DANIEL ANDRESCAVAGE
(856)423 2193 / djandrescavage@icloud.com
Profile
35+ years of success in project controls positions, with experience in financial and schedule management
Key Results Include:
 Developed a reputation as a highly reliable project controls professional in various industries,
including transmission & distribution, nuclear, and fossil
 Executed successful projects simultaneously in a timely and cost effective manner, with the use of
Primavera P6, PRISM
Key Experience
AECOM, Princeton, NJ
Project Controls Manager (September 1979 – present)
 PSEG, 69kV Conversion Projects (Central and Metro Divisions) Engineering and Procurement,
Senior Project Controls Manager.
Project consists of the design of a GIS and transformers in eleven existing substations.
Duties include weekly resource planning, schedule updates, milestone tracking and critical path
analysis. Change order log and monthly cost and cash flow reporting.
 Electrical Transmission Texas (ETT), Competitive Renewable Energy Zone (CREZ) Project,
Central Texas, Assistant Project Controls Manager.
Project consists of the design and construction of 345 kV transmission and substation
facilities to facilitate the transmission of wind generated energy from west to east in Texas. Duties
included development of a weekly Transmission Line construction report that tacked percent
complete using earned value, quantities installed versus planned, forecasted completion based on
achieved installation rates. Was able to prove to the Subcontractor that based on their achieved
installation rates that additional crews were needed, they eventually agreed an brought in additional
crews and equipment and completed on time.
 PSEG, Program Manager 230 kV Upgrade Projects, Princeton New Jersey, Project Controls
Manager.
Project consists of the design and construction of 230 kV transmission line and substation.
Duties included development of a Project Cost Report (PRISM) that aligned with the clients WBS and
included actual costs and commitments from the clients cost system (SAP). Prepared and issued
monthly cost and trend reports, cash flows, and contingency draw down. Developed an integrated
schedule that included PSE&G, URS Outside Plant Engineering, Inside Plant Engineering Contractors,
and Permitting, Procurement and Construction and Sequencing Plan. Issued and presented a bi-
weekly schedule reports that included, critical path analysis, Project milestone tracking, Engineering
deliverable and activity completion tracking, float density, and one month look-ahead's. Project was
completed on time and under budget.
 PSEG, Hudson U/2 BET Project, Jersey City, New Jersey, Project Controls Manager.
Project consisted of take over from another contractor and completion of design,
procurement, subcontracting, construction and start-up of an SCR, Baghouse and SDA within twenty
months. Managed the Project Cost Report (including owner's costs), cash flows, performance
monitoring (CPI) and contingency draw down. Lead the development of the integrated resource and
quantity loaded Project schedule from project take over through commissioning to meet Government
imposed completion dates, issued weekly schedule reports which included, critical path analysis,
quantity tracking, two-week look-ahead's, and histograms. Project completed 10 days prior to the
Government imposed completion date.
 GE-Hitachi Nuclear Energy, ESBWR Project, Princeton, New Jersey, Project Controls Manager
Project consisted of developing the generic design of the GE-Hitachi ESBWR. Managed the
development of an integrated (GE-Hitachi, and two Engineering and Construction firms) Engineering
and Procurement schedule, cost tracking, change order preparation and submittal, forecasting and
performance reporting. Lead the development of the Nuclear Island construction schedule and cash
flow, also worked directly with a utility to develop their site preparation schedule.
 Power Transmission and Distribution North Iraq, Princeton, New Jersey, Project Controls
Manager.
Project consisted of rebuilding substations and transmission lines in Iraq. Managed the cost
tracking, forecasting, performance reporting, contract change request development and submittal.
Lead the schedule development of the installation and commissioning of the country-wide SCADA
system.
 PSEG, Salem Nuclear Generating Station, Hancocks Bridge, New Jersey, Project Controls
Manager.
Seconded to PSEG as a Project Controls Manager to manage three large Capital Projects
(Electrical Raceway Fire Barrier, Dry Cask Storage and CFCU Chilled Water Cooling) Projects totaling
$150M . Duties included development and maintenance of Level III project schedules, estimates, cash
flows, processing/coordinate requisitions, contract change requests, and monthly accruals.
Developed a detailed cost report and an Executive Summary Report. Two of the Projects completed
on time and on budget and one was cancelled.
 Exelon Corporation, Peach Bottom Atomic Power Station, Interim Spent Fuel Storage Facility,
Project Lump Sum Project, Delta, Pennsylvania, Project Controls Manager.
Duties included development and maintenance of cost tracking system (CRMS), project
schedule, preparation and submittal of contract change requests, and update of manual/non-manual
performance reports.
 PSEG, Salem Nuclear Generating Station, Steam Generator Replacement Project, Hancock's
Bridge, New Jersey, Project Controls Supervisor.
Project consisted of Engineering, Licensing and logistics to remove four Steam Generators
from a moth balled plant in New Hampshire, transportation and installation in Salem Unit #1.
Managed preparation and monitoring of resource loaded integrated schedule for engineering,
construction, subcontractors, and licensing departments. Analyzed and presented the critical path at
the weekly Project Review meeting with the Owner.
 Exelon Corporation, Limerick Generating Station Unit 2, Fourth Refueling Outage, Sanatoga,
Pennsylvania, Project Controls Supervisor.
Duties included development and maintenance of cost tracking system, contract change
request log, and manual/non-manual performance report for T&M, incentive, and lump sum projects.
Prepared and monitored budgets for, access training and scaffolding.
 PSEG, Salem Nuclear Generating Station, Hancock's Bridge, New Jersey, Planning and
Scheduling Supervisor.
Seconded to PSEG as Planning and Scheduling Supervisor for the Design Change Installation
group. Managed Planners and Schedulers including, PSEG employees and subcontractors. Lead
interface between Engineering, Installation and Station Outage Management groups. This included
preparation of Order of Magnitude estimates from preliminary engineering information, and input of
work window activities in the outage schedule. Also prepared desktop guide for Design Change
Planning and Scheduling groups.
 PSEG, Salem Nuclear Generating Station, Plant Betterment and Maintenance Contract,
Hancock's Bridge, New Jersey, Project Controls Engineer
Responsibilities included: Performed all aspects of cost and scheduling functions for Salem
Units 1 and 2, outage and non-outage periods. Functions included preparation and update of job
order estimates and schedules, manpower planning, craft performance analysis, and reporting.
Analyzed and controlled field costs through use of computerized labor summary.
 PSEG, Salem Nuclear Generating Station, Hancock's Bridge,
New Jersey, Scheduling Engineer.
Seconded to PSEG as Scheduler for the Design Change Engineering Group. Responsibilities
included: preparation and monitoring of engineering schedules for in-house and outside engineering
contractors, and interfacing with Station Scheduling/ OPS/Maintenance Departments to develop
project work windows for outage work. Monitor installation contractors during outages, preparation
and scheduling of work orders, and maintenance of outage work list. Major projects included:
Penetration Seal, Spent Fuel Reracking, Service Water Pipe Replacement, Main Transformer
Replacement, and Steam Generator Feed water Nozzle Replacement.
 Project Controls Supervisor for the following projects:
o PSEG, Hope Creek Generating Station, Control Rod Drive Handling Equipment Replacement
Lump Sum Contract, Hancock's Bridge,
New Jersey
o Exelon, Peach Bottom Atomic Power Station Unit 2, Control Rod Drive Replacement Project,
Delta, Pennsylvania
o PSEG, Salem Nuclear Generating Station, Plant Betterment and Maintenance Contract,
Hancock's Bridge, New Jersey
 Project Controls Engineer for the following projects:
o Exelon, Peach Bottom Atomic Power Station, Delta, Pennsylvania
o Boiler Retrofit Project, Mobil Refinery, Paulsboro, New Jersey
o Southern California Edison, Mohave Generating Station, Laughlin, Nevada
o Carbide Isopreme, Fire Restoration Project, Ponce, Puerto Rico
o Hercules Incorporated, Natrosal De Bottlenecking Project, Parlin,
New Jersey
o GPU, Oyster Creek Nuclear Power Station, Unit 1, Eleventh Refueling Outage, Forked
River, New Jersey
Education
A.A.S., Business Administration
Gloucester County College, Sewell, NJ, 2000
Certificate, Project Management
Villanova University, Villanova, PA, 2006
Certificate, Leadership
Villanova University, Villanova, PA, 2012
Technical Skills
 Highly proficient in Primavera, PRISM and Microsoft Office
 Scheduling, development, critical path, updating and maintenance
 Earned value, cost control, work breakdown structure, code of accounts, forecasting

More Related Content

What's hot (19)

K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
CV of CCEquibal
CV of CCEquibalCV of CCEquibal
CV of CCEquibal
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Steven Longman Resume 2016
Steven Longman Resume 2016Steven Longman Resume 2016
Steven Longman Resume 2016
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
B Nicholls resume 2016-07-17
B Nicholls resume   2016-07-17B Nicholls resume   2016-07-17
B Nicholls resume 2016-07-17
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
RESUME
RESUMERESUME
RESUME
 
Michael W Busch
Michael W BuschMichael W Busch
Michael W Busch
 
CV - Hassan-Planning
CV - Hassan-PlanningCV - Hassan-Planning
CV - Hassan-Planning
 

Viewers also liked

Formato sesion de_aprendizaje_primaria
Formato sesion de_aprendizaje_primariaFormato sesion de_aprendizaje_primaria
Formato sesion de_aprendizaje_primariagustha
 
Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14
Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14
Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14Restraint Reduction Network
 
ZANSTA 7 Traders Presentation
ZANSTA 7 Traders PresentationZANSTA 7 Traders Presentation
ZANSTA 7 Traders PresentationLana Matheson
 
A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...
A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...
A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...Agriculture Journal IJOEAR
 
Michael Brown, West Midlands Police. RR conference workshop 27th June '14
Michael Brown, West Midlands Police. RR conference workshop 27th June '14Michael Brown, West Midlands Police. RR conference workshop 27th June '14
Michael Brown, West Midlands Police. RR conference workshop 27th June '14Restraint Reduction Network
 
портфолио баранов 2016
портфолио баранов 2016портфолио баранов 2016
портфолио баранов 2016school17ztua
 
Bioethanol market: growing rapidly for E85 ethanol
Bioethanol market: growing rapidly for E85 ethanolBioethanol market: growing rapidly for E85 ethanol
Bioethanol market: growing rapidly for E85 ethanolPuja Pritam
 
Principles, Steps of programme planning, evaluation and monitoring of program...
Principles, Steps of programme planning, evaluation and monitoring of program...Principles, Steps of programme planning, evaluation and monitoring of program...
Principles, Steps of programme planning, evaluation and monitoring of program...GBPUA&T, Pantnagar
 
Nursing Leadership
Nursing Leadership  Nursing Leadership
Nursing Leadership kjones24
 

Viewers also liked (15)

Driver's licence
Driver's licenceDriver's licence
Driver's licence
 
Producto en oferta (i)
Producto en oferta (i)Producto en oferta (i)
Producto en oferta (i)
 
Formato sesion de_aprendizaje_primaria
Formato sesion de_aprendizaje_primariaFormato sesion de_aprendizaje_primaria
Formato sesion de_aprendizaje_primaria
 
Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14
Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14
Joanne Coulson, National Autistic Society. RR Conference workshop 26th June '14
 
ZANSTA 7 Traders Presentation
ZANSTA 7 Traders PresentationZANSTA 7 Traders Presentation
ZANSTA 7 Traders Presentation
 
A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...
A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...
A Major Irrigation Project (Accelerated Mahaweli Programme) and the Chronic K...
 
Michael Brown, West Midlands Police. RR conference workshop 27th June '14
Michael Brown, West Midlands Police. RR conference workshop 27th June '14Michael Brown, West Midlands Police. RR conference workshop 27th June '14
Michael Brown, West Midlands Police. RR conference workshop 27th June '14
 
Reportaje gorbeia en álava tour
Reportaje gorbeia en álava tourReportaje gorbeia en álava tour
Reportaje gorbeia en álava tour
 
Autonomy
AutonomyAutonomy
Autonomy
 
Financial reform article
Financial reform articleFinancial reform article
Financial reform article
 
Producto en oferta (i)
Producto en oferta (i)Producto en oferta (i)
Producto en oferta (i)
 
портфолио баранов 2016
портфолио баранов 2016портфолио баранов 2016
портфолио баранов 2016
 
Bioethanol market: growing rapidly for E85 ethanol
Bioethanol market: growing rapidly for E85 ethanolBioethanol market: growing rapidly for E85 ethanol
Bioethanol market: growing rapidly for E85 ethanol
 
Principles, Steps of programme planning, evaluation and monitoring of program...
Principles, Steps of programme planning, evaluation and monitoring of program...Principles, Steps of programme planning, evaluation and monitoring of program...
Principles, Steps of programme planning, evaluation and monitoring of program...
 
Nursing Leadership
Nursing Leadership  Nursing Leadership
Nursing Leadership
 

Similar to Daniel Andrescavage

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne PearceSuzanne Pearce
 
W. Khan O&G Exp. Nov. 2015
W. Khan O&G Exp. Nov. 2015W. Khan O&G Exp. Nov. 2015
W. Khan O&G Exp. Nov. 2015Waseem Khan, PG
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx currentEdward Budney
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Robert McCray
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016Brian Hannigan
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2Rodney Taylor
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONmaheshvkat1972
 
diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)Lilly K
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning EngineerMD TAUSIF ASLAM
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam HarbyEssam Harby
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15 Mike Syslak
 

Similar to Daniel Andrescavage (20)

CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Resume - Suzanne Pearce
Resume - Suzanne PearceResume - Suzanne Pearce
Resume - Suzanne Pearce
 
W. Khan O&G Exp. Nov. 2015
W. Khan O&G Exp. Nov. 2015W. Khan O&G Exp. Nov. 2015
W. Khan O&G Exp. Nov. 2015
 
Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Ed resume 2017.docx current
Ed resume   2017.docx currentEd resume   2017.docx current
Ed resume 2017.docx current
 
Resume R_McCray FEB 2016
Resume R_McCray FEB 2016Resume R_McCray FEB 2016
Resume R_McCray FEB 2016
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16
 
Bill resume
Bill resumeBill resume
Bill resume
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATION
 
diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)diruhi-lilly-korkukluoglu Resume (3)
diruhi-lilly-korkukluoglu Resume (3)
 
Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
Darrell Resume2014
Darrell Resume2014Darrell Resume2014
Darrell Resume2014
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History Details
 
Job Profile as a Planning Engineer
Job Profile as a Planning EngineerJob Profile as a Planning Engineer
Job Profile as a Planning Engineer
 
2017 Updated CV - Essam Harby
2017 Updated  CV - Essam Harby2017 Updated  CV - Essam Harby
2017 Updated CV - Essam Harby
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15  Mike Syslak Resume Sept 02-15
Mike Syslak Resume Sept 02-15
 

Daniel Andrescavage

  • 1. DANIEL ANDRESCAVAGE (856)423 2193 / djandrescavage@icloud.com Profile 35+ years of success in project controls positions, with experience in financial and schedule management Key Results Include:  Developed a reputation as a highly reliable project controls professional in various industries, including transmission & distribution, nuclear, and fossil  Executed successful projects simultaneously in a timely and cost effective manner, with the use of Primavera P6, PRISM Key Experience AECOM, Princeton, NJ Project Controls Manager (September 1979 – present)  PSEG, 69kV Conversion Projects (Central and Metro Divisions) Engineering and Procurement, Senior Project Controls Manager. Project consists of the design of a GIS and transformers in eleven existing substations. Duties include weekly resource planning, schedule updates, milestone tracking and critical path analysis. Change order log and monthly cost and cash flow reporting.  Electrical Transmission Texas (ETT), Competitive Renewable Energy Zone (CREZ) Project, Central Texas, Assistant Project Controls Manager. Project consists of the design and construction of 345 kV transmission and substation facilities to facilitate the transmission of wind generated energy from west to east in Texas. Duties included development of a weekly Transmission Line construction report that tacked percent complete using earned value, quantities installed versus planned, forecasted completion based on achieved installation rates. Was able to prove to the Subcontractor that based on their achieved installation rates that additional crews were needed, they eventually agreed an brought in additional crews and equipment and completed on time.  PSEG, Program Manager 230 kV Upgrade Projects, Princeton New Jersey, Project Controls Manager. Project consists of the design and construction of 230 kV transmission line and substation. Duties included development of a Project Cost Report (PRISM) that aligned with the clients WBS and included actual costs and commitments from the clients cost system (SAP). Prepared and issued monthly cost and trend reports, cash flows, and contingency draw down. Developed an integrated schedule that included PSE&G, URS Outside Plant Engineering, Inside Plant Engineering Contractors, and Permitting, Procurement and Construction and Sequencing Plan. Issued and presented a bi- weekly schedule reports that included, critical path analysis, Project milestone tracking, Engineering deliverable and activity completion tracking, float density, and one month look-ahead's. Project was completed on time and under budget.  PSEG, Hudson U/2 BET Project, Jersey City, New Jersey, Project Controls Manager. Project consisted of take over from another contractor and completion of design, procurement, subcontracting, construction and start-up of an SCR, Baghouse and SDA within twenty months. Managed the Project Cost Report (including owner's costs), cash flows, performance monitoring (CPI) and contingency draw down. Lead the development of the integrated resource and quantity loaded Project schedule from project take over through commissioning to meet Government imposed completion dates, issued weekly schedule reports which included, critical path analysis, quantity tracking, two-week look-ahead's, and histograms. Project completed 10 days prior to the Government imposed completion date.
  • 2.  GE-Hitachi Nuclear Energy, ESBWR Project, Princeton, New Jersey, Project Controls Manager Project consisted of developing the generic design of the GE-Hitachi ESBWR. Managed the development of an integrated (GE-Hitachi, and two Engineering and Construction firms) Engineering and Procurement schedule, cost tracking, change order preparation and submittal, forecasting and performance reporting. Lead the development of the Nuclear Island construction schedule and cash flow, also worked directly with a utility to develop their site preparation schedule.  Power Transmission and Distribution North Iraq, Princeton, New Jersey, Project Controls Manager. Project consisted of rebuilding substations and transmission lines in Iraq. Managed the cost tracking, forecasting, performance reporting, contract change request development and submittal. Lead the schedule development of the installation and commissioning of the country-wide SCADA system.  PSEG, Salem Nuclear Generating Station, Hancocks Bridge, New Jersey, Project Controls Manager. Seconded to PSEG as a Project Controls Manager to manage three large Capital Projects (Electrical Raceway Fire Barrier, Dry Cask Storage and CFCU Chilled Water Cooling) Projects totaling $150M . Duties included development and maintenance of Level III project schedules, estimates, cash flows, processing/coordinate requisitions, contract change requests, and monthly accruals. Developed a detailed cost report and an Executive Summary Report. Two of the Projects completed on time and on budget and one was cancelled.  Exelon Corporation, Peach Bottom Atomic Power Station, Interim Spent Fuel Storage Facility, Project Lump Sum Project, Delta, Pennsylvania, Project Controls Manager. Duties included development and maintenance of cost tracking system (CRMS), project schedule, preparation and submittal of contract change requests, and update of manual/non-manual performance reports.  PSEG, Salem Nuclear Generating Station, Steam Generator Replacement Project, Hancock's Bridge, New Jersey, Project Controls Supervisor. Project consisted of Engineering, Licensing and logistics to remove four Steam Generators from a moth balled plant in New Hampshire, transportation and installation in Salem Unit #1. Managed preparation and monitoring of resource loaded integrated schedule for engineering, construction, subcontractors, and licensing departments. Analyzed and presented the critical path at the weekly Project Review meeting with the Owner.  Exelon Corporation, Limerick Generating Station Unit 2, Fourth Refueling Outage, Sanatoga, Pennsylvania, Project Controls Supervisor. Duties included development and maintenance of cost tracking system, contract change request log, and manual/non-manual performance report for T&M, incentive, and lump sum projects. Prepared and monitored budgets for, access training and scaffolding.  PSEG, Salem Nuclear Generating Station, Hancock's Bridge, New Jersey, Planning and Scheduling Supervisor. Seconded to PSEG as Planning and Scheduling Supervisor for the Design Change Installation group. Managed Planners and Schedulers including, PSEG employees and subcontractors. Lead interface between Engineering, Installation and Station Outage Management groups. This included preparation of Order of Magnitude estimates from preliminary engineering information, and input of work window activities in the outage schedule. Also prepared desktop guide for Design Change Planning and Scheduling groups.  PSEG, Salem Nuclear Generating Station, Plant Betterment and Maintenance Contract, Hancock's Bridge, New Jersey, Project Controls Engineer Responsibilities included: Performed all aspects of cost and scheduling functions for Salem Units 1 and 2, outage and non-outage periods. Functions included preparation and update of job order estimates and schedules, manpower planning, craft performance analysis, and reporting. Analyzed and controlled field costs through use of computerized labor summary.
  • 3.  PSEG, Salem Nuclear Generating Station, Hancock's Bridge, New Jersey, Scheduling Engineer. Seconded to PSEG as Scheduler for the Design Change Engineering Group. Responsibilities included: preparation and monitoring of engineering schedules for in-house and outside engineering contractors, and interfacing with Station Scheduling/ OPS/Maintenance Departments to develop project work windows for outage work. Monitor installation contractors during outages, preparation and scheduling of work orders, and maintenance of outage work list. Major projects included: Penetration Seal, Spent Fuel Reracking, Service Water Pipe Replacement, Main Transformer Replacement, and Steam Generator Feed water Nozzle Replacement.  Project Controls Supervisor for the following projects: o PSEG, Hope Creek Generating Station, Control Rod Drive Handling Equipment Replacement Lump Sum Contract, Hancock's Bridge, New Jersey o Exelon, Peach Bottom Atomic Power Station Unit 2, Control Rod Drive Replacement Project, Delta, Pennsylvania o PSEG, Salem Nuclear Generating Station, Plant Betterment and Maintenance Contract, Hancock's Bridge, New Jersey  Project Controls Engineer for the following projects: o Exelon, Peach Bottom Atomic Power Station, Delta, Pennsylvania o Boiler Retrofit Project, Mobil Refinery, Paulsboro, New Jersey o Southern California Edison, Mohave Generating Station, Laughlin, Nevada o Carbide Isopreme, Fire Restoration Project, Ponce, Puerto Rico o Hercules Incorporated, Natrosal De Bottlenecking Project, Parlin, New Jersey o GPU, Oyster Creek Nuclear Power Station, Unit 1, Eleventh Refueling Outage, Forked River, New Jersey Education A.A.S., Business Administration Gloucester County College, Sewell, NJ, 2000 Certificate, Project Management Villanova University, Villanova, PA, 2006 Certificate, Leadership Villanova University, Villanova, PA, 2012 Technical Skills  Highly proficient in Primavera, PRISM and Microsoft Office  Scheduling, development, critical path, updating and maintenance  Earned value, cost control, work breakdown structure, code of accounts, forecasting