkal
 
Lawrence_Jacobs_CV_2017
Lawrence_Jacobs_CV_2017Lawrence_Jacobs_CV_2017
Lawrence_Jacobs_CV_2017
 
Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)Resume - Steve Poulter (Document Control)
Resume - Steve Poulter (Document Control)
 
BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)BCA resume - Admin Cum Doc Cont (red1)
BCA resume - Admin Cum Doc Cont (red1)
 
my_resume Updatea (4 (3)
my_resume Updatea (4 (3)my_resume Updatea (4 (3)
my_resume Updatea (4 (3)
 
my_resume
my_resumemy_resume
my_resume
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01Jose de Jesus Resume July 2016 Rev 01
Jose de Jesus Resume July 2016 Rev 01
 
Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)Resume - MOSTAFA SAYED (C.V)
Resume - MOSTAFA SAYED (C.V)
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
Resume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno NobelResume 09_15_15 Dyno Nobel
Resume 09_15_15 Dyno Nobel
 

Tony Fox CV latest 06 May 2016

  • 1. 1 of 2 CV for T.Fox Tony Fox Basingstoke 07469 207572 Tony.j.fox@hotmail.com Personal Profile I have been employed mainly in the Petrochemical Contracting industry for 37 years, most recently as a Senior Document Control Supervisor. I have supervised document control activities on a wide variety of projects, including a Fused Silica Facility in Holland, a Refinery Project in Yanbu, several BP refineries in Hull and a pharmaceutical facility in Dublin. In addition to being based in the Home Office, I have also spent periods abroad working in site document control and in contractor and client offices, most recently performing PMC duties in an integrated client team in a contractor’s office in Seoul. I enjoy working as part of a team and thrive under pressure, particularly enjoying the work carried out in remote locations. Employment History Amec Foster Wheeler Energy Limited – Senior Document Control Supervisor - 2002 – May 2016 Senior Document Control Supervisor, Chemaweyaat Tacaamol Project (2014 – present) My current role consists of supervising the document control activities on a PMC project with a client team, processing documentation issued by the project team and various contractors. Assisting in the bid evaluation process for EPC contractors Senior Document control supervisor, KNPC Clean Fuels Project (2013) Supervising the document control activities of a PMC team working with Samsung SC&T in their Seoul office on behalf of KNPC. Quality checking and distribution of all Samsung documentation and managing all correspondence and associated logs. Senior Document Control Supervisor, Statoil Snohvit FDP (2011 – 2012) Issuing documents to project personnel. Uploading document files into DocStore and into the Statoil ERoom system for project review. Preparation of handover packages to client. Set-up of distribution matrix. Samref 2013 Turnaround Project (2010 – 2011) Issuing documents to project personnel as per the distribution matrix. Uploading document files into DocStore. Compiling handover packages to client. Distribution Matrix set-up and maintenance, Maintenance of WebDMS progress measurement data. Generating project progress/document/ transmittal reports for management use. Woodside Pluto 2/3 LNG FEED (2009 – 2010) Issue of documents to the project team. Distribution Matrix set-up. Maintenance of WebDMS progress measurement data. Production of weekly reports. Compilation and issue of handover packages to client. Ngi Son Refinery Petrochemical (NSRP) Pre-FEED & FEED (2008 – 2009) Responsible for the set-up and supervision of Document Control activities including initialising WebDMS to meet FEED requirements. Bulk loading of deliverable details in the system. Produced reports for management use. Issued hard copy and electronic ITB and FEED packages for handover to client. Handover comprised 144 volumes with 13 copies of each required for hard copy handover plus corresponding PDF copies. Malaysian Refinery Company PSR2 Revamp EPCm (2007 – 2008) Responsible for the setting up of systems, operation of both WebDMS Design and Vendor documentation systems input and output of planning/scheduling data, day to day running of this project. Input of progress data and extraction of reports. SHARQ U&O 3rd Expansion Project (2005 – 2007) Responsible for the start-up and supervision of this project, dealing with all day to day issues of documents to client and site. Worked long hours to meet all deadlines during the project. In addition to working as Project
  • 2. 2 of 2 CV for T.Fox document control supervisor on this project, I worked evenings as client document controller doing onward distribution to the client team. TAKEDA API Plant Project (2002 – 2005) Responsible for the start-up and supervision of this project, involving much use of electronic data transfers and close liaison with the clients’ representatives, IHI. Compiled end of project documentation comprising over 300 volumes and successfully closed out project. Amec Foster Wheeler Energy Limited - 1989 – 2002 (Highlights) Responsible for setting up and supervising document control teams on various projects including CHEVRON EGTL Project (2001 – 2002), BP Amoco Geel Paraxylenes Project(1999-2001), BP Amoco VAM & ETAC Project (1997-1999), GE Silicones Fused Silica Facility (1995-1997) Samref (Yanbu) AES Turnaround Project (1993-1995). Was assigned to the new Foster Wheeler Sriracha office in 1993 to assist with support to site and to train local document control personnel. In 1991-1992, I was loaned to ADNOC as a document control specialist tasked with consolidating that companies procedures, assisting in developing a new document management system and onward implementation across various ongoing ADNOC projects and training staff. Liased closely with ADNOC Projects division management to ensure development was in line with client aims and philosophies. Over this period made visits to various sites and spent a year in Geel, Belgium in a site document control supervisor role Previous employment BP Chemicals, A5 Project, Hull (1988-1989) Senior Document Controller Tasked with taking over the running of the document handling group from the managing contractor Davy McKee and setting up a new centre at a management office in Hull. This involved all services such as telephones, printers, office equipment and organising document control staff and outside printing services. The centre provided a complete technical back up to the site including the receipt and issue of all vendor and design documentation, the setting up of a record retrieval system and the compilation and handover of dossiers to site. UK Construction LTD, BP Southern North Sea Project, Easington (1987-1988) Planning Assistant Duties included production of S Curves and four week lookaheads, monitoring of progress and collation of figures for productivity rates. Later joined the test department where I marked up P&ID’s to show the extent of hydro testing. British Gas PLC, Rough Storage Project, Stallinborough (1986-1987) Document Controller Responsible for the registration and distribution of vendor documentation and for maintaining document registers and issuing weekly status reports. Liason with engineers and vendors. Fairey Construction LTD, Torness Power Station, East Lothian (1985) Technical Clerk Responsible for producing inspection check sheets on core build contract. Final check of erection pckages prior to quality audit by clients representative, National Nuclear Corporation Ltd. Laing IE&C LTD, Rough Storage Onshore Terminal, Easington (1983-1985) Senior Technical Clerk Employed in QA Department on piping/mechanical contract. Responsible for producing weld inspection record sheets and for the coordination of all PWHT and radiography. Also responsible for final documentation check before handover of packages to client. Lummus Company LTD, BP Chemicals A4 Project, Hull (1978-1982) Technical Clerk Responsible for setting up and maintaining a site office documentation system providing a complete service to site personnel. At a later stage I was responsible for handing over all piping, mechanical and NDT records to the client.