Jeff Murcer, PMP
Contact
Tel:520-471-6691
e-mail : H - jmurcer@gmail.com
W - jeffrey.murcer@mwhglobal.com
Permanent Address
301 South Twenty Sixth Street, Colorado Springs, CO., 80904
Project Portfolio
Project Engineering Manager
MWHC, Colorado Springs, CO
Southern DeliverySystem (SDS)
Colorado Springs Utilities, Colorado Springs, CO., (03/2013 – Present)
Currently serving as Project Engineer for the $841M Southern Delivery System. The project consists
of 50 miles of large diameter pipeline, a dam connection, three pump stations and a water treatment
facility designed to deliver 50-MGD of potable water. As the Project Engineer for this program, he
manages and maintains the Documentation, Cost, Schedule, Quality and Contract Management for
each work package.
Quality Assurance / Quality Control Manager
MWHC, Tucson, AZ
Ina Road WRF Capacity and Effluent Quality Upgrade Project
Pima County Regional Wastewater Reclamation Department, Tucson, AZ., (10/2011 – 03/2013)
Quality Manager for the $215M expansion project. This project consists of the expansion from 37.5-
mgd to 50-mgd and includes implementing a 5-stage Bardenpho technology, repairing process units,
replacing equipment and structures, addressing odor control issues and upgrading the facility to be
compliant with environmental, regulatory and building code requirements. As the quality manager for
this project, he managed the planning, implementation, and supervision of the project quality control
plan. He reviewed and analyzed drawings and specifications, performed field verification and directed
the correction of work when necessary. He worked with self-perform crews and subcontractors to
maintain quality requirements, control risk and maintain the schedule. He scheduled special
inspections and analyzed results for comparison to quality standards.
Operation and Maintenance Manager
MWH, Ramallah, Palestine
Infrastructure Needs Program(INP)
United States Agency for International Development (USAID), West Bank/Gaza, Palestine,
(9/2010 - 8/2011)
Designed and managed an initial $25M O&M program to build a self-reliant maintenance capacity
within the West Bank Water Department (WBWD). The objective of this program was to improve and
enhance a bulk water supply utility to ensure the water infrastructure and equipment provides
uninterrupted water supply throughout the West Bank. His primary responsibilities included preparing
master plans, procurement of special tools and critical spare parts, training personnel in Computerized
Maintenance Management (CMMS) activities and functional maintenance practices. He also
developed the Standard Operating Procedures (SOP’s), conducted progress and coordination
meetings, trained and supervised engineers and construction support staff.
Senior Water Design Engineer
MWH, Ramallah, Palestine
Infrastructure Needs Program(INP)
United States Agency for International Development (USAID), West Bank/Gaza, Palestine,
(3/2010 – 9/2010)
Design Manager on site for the comprehensive water supply projects throughout the West Bank
valued at $185M. Primary projects included the design and rehabilitation of the existing water supply
and distribution systems in addition to the design of new water supply and distribution systems. The
scope of work consisted of new and existing well stations; booster stations; well development,
alignment and capacity testing; balance tanks and reservoirs; disinfection systems; transmission
mains and distribution piping throughout the West Bank. Mr. Murcer was responsible for project
planning and design, coordination between West Bank and US design teams, procurement of water
and road equipment, permitting and land acquisition activities, and coordination with local sub-
consultants.
Resident Engineer
MWH, Colorado Springs, CO
Sand Creek 66 inch Interceptor Replacement
Colorado Springs Utilities, Colorado Springs, CO, (10/2009 – 3/2010)
Resident Engineer to provide engineering, field documentation and quality control services for the construction of
a 66-inch diameter interceptor creek crossing. The interceptor design required encasement in a 9ft by 12ft
reinforced concrete structure on 48-inch dia. piers capable of withstanding the one hundred year flood event.
Project Engineer
MWH, Colorado Springs, CO
Snowball Pipeline Replacement Evaluation in the Vicinity Jackson Mountain Landslide Area
Pagosa Area Water and Sanitation District, Pagosa Springs, CO, (6/2009 – 10/2009)
Provided engineering services for a study to re-align a 5 MGD raw water pipeline at high risk of failure due to an
active landslide. The study included field reconnaissance to examine the site conditions compared to geotechnical
reports and determine alternative alignments. Developed a hydraulic model of alternatives for analysis; and
developed GIS mapping of alternative alignments to evaluate and compare potential impacts to land owners from
construction. Participated in development of final report for the client.
Project Engineer
MWH, Colorado Springs, CO
Sanitary Sewer Evaluation and Rehabilitation Program (SSERP)
Colorado Springs Utilities, Colorado Springs, CO, (9/2005 – 9/2007) (10/2008 – 3/2010)
Provided engineering services for the Colorado Springs Utilities Sanitary Sewer Evaluation and
Rehabilitation Program, which provided comprehensive and systematic evaluation, design, program
management and construction management for the rehabilitation, replacement and repair of Colorado
Springs Utilities sanitary sewer collection system on a multi-year basis for pipes 10 inches to 66
inches in diameter and local collectors 12 inches in diameter and smaller. Mr. Murcer’s duties
consisted of pipeline evaluation, assessment, recommendation, design, and prioritization of main line
rehabilitation options and construction management for over 460,000 linear feet of sanitary sewers. He
was responsible for issuing task orders and change orders, reviewed contractor submittals,
construction schedules, and pay applications; he also conducted progress meetings, coordinated in
house design efforts, and sub-contractor activities including geotechnical analysis, engineering
surveys and material testing. In addition, he was responsible for the design and rehabilitation of
several major creek crossings determined to be at risk by 100 year flood events.
Project Engineer
MWHC, Colorado Springs, CO
Arrival/Departure Airlift Command Group (ADACG) Phase II Facility
United States Army Corps of Engineers, Colorado Springs, CO, (9/2007 – 10/2008)
Provided Project Engineering services for the construction of a $25M Military Deployment Facility.
Specific duties included QA/QC management assistance; field design change requisitions; resolution
of drawing interpretation conflicts; preparing as-built documents for Contract Drawings and
Specifications; providing supervision and technical direction; interfacing with all on-site sub-contractors
as required to resolve problems; and disseminating technical engineering information to insure
construction work complies with all engineering standards, codes, and specifications.
Project Engineer
MWH, Colorado Springs, CO
Interceptor Alignment, Clear Spring Regional Water Reclamation Facility (CSRWRF)
Colorado Springs Utilities, Colorado Springs, CO, (6/2007 – 9/2007)
Provided engineering services and coordination activities for regional utilities managers, engineers
and developers for the acquisition of existing sub-surface utilities data for the planning and design of
parallel 36 inch dia. sanitary sewer interceptors to convey gravity flows approximately 10 miles to the
CSRWRF. Project duties included research of potential conflicts and coordination of field activities with
subcontractors for gathering surface and subsurface data related to proposed interceptor alignment.

More Related Content

What's hot

Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 PersonalGary Jackson
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)Danny Kilpatrick
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan KilpatrickDanny Kilpatrick
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhil Karow
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)James Herrmann
 
Prachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed A. Baquerizo
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16Amir pia
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEErik NEILSEN
 
One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13Jeffrey Hart
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2Robert Sleeman
 

What's hot (20)

Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 Personal
 
SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016SRKCan_MRoyle_July_2016
SRKCan_MRoyle_July_2016
 
5_2016 Resume_ Dan Kilpatrick (1)
5_2016  Resume_ Dan Kilpatrick (1)5_2016  Resume_ Dan Kilpatrick (1)
5_2016 Resume_ Dan Kilpatrick (1)
 
11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick11_2014 Resume Dan Kilpatrick
11_2014 Resume Dan Kilpatrick
 
Philip Karow_FinalResumeJL
Philip Karow_FinalResumeJLPhilip Karow_FinalResumeJL
Philip Karow_FinalResumeJL
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
Prachi Vohra-Resume
Prachi Vohra-ResumePrachi Vohra-Resume
Prachi Vohra-Resume
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Rick Guenther Jr Resume
Rick Guenther Jr ResumeRick Guenther Jr Resume
Rick Guenther Jr Resume
 
2016 resume
2016 resume2016 resume
2016 resume
 
Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015Thomas Cleveland Resume'- June 20th 2015
Thomas Cleveland Resume'- June 20th 2015
 
Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)Ed Baquerizo CV (Updated April 2015)
Ed Baquerizo CV (Updated April 2015)
 
AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16AMIR PIA_Resume_7-16
AMIR PIA_Resume_7-16
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015Karl Keller Clover Leaf Resume Sept2015
Karl Keller Clover Leaf Resume Sept2015
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13One-Page Red Hill SI RA modeling Omaha feb13
One-Page Red Hill SI RA modeling Omaha feb13
 
LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2LinkedIn_RS_Cv_20150417_v2
LinkedIn_RS_Cv_20150417_v2
 

Viewers also liked

Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...
Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...
Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...disagreeablealc49
 
Robert Pesich_PAVA_Stanford Resume v. 8_22_16
Robert Pesich_PAVA_Stanford Resume v. 8_22_16Robert Pesich_PAVA_Stanford Resume v. 8_22_16
Robert Pesich_PAVA_Stanford Resume v. 8_22_16Robert Pesich
 
AmarJadhav_Update
AmarJadhav_UpdateAmarJadhav_Update
AmarJadhav_UpdateAmar Jadhav
 
Tymen Schreuder Curriculum Vitae
Tymen Schreuder Curriculum VitaeTymen Schreuder Curriculum Vitae
Tymen Schreuder Curriculum VitaeTymen Schreuder
 
Top 8 software development engineer resume samples
Top 8 software development engineer resume samplesTop 8 software development engineer resume samples
Top 8 software development engineer resume samplestonychoper2205
 
AmolKumbharDevelopment
AmolKumbharDevelopmentAmolKumbharDevelopment
AmolKumbharDevelopmentAmoL Kumbhar
 
2016_Mrutyunjaya_SharePoint2013
2016_Mrutyunjaya_SharePoint2013 2016_Mrutyunjaya_SharePoint2013
2016_Mrutyunjaya_SharePoint2013 Mrutyunjaya Rath
 

Viewers also liked (18)

Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...
Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...
Fitch Rates City & Cnty of San Francisco (CA) Lease Rev CP Certificates, Ser ...
 
Robert Pesich_PAVA_Stanford Resume v. 8_22_16
Robert Pesich_PAVA_Stanford Resume v. 8_22_16Robert Pesich_PAVA_Stanford Resume v. 8_22_16
Robert Pesich_PAVA_Stanford Resume v. 8_22_16
 
AmarJadhav_Update
AmarJadhav_UpdateAmarJadhav_Update
AmarJadhav_Update
 
Yvonne ho resume
Yvonne ho resumeYvonne ho resume
Yvonne ho resume
 
JacobsonResume3
JacobsonResume3JacobsonResume3
JacobsonResume3
 
cv_2015
cv_2015cv_2015
cv_2015
 
JASIM UDDIN CV
JASIM UDDIN CVJASIM UDDIN CV
JASIM UDDIN CV
 
Manigandan_narasimhan_resume
Manigandan_narasimhan_resumeManigandan_narasimhan_resume
Manigandan_narasimhan_resume
 
Tymen Schreuder Curriculum Vitae
Tymen Schreuder Curriculum VitaeTymen Schreuder Curriculum Vitae
Tymen Schreuder Curriculum Vitae
 
Resume
ResumeResume
Resume
 
Surender Dhanasekaran Resume
Surender Dhanasekaran ResumeSurender Dhanasekaran Resume
Surender Dhanasekaran Resume
 
Top 8 software development engineer resume samples
Top 8 software development engineer resume samplesTop 8 software development engineer resume samples
Top 8 software development engineer resume samples
 
Aditya Swarup resume
Aditya Swarup resumeAditya Swarup resume
Aditya Swarup resume
 
ResumeKarthikBhupalam
ResumeKarthikBhupalamResumeKarthikBhupalam
ResumeKarthikBhupalam
 
AmolKumbharDevelopment
AmolKumbharDevelopmentAmolKumbharDevelopment
AmolKumbharDevelopment
 
BIM_portfolio
BIM_portfolioBIM_portfolio
BIM_portfolio
 
2016_Mrutyunjaya_SharePoint2013
2016_Mrutyunjaya_SharePoint2013 2016_Mrutyunjaya_SharePoint2013
2016_Mrutyunjaya_SharePoint2013
 
Randy A. Yamane
Randy A. YamaneRandy A. Yamane
Randy A. Yamane
 

Similar to JM Portfolio 04-2016

Similar to JM Portfolio 04-2016 (20)

Aaron zambo - Civil Engineer
Aaron  zambo - Civil EngineerAaron  zambo - Civil Engineer
Aaron zambo - Civil Engineer
 
robert mcgregor 006865u 25Apr2016
robert mcgregor 006865u 25Apr2016robert mcgregor 006865u 25Apr2016
robert mcgregor 006865u 25Apr2016
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resume
 
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015Harry Holland CV Update Water Infrastructure & Pipelines August 2015
Harry Holland CV Update Water Infrastructure & Pipelines August 2015
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
William Power Resume
William Power ResumeWilliam Power Resume
William Power Resume
 
James Thomas Resume 1 (23)
James Thomas Resume 1 (23)James Thomas Resume 1 (23)
James Thomas Resume 1 (23)
 
Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
PM Resume 9_30_15
PM Resume 9_30_15PM Resume 9_30_15
PM Resume 9_30_15
 
Heather McCall Resume
Heather McCall ResumeHeather McCall Resume
Heather McCall Resume
 
NA
NANA
NA
 
Zade Couch - resume
Zade Couch - resumeZade Couch - resume
Zade Couch - resume
 
Anderton 0615
Anderton 0615Anderton 0615
Anderton 0615
 
CraigMcDermottPDF2
CraigMcDermottPDF2CraigMcDermottPDF2
CraigMcDermottPDF2
 
Resume
ResumeResume
Resume
 
Contino Stephen Resume LinkedIn
Contino Stephen Resume LinkedInContino Stephen Resume LinkedIn
Contino Stephen Resume LinkedIn
 
Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
Personal_Resume_11_2013
Personal_Resume_11_2013Personal_Resume_11_2013
Personal_Resume_11_2013
 
Daniel Andrescavage
Daniel AndrescavageDaniel Andrescavage
Daniel Andrescavage
 
Bokath Resume
Bokath ResumeBokath Resume
Bokath Resume
 

JM Portfolio 04-2016

  • 1. Jeff Murcer, PMP Contact Tel:520-471-6691 e-mail : H - jmurcer@gmail.com W - jeffrey.murcer@mwhglobal.com Permanent Address 301 South Twenty Sixth Street, Colorado Springs, CO., 80904 Project Portfolio Project Engineering Manager MWHC, Colorado Springs, CO Southern DeliverySystem (SDS) Colorado Springs Utilities, Colorado Springs, CO., (03/2013 – Present) Currently serving as Project Engineer for the $841M Southern Delivery System. The project consists of 50 miles of large diameter pipeline, a dam connection, three pump stations and a water treatment facility designed to deliver 50-MGD of potable water. As the Project Engineer for this program, he manages and maintains the Documentation, Cost, Schedule, Quality and Contract Management for each work package. Quality Assurance / Quality Control Manager MWHC, Tucson, AZ Ina Road WRF Capacity and Effluent Quality Upgrade Project Pima County Regional Wastewater Reclamation Department, Tucson, AZ., (10/2011 – 03/2013) Quality Manager for the $215M expansion project. This project consists of the expansion from 37.5- mgd to 50-mgd and includes implementing a 5-stage Bardenpho technology, repairing process units, replacing equipment and structures, addressing odor control issues and upgrading the facility to be compliant with environmental, regulatory and building code requirements. As the quality manager for this project, he managed the planning, implementation, and supervision of the project quality control plan. He reviewed and analyzed drawings and specifications, performed field verification and directed the correction of work when necessary. He worked with self-perform crews and subcontractors to maintain quality requirements, control risk and maintain the schedule. He scheduled special inspections and analyzed results for comparison to quality standards. Operation and Maintenance Manager MWH, Ramallah, Palestine Infrastructure Needs Program(INP) United States Agency for International Development (USAID), West Bank/Gaza, Palestine, (9/2010 - 8/2011) Designed and managed an initial $25M O&M program to build a self-reliant maintenance capacity within the West Bank Water Department (WBWD). The objective of this program was to improve and enhance a bulk water supply utility to ensure the water infrastructure and equipment provides uninterrupted water supply throughout the West Bank. His primary responsibilities included preparing master plans, procurement of special tools and critical spare parts, training personnel in Computerized Maintenance Management (CMMS) activities and functional maintenance practices. He also developed the Standard Operating Procedures (SOP’s), conducted progress and coordination meetings, trained and supervised engineers and construction support staff. Senior Water Design Engineer MWH, Ramallah, Palestine Infrastructure Needs Program(INP) United States Agency for International Development (USAID), West Bank/Gaza, Palestine, (3/2010 – 9/2010) Design Manager on site for the comprehensive water supply projects throughout the West Bank valued at $185M. Primary projects included the design and rehabilitation of the existing water supply and distribution systems in addition to the design of new water supply and distribution systems. The scope of work consisted of new and existing well stations; booster stations; well development, alignment and capacity testing; balance tanks and reservoirs; disinfection systems; transmission mains and distribution piping throughout the West Bank. Mr. Murcer was responsible for project
  • 2. planning and design, coordination between West Bank and US design teams, procurement of water and road equipment, permitting and land acquisition activities, and coordination with local sub- consultants. Resident Engineer MWH, Colorado Springs, CO Sand Creek 66 inch Interceptor Replacement Colorado Springs Utilities, Colorado Springs, CO, (10/2009 – 3/2010) Resident Engineer to provide engineering, field documentation and quality control services for the construction of a 66-inch diameter interceptor creek crossing. The interceptor design required encasement in a 9ft by 12ft reinforced concrete structure on 48-inch dia. piers capable of withstanding the one hundred year flood event. Project Engineer MWH, Colorado Springs, CO Snowball Pipeline Replacement Evaluation in the Vicinity Jackson Mountain Landslide Area Pagosa Area Water and Sanitation District, Pagosa Springs, CO, (6/2009 – 10/2009) Provided engineering services for a study to re-align a 5 MGD raw water pipeline at high risk of failure due to an active landslide. The study included field reconnaissance to examine the site conditions compared to geotechnical reports and determine alternative alignments. Developed a hydraulic model of alternatives for analysis; and developed GIS mapping of alternative alignments to evaluate and compare potential impacts to land owners from construction. Participated in development of final report for the client. Project Engineer MWH, Colorado Springs, CO Sanitary Sewer Evaluation and Rehabilitation Program (SSERP) Colorado Springs Utilities, Colorado Springs, CO, (9/2005 – 9/2007) (10/2008 – 3/2010) Provided engineering services for the Colorado Springs Utilities Sanitary Sewer Evaluation and Rehabilitation Program, which provided comprehensive and systematic evaluation, design, program management and construction management for the rehabilitation, replacement and repair of Colorado Springs Utilities sanitary sewer collection system on a multi-year basis for pipes 10 inches to 66 inches in diameter and local collectors 12 inches in diameter and smaller. Mr. Murcer’s duties consisted of pipeline evaluation, assessment, recommendation, design, and prioritization of main line rehabilitation options and construction management for over 460,000 linear feet of sanitary sewers. He was responsible for issuing task orders and change orders, reviewed contractor submittals, construction schedules, and pay applications; he also conducted progress meetings, coordinated in house design efforts, and sub-contractor activities including geotechnical analysis, engineering surveys and material testing. In addition, he was responsible for the design and rehabilitation of several major creek crossings determined to be at risk by 100 year flood events. Project Engineer MWHC, Colorado Springs, CO Arrival/Departure Airlift Command Group (ADACG) Phase II Facility United States Army Corps of Engineers, Colorado Springs, CO, (9/2007 – 10/2008) Provided Project Engineering services for the construction of a $25M Military Deployment Facility. Specific duties included QA/QC management assistance; field design change requisitions; resolution of drawing interpretation conflicts; preparing as-built documents for Contract Drawings and Specifications; providing supervision and technical direction; interfacing with all on-site sub-contractors as required to resolve problems; and disseminating technical engineering information to insure construction work complies with all engineering standards, codes, and specifications. Project Engineer MWH, Colorado Springs, CO Interceptor Alignment, Clear Spring Regional Water Reclamation Facility (CSRWRF) Colorado Springs Utilities, Colorado Springs, CO, (6/2007 – 9/2007) Provided engineering services and coordination activities for regional utilities managers, engineers and developers for the acquisition of existing sub-surface utilities data for the planning and design of parallel 36 inch dia. sanitary sewer interceptors to convey gravity flows approximately 10 miles to the CSRWRF. Project duties included research of potential conflicts and coordination of field activities with subcontractors for gathering surface and subsurface data related to proposed interceptor alignment.