Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.

Joubert_Dianna_Resume

118 views

Published on

  • Be the first to comment

  • Be the first to like this

Joubert_Dianna_Resume

  1. 1. Dianna Joubert Call (850) 450-2892 DiannaJoubert@yahoo.com 3915 Highway 90 East, (850) 450-2892 Crestview, FL 32539 DiannaJoubert@yahoo.com High Level Project Coordinator/Piping Field Engineer With Extensive Leadership Expertise Qualification Summary  Possesses 24 years' progressive experience in industrial construction engineering.  Committed to quality and safety with an excellent track record. Up to date on numerous topics from various safety and quality training programs.  Skilled at maintaining quality of systems installed via punch-out and assisting field superintendents with any questions and troubleshooting obstacles.  Excellent proficiency in generating RFI's and FCO's. Complimentary experience in handling material take-offs,true- ups, and procurement of materials.  Efficient in quantity survey/accountability, in addition to initiating and maintaining great client relationships. Key Strengths  Engineering and Piping System Construction  RFI and FCO Creation and Analysis  Keen Attention to Detail, Safety and Quality  Project Completion and Turnover Documentation  Excellent Liaison & Communicator  Problem Resolution and Field Issue Remediation Professional Experience Lauren Engineering and Constructors Lead Piping Engineer 2014 -Present Track spools, ensure all lines have been captured and IFC'd by performing a drawing true-up. Troubleshoot issues as found. Drew as-built and redlines. Scoped P&ID’s for system turnover. Made work, testing, and turnover packages. Performed final walk with client for CCC. Maintained RFI’s and FCO’s. Managed and assisted all engineering disciplines. Assist superintendent.  Worked closely with both process and piping engineers to ensure all issues were addressed prior to field installation. Identified, offered solution, and upon PE approval, drew FSK drawing and issued to field. Walked down lines for pre, post, and final and generated paperwork for CCC to client. Jacob's Field Services Piping Coordinator 2013 - 2014 Track spools, ensure all lines have been captured and IFC'd by performing a drawing true-up. Troubleshoot issues as found. Drew as-built and redlines. Assist superintendent.  Worked closely with both process and piping engineers to ensure all issues were addressed prior to field installation. Identified, offered solution, and upon PE approval, drew FSK drawing and issued to field. Walked down lines for pre, post, and final and generated paperwork for CCC to client. Project Coordinator Westcon Industrial 2012-2013 Managed all fabrication shops. Performed drawing true-up to determine all systems were captured. Wrote RFI's and FCO's as required. Troubleshot field interferences and issues. Drew as-built and redlines. Assisted PM and superintendents.  Direct liaison between fabrication shops and client. Responsible to ensure RFI's were answered, resolve any material issues, and spools were fabricated to the latest revision in a timely manner. (TOTAL 3 FABRICATION SHOPS) Dianna Joubert
  2. 2. Dianna Joubert Call (850) 450-2892 DiannaJoubert@yahoo.com ... Professional Experience Continued KBR Piping Field Engineer 2012-2012 Walked all completed systems for punch-out and transfer of custody to the client. Troubleshot field interferences and issues. Drew as-built and redlines. Assisted superintendents.  Walked as many as 50 work packages a day. Also responsible for ensuring piping installation was installed per specification and correct material, support assemblies, and trim was used. Day And Zimmerman Piping Field Engineer 2010 - 2012 Scoped P&ID's for system turnover. Made work packages for field installation. Made test packages. Drew as-built and redlines. Performed a "true-up" material take off . Managed min/max and fab shop. Troubleshot field interferences and issues. Performed final walk with client for custody change. Maintained RFI's and FCO's.  Was the only piping/mechanical field engineer onsite. Ordered all materials and managed fabrication both onsite and off. Answered field issues both for piping (above and underground) and mechanical. Built work packages and testing packages. Drew isometrics for all small bore instrument air drops. Aided in the design for the fire water loop around the new Dimla facility. Work performed was both OSBL and ISBL. Topps Mechanical Piping Field Engineer 2009 - 2010 Wrote RFI's and FCO's as required. Troubleshot field interferences and issues. Drew as-built and redlines.  Used Navisworks 3D model as an aid in troubleshooting. I aided approximately 10 to 15 foreman at any given time. HB Zachary Project Coordinator 2008 - 2009 Ensured all materials were procured and received. Wrote RFI's and FCO's as required. Made test packages and signed off successfultests.  Performed tests on both above ground and underground piping systems. Also aided in steam blowing operation. Construction Turnaround Services Project Coordinator/ Field Engineer 2006 - 2008 Scoped P&ID's for system turnover. Made work packages for field installation. Made test packages. Drew as-built and redlines. Troubleshot field interferences and issued. Performed final walk with client for custody change. Maintained RFI's and FCO's.  Performed a drawing "true-up" to ensure all was captured during initial estimation bid and that what was missed was procured and received for installation. Sanders Brothers,Inc. Project Coordinator / QA-QC 2003 - 2006 Ensured all materials were procured and received. Wrote RFI's and FCO's as required. Made test packages and signed off successfultests. Performed punch-out of completed systems and client custody walks.  Performed initial take off and purchased all materials required for project. Responsible for quality assurance and system completion. Foster Wheeler Piping Foreman 2000 - 2003 Supervised the installation of various piping and mechanical. Built a total of 14 HRSG units and work outages at gas plants while employed. Responsible for all testing of associated piping systems.  Performed all testing on all piping and tubing for 14 HRSG units including both hydrostatic and pneumatic. Worked punch list and all other needed as directed by the superintendent. Dianna Joubert
  3. 3. Dianna Joubert Call (850) 450-2892 DiannaJoubert@yahoo.com Fluor Daniel Turnover Coordinator/ Engineering Assistant 1991 - 1999 Built turnover packages. Assisted piping and mechanical engineers. Tracked and ordered materials. Built test packages. Maintained RFI's and FCO's. Tagged lines for RT and UT.  Worked for Fluor Daniel for a number of years. I had a facet of different roles in those years which included engineering aide, material control, turnover coordinator, and document control. All of these different jobs and the safety and quality ethic that Fluor Daniel taught has made me the well rounded person that I am today. Education Escambia High School, Pensacola, Florida Completed various training courses focused on areas of safety and quality OSHA 30 MSHA 40 VARIOUS SUPERVISOR TRAINING COURSES

×