Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 1/13
PERSONAL INFORMATION
Name Claudel
First name Jean-René
Date of birth May 30th
, 1977
Nationality country France
Languages French, English
Education Ecole Nationale Supérieure d’Arts et Métiers (E.N.S.A.M.), Paris, France
Graduate Engineer
PROFILE
Fifteen (15) years experience across technical work disciplines in the fields of Oil & Gas,
Power Generation and General Industrial Plants, working in Manufacturer(s), Contractor(s)
and “Major” Multi-National Oil Company organizations.
Execution of Turnkey Projects, Multi-National Joint Venture, non-European working
environments and internationally financed multi-currency Projects as a rotating equipment
engineer.
Current assignment is Project Manager for MAN Diesel and Turbo France SAS for a
revamping project on a Steam turbine/Axial Compressor train.
WORK HISTORY WITH HELIATEC (SINCE JULY 2016)
Project Manager
July 2016 – September
2016
FOSAX 1 revamping project for MAN Diesel and Turbo France SAS
ArcelorMittal has a significant presence in France, the two blast furnaces in
operation in Fos-Sur-Mer have a capacity of 4 million tons per year (Mt/y) of
crude steel.
Seven (7) steam turbine driven trains are actually in operation or standby,
waiting for a major overhaul or extension of the design life (already forty years
old design)
Three (3) steam turbine driven compressors had been designed and manufactured
by MAN Oberhausen and the remaining four (4) steam turbine driven generators
are Third Party manufacturers.
One (1) of the steam turbine driven compressors is ready for refurbishment with
new parts from MAN Oberhausen workshop for both steam turbine and
compressor rotor. The FOSAX1 revamping project consists on the re-assembly
of the main shaft line, minor modifications of the auxiliaries, mechanical
completion, pre-commissioning and commissioning activities.
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 2/13
Project Manager in Fos-Sur-Mer, France
- Ensure clear communication among all entities involved in successful delivery
of the project. This includes day-to-day communication with the CLIENT;
coordination with other client subcontractors, our VENDORs and our local
partners; and communicating project milestones to internal and external
stakeholders.
- Expand and leverage client relationship through understanding of client
objectives; participation in conference calls and meetings.
- Resource allocation and coordination (Field Service Engineer(s),
subcontractors, local partners, CLIENT) Ensure that all project personnel
receive an appropriate training prior to execute the project.
- Project Schedule delivery enforcing, monitoring progress of the project and
adjusting as necessary to ensure the successful completion.
- Ownership and management of project materials and CLIENT spare parts;
consolidating and up-keeping; updating; distribution of materials to support
Field Services.
- Set up and implement strategy for successful completion of new and on-going
projects to be delivered on time, on budget, on scope, and at the required level of
quality. This includes project delivery timelines; identifying project risks and
developing risk mitigation plans;and managing changes in project scope and
providing alternate solutions as necessary.
- Ensure that all financial records for the project are up to date.
- Develop forms and records to document project activities including field
quality checks including alignment checks, welding book, piping isometrics,
material certificates,Non Destructive Testing results, etc. Set up files to ensure
that all project information is appropriately documented and secured.
- Manage all post-delivery project needs including lessons learnt, debriefs and
creating rebound opportunities; and assuring client satisfaction.
- Establish and implement COMPANY policies and procedures for Quality
Control, Heath Safety and Environment, etc. Initiate site safety moments and
toolbox talks.
PREVIOUS WORK HISTORY
ANOTECH ENERGY FOR TOTAL E&P NORGE AS - 2013 - 2016
Self-Employed Mechanical Engineer
December 2015 – March
2016
Martin Linge Project for TOTAL E&P Norge A.S.
Hild oil and gas field is located in the North Sea,Norway. It lies in a water depth
of 115m and is the largest undeveloped field in the North Sea.
TOTAL holds a 51% stake in the field and is the operator. Other stakeholders are
Petoro (30%) and Statoil (19%). TOTAL launched the development of the field
in February 2012.
First production from the field is expected in the year 2017. Peak production
from the field is expected to be 100,000 barrels of oil equivalent (boe) each day.
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 3/13
The development plan includes installation of a wellhead platform and a floating,
storage and offloading (FSO) vessel. TOTAL has designed a sustainable
development plan for the field to reduce the environmental footprint.
The platform and FSO will be powered from the shore through a 160km long
cable. The cable will include fibre optic links to enable the facilities to be
monitored from TOTAL's base in Stavanger, Norway. The field will be
developed using an integrated wellhead platform designed to operate for 30
years.
Liquids produced at the field will be sent to the FSO. The FSO will process the
oil to separate water which will be used for reinjection. The processed crude oil
is unloaded onto shuttle tankers.
The FSO (owned and operated by Knutsen OAS Shipping AS) is a conversion of
Hanne Knutsen tanker that will be refurbished and modified in accordance with
the rules of Det Norske Veritas (DNV) and regulations of Petroleum Safety
Authority (PSA) Norway, for a design life of 12 years without dry-docking.
Field Engineer in Gdansk, Poland
- Provide support to the site and commissioning teams in development and
resolution of technical findings.
- Manage punch-list (from reviews or testing) clearance that he has been
assigned.
- Ensure the work performed is consistent with other disciplines and check
relevant interfaces.
- Cooperate with Field Operation representative and make sure correct hand-
over can be performed.
- Monitor progress of the Mechanical Equipment activities at the YARD and
provide progress reports as required by the Project Management Team (PMT)
and the Site Representative.
FSO Mechanical Engineer
- Review and approve vendor documentation
- Attendance of equipment testing at manufacturer premises
- Follow up for all remaining packages such as:
- Deck Cranes - WESTCON / PROTEA (Poland)
Offshore Crane
Turret Service Crane
Offloading Service Crane
- Offloading System – MacGregor Pusnes / RMES (Singapore)
Offloading Hose Reel
Hawser Winch
Auxiliary Winch
Hose Replacement Tool
- Mechanical Handling Equipment - WESTCON / PROTEA
Helideck Cargo Lift
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 4/13
FSO Mechanical Engineer
December 2013 –
November 2015
Martin Linge Project for TOTAL E&P Norge A.S.
Hild oil and gas field is located in the North Sea,Norway. It lies in a water depth
of 115m and is the largest undeveloped field in the North Sea.
TOTAL holds a 51% stake in the field and is the operator. Other stakeholders are
Petoro (30%) and Statoil (19%). TOTAL launched the development of the field
in February 2012.
The FSO (owned and oeprated by Knutsen OAS Shipping AS) is a conversion of
Hanne Knutsen tanker that will be refurbished and modified in accordance with
the rules of Det Norske Veritas (DNV) and regulations of Petroleum Safety
Authority (PSA) Norway, for a design life of 12 years without dry-docking.
FSO Mechanical Engineer based in Stavanger, Norway
- Assist the Engineering Leader by leading the supervision and management of
the engineering & procurement activities performed for the FSO Package in
relation to the mechanical and rotating Equipment (Process and Marine),
Heating Ventilation Air Conditioning (HVAC)and Material Handling disciplines
in order to assure technical integrity, quality, constructability, maintainability
and performance operability whilst respecting schedule and budget.
The Packagecovers a FloatingStorage and Offloading unit with oil/water
separation processing (distributors & static mixers), diesel driven Fire Fighting
pumps, submerged pumps and associated Hydraulic PowerUnits (HPUs),
Produced Water export boosterpumps, GasRecovery Unit, New Boiler, Fresh
Water Generation, Chemical Injection packages, Air Compressors, Nitrogen
Generation, tank cleaning machines, handling equipment including deck cranes,
Hydraulic PowerUnits (HPUs) for the turret etc.
- Expedite CONTRACTORto issue engineeringdeliverables with the right quality
level and safety in design and ensure compliance with applicable codes and
standards (PSA/NORSOK,NMD/DNV, Client’sspecifications)and best engineering
practices.
- Verify and commenton time, CONTRACTORengineering deliverables and make
sure that CONTRACT requirements are met (basis of design, project
specifications, contract requirements, etc)
- Assess and review on regular basis the progress of the CONTRACTOR’s
engineering deliverablesby reviewing the MasterDocument Register (MDR) for
his discipline(s). Alert his hierarchy in case of CONTRACTOR under
performance.
- Take part in 3D model, HAZOPs, Project Technical Reviews (PTR) and other
design reviews
- Review and propose response to Technical Queries, Non-Conformities and
Change order Requests for project management approval.
- Perform regular visits at the Engineering offices, WORKSHOP and
WORKSITE or any surveys.
- Liaise and keep TOTAL Head Quarter contact point(s) updated on ongoing
work and major issuesfaced. Seek for technical resolutions in compliance with
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 5/13
Project constraints.
- Maintain a close working relationship with CONTRACTOR to assist them for
designing and execution of the works and propose solutions or optimizations to
the FSO Engineering Lead.
- Manage his discipline(s) asdiscipline leaderand organize for his discipline(s)
weekly coordination meetings with CONTRACTOR.
- Participate to the preparation of any internal technical documents.
- Participate in any technical, coordination, interfacesmeetings necessary to
fulfil the job responsibility.
- InformProject Management of any concernsthat might jeopardize the quality,
the cost or the project schedule.
- Report weekly activities performed and attend to coordination meetings.
- Assist the procurement coordinator in VENDOR approval. Attend the BID
Clarifications Meetings prior Purchase Order.
- Review and comment the BID technical evaluations performed by
CONTRACTOR and his subcontractors.
- Attend the Kick Off Meetings (KOM) after Purchase Order between
CONTRACTOR and the selected VENDORs.
- Review and comment VENDOR documents that have been assigned to him and
assist package engineers in technical problem solving at all stage of work.
Attend to VENDORs meeting as required.
- Witness Factory Acceptance Tests (FAT) and final inspections at VENDOR
premises.
- Follow up for VENDOR packages such as:
- Oil/water separation processing – SULZER (Switzerland)
Distributors
Static mixers
- Submerged pumps and associated Hydraulic PowerUnits (HPUs) –
Frank Mohn (FRAMO) Fusa, Norway
- Fire Fighting pumps – Frank Mohn (FRAMO) Flatoy, Norway
Hydraulic Driven Fire Fighting Lift pumps
Diesel driven Fire Fighting pumps containers
- Electrically Driven Process Pumps
Produced Water export booster pumps – FLOWSERVE (Italy)
Fresh Water Pumps – FLOWSERVE (United Kingdom)
- New Boiler – JOHN ZINK / Mitsubishi (Japan)
- Gas Recovery Unit / Blanket Gas System - JOHN ZINK (United
Kingdom)
- Fresh Water Generation – HALVORSEN (Norway)
- Chemical Injection package – HITEC Products (Norway)
- Instrumental Air Compressors - ATLAS COPCO (Belgium)
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 6/13
- Tank cleaning machines – SCANJET (Sweden)
- Hydraulic PowerUnits (HPUs) for the turret – OneSubsea / SERVI
HYDRANOR (Norway)
Barrier Fluid HPU
ESD Control Fluid HPU
- Deck Cranes - WESTCON / PROTEA (Poland)
Offshore Crane
Turret Service Crane
Offloading Service Crane
- Offloading System – MacGregor Pusnes / RMES (Singapore)
Offloading Hose Reel
Hawser Winch
Auxiliary Winch
Hose Replacement Tool
- Mechanical Handling Equipment - WESTCON / PROTEA
(Poland)
Helideck Cargo Lift
- Nitrogen Generation - to be purchased
- Marine Equipment - to be purchased directly by the YARD
SINGLE BUOY MOORING (SBM) OFFSHORE – MONACO – 2011- 2013
Rotating Equipment Engineer
June 2012 - November
2013
OSX 2 FPSO Project for OSX 2 Leasing B.V., an indirect subsidiary of OSX
Brasil S.A.
EPCI contract for a turret moored Floating Production Storage and Offloading
unit (oil production and treatment of 100,000 bopd and will have water injection
capacity of 150,000 bpwd and gas compression capability up to 1,500,000
Sm3/d) to be located in the Campos Basin, offshore Brazil in a nominal water
depth of 135 meters.
The contract covers project management, engineering, supply of material and
equipment, construction and conversion, commissioning, installation and startup
of the FPSO.
The FPSO will be a converted VLCC that will be refurbished and modified in
accordance with the rules and regulations of American Bureau of Shipping
(ABS), for a design life of 20 years without dry-docking.
Mechanical Equipment Discipline Lead Engineer (DLE)
- Lead, control and direct the engineering project Mechanical Equipment team
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 7/13
in a way that ensures the safe, timely, efficient and profitable delivery of
Mechanical Equipment fit-for-purpose meeting the project’s requirements and
expectation
- Supervise up to ten (10) team members
- Together with the Discipline Manager,allocate package engineer as required
for each identified equipment
- Arrange handovers, organize training for the new comers and mainly
contractors
- Ensure that package engineer coordinates review of vendor documentation
with other Disciplines
- Monitor progress of the Mechanical Equipment activities (including
deliverables, package engineering and discipline management) and provide
progress reports as required by the Project Management Team (PMT) and
Discipline Manager
- Assist site and commissioning teams for equipment integration
- Provide inputs to the project lessons learnt database
- Ensure that discipline lessons learnt from past projects and SBM fleet are
considered during the project execution
- Identify any changes in scope, frominternal and external sources, highlight to
Engineering Project Manager and raise or bring inputs to raise a design change
request.
Package Engineer
- Review and approve vendor documentation
- Assist local inspectors and package managers for equipment testing at
manufacturer premises
- Provide technical expertise in case of Mechanical Equipment upgrade or
repairs
- Follow up for all remaining packages such as:
- Seawater Treatment Plant (complete Topsides module)
Sulphate Reduction Unit - CAMERON (Singapore) Pte. Ltd.
- Power Generation
Aero derivative Gas Turbine (DR-61GP) – DRESSER RAND AS
- Produced Water Treatment Package
Hydrocyclones and Oil Flotation Cell - VEOLIA Water Solutions &
Technologies (SEA) Pte Ltd
- Static Equipment
Separators, separator internals, seawater coarse filters, gas scrubbers,
miscellaneous Pressure Vessels, etc.
- Heat Exchangers
Plate and Frame Heat Exchangers – TRANTER International AB
Printed Circuit Heat Exchangers – HEATRIC Division of Meggitt (UK) Ltd.
Shell and Tube Heat Exchangers – HEATEC Jietong Pte Ltd
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 8/13
- Deck Cranes
Knuckle Boom and Fixed Boom cranes – ITALGRU Srl
- Pipe Rack Trolley
Electric Powered Self Propelled Trolley on Track Rails – BRADSHAW Electric
Vehicles
- Mechanical Handling Equipment
Electrically and/orManually Operated Customized Trolleys With 4 Wheels,
Electrically and/orManually Operated Walk Behind Pallet Trucks With Locking
Brake,
Pedestal, Fixed Radius Manual, Manual Portable, Man Riding Davits,
Pneumatic Combined and Manual Combined Trolley Hoists,
Portable A-Frame, Single Cylinder Lift Trolley, BeamClamps, Heavy Duty
Rollers, etc.
- Marine Equipment
Offloading Hose Reel, Bunkering Hose Reel (Portable Water and Marine Diesel
Oil) , MDO Purifier, Fresh Water Generator, Bilge Water Separator, Quick
Release Hook, etc.
Rotating Equipment Engineer
January 2011 - November
2013
OSX 2 FPSO Project for OSX 2 Leasing B.V., an indirect subsidiary of OSX
Brasil S.A.
EPCI contract for a turret moored Floating Production Storage and Offloading
unit (oil production and treatment of 100,000 bopd and will have water injection
capacity of 150,000 bpwd and gas compression capability up to 1,500,000
Sm3/d) to be located in the Campos Basin, offshore Brazil in a nominal water
depth of 135 meters.
Deputy Mechanical Equipment Discipline Lead Engineer and Package
Engineer
- Issue equipment specifications prior to Request For Quotation (RFQ)
- Technical clarifications and evaluation of supplier proposals
- Participate to Bid Clarification Meetings (BCM), Kick Off Meetings, HAZOP
meetings, 3D model reviews and design freeze meetings
- Follow up for various rotating equipment and packages such as:
- Gas Treatment Plant (complete Topsides module)
Gas Sweetening and Gas Dehydration units – FRASER Uniquip Sdn. Bhd.
- Flash Gas Compressor
Wet Screw Compressor – MAYEKAWA (Mycom)
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 9/13
TECHNIP FRANCE – LA DEFENSE, PARIS – 2005 - 2010
Rotating Equipment Engineer
August - December 2010 Shtokman Gas Condensate Field Development – Single Phase Flow
(GAZPROM, TOTAL, STATOILHYDRO) Natural Gas production (70 million
Sm3 per day)
Conceptual Studies in partnership with AKERSolutions and SBM (ATS). Gas
Field located 610km from Murmansk in the Barents Sea.
SDAG would like to study all possible variants to develop such a complex field,
namely the single phase flow.
ATS will perform conceptual studies of the single phase flow so as to enable
SDAG, its Share Holders and Gazprom Dobysha Shelf (GDSh) to make a
selection of the best concept.
Mechanical Discipline Lead.
- Concept studies: Investigate the different concepts associated to the Single
Phase Flow (SPF).
- Tender activities: Issue a qualified comparison between the SDAG concept
based on two (2) phase flow and alternative concepts based on the Single Phase
Flow (SPF).
Rotating Equipment Engineer
June - December 2010 Tupi Field Overall Development Plan – Phase 4 Dry completion units and
FLNG (PETROBRAS Netherland B.V. and its partners BG, GALP Energia,
REPSOL) Liquefied Natural Gas production (2.7 million tons per annum)
Silent Consortium between Technip France,JGC Corporation, Modec Inc.
(TJM) FEED for a Floating Liquefied NaturalGas (LNG) unit. Brazil, moored in
Santos Basin : 2200 m water depth.
Rotating Equipment Engineer
- Collect major information frompotential VENDORs about proven technology
used for critical equipment identified as “Novelty”- Marinisation or Scale Up.
- Issue project Novelty Management Plans to PNBV.
- Follow up of a Novelty Register.
The level of detail required to have a proposed novelty will be expected to vary
depending on how different the proposed novelty is from proven units and what
the impact of underperformance would be on the project.
Mechanical Commissioning Engineer
April - May 2010 Offshore Associated Gas (OAG) Package 1 - Compressor and booster stations
(ADGAS – Abu Dhabi Gas Liquefaction Company Limited) Das Island, United
Arab Emirates. Lump Sum Turnkey (LSTK) contract awarded to Middle East
Projects International (MEPI), a fully owned subsidiary of Technip.
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 10/13
Supply and installation of compressors, booster stations, dehydration units and
facilities on Das Island for the separation and treatment of bulk natural gas
liquids received from offshore gas.
The Offshore Associated Gas (OAG) project will dispatch offshore gases to the
facilities of Habshan, to be processed and provided for local consumption.
The project is based on a modularized plant for which 60 modules are fabricated
onshore and transported by cargo barge to the plant location at Das Island.
Mechanical Commissioning Engineer
- Prepare the necessary Commissioning work permit prior to carrying out any
powering up of Mechanical Equipment. Ensure that the lock out and tag out
procedure have been applied for the Electrical Equipment.
- Coordinate and give instructions to Sub-contractorsfor the implementation of
Pre- Commissioning activities
- Assist in Air Blowing, Inerting, Punch clearing and Line-up preparation.
- Report directly to the Commissioning Manager and Deputy Site Manager for
the daily activities.
Rotating Equipment Engineer
March 2009 - April 2010 Shtokman Gas Condensate Field Development - Floating Production Unit
(GAZPROM, TOTAL, STATOILHYDRO) Natural Gas production (70 million
Sm3 per day)
Compensated Call For Tender (CCFT) Project in partnership with
AKERSolutions and SBM (ATS). Gas Field located 610km from Murmansk in
the Barents Sea.
The area is a harsh Arctic environment that can be covered in sea ice and is also
known for its icebergs and experiences long periods of darkness during the
winter months. Facilities in this region can expect to be subject to the effects of;
very low ambient air temperatures, significant snow and surface accreted ice
cover and wind chill unless winterisation measures are taken.
The offshore facilities of Phase 1 consist mainly of Subsea Production System
(SPS), Umbilicals, Flowlines and Risers (UFR) to gather production from SPS
and transport it to the Ice-resistant disconnectable Floating Production Unit
(FPU) and to connect the FPU to pipeline to shore.
Mechanical Discipline Lead.
- Basis Of Design review: Comment and clarify Company Furnished
Information,
- FEED: Complete Company project documentation for Main Cranes, Sea Water
Lift Pumps, Heating Medium Circulation Pumps and Cooling Medium Pumps.
- Tender activities: Issue material requisitions for inquiry and transmit technical
bid packages to issue request for quotation (RFQ)
Technical clarifications and evaluation of supplier proposals for Turbo-
Generators, Turbo-Compressors, Gas Compressors, Pedestal Cranes and
Centrifugal/reciprocating/progressive cavity Pumps.
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 11/13
Rotating Equipment Engineer
October 2008 - June 2009 Cravo-Lirio-Orquidea-Violeta (CLOV) Floating Production Storage and
Offloading vessel (TOTAL E&P ANGOLA, SONANGOL) Oil production
(168.5KBLPD)
Compensated Call For Tender (CCFT) Project. Block 17, offshore Angola.
The Floating Production Storage and Offloading unit includes hull, mooring,
accommodation, process (oil, gas, water as needed) water re-injection, oil
storage and export facilities (pumping and metering), power generation, utilities,
flaring and gas export.
Mechanical Discipline Lead.
Collect major information from Company Furnished Information, complete
TOTAL evaluation of supplier proposals for Turbo-Generators, Gas
Compressors. Transmit technical bid packages to issue request for quotation
(RFQ)
Issue material requisitions forinquiry and short-list bidders for other rotating
equipment, i.e. Water Injection Pumps, Essential Diesel Generators, etc.
Field Engineer
January - September 2008 PETROVIETNAM, 145,000 BPSD grassroots refinery, LSTK contract in
Consortium with JGC and Tecnicas Reunidas, Dung Quat (Quang Ngai),
Vietnam.
Field Engineer.
Serve as primary interface for rotating equipment on technical issues with
project management, field installation, and end customer.
Provide technical support to construction and pre-commissioning teams.
Prepare site modification of existing design to reflect customer-specific project
requirements.
Quality Control Inspector
January - April 2007 Mainly involved in the following dutiesas required by the applicable codes and
standards:
- Inspection of casting parts
- Hydrostatic pressure tests of pressure parts
- Pre-Inspection Meeting (PIM)
- Balancing of rotating parts
- Checking of internal parts / clearances before assembly
- Performance / mechanical tests of pumps, compressors, gas
turbines, lube oil units.
- Inspection of complete units
- Review of inspection books
for various rotating equipment and packages such as :
- Gas turbines
Frame 6 Gas turbines - GE Energy
- Compressors
Integrally geared Compressors – KOBELCO
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 12/13
- Pumps
Controlled Volume pumps - MILTON ROY Europe
Non API pumps - KSB SAS
Firewater and Jockey pumps - FLOWSERVE & SPP Pumps
Sealless pumps - HERMETIC Pumpen GMBH
- Mixers
Mixers - LUMPP SA & MILTON ROY Mixing
- and Packages
Chemical Injection Units - MILTON ROY Europe
Rotating Equipment Engineer
2005 - 2006 RASGAS 3 – RAS LAFFAN LIQUEFIED NATURAL GAS CO (3)
(QP/EXXONMOBIL), LNG trains 6 & 7, (2 x 7.8 MMTPY), largest capacities
in the world, US$ 4 billion EPC contract in joint venture with CHIYODA, Ras
Laffan, Qatar.
Deputy Mechanical Discipline Lead.
Coordination of activities executed in Technip Abu Dhabi and Paris offices.
In charge of centrifugal compressors requisition, technical bid evaluation of
supplier proposals,follow-up of the design and manufacturing phases with the
selected supplier, engineering activities including coordination with other
disciplines involved in the project.
ASSYSTEM FRANCE FOR GENERAL ELECTRIC THERMODYN - LE CREUSOT – 2004 - 2005
Project Engineer
2004 - 2005 GASSI EL AGRED REDEVELOPMENT PROJECT covering the El Gassi, El
Agred, Zotti Fields from the Algerian state oil company, SONATRACH.
Work in collaboration with NUOVO PIGNONE in Italy in contracts to Bechtel
Corp to provide moto-compressors with variable speed drive systems for
SONAHESS join operating company between SONATRACH and US firm
AMERADA HESS.
El Gassi, El Agred, Zotti Fields - 60 miles south-west of the Hassi Messaoud Field
in the major oil-production region of central Algeria.
 Analysis of each contract.
 Creation and tracking of the lists of documents for each project.
 Tracking of P&ID diagrams and general layouts realized by various
subcontractors: creation, revision, update with the comments of the
customer.
 Creation and update of specifications and ordering sheets for equipment
such as generator, gear, lube oil systems, valves of control, valves and
fittings, instrumentation...
Jean-René CLAUDEL
Rotating Equipment Engineer
September 2016
Page 13/13
AKKA TECHNOLOGIES FOR GENERAL ELECTRICENERGYPRODUCTS EUROPE –
BELFORT – 2001 - 2004
Design Engineer
2001 - 2004  New Products Introduction programs on: 6FA+e and 6C projects for
the following equipment: structural supports for gas turbines and gears
– gear – turning gear – high speed coupling– nuts and bolts.
Work in collaboration with GE POWER SYSTEMS in the United States.
 Tracking of the manufacturing (L.C.C.: low cost countries) and
finalization of the drawings. Co-design with the suppliers of gears and
couplings.
 Tracking of the qualification of the suppliers and of the first piece.
 Recovery of existing, optimization, cost reduction or improvement of
not-quality projects.
 Item owner.

More Related Content

What's hot

What's hot (20)

CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
OMN_CV_2014_eng (1)
OMN_CV_2014_eng (1)OMN_CV_2014_eng (1)
OMN_CV_2014_eng (1)
 
CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10CV-JACKIE HA-Updated 2015-10
CV-JACKIE HA-Updated 2015-10
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
Resume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls SpecialistResume Alanna Scott - Project Controls Specialist
Resume Alanna Scott - Project Controls Specialist
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Moh.Ramadan-CV
Moh.Ramadan-CVMoh.Ramadan-CV
Moh.Ramadan-CV
 
TERRY LUMLEY C.V. 2015.
TERRY LUMLEY C.V. 2015.TERRY LUMLEY C.V. 2015.
TERRY LUMLEY C.V. 2015.
 
RESUME - DAVID SILVA (1) (1)
RESUME -  DAVID SILVA (1) (1)RESUME -  DAVID SILVA (1) (1)
RESUME - DAVID SILVA (1) (1)
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Hisham.cv
Hisham.cvHisham.cv
Hisham.cv
 
FranksCV[2][1] (Repaired)
FranksCV[2][1] (Repaired)FranksCV[2][1] (Repaired)
FranksCV[2][1] (Repaired)
 
Andrew Dennis Cooper CV 1 (4)
Andrew Dennis Cooper CV 1 (4)Andrew Dennis Cooper CV 1 (4)
Andrew Dennis Cooper CV 1 (4)
 
2015. 12. 09 Granada Group Profile
2015. 12. 09  Granada Group Profile2015. 12. 09  Granada Group Profile
2015. 12. 09 Granada Group Profile
 
CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Nishanth N
Nishanth NNishanth N
Nishanth N
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Tom Paterson-resume
Tom Paterson-resumeTom Paterson-resume
Tom Paterson-resume
 

Viewers also liked

Dawn Duchess resume
Dawn Duchess resumeDawn Duchess resume
Dawn Duchess resumeDawn Duchess
 
13a brandontrimble Portfolio
13a brandontrimble Portfolio13a brandontrimble Portfolio
13a brandontrimble PortfolioBrandon Trimble
 
Claims Reserving in Non-life Insurance in the Presence of Annuities
Claims Reserving in Non-life Insurance in the Presence of Annuities Claims Reserving in Non-life Insurance in the Presence of Annuities
Claims Reserving in Non-life Insurance in the Presence of Annuities Jarl Sigurdsson
 
Práctica 3
Práctica 3Práctica 3
Práctica 3laurafh
 
5 not so_hot_selling_cars
5 not so_hot_selling_cars5 not so_hot_selling_cars
5 not so_hot_selling_carsAmit Sharma
 
Protocolo de negociacion japon (1) (1)
Protocolo de negociacion japon (1) (1)Protocolo de negociacion japon (1) (1)
Protocolo de negociacion japon (1) (1)blanca1919
 
Dosificacion matematicas 2 grado de secundaria
Dosificacion matematicas 2 grado de secundariaDosificacion matematicas 2 grado de secundaria
Dosificacion matematicas 2 grado de secundariaJEDANNIE Apellidos
 

Viewers also liked (14)

Story Time: Dragon Day
Story Time: Dragon DayStory Time: Dragon Day
Story Time: Dragon Day
 
Dawn Duchess resume
Dawn Duchess resumeDawn Duchess resume
Dawn Duchess resume
 
RDS0003
RDS0003RDS0003
RDS0003
 
13a brandontrimble Portfolio
13a brandontrimble Portfolio13a brandontrimble Portfolio
13a brandontrimble Portfolio
 
Claims Reserving in Non-life Insurance in the Presence of Annuities
Claims Reserving in Non-life Insurance in the Presence of Annuities Claims Reserving in Non-life Insurance in the Presence of Annuities
Claims Reserving in Non-life Insurance in the Presence of Annuities
 
13 a carliejones
13 a carliejones13 a carliejones
13 a carliejones
 
Resume 28092016
Resume 28092016Resume 28092016
Resume 28092016
 
Portfolio
PortfolioPortfolio
Portfolio
 
Práctica 3
Práctica 3Práctica 3
Práctica 3
 
5 not so_hot_selling_cars
5 not so_hot_selling_cars5 not so_hot_selling_cars
5 not so_hot_selling_cars
 
Protocolo de negociacion japon (1) (1)
Protocolo de negociacion japon (1) (1)Protocolo de negociacion japon (1) (1)
Protocolo de negociacion japon (1) (1)
 
Raporte de Huauchinango
Raporte de HuauchinangoRaporte de Huauchinango
Raporte de Huauchinango
 
Resume
ResumeResume
Resume
 
Dosificacion matematicas 2 grado de secundaria
Dosificacion matematicas 2 grado de secundariaDosificacion matematicas 2 grado de secundaria
Dosificacion matematicas 2 grado de secundaria
 

Similar to CV - CJR - Rev 02

Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Gideon Manthorp
 
CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)Gideon Manthorp
 
cv BJB Feb2015
cv BJB Feb2015cv BJB Feb2015
cv BJB Feb2015Bazza B
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015Gideon Manthorp
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.walaa ahmed ahmed attiia
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layoutAnders Engstroem
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 

Similar to CV - CJR - Rev 02 (20)

Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)Curriculum vitae 22 07 2016 (1)
Curriculum vitae 22 07 2016 (1)
 
CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)CURRICULUM VITAE 22_07_2016 (1)
CURRICULUM VITAE 22_07_2016 (1)
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
cv BJB Feb2015
cv BJB Feb2015cv BJB Feb2015
cv BJB Feb2015
 
Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016Mohamed El Hadi ADJABI 2016
Mohamed El Hadi ADJABI 2016
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015CURRICULUM VITAE 15112015
CURRICULUM VITAE 15112015
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
1 re sume 2016 anders engstroem piping & layout
1   re sume 2016 anders engstroem piping & layout1   re sume 2016 anders engstroem piping & layout
1 re sume 2016 anders engstroem piping & layout
 
JESEDLOPECCV042017
JESEDLOPECCV042017JESEDLOPECCV042017
JESEDLOPECCV042017
 
CV2.DOC
CV2.DOCCV2.DOC
CV2.DOC
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Cv (2). kh
Cv (2). kh Cv (2). kh
Cv (2). kh
 
Paul details 2014today
Paul details 2014todayPaul details 2014today
Paul details 2014today
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 

CV - CJR - Rev 02

  • 1. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 1/13 PERSONAL INFORMATION Name Claudel First name Jean-René Date of birth May 30th , 1977 Nationality country France Languages French, English Education Ecole Nationale Supérieure d’Arts et Métiers (E.N.S.A.M.), Paris, France Graduate Engineer PROFILE Fifteen (15) years experience across technical work disciplines in the fields of Oil & Gas, Power Generation and General Industrial Plants, working in Manufacturer(s), Contractor(s) and “Major” Multi-National Oil Company organizations. Execution of Turnkey Projects, Multi-National Joint Venture, non-European working environments and internationally financed multi-currency Projects as a rotating equipment engineer. Current assignment is Project Manager for MAN Diesel and Turbo France SAS for a revamping project on a Steam turbine/Axial Compressor train. WORK HISTORY WITH HELIATEC (SINCE JULY 2016) Project Manager July 2016 – September 2016 FOSAX 1 revamping project for MAN Diesel and Turbo France SAS ArcelorMittal has a significant presence in France, the two blast furnaces in operation in Fos-Sur-Mer have a capacity of 4 million tons per year (Mt/y) of crude steel. Seven (7) steam turbine driven trains are actually in operation or standby, waiting for a major overhaul or extension of the design life (already forty years old design) Three (3) steam turbine driven compressors had been designed and manufactured by MAN Oberhausen and the remaining four (4) steam turbine driven generators are Third Party manufacturers. One (1) of the steam turbine driven compressors is ready for refurbishment with new parts from MAN Oberhausen workshop for both steam turbine and compressor rotor. The FOSAX1 revamping project consists on the re-assembly of the main shaft line, minor modifications of the auxiliaries, mechanical completion, pre-commissioning and commissioning activities.
  • 2. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 2/13 Project Manager in Fos-Sur-Mer, France - Ensure clear communication among all entities involved in successful delivery of the project. This includes day-to-day communication with the CLIENT; coordination with other client subcontractors, our VENDORs and our local partners; and communicating project milestones to internal and external stakeholders. - Expand and leverage client relationship through understanding of client objectives; participation in conference calls and meetings. - Resource allocation and coordination (Field Service Engineer(s), subcontractors, local partners, CLIENT) Ensure that all project personnel receive an appropriate training prior to execute the project. - Project Schedule delivery enforcing, monitoring progress of the project and adjusting as necessary to ensure the successful completion. - Ownership and management of project materials and CLIENT spare parts; consolidating and up-keeping; updating; distribution of materials to support Field Services. - Set up and implement strategy for successful completion of new and on-going projects to be delivered on time, on budget, on scope, and at the required level of quality. This includes project delivery timelines; identifying project risks and developing risk mitigation plans;and managing changes in project scope and providing alternate solutions as necessary. - Ensure that all financial records for the project are up to date. - Develop forms and records to document project activities including field quality checks including alignment checks, welding book, piping isometrics, material certificates,Non Destructive Testing results, etc. Set up files to ensure that all project information is appropriately documented and secured. - Manage all post-delivery project needs including lessons learnt, debriefs and creating rebound opportunities; and assuring client satisfaction. - Establish and implement COMPANY policies and procedures for Quality Control, Heath Safety and Environment, etc. Initiate site safety moments and toolbox talks. PREVIOUS WORK HISTORY ANOTECH ENERGY FOR TOTAL E&P NORGE AS - 2013 - 2016 Self-Employed Mechanical Engineer December 2015 – March 2016 Martin Linge Project for TOTAL E&P Norge A.S. Hild oil and gas field is located in the North Sea,Norway. It lies in a water depth of 115m and is the largest undeveloped field in the North Sea. TOTAL holds a 51% stake in the field and is the operator. Other stakeholders are Petoro (30%) and Statoil (19%). TOTAL launched the development of the field in February 2012. First production from the field is expected in the year 2017. Peak production from the field is expected to be 100,000 barrels of oil equivalent (boe) each day.
  • 3. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 3/13 The development plan includes installation of a wellhead platform and a floating, storage and offloading (FSO) vessel. TOTAL has designed a sustainable development plan for the field to reduce the environmental footprint. The platform and FSO will be powered from the shore through a 160km long cable. The cable will include fibre optic links to enable the facilities to be monitored from TOTAL's base in Stavanger, Norway. The field will be developed using an integrated wellhead platform designed to operate for 30 years. Liquids produced at the field will be sent to the FSO. The FSO will process the oil to separate water which will be used for reinjection. The processed crude oil is unloaded onto shuttle tankers. The FSO (owned and operated by Knutsen OAS Shipping AS) is a conversion of Hanne Knutsen tanker that will be refurbished and modified in accordance with the rules of Det Norske Veritas (DNV) and regulations of Petroleum Safety Authority (PSA) Norway, for a design life of 12 years without dry-docking. Field Engineer in Gdansk, Poland - Provide support to the site and commissioning teams in development and resolution of technical findings. - Manage punch-list (from reviews or testing) clearance that he has been assigned. - Ensure the work performed is consistent with other disciplines and check relevant interfaces. - Cooperate with Field Operation representative and make sure correct hand- over can be performed. - Monitor progress of the Mechanical Equipment activities at the YARD and provide progress reports as required by the Project Management Team (PMT) and the Site Representative. FSO Mechanical Engineer - Review and approve vendor documentation - Attendance of equipment testing at manufacturer premises - Follow up for all remaining packages such as: - Deck Cranes - WESTCON / PROTEA (Poland) Offshore Crane Turret Service Crane Offloading Service Crane - Offloading System – MacGregor Pusnes / RMES (Singapore) Offloading Hose Reel Hawser Winch Auxiliary Winch Hose Replacement Tool - Mechanical Handling Equipment - WESTCON / PROTEA Helideck Cargo Lift
  • 4. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 4/13 FSO Mechanical Engineer December 2013 – November 2015 Martin Linge Project for TOTAL E&P Norge A.S. Hild oil and gas field is located in the North Sea,Norway. It lies in a water depth of 115m and is the largest undeveloped field in the North Sea. TOTAL holds a 51% stake in the field and is the operator. Other stakeholders are Petoro (30%) and Statoil (19%). TOTAL launched the development of the field in February 2012. The FSO (owned and oeprated by Knutsen OAS Shipping AS) is a conversion of Hanne Knutsen tanker that will be refurbished and modified in accordance with the rules of Det Norske Veritas (DNV) and regulations of Petroleum Safety Authority (PSA) Norway, for a design life of 12 years without dry-docking. FSO Mechanical Engineer based in Stavanger, Norway - Assist the Engineering Leader by leading the supervision and management of the engineering & procurement activities performed for the FSO Package in relation to the mechanical and rotating Equipment (Process and Marine), Heating Ventilation Air Conditioning (HVAC)and Material Handling disciplines in order to assure technical integrity, quality, constructability, maintainability and performance operability whilst respecting schedule and budget. The Packagecovers a FloatingStorage and Offloading unit with oil/water separation processing (distributors & static mixers), diesel driven Fire Fighting pumps, submerged pumps and associated Hydraulic PowerUnits (HPUs), Produced Water export boosterpumps, GasRecovery Unit, New Boiler, Fresh Water Generation, Chemical Injection packages, Air Compressors, Nitrogen Generation, tank cleaning machines, handling equipment including deck cranes, Hydraulic PowerUnits (HPUs) for the turret etc. - Expedite CONTRACTORto issue engineeringdeliverables with the right quality level and safety in design and ensure compliance with applicable codes and standards (PSA/NORSOK,NMD/DNV, Client’sspecifications)and best engineering practices. - Verify and commenton time, CONTRACTORengineering deliverables and make sure that CONTRACT requirements are met (basis of design, project specifications, contract requirements, etc) - Assess and review on regular basis the progress of the CONTRACTOR’s engineering deliverablesby reviewing the MasterDocument Register (MDR) for his discipline(s). Alert his hierarchy in case of CONTRACTOR under performance. - Take part in 3D model, HAZOPs, Project Technical Reviews (PTR) and other design reviews - Review and propose response to Technical Queries, Non-Conformities and Change order Requests for project management approval. - Perform regular visits at the Engineering offices, WORKSHOP and WORKSITE or any surveys. - Liaise and keep TOTAL Head Quarter contact point(s) updated on ongoing work and major issuesfaced. Seek for technical resolutions in compliance with
  • 5. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 5/13 Project constraints. - Maintain a close working relationship with CONTRACTOR to assist them for designing and execution of the works and propose solutions or optimizations to the FSO Engineering Lead. - Manage his discipline(s) asdiscipline leaderand organize for his discipline(s) weekly coordination meetings with CONTRACTOR. - Participate to the preparation of any internal technical documents. - Participate in any technical, coordination, interfacesmeetings necessary to fulfil the job responsibility. - InformProject Management of any concernsthat might jeopardize the quality, the cost or the project schedule. - Report weekly activities performed and attend to coordination meetings. - Assist the procurement coordinator in VENDOR approval. Attend the BID Clarifications Meetings prior Purchase Order. - Review and comment the BID technical evaluations performed by CONTRACTOR and his subcontractors. - Attend the Kick Off Meetings (KOM) after Purchase Order between CONTRACTOR and the selected VENDORs. - Review and comment VENDOR documents that have been assigned to him and assist package engineers in technical problem solving at all stage of work. Attend to VENDORs meeting as required. - Witness Factory Acceptance Tests (FAT) and final inspections at VENDOR premises. - Follow up for VENDOR packages such as: - Oil/water separation processing – SULZER (Switzerland) Distributors Static mixers - Submerged pumps and associated Hydraulic PowerUnits (HPUs) – Frank Mohn (FRAMO) Fusa, Norway - Fire Fighting pumps – Frank Mohn (FRAMO) Flatoy, Norway Hydraulic Driven Fire Fighting Lift pumps Diesel driven Fire Fighting pumps containers - Electrically Driven Process Pumps Produced Water export booster pumps – FLOWSERVE (Italy) Fresh Water Pumps – FLOWSERVE (United Kingdom) - New Boiler – JOHN ZINK / Mitsubishi (Japan) - Gas Recovery Unit / Blanket Gas System - JOHN ZINK (United Kingdom) - Fresh Water Generation – HALVORSEN (Norway) - Chemical Injection package – HITEC Products (Norway) - Instrumental Air Compressors - ATLAS COPCO (Belgium)
  • 6. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 6/13 - Tank cleaning machines – SCANJET (Sweden) - Hydraulic PowerUnits (HPUs) for the turret – OneSubsea / SERVI HYDRANOR (Norway) Barrier Fluid HPU ESD Control Fluid HPU - Deck Cranes - WESTCON / PROTEA (Poland) Offshore Crane Turret Service Crane Offloading Service Crane - Offloading System – MacGregor Pusnes / RMES (Singapore) Offloading Hose Reel Hawser Winch Auxiliary Winch Hose Replacement Tool - Mechanical Handling Equipment - WESTCON / PROTEA (Poland) Helideck Cargo Lift - Nitrogen Generation - to be purchased - Marine Equipment - to be purchased directly by the YARD SINGLE BUOY MOORING (SBM) OFFSHORE – MONACO – 2011- 2013 Rotating Equipment Engineer June 2012 - November 2013 OSX 2 FPSO Project for OSX 2 Leasing B.V., an indirect subsidiary of OSX Brasil S.A. EPCI contract for a turret moored Floating Production Storage and Offloading unit (oil production and treatment of 100,000 bopd and will have water injection capacity of 150,000 bpwd and gas compression capability up to 1,500,000 Sm3/d) to be located in the Campos Basin, offshore Brazil in a nominal water depth of 135 meters. The contract covers project management, engineering, supply of material and equipment, construction and conversion, commissioning, installation and startup of the FPSO. The FPSO will be a converted VLCC that will be refurbished and modified in accordance with the rules and regulations of American Bureau of Shipping (ABS), for a design life of 20 years without dry-docking. Mechanical Equipment Discipline Lead Engineer (DLE) - Lead, control and direct the engineering project Mechanical Equipment team
  • 7. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 7/13 in a way that ensures the safe, timely, efficient and profitable delivery of Mechanical Equipment fit-for-purpose meeting the project’s requirements and expectation - Supervise up to ten (10) team members - Together with the Discipline Manager,allocate package engineer as required for each identified equipment - Arrange handovers, organize training for the new comers and mainly contractors - Ensure that package engineer coordinates review of vendor documentation with other Disciplines - Monitor progress of the Mechanical Equipment activities (including deliverables, package engineering and discipline management) and provide progress reports as required by the Project Management Team (PMT) and Discipline Manager - Assist site and commissioning teams for equipment integration - Provide inputs to the project lessons learnt database - Ensure that discipline lessons learnt from past projects and SBM fleet are considered during the project execution - Identify any changes in scope, frominternal and external sources, highlight to Engineering Project Manager and raise or bring inputs to raise a design change request. Package Engineer - Review and approve vendor documentation - Assist local inspectors and package managers for equipment testing at manufacturer premises - Provide technical expertise in case of Mechanical Equipment upgrade or repairs - Follow up for all remaining packages such as: - Seawater Treatment Plant (complete Topsides module) Sulphate Reduction Unit - CAMERON (Singapore) Pte. Ltd. - Power Generation Aero derivative Gas Turbine (DR-61GP) – DRESSER RAND AS - Produced Water Treatment Package Hydrocyclones and Oil Flotation Cell - VEOLIA Water Solutions & Technologies (SEA) Pte Ltd - Static Equipment Separators, separator internals, seawater coarse filters, gas scrubbers, miscellaneous Pressure Vessels, etc. - Heat Exchangers Plate and Frame Heat Exchangers – TRANTER International AB Printed Circuit Heat Exchangers – HEATRIC Division of Meggitt (UK) Ltd. Shell and Tube Heat Exchangers – HEATEC Jietong Pte Ltd
  • 8. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 8/13 - Deck Cranes Knuckle Boom and Fixed Boom cranes – ITALGRU Srl - Pipe Rack Trolley Electric Powered Self Propelled Trolley on Track Rails – BRADSHAW Electric Vehicles - Mechanical Handling Equipment Electrically and/orManually Operated Customized Trolleys With 4 Wheels, Electrically and/orManually Operated Walk Behind Pallet Trucks With Locking Brake, Pedestal, Fixed Radius Manual, Manual Portable, Man Riding Davits, Pneumatic Combined and Manual Combined Trolley Hoists, Portable A-Frame, Single Cylinder Lift Trolley, BeamClamps, Heavy Duty Rollers, etc. - Marine Equipment Offloading Hose Reel, Bunkering Hose Reel (Portable Water and Marine Diesel Oil) , MDO Purifier, Fresh Water Generator, Bilge Water Separator, Quick Release Hook, etc. Rotating Equipment Engineer January 2011 - November 2013 OSX 2 FPSO Project for OSX 2 Leasing B.V., an indirect subsidiary of OSX Brasil S.A. EPCI contract for a turret moored Floating Production Storage and Offloading unit (oil production and treatment of 100,000 bopd and will have water injection capacity of 150,000 bpwd and gas compression capability up to 1,500,000 Sm3/d) to be located in the Campos Basin, offshore Brazil in a nominal water depth of 135 meters. Deputy Mechanical Equipment Discipline Lead Engineer and Package Engineer - Issue equipment specifications prior to Request For Quotation (RFQ) - Technical clarifications and evaluation of supplier proposals - Participate to Bid Clarification Meetings (BCM), Kick Off Meetings, HAZOP meetings, 3D model reviews and design freeze meetings - Follow up for various rotating equipment and packages such as: - Gas Treatment Plant (complete Topsides module) Gas Sweetening and Gas Dehydration units – FRASER Uniquip Sdn. Bhd. - Flash Gas Compressor Wet Screw Compressor – MAYEKAWA (Mycom)
  • 9. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 9/13 TECHNIP FRANCE – LA DEFENSE, PARIS – 2005 - 2010 Rotating Equipment Engineer August - December 2010 Shtokman Gas Condensate Field Development – Single Phase Flow (GAZPROM, TOTAL, STATOILHYDRO) Natural Gas production (70 million Sm3 per day) Conceptual Studies in partnership with AKERSolutions and SBM (ATS). Gas Field located 610km from Murmansk in the Barents Sea. SDAG would like to study all possible variants to develop such a complex field, namely the single phase flow. ATS will perform conceptual studies of the single phase flow so as to enable SDAG, its Share Holders and Gazprom Dobysha Shelf (GDSh) to make a selection of the best concept. Mechanical Discipline Lead. - Concept studies: Investigate the different concepts associated to the Single Phase Flow (SPF). - Tender activities: Issue a qualified comparison between the SDAG concept based on two (2) phase flow and alternative concepts based on the Single Phase Flow (SPF). Rotating Equipment Engineer June - December 2010 Tupi Field Overall Development Plan – Phase 4 Dry completion units and FLNG (PETROBRAS Netherland B.V. and its partners BG, GALP Energia, REPSOL) Liquefied Natural Gas production (2.7 million tons per annum) Silent Consortium between Technip France,JGC Corporation, Modec Inc. (TJM) FEED for a Floating Liquefied NaturalGas (LNG) unit. Brazil, moored in Santos Basin : 2200 m water depth. Rotating Equipment Engineer - Collect major information frompotential VENDORs about proven technology used for critical equipment identified as “Novelty”- Marinisation or Scale Up. - Issue project Novelty Management Plans to PNBV. - Follow up of a Novelty Register. The level of detail required to have a proposed novelty will be expected to vary depending on how different the proposed novelty is from proven units and what the impact of underperformance would be on the project. Mechanical Commissioning Engineer April - May 2010 Offshore Associated Gas (OAG) Package 1 - Compressor and booster stations (ADGAS – Abu Dhabi Gas Liquefaction Company Limited) Das Island, United Arab Emirates. Lump Sum Turnkey (LSTK) contract awarded to Middle East Projects International (MEPI), a fully owned subsidiary of Technip.
  • 10. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 10/13 Supply and installation of compressors, booster stations, dehydration units and facilities on Das Island for the separation and treatment of bulk natural gas liquids received from offshore gas. The Offshore Associated Gas (OAG) project will dispatch offshore gases to the facilities of Habshan, to be processed and provided for local consumption. The project is based on a modularized plant for which 60 modules are fabricated onshore and transported by cargo barge to the plant location at Das Island. Mechanical Commissioning Engineer - Prepare the necessary Commissioning work permit prior to carrying out any powering up of Mechanical Equipment. Ensure that the lock out and tag out procedure have been applied for the Electrical Equipment. - Coordinate and give instructions to Sub-contractorsfor the implementation of Pre- Commissioning activities - Assist in Air Blowing, Inerting, Punch clearing and Line-up preparation. - Report directly to the Commissioning Manager and Deputy Site Manager for the daily activities. Rotating Equipment Engineer March 2009 - April 2010 Shtokman Gas Condensate Field Development - Floating Production Unit (GAZPROM, TOTAL, STATOILHYDRO) Natural Gas production (70 million Sm3 per day) Compensated Call For Tender (CCFT) Project in partnership with AKERSolutions and SBM (ATS). Gas Field located 610km from Murmansk in the Barents Sea. The area is a harsh Arctic environment that can be covered in sea ice and is also known for its icebergs and experiences long periods of darkness during the winter months. Facilities in this region can expect to be subject to the effects of; very low ambient air temperatures, significant snow and surface accreted ice cover and wind chill unless winterisation measures are taken. The offshore facilities of Phase 1 consist mainly of Subsea Production System (SPS), Umbilicals, Flowlines and Risers (UFR) to gather production from SPS and transport it to the Ice-resistant disconnectable Floating Production Unit (FPU) and to connect the FPU to pipeline to shore. Mechanical Discipline Lead. - Basis Of Design review: Comment and clarify Company Furnished Information, - FEED: Complete Company project documentation for Main Cranes, Sea Water Lift Pumps, Heating Medium Circulation Pumps and Cooling Medium Pumps. - Tender activities: Issue material requisitions for inquiry and transmit technical bid packages to issue request for quotation (RFQ) Technical clarifications and evaluation of supplier proposals for Turbo- Generators, Turbo-Compressors, Gas Compressors, Pedestal Cranes and Centrifugal/reciprocating/progressive cavity Pumps.
  • 11. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 11/13 Rotating Equipment Engineer October 2008 - June 2009 Cravo-Lirio-Orquidea-Violeta (CLOV) Floating Production Storage and Offloading vessel (TOTAL E&P ANGOLA, SONANGOL) Oil production (168.5KBLPD) Compensated Call For Tender (CCFT) Project. Block 17, offshore Angola. The Floating Production Storage and Offloading unit includes hull, mooring, accommodation, process (oil, gas, water as needed) water re-injection, oil storage and export facilities (pumping and metering), power generation, utilities, flaring and gas export. Mechanical Discipline Lead. Collect major information from Company Furnished Information, complete TOTAL evaluation of supplier proposals for Turbo-Generators, Gas Compressors. Transmit technical bid packages to issue request for quotation (RFQ) Issue material requisitions forinquiry and short-list bidders for other rotating equipment, i.e. Water Injection Pumps, Essential Diesel Generators, etc. Field Engineer January - September 2008 PETROVIETNAM, 145,000 BPSD grassroots refinery, LSTK contract in Consortium with JGC and Tecnicas Reunidas, Dung Quat (Quang Ngai), Vietnam. Field Engineer. Serve as primary interface for rotating equipment on technical issues with project management, field installation, and end customer. Provide technical support to construction and pre-commissioning teams. Prepare site modification of existing design to reflect customer-specific project requirements. Quality Control Inspector January - April 2007 Mainly involved in the following dutiesas required by the applicable codes and standards: - Inspection of casting parts - Hydrostatic pressure tests of pressure parts - Pre-Inspection Meeting (PIM) - Balancing of rotating parts - Checking of internal parts / clearances before assembly - Performance / mechanical tests of pumps, compressors, gas turbines, lube oil units. - Inspection of complete units - Review of inspection books for various rotating equipment and packages such as : - Gas turbines Frame 6 Gas turbines - GE Energy - Compressors Integrally geared Compressors – KOBELCO
  • 12. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 12/13 - Pumps Controlled Volume pumps - MILTON ROY Europe Non API pumps - KSB SAS Firewater and Jockey pumps - FLOWSERVE & SPP Pumps Sealless pumps - HERMETIC Pumpen GMBH - Mixers Mixers - LUMPP SA & MILTON ROY Mixing - and Packages Chemical Injection Units - MILTON ROY Europe Rotating Equipment Engineer 2005 - 2006 RASGAS 3 – RAS LAFFAN LIQUEFIED NATURAL GAS CO (3) (QP/EXXONMOBIL), LNG trains 6 & 7, (2 x 7.8 MMTPY), largest capacities in the world, US$ 4 billion EPC contract in joint venture with CHIYODA, Ras Laffan, Qatar. Deputy Mechanical Discipline Lead. Coordination of activities executed in Technip Abu Dhabi and Paris offices. In charge of centrifugal compressors requisition, technical bid evaluation of supplier proposals,follow-up of the design and manufacturing phases with the selected supplier, engineering activities including coordination with other disciplines involved in the project. ASSYSTEM FRANCE FOR GENERAL ELECTRIC THERMODYN - LE CREUSOT – 2004 - 2005 Project Engineer 2004 - 2005 GASSI EL AGRED REDEVELOPMENT PROJECT covering the El Gassi, El Agred, Zotti Fields from the Algerian state oil company, SONATRACH. Work in collaboration with NUOVO PIGNONE in Italy in contracts to Bechtel Corp to provide moto-compressors with variable speed drive systems for SONAHESS join operating company between SONATRACH and US firm AMERADA HESS. El Gassi, El Agred, Zotti Fields - 60 miles south-west of the Hassi Messaoud Field in the major oil-production region of central Algeria.  Analysis of each contract.  Creation and tracking of the lists of documents for each project.  Tracking of P&ID diagrams and general layouts realized by various subcontractors: creation, revision, update with the comments of the customer.  Creation and update of specifications and ordering sheets for equipment such as generator, gear, lube oil systems, valves of control, valves and fittings, instrumentation...
  • 13. Jean-René CLAUDEL Rotating Equipment Engineer September 2016 Page 13/13 AKKA TECHNOLOGIES FOR GENERAL ELECTRICENERGYPRODUCTS EUROPE – BELFORT – 2001 - 2004 Design Engineer 2001 - 2004  New Products Introduction programs on: 6FA+e and 6C projects for the following equipment: structural supports for gas turbines and gears – gear – turning gear – high speed coupling– nuts and bolts. Work in collaboration with GE POWER SYSTEMS in the United States.  Tracking of the manufacturing (L.C.C.: low cost countries) and finalization of the drawings. Co-design with the suppliers of gears and couplings.  Tracking of the qualification of the suppliers and of the first piece.  Recovery of existing, optimization, cost reduction or improvement of not-quality projects.  Item owner.