OBJECTIVE:
To use my experience and skills to date to work as part of a multi disciplined team in the engineering and
construction.Petrochemical and boilers.working with qualified individuals that would enchance and
utilize my skills in the field of piping and mechanical managements/supervisor
PROFILE:
My career started in 1978 as pipefitter on Sasol 1 on the boilers.
My career has followed a natural progression from trade apprenticeship up to my current role as a Piping project
superintendent. Over the last eighteen years I have worked on a continuous basis on multi projects for a large number
of multi disciplined companies both at home as a Piping Supervisor / superintendent and construction coordinator in the
Boilers PowerStation’s, petrochemical industries. I am fully conversant in all aspects of the engineering business and
knowledgeable in current “best practices” and safety requirements. I consider myself to be a “team player” and natural
2. man manager with the ability to both listen and understand at all levels and implement accordingly providing the
necessary motivation and control which is crucial to company success.I have good comminucation skills and have the
ability to grow within a company and I can work with any nationality.I am hard working and totally dedicated to my work.
Qualifications
Std. 8 – Technical High School Brakpan, South Africa
COURCES;
Trade test in 1985 certificatenr E00354
Legal Compliance course (20-03-2009) Certificate No: 22290
Certificate of training, Protection services – Breathing Apparatus
Risk assessment training cource
Legal liabilitity
Concstruction regulations
WORK EXPERIENCE:
WETBACK ENG(Medupi powerstation)
October 2014 – November 2014
Piping foreman
Turbines on unit 4
Lubeoil and sealoil piping
Kents (Quyn International Outsourcing)
Sasol Wax Plant
April 2014 – augustus 2014
Piping Foreman
Planning and production control and reporting production
Fabrication and installing of piping and valves
Overseeing the production and updating of all new rvisions
Technical queries from contractor and overseeing the production and updating of work
Steam blow, utilitys and piping(flushing, airblow and steam)
Punch item verification
Familiar with x-rays ut mpi and dypen
Fire water system and sprinklers
Worked with isometric drawings
Working with general arrangements,PNID, and pressuretesting
3. Attending all meetings and risk assesments
Reporting to client and construction manager
Support and Commissioningworking with the safety departments and sighning permit to work.
Pressure test technical queries
Redline drawings
Developing and pnid en coordinaters and qcp’s
Trackings sheets and bar charts
Working on feed pumps and small and big bore hp piping
Method statements a d risk assements
Working on wax project at sasol 1
15 Artisan’s( boilermakers, pipefitters, mechanical fitters and welders
6 General workers
DB THERMAL ( Majuba Power Station)
27 December 2013 – April 2014
Supervisor
Maintenance Boiler 2
Remove and replace pipe`s and valves on turbine unit 1
Work with MFD,General arrangements,pnid and weldcarts,
Follow ITP and QCP, work with QC
Report to construction manager of Escom and my site manager
4 Foremans
17 Artisan’s Turbine and Boilers
Supervise Riggers, Welders, Fitters and Boilermakers
Installations of lube oil on boilers
Pressure test
Qcp’s and pnid
Asometric and general arrangement drawings and reline drawings
Tracting sheets and bar charts
Big and small bore hp pipes
Feed pumps and condensor
Sisonke ( Medupi Power Station )
1July 2013 – 16 December 2013
Boiler Superintendent
Boiler 6 and Boiler 4
Supervise of all construction activities.
4 Supervisors
12 Foreman
36 Artisans
Coordenate drawings and itp and qcp with metastatements,Work with QC
And risk assesments to supervisors, attend all production and safety
meetings
4. report to site and production managers
DB THERMAL (Majuba Power Station )
28 December 2012- April 2013
Maintenance on Boiler 1 (Shutdown)
Turbine and Boilers
Supervise Riggers, Welders, Fitters and BoilermakersRemove valves,pipes on turbine,work with
cutting instructionsQCPs and work packs with QCs Report to site manager on production,do
pressure tests and commision
DB THERMAL ( Duvha Power Station Witbank )
May 2012 – Nov 2012- Supervisor
Maintenance on Boiler 2,3 and 4 Dome installed. Pressure test!
Supervise Riggers, welders, fitters and boilermakers
Turbine and boilers,work with work packs with QCcoordenate work to foremans and have production
Meetings,report to site and production managers,work with QCPs and cutting instructios,do pressure
Tests and commissioning,signed of all work packs
HARRISON & WHITE ( Sasol 1 )
September 2011 – APRIL 2012- Foreman
Working as piping foreman on work pack 1(FFE) wax plant and east west pipe rack coordinate pipe fitters
and attending progress meetings with client. Safety meetings and mechanical completion. Report to project
manager. Work with Q.Cs and ITPs and pnid and tyings and hot tapings
Pre fabrication spools
Planning and production control and reporting of productions
Prefabricated installing of piping and valves,oversee the production and updating of all new revisions
Actom John Thompson Mittal
February 2011- September 2011 Construction Supervisor
Strip and rebuild of Boiler 4
Replace of side wall tubes, Build new Air Heater , Install new super heater, Install new air duct, Pressure
testing. Refit Skin Casing’s,
Stein Muller Tutuka Power station
November 2010 – February 2011 Piping Supervisor
Fabricate and install of all main steam big bore piping,
Field supervision, Qcp ,Itp
Progress meetings, Report to Site manager.
Harrison & White ( Natref )
5. 3 August 2010 – 5 November 2010 Piping & Mechanical Supervisor.
Fabricate and install new loading bay and all piping to fill up the containers(diesel petrol and jet fuel
Signing of permits, Method statements, Coordinate all work activity’s and field supervision.
Progress meetings and planning. Signing off punch items and handover to client.planning and production
control and reporting control and reporting of production
Techinal queries and redline drawings and isomectric drawings (pnid mfd ga’s and isometrics)
Reported direct to site manager
Installation of super heaters(dome) and built cruitoil(floating roofs) tanks
Taking damage control/work with bar charts and tracking sheets.
Pressure testing
6 foremans and 18 artisans(pipefitters boilermakers riggers and welders)
Technical queries from contractor and overseeing yhe production and updating of work.
Steam blow, utilitys and piping. Flushing airblow and steam
Punch item verification
Familiar with x-rays ut mpi and dypen
Capital Outsourcing Saudi Arabia Main Contractor Dayim Punch Lloyd.
6 June 2009 – 28 June 2009 - Piping and fire water tanks
Facilitate inter trade co-ordination and supplier support to construction.
Working to project milestones and program needs
Participate in design reviews
Supervising and coordinating of vendor representatives on the installation of specialized piping and equipment
Manage and co-ordinate all mechanical equipment and pipe installation activities, including task risk assessments and
compilation of methods statements.
Reporting directly to the construction manager and submitting daily and weekly reports on construction and pre
commissioning / activities.
Driving safe practices within the work place with the preparation and presentation of tool box talks and conducting
safety audits.
2 Supervisors,4 Foremans and185 peopleb
Harrison & White construction (Natref )
March 2007 – June 2009, Piping Supervisor
Manage and co-ordinate all mechanical equipment and pipe installation activities.
Verify close out of all system punch lists prior to hand over to client. Coordinate all commissioning activities, review and
approve all associated documentation.
Supervising and coordinating of vendor representatives on the installation of specialized piping and equipment.
Responsible for the coordination of mechanical commissioning and documentation procedures from commencement to
hand over to client
Reporting directly to the construction manager and submitting daily and weekly reports on pre commissioning /
construction activities.
Driving safe practices within the work place with the preparation and presentation of tool box talks and conducting
safety audits.
Responsible for signing Permits on and off.
Goss & Balfe, Klerksdorp (Uranium Upgrade Project)
Jan 2007 – Nov 2007 - Piping Supervisor
Manage and co-ordinate all mechanical equipment and pipe installation activities including task risk assessments and
compilation of methods statements
and Manage supervise pressure testing and snagging crews including P&ID walk down and execution of MC packs
Supervising and coordinating of vendor representatives on the installation of specialized piping and equipment
6. Reviewing new projects with clients and preparing cost estimates and execution of plans, Procurement of pipe work and
special equipment
Supervising the pre-fabrication of all spool assemblies from material inspection through to final review of test packs
Verify close out of all system punch lists prior to hand over
Driving safe practices within the work place and preparation of method statements and risk assessments / presentation
of tool box talks
Coordinate all commissioning activities, review and approve all associated documentation
Fabrication and installed thickners piping and mechanical and welding
G E A Alberton.
Oct 2006 – Dec 2006 - Mechanical Fitter
Pre -fabrication of all spool assemblies from material inspection through to final review of test packs
all mechanical equipment and pipe installation activities including task risk assessments and compilation of methods
statements .pressure testing and snagging crews
Verify close out of all system punch lists prior to hand over.
Coordinate all commissioning activities, review and approve all associated documentation
Driving safe practices within the work place and preparation of method statements and risk assessments’ / presentation
of tool box talks
Mopani mine Zambia (kitwe) Harrison and White
July 2006- Sept 2006
Piping and Mechanical Supervisor
Working with isos and general arrangemends.
Manage supervise pressure testing and rigging crews including P&ID walk down and execution of MC packs
Installed fickners fabricating mechanical and welding
3 foremans , 12 artasans , 12 assistants , 4 welders ,4 riggers
Reference No:
Upana DB Thermal
Office: 016 931 1332 Victor Moodley 0842531451
Lourens: 0833982110 Frikkie Fourie (Site Manager) 0795107619
Quin Outsourcing
Carli: 0832860795
Kentz
Danie: 0727800522 Site
References and more work experience Available On Request