Aaron A. Zambo, PE, MBA, LEED AP
10 10th
Street
St. Augustine, FL 32080
(808) 631-1543
AaronZambo@aol.com
SUMMARY
Civil Engineer experienced in civil construction planning, construction management, reservoir
construction, landfill design, constructed wetlands, water and sewer utility design, geotechnical
and hydrological analysis, design and CQA, watershed management, site development,
civil/environmental permitting, and site remediation.
An articulate and motivated individual possessing strong problem solving, interpersonal and
communication skills. Adapts positively to change by seeking new ways to accomplish
objectives. Works successfully with individuals at all levels within an organization, and delivers
innovative focused solutions.
EXPERIENCE
2014-Present
Parsons Brinkerhoff, Inc. Miami, FL
Supervisory Construction Engineer
South Florida Water Management District requested that I be hired by the consultant to salvage a
~$150MM construction job. Duties include project and construction management; staff
management; management and oversight of all contractors; review of all plans and submittals;
budget management. Three simultaneous/supplementary individual projects under management
went from over budget and 1 year behind schedule to under budget and on time completions.
C-44 STA Project - $120MM construction cost; Completion date of 2017 (on budget, on time)
C-44 System Discharge Project - $20MM construction cost; Completion date 2016
C-44 Reservoir Soil Remediation Project - $10MM construction cost; Completion date 2015
2013-2015
Resource Savers, Inc. / Hawaii Utility Locators, Inc. St. Augustine, FL / Lihue, HI
Managing Partner
Projects include include hydrogeological/seepage analysis, drainage analysis, SWPPP’s,
environmental permitting and investigations, septic design and inspection, sonic leak detection,
ground penetrating radar, and general staff, budget, and project management.
2010-2013
County of Kauai, Lihue, HI
Civil Engineer V-VI
Duties included staff, project, construction, and consultant management. Management duties
include project prioritization, budget analysis, and Board presentations. Project duties included
environmental investigations, permitting, land acquisition, hydrological and geotechnical analysis,
GIS/SCADA integration, consultant/contractor management, high service pump sizing and
oversight, and contract administration. Projects range from pipeline, storage tank, and well pump
installation/replacements to determining creative solutions to bring several 100 year old water-
producing tunnels back into service.
2008-2010
St. Johns County St. Augustine, FL
Civil Engineer III-IV/Project Manager
Duties included project and staff management on 15 individual ongoing projects with budgets
totaling over $30MM per year - responsible for coordinating with contractors, consultants,
agencies and municipalities, engineers and inspectors to facilitate projects. Other duties included
geotechnical and hydrological analysis, environmental permitting, wellhead protection plans,
ARRA and SRF grant administration, system modeling (Infowater), GIS/SCADA integration, land
acquisition, consultant/contractor management, design and construction of gravity sewer, water
and sewer force mains, and booster stations, capacity analysis reporting, consumptive use
permitting, high service pump sizing and oversight, and contract administration.
City of St. Augustine Beach (COSAB) Water Main and Sewer Project. The County Utility
Department, in collaboration with the COSAB, developed a plan to utilize State grants and low
interest loans to finance the installation of centralized water and gravity sewer systems within the
COSAB. Upon completion, approximately 890 homes were able to connect to the County Utility
system. The project was awarded American Recovery and Reinvestment Act (ARRA) stimulus
funds in May 2009. The total project cost approximately $15 million with 65% of its cost to be
forgiven via ARRA grants.
• Provided Project Management
• Managed and oversaw County/consultant engineers and inspectors
• Provided Grant Administration and coordination with FDEP SRF program
• Oversaw planning, preparation, and quality assurance of permit applications for submittal
to the Florida Department of Environmental Protection, FDOT, SJRWMD, US EPA, and
the US Army Corps of Engineers
• Managed consultants and oversaw design and specifications package
• Provided presentations to Board of County Commissioners and COSAB Board on a
regular basis to provide project status update
• Construction Management
2003-2008
HDR Engineering, Inc. West Palm Beach, FL
Civil Engineer/Project Manager
Projects include civil engineering design and inspection, geotechnical and hydrological analysis
and oversight, environmental permitting, construction management of several reservoirs and
STA's, contract administration, land acquisition, and client/contractor mediation.
C-44 Reservoir/Stormwater Treatment Area (STA) Project. The C-44 Reservoir and Stormwater
Treatment Area (STA) Project supports the goals and objectives of the Comprehensive Everglades
Restoration Plan (CERP). This ambitious plan calls for the implementation of more than sixty projects
over a period of thirty years and will cost an estimated 10.9 billion dollars. The overarching goal of the
plan is to restore, protect, and preserve the water resources in a sixteen county area of central and
southern Florida, including the Everglades. The goal will be achieved primarily by capturing excess
surface water runoff that currently flows to the Atlantic Ocean and Gulf of Mexico and re-directing it to a
series of impoundments for storage and treatment. As charged by the Water Resources Development
Act of 2000 (WRDA 2000), the Indian River Lagoon – South (IRL-S) Project Implementation Report
(PIR) identified general and specific goals for the C-44 Project. The overall goal of the Project is to
"capture local runoff from the C-44 Basin, treat some or all of it via sedimentation and natural
transformation of nutrients, and return it to C-44 when there is a need. The components are designed
for flood flow attenuation to the estuary; water quality benefits resulting from reduced loading of
nutrients, pesticides, and other pollutants contained in runoff presently discharged to the estuary; and
water supply benefits”.
• Analyze site geological and hydrogeological data on a monthly basis for use in monthly
site report
• Apply the soil classification and hydrogeology knowledge to assist in the Preliminary
Design phase
• Provided Construction Management for Phase I-II Site Preparation
• Provided Construction Management and onsite inspection for the reconfiguration of the
Troup-Indiantown Water Control District; including government agency, contractor,
property holder coordination and public meetings
• Provided Construction Management for two Test Cells and two STA’s for the Test Cell
Project
• Provided Site Management and geotechnical assistance for initial 13,000 acre site
investigation
• Coordinated land management plan and schedule for the C-44 Project, located on 13,000
acres, including remediation activities, environmental site assessments, land settlement
agreement/real estate documents, adjacent property project research, cultural resources,
and communication with local utilities and government staff
• Collaborated with consultant, contractor, and clients in management of the C-44
Reservoir/STA Test Cell construction, a pilot study of the C-44 Project, located on 475
acres of the Project site, including implementation of Primavera’s Expedition®
• Coordinate and plan algae monitoring and testing on the C-44 Reservoir/STA Test Cell
Project
• Planned and utilized CE-QUAL-W2 to evaluate the in-reservoir water quality of the C-44
Reservoir for the Basis of Design and Preliminary Design phases, including evaluations
of algae blooms, dissolved oxygen concentrations, and nutrient concentrations
• Conduct contract and budget planning and invoicing; client, stakeholder, and public
involvement meetings; managing GIS and CAD activities; and communication with local
permit agencies and County Growth Management staff
• Assisted in planning, preparation, and quality assurance of permit applications for
submittal to the Florida Department of Environmental Protection and the US Army Corps
of Engineers
2001-2003
Andrews Environmental Engineering Warrenville, IL
Environmental Engineer
Projects included boring and analysis for site remediations, line and grade control surveying,
drilling oversight, subdivision design and surveying, pump station design and analysis, landfill cell
design, design and nuclear testing of clay/geotextile liners, and QA/QC certification testing.
1997-2000 (Summers)
Graycor Construction South Holland, IL
Construction Engineer
Aided in planning of several major construction projects/bids.
Performed quantity take-off and estimated bids on several major projects.
Answered questions of prospective bidders on a daily basis.
EDUCATION
1996-2001
Purdue University West Lafayette, IN
Major: Civil Engineering
Minor: Psychology
2005-2008
Florida Atlantic University Boca Raton, FL
Master Business Administration (MBA) – Environmental Emphasis
2014-2017
Harvard University Cambridge, MA
Green Building and Community Sustainability Certificate
MEMBERSHIPS
1996-Present
American Society of Civil Engineers
National Society of Professional Engineers
Omicron Delta Kappa Honor Society
2002-Present
Council for Sustainable Florida, Collins Center
Engineers Without Borders (President, Central-South Florida Chapter 2007-2008)
MENSA
Purdue Alumni Association
CERTIFICATIONS
LEED Accredited Professional, Issued: 11/02/2007, Expires: None Listed
Bituminous Mixtures Inspection Methods, Issued: 3/2011, Expires: 3/2016
Certified Professional in Soil Erosion and Sediment Control, Issued: 07/24/2007, Expires:
09/24/2016
CPR Certified by the American Red Cross, Florida, Issued: 06/05/2007, Expires: 06/05/2015
Professional Engineer - Civil and Environmental, Florida, No. 65725, Issued: 12/25/2006, Expires:
02/28/2015
Professional Engineer - Civil and Environmental, Hawaii, No. 13676, Issued: 11/24/2009, Expires:
02/28/2016
OSHA 29 CFR1910.120, Florida, Issued: 05/05/2002, Expires: 04/30/2015
Certified Nuclear Gauge Operator, Illinois, Issued: 05/04/2003, Expires: 05/04/2015
Dale Carnegie People Skills
PUBLICATIONS AND PRESENTATIONS
Articles
Aaron A. Zambo, “Global Warming: An Early Warning”, Journal of Green Building, 3/2008
Aaron A. Zambo, "Sustainable Treatment of Agricultural Runoff - The Elliot Ditch Constructed
Wetlands", The Journal of Engineering for Sustainable Development, Volume 2, Number
1, 1/2008
Aaron A. Zambo, "The Elliot Ditch Constructed Wetlands", Journal of Green Building, 10/2007
Presentations
Aaron A. Zambo, "Sustainable Treatment of Agricultural Runoff - The Elliot Ditch Constructed
Wetlands", National Water Conference, Sparks, NV, 1/3/2008
Aaron A. Zambo, "Sustainable Treatment of Agricultural Runoff - The Elliot Ditch Constructed
Wetlands", ASCE World Conference, Honolulu, HI, 5/15/2008
Aaron A. Zambo, "Energy Savings of Surface Water Treatment Facilities - Kalaheo, Kokolau,
Akulikuli Sources", AWWA Hawaii Section Conference, Honolulu, HI, 4/18/2012

Aaron zambo - Civil Engineer

  • 1.
    Aaron A. Zambo,PE, MBA, LEED AP 10 10th Street St. Augustine, FL 32080 (808) 631-1543 AaronZambo@aol.com SUMMARY Civil Engineer experienced in civil construction planning, construction management, reservoir construction, landfill design, constructed wetlands, water and sewer utility design, geotechnical and hydrological analysis, design and CQA, watershed management, site development, civil/environmental permitting, and site remediation. An articulate and motivated individual possessing strong problem solving, interpersonal and communication skills. Adapts positively to change by seeking new ways to accomplish objectives. Works successfully with individuals at all levels within an organization, and delivers innovative focused solutions. EXPERIENCE 2014-Present Parsons Brinkerhoff, Inc. Miami, FL Supervisory Construction Engineer South Florida Water Management District requested that I be hired by the consultant to salvage a ~$150MM construction job. Duties include project and construction management; staff management; management and oversight of all contractors; review of all plans and submittals; budget management. Three simultaneous/supplementary individual projects under management went from over budget and 1 year behind schedule to under budget and on time completions. C-44 STA Project - $120MM construction cost; Completion date of 2017 (on budget, on time) C-44 System Discharge Project - $20MM construction cost; Completion date 2016 C-44 Reservoir Soil Remediation Project - $10MM construction cost; Completion date 2015 2013-2015 Resource Savers, Inc. / Hawaii Utility Locators, Inc. St. Augustine, FL / Lihue, HI Managing Partner Projects include include hydrogeological/seepage analysis, drainage analysis, SWPPP’s, environmental permitting and investigations, septic design and inspection, sonic leak detection, ground penetrating radar, and general staff, budget, and project management. 2010-2013 County of Kauai, Lihue, HI Civil Engineer V-VI Duties included staff, project, construction, and consultant management. Management duties include project prioritization, budget analysis, and Board presentations. Project duties included environmental investigations, permitting, land acquisition, hydrological and geotechnical analysis, GIS/SCADA integration, consultant/contractor management, high service pump sizing and oversight, and contract administration. Projects range from pipeline, storage tank, and well pump installation/replacements to determining creative solutions to bring several 100 year old water- producing tunnels back into service.
  • 2.
    2008-2010 St. Johns CountySt. Augustine, FL Civil Engineer III-IV/Project Manager Duties included project and staff management on 15 individual ongoing projects with budgets totaling over $30MM per year - responsible for coordinating with contractors, consultants, agencies and municipalities, engineers and inspectors to facilitate projects. Other duties included geotechnical and hydrological analysis, environmental permitting, wellhead protection plans, ARRA and SRF grant administration, system modeling (Infowater), GIS/SCADA integration, land acquisition, consultant/contractor management, design and construction of gravity sewer, water and sewer force mains, and booster stations, capacity analysis reporting, consumptive use permitting, high service pump sizing and oversight, and contract administration. City of St. Augustine Beach (COSAB) Water Main and Sewer Project. The County Utility Department, in collaboration with the COSAB, developed a plan to utilize State grants and low interest loans to finance the installation of centralized water and gravity sewer systems within the COSAB. Upon completion, approximately 890 homes were able to connect to the County Utility system. The project was awarded American Recovery and Reinvestment Act (ARRA) stimulus funds in May 2009. The total project cost approximately $15 million with 65% of its cost to be forgiven via ARRA grants. • Provided Project Management • Managed and oversaw County/consultant engineers and inspectors • Provided Grant Administration and coordination with FDEP SRF program • Oversaw planning, preparation, and quality assurance of permit applications for submittal to the Florida Department of Environmental Protection, FDOT, SJRWMD, US EPA, and the US Army Corps of Engineers • Managed consultants and oversaw design and specifications package • Provided presentations to Board of County Commissioners and COSAB Board on a regular basis to provide project status update • Construction Management 2003-2008 HDR Engineering, Inc. West Palm Beach, FL Civil Engineer/Project Manager Projects include civil engineering design and inspection, geotechnical and hydrological analysis and oversight, environmental permitting, construction management of several reservoirs and STA's, contract administration, land acquisition, and client/contractor mediation. C-44 Reservoir/Stormwater Treatment Area (STA) Project. The C-44 Reservoir and Stormwater Treatment Area (STA) Project supports the goals and objectives of the Comprehensive Everglades Restoration Plan (CERP). This ambitious plan calls for the implementation of more than sixty projects over a period of thirty years and will cost an estimated 10.9 billion dollars. The overarching goal of the plan is to restore, protect, and preserve the water resources in a sixteen county area of central and southern Florida, including the Everglades. The goal will be achieved primarily by capturing excess surface water runoff that currently flows to the Atlantic Ocean and Gulf of Mexico and re-directing it to a series of impoundments for storage and treatment. As charged by the Water Resources Development Act of 2000 (WRDA 2000), the Indian River Lagoon – South (IRL-S) Project Implementation Report (PIR) identified general and specific goals for the C-44 Project. The overall goal of the Project is to "capture local runoff from the C-44 Basin, treat some or all of it via sedimentation and natural transformation of nutrients, and return it to C-44 when there is a need. The components are designed for flood flow attenuation to the estuary; water quality benefits resulting from reduced loading of nutrients, pesticides, and other pollutants contained in runoff presently discharged to the estuary; and water supply benefits”.
  • 3.
    • Analyze sitegeological and hydrogeological data on a monthly basis for use in monthly site report • Apply the soil classification and hydrogeology knowledge to assist in the Preliminary Design phase • Provided Construction Management for Phase I-II Site Preparation • Provided Construction Management and onsite inspection for the reconfiguration of the Troup-Indiantown Water Control District; including government agency, contractor, property holder coordination and public meetings • Provided Construction Management for two Test Cells and two STA’s for the Test Cell Project • Provided Site Management and geotechnical assistance for initial 13,000 acre site investigation • Coordinated land management plan and schedule for the C-44 Project, located on 13,000 acres, including remediation activities, environmental site assessments, land settlement agreement/real estate documents, adjacent property project research, cultural resources, and communication with local utilities and government staff • Collaborated with consultant, contractor, and clients in management of the C-44 Reservoir/STA Test Cell construction, a pilot study of the C-44 Project, located on 475 acres of the Project site, including implementation of Primavera’s Expedition® • Coordinate and plan algae monitoring and testing on the C-44 Reservoir/STA Test Cell Project • Planned and utilized CE-QUAL-W2 to evaluate the in-reservoir water quality of the C-44 Reservoir for the Basis of Design and Preliminary Design phases, including evaluations of algae blooms, dissolved oxygen concentrations, and nutrient concentrations • Conduct contract and budget planning and invoicing; client, stakeholder, and public involvement meetings; managing GIS and CAD activities; and communication with local permit agencies and County Growth Management staff • Assisted in planning, preparation, and quality assurance of permit applications for submittal to the Florida Department of Environmental Protection and the US Army Corps of Engineers 2001-2003 Andrews Environmental Engineering Warrenville, IL Environmental Engineer Projects included boring and analysis for site remediations, line and grade control surveying, drilling oversight, subdivision design and surveying, pump station design and analysis, landfill cell design, design and nuclear testing of clay/geotextile liners, and QA/QC certification testing. 1997-2000 (Summers) Graycor Construction South Holland, IL Construction Engineer Aided in planning of several major construction projects/bids. Performed quantity take-off and estimated bids on several major projects. Answered questions of prospective bidders on a daily basis. EDUCATION 1996-2001 Purdue University West Lafayette, IN Major: Civil Engineering Minor: Psychology 2005-2008 Florida Atlantic University Boca Raton, FL
  • 4.
    Master Business Administration(MBA) – Environmental Emphasis 2014-2017 Harvard University Cambridge, MA Green Building and Community Sustainability Certificate MEMBERSHIPS 1996-Present American Society of Civil Engineers National Society of Professional Engineers Omicron Delta Kappa Honor Society 2002-Present Council for Sustainable Florida, Collins Center Engineers Without Borders (President, Central-South Florida Chapter 2007-2008) MENSA Purdue Alumni Association CERTIFICATIONS LEED Accredited Professional, Issued: 11/02/2007, Expires: None Listed Bituminous Mixtures Inspection Methods, Issued: 3/2011, Expires: 3/2016 Certified Professional in Soil Erosion and Sediment Control, Issued: 07/24/2007, Expires: 09/24/2016 CPR Certified by the American Red Cross, Florida, Issued: 06/05/2007, Expires: 06/05/2015 Professional Engineer - Civil and Environmental, Florida, No. 65725, Issued: 12/25/2006, Expires: 02/28/2015 Professional Engineer - Civil and Environmental, Hawaii, No. 13676, Issued: 11/24/2009, Expires: 02/28/2016 OSHA 29 CFR1910.120, Florida, Issued: 05/05/2002, Expires: 04/30/2015 Certified Nuclear Gauge Operator, Illinois, Issued: 05/04/2003, Expires: 05/04/2015 Dale Carnegie People Skills PUBLICATIONS AND PRESENTATIONS Articles Aaron A. Zambo, “Global Warming: An Early Warning”, Journal of Green Building, 3/2008 Aaron A. Zambo, "Sustainable Treatment of Agricultural Runoff - The Elliot Ditch Constructed Wetlands", The Journal of Engineering for Sustainable Development, Volume 2, Number 1, 1/2008 Aaron A. Zambo, "The Elliot Ditch Constructed Wetlands", Journal of Green Building, 10/2007 Presentations Aaron A. Zambo, "Sustainable Treatment of Agricultural Runoff - The Elliot Ditch Constructed Wetlands", National Water Conference, Sparks, NV, 1/3/2008 Aaron A. Zambo, "Sustainable Treatment of Agricultural Runoff - The Elliot Ditch Constructed Wetlands", ASCE World Conference, Honolulu, HI, 5/15/2008 Aaron A. Zambo, "Energy Savings of Surface Water Treatment Facilities - Kalaheo, Kokolau, Akulikuli Sources", AWWA Hawaii Section Conference, Honolulu, HI, 4/18/2012