SlideShare a Scribd company logo
1 of 7
Curriculum Vitae
Name: Ole Martin Nag
Date of Birth: 17.05.1965
Nationality: Norwegian
Profession: Project manager, Senior Structural Engineer
Languages: Norwegian, English, some German
KEY QUALIFICATIONS
25 years total engineering experience from offshore oil and gas industry. 3,5 years as Project Engineer
for subsea installation contractor (SCS as), over 9 years as Senior Structural Engineer for Umoe/ABB
and 12 years as Staff engineer and project leader at Statoil Asa.
EDUCATION
1984 - 1987 HSR (Rogaland Regional University), Stavanger. Civil
engineering, structural division.
1988 - 1990 NTH (Norwegian Institute of Technology), Trondheim.
Division of structural engineering.
COURSES
1992 Design of offshore steel structures in accordance with OD
regulations, Stavanger.
Leiro basic safety and emergency preparedness training
(Offshore safety course).
1993 Fatigue analysis of offshore steel structures, Gol.
Offshore Marine Operations, NIF conference, Oslo.
Static and dynamic analysis of flexible pipelines. ORCINA
FEM software. One week "in-house" course.
1994 MS Project, Autosketch, Powerpoint, CIMTEX software
courses.
1995 NORSOK standards for steel structures, Oslo 22.11.
1996 SESAM FEM. One day introduction course at DNV, Høvik
Negotiation techniques, NIF two day course.
Organisation knowledge, NIF two day course.
SESAM FEM. Two days inhouse course.
Decommissioning Offshore Structures. IIR two day course,
London.
1997 ENS, Stavanger.
1998 SESAM user association meeting, London.
1999 Offshore Safety Course – refreshment, sert. Valid to 12/03.
2000 Moses inhouse 2 days course
NIF – Design of offshore steel structures, 2 days course,
Oslo.
2001 Microsoft Word, Excel and Powerpoint courses
2002 – 2014 (Various pipeline- and project management courses.)
EMPLOYEE REPRESENTATIONS
1994 Deputy Chairman for NIF at SCS.
1996-1998 Chairman for NIF at Umoe olje og gass
Rev.: Date: 12/28/15 CV for Ole Martin Nag Sign.: Ref.:
H:DATASHEASCVomncv99 Page 1 of 6
Statoil asa
PRACTICE
STATOIL ASA
2011 – 2014 STATOIL KÅRSTØ
Project Manager, Early Phase studies and modifications
- Responsible for study management of internal early phase studies and modifications in early phases up to
Statoil DG2.
- List of managed studies; PIGGY (LRA long time storage), New building-extensions at site, Johan Sverdrup to
Kårstø study and finally New fuelgas system for gas compressors (ongoing study).
2002 – 2011 STATOIL PIPELINE OPERATIONS
Staff Engineer, Pipeline Operations
Technical and professional responsible for various oil and gas transportation pipelines. Establishment of risk based
structural integrity management.
- Responsible for the structural professional group evaluating risk based integrity for Statoil- and Gassco
operated transportation pipelines
- System responsible for various gas and oil pipelines over the years. Including coordination and management of
various stakeholders internal and external, authority contact and management of external studies concerning
pipeline integrity and development of risk based external inspection management.
- Study management, i.e. SOW definition, budget, cost, plan, follow up, recommendations and implementation.
A large variations of studies and calculations followed up and managed (new technology development,
geotechnical stability issues, freespan evaluations, trawling and anchor impact, new pig development and
capacity studies …)
- Established Statoil internal guideline for risk based structural integrity evaluation.
- Management of internal structural team, arranged courses and seminars regarding structural integrity
- The latest years especially focused on handling external threats to pipeline integrity. Focused typically on
trawling and anchor threats. Initiated and followed up research and development to establish risk and mitigating
actions.
Rev.: Date: 12/28/15 CV for Ole Martin Nag Sign.: Ref.:
H:DATASHEASCVomncv99 Page 2 of 6
Statoil asa
ABB OFFSHORE SYSTEMS AS,
Aug. 00 – 2002 Marine and Structural engineering department
Senior Engineer, Structural Analyses
Aug 01 – feb 02 TotalFinaElf, Frøy removal project
Engineering coordinator
Removal of Frøy Topside. Coordination of engineering relating to
Topside preparation for removal by HMC.
June 01 – feb 02 Statoil, Kvitebjørn.
Various tasks in connection with design of Utility Module
- Design and calculation of aluminium stairtower
- Calculation of equipment- and pipe supports
Apr 01- May 01 Sesam FEM modelling, Statoil
Moddeling in PREFEM of barge CASTORO for use in
sea transportation analyses for Kvitebjørn deck structure.
Feb. 01 – Mar. 01 Norsk Hydro as, M&M project
Calculation of new monorail extensions Troll C.
Dec. 00 – Mar. 01 Statoil, Kårstø
- Calculation of new Davit.
- Calculation of new access platform
Oct. 00 Participating in tender for upgrading of Petrojarl.
Apr. 00 – Dec. 00 Various M&M projects
- Reinforcement of gateway for truck at Njord platform, Norsk Hydro
- Kvitebjørn fabrication supports. Pre- study on possibility for reuse of existing support
beams.
Sept. 00 – Oct. 00 Norsk Hydro as, M&M project
Calculation of Muffler on top of seawater caisson, Troll C.
A new muffler was designed to prevent warm, blowing seawater to escape through top of
seawater caisson.
Aug. 00 – Feb. 01 Norsk Hydro as, M&M projects
Protection structures at main deck, Troll C.
Evaluation of options for protectiong against falling and swinging crane loads. Responsible
pre-conseptual and main study and finally calculation report.
UMOE OLJE OG GASS AS,
Mar. 95 – Aug. 00 Marine and Structural engineering department
Apr. 00 – Aug. 00 Norsk Hydro as, M&M project
Protection structure over piperack, Visund FPU
Responsible for design, global and local calculations of protection structure for securing
piperack against falling crane boom.
Mar. 00 - Apr. 00 One month at home, father-permission
Feb.00- Mar. 00 ELF. Tender for removal and disposal of East Frigg, Lille Frigg, Flare base and Frøy
installations. Tender Manager
CV for Ole Martin Nag Page 1
Okt 99 - Mar 00 Statoil
Gullfaks A modification project (GAM2), hired to Oslo office.
Responsible for Installation and offshore transportation analyses.
Offshore during installation.
Sep 99 - Dec 99 Umoe Design Manual
Coordinator for development of Umoe Design Manual for Lotus Notes. Also responsible for
steel/structural design input
Mar 99 - Sept 99 Study - removal of Frigg DP2 and TP1 for Elf
Study coordinator for Topside Preparations work within the HUB alliance.
Feb. 99 - May 99 Kårstø Inner Area Project
Responsible for lifting installation analyses and transportation of two Condenser modules at
Kaarstoe.
Feb 99 - Mar 99 Study of removal of Frøy platform for Elf
Study coordinator for Topside Preparations work within the HUB alliance.
July 98 - Jan 99 Phillips Norway - Ekofisk I Cessation Project.
Topsides Preparations Leader
The HUB alliance (Heerema, Umoe, Bres). Responsible for the topside preparation activitie
in regard to developing Method Statements and Cost Estimates for the Removal and Dispo
of the Ekofisk I platforms as input to PPCoN’s cessation plan.
Mar 98 - Nov 98 Statoil - Kårstø Tie-in and Inner Area Projects
Disipline coordinator
Responsible for coordination of the engineering group performing the detail design of the
structural connections at the Kårstø terminal. Including lifting, turning and transportation
arrangements.
Mar 98 - Jun 98 Norsk Hydro - Troll C FPU
Lifting, handling and transportation calculations for pipe rack modules.
Dec 97 - Feb 98 Statoil - Veslefrikk B modifications - conceptual study.
Study coordinator
Responsible for the study; concept development, coordination and SESAM structural and
dynamic analysis.
Oct 97 - Nov 97 Norsk Hydro - VISUND FPU - Mating
Participating in the Mating operations.
Sep 97 - Oct 97 PPCoN - Eldfisk Water Injection Platform
Responsible for the marine operation method evaluation during the tender phase.
Aug 97 PPCoN - Ekofisk North Complex Removal, Pre Qualification.
Umoe representative in the HUB (Heeremac, Umoe and Bres) alliance.
Apr. 97 - Jun 97 Norsk Hydro - Troll C - Umoe Pipe Support Standard
Responsible for development of Umoe’s Pipe Support Standard.
Calculation of strength of pipe supports. Co-ordination and calculation.
Feb 97 - Jun 97 Lifting design for temporary removal of 430 Tonn Molde Crane. Responsible for co-
ordination, design and calculation.
Nov 96 - Jan 97 Statoil - Pre-engineering study. Constructability and method study for the Åsgard terminal a
Kårstø.
CV for Ole Martin Nag Page 2
Oct 96 Saga - Pre engineering study for Saga PL199. Method and cost evaluations of the marine
operations.
Apr 96 - 98 Removal of offshore installations
Responsible for all technical aspects concerning removal, decommissioning and onshore
disposal of offshore installations at Umoe.
Apr - July 96 Brent Spar Decommissioning Project, Pre-Qualification for Shell
Pre-qualification co-ordinator
Responsible for the pre-qualification, which includes technical solutions, co-ordination of a
personnel involved, contact with partners and sub-contractors, calculations and studies
involved.
July 96 Maureen Alpha, Pre-qualification for Phillips
Pre-qualification Co-ordinator
Responsible for the pre-qualification.
1996 Visund Floating Production Unit (FPU)
Feasibility study - "Mating" of the Visund FPU.
Load transfer and deflections during the various stages of the assembly.
1996 Ekofisk 2/4-J Separation module
Responsible for the co-ordination of the personnel involved in transport and lifting
calculations and all structural analyses in connection with temporary phases, such as
fabrication and erection. Preparation of design reports according to DNV, NS 3472 and OD
specifications.
1995 Ekofisk 2/4-X Wellhead and Mud module
Structural analyses by means of STAAD III and hand calculations concerning internal
transport and lifting of sections and modules at HMV.
1995 Tjeldbergodden Methanol Plant
Preparation of lifting and transport arrangement.
Internal transport and lifting calculations by means of STAAD III and hand calculations.
1995 Miscellaneous
Design and strength calculations on a general basis, e.g.
- design of module fabrication supports.
- design of foundation for crane pedestal onboard the supply boat "Sira
Supporter".
- Pressure Vessel design acc. to BS5500.
- new "coffe-bar" on "Polyconfidence". Structural design calculations of
module strength acc. to DNV rules.
- general design and strength calculations of equipment and structures used fo
yard production activities.
01.12.94 - 01.03.95 Rogaland Consultants
Hired by Kværner Rosenberg as consultant to participate in tender calculations for product
of the Norne Turret. Lifting, grillage and transportation analyses.
09.11.92 Stolt Comex Seaway A/S
Project Engineer
01.10.94 - 01.12.94 Design study for Statoil on field design and installation for the Gullfaks Sør and Rimfaks
development.
CV for Ole Martin Nag Page 3
10.08.94 - 01.10.94 Heidrun Tether Installation Project
Calculation and design verification of the Temporary Buoyancy Modules (TBMs) to be use
for installation of the Heidrun tethers.
25.04.94 - 10.08.94 Veslefrikk Jumper Installation Project
Responsible for steel design and structural calculations connected to modification on DSV
Seaway Osprey. Transport, sea fastening and grillage analysis. Offshore 28.07 - 05.08.
01.08.93 - 25.04.94 Troll olje project
Flexible pipelines installation. Static and dynamic lay analysis of flexible pipelines using
ORCINA FEM software (Orca -flex, hose and pull). Involved in all aspects of the flexible
pipe installation analyses.
01.06.93 - 01.08.93 Statfjord Satellite Project
Contingency calculations. Spool lifting and installation.
ANSYS 50 flexible pipeline analyses
Tender calculations for Europipe, Frøy and Troll Tie-ins.
09.11.92 - 01.06.93 Draugen Templates Installation
Development, design, calculation and fabrication control of subsea installation equipment.
Contact and follow-up of construction subcontractors. Offshore 11.05 - 23.05.
03.04.91 – 09.11.92 Comex Norway A/S
Project Engineer
18.11.91 - 09.11.92 Zeepipe Development Project
Structural design calculations on various subsea welding equipment. Seafastening and
transportation analysis. Lifting, transportation and pipe manipulation analysis (FEM,
spreadsheet and hand calculations). Design calculations and planning.
Offshore during installation in November.
03.04.91 - 18.11.91 Oseberg 2 MTS Project
Junior Project Engineer
Production of design manuals.Calculations ( hand and computer) of lifting, pipe manipulati
seafastening, transportation and subsea equipment.
Software development within Lotus, Excel and Mathcad. FEM analysis using
ANSYS43.Procedure development. Offshore during installation phase.
01.01.91 - 01.04.91 S.O.T. Stavanger
Bus driver. Drove bus for public transportation in Stavanger.
1987 - 1988 F.B.T (Forsvarets Bygningstjeneste) ,Sola.
Engineer. Civil engineering related tasks during stay in army.
1983 - 1984 Kværner Rosenberg A/S
Practicant on shipyard
CV for Ole Martin Nag Page 4
10.08.94 - 01.10.94 Heidrun Tether Installation Project
Calculation and design verification of the Temporary Buoyancy Modules (TBMs) to be use
for installation of the Heidrun tethers.
25.04.94 - 10.08.94 Veslefrikk Jumper Installation Project
Responsible for steel design and structural calculations connected to modification on DSV
Seaway Osprey. Transport, sea fastening and grillage analysis. Offshore 28.07 - 05.08.
01.08.93 - 25.04.94 Troll olje project
Flexible pipelines installation. Static and dynamic lay analysis of flexible pipelines using
ORCINA FEM software (Orca -flex, hose and pull). Involved in all aspects of the flexible
pipe installation analyses.
01.06.93 - 01.08.93 Statfjord Satellite Project
Contingency calculations. Spool lifting and installation.
ANSYS 50 flexible pipeline analyses
Tender calculations for Europipe, Frøy and Troll Tie-ins.
09.11.92 - 01.06.93 Draugen Templates Installation
Development, design, calculation and fabrication control of subsea installation equipment.
Contact and follow-up of construction subcontractors. Offshore 11.05 - 23.05.
03.04.91 – 09.11.92 Comex Norway A/S
Project Engineer
18.11.91 - 09.11.92 Zeepipe Development Project
Structural design calculations on various subsea welding equipment. Seafastening and
transportation analysis. Lifting, transportation and pipe manipulation analysis (FEM,
spreadsheet and hand calculations). Design calculations and planning.
Offshore during installation in November.
03.04.91 - 18.11.91 Oseberg 2 MTS Project
Junior Project Engineer
Production of design manuals.Calculations ( hand and computer) of lifting, pipe manipulati
seafastening, transportation and subsea equipment.
Software development within Lotus, Excel and Mathcad. FEM analysis using
ANSYS43.Procedure development. Offshore during installation phase.
01.01.91 - 01.04.91 S.O.T. Stavanger
Bus driver. Drove bus for public transportation in Stavanger.
1987 - 1988 F.B.T (Forsvarets Bygningstjeneste) ,Sola.
Engineer. Civil engineering related tasks during stay in army.
1983 - 1984 Kværner Rosenberg A/S
Practicant on shipyard
CV for Ole Martin Nag Page 4

More Related Content

What's hot

CVRune.docx ENG
CVRune.docx ENGCVRune.docx ENG
CVRune.docx ENGRune
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Sigve Hamilton Aspelund
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018SanjuBK
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829wayne vause
 
Terence Alan Kelly CV 1
Terence Alan Kelly CV 1Terence Alan Kelly CV 1
Terence Alan Kelly CV 1terry Kelly
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016Richard Hyatt
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16bill ure
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationDeepDarsanKalita1
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project listAhmad Mousa
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad Mousa
 

What's hot (20)

Immanuel's Resume
Immanuel's ResumeImmanuel's Resume
Immanuel's Resume
 
CVRune.docx ENG
CVRune.docx ENGCVRune.docx ENG
CVRune.docx ENG
 
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
Cv Sigve Hamilton Aspelund 092014 short version petroleum production engineer...
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018
 
112020 cv sigve hamilton aspelund
112020 cv sigve hamilton aspelund112020 cv sigve hamilton aspelund
112020 cv sigve hamilton aspelund
 
Curriculum vitae reservoir engineer
Curriculum vitae reservoir engineerCurriculum vitae reservoir engineer
Curriculum vitae reservoir engineer
 
Ronald-Smith
Ronald-SmithRonald-Smith
Ronald-Smith
 
Oana Barabancea-CV
Oana Barabancea-CVOana Barabancea-CV
Oana Barabancea-CV
 
NJCCV_2016
NJCCV_2016NJCCV_2016
NJCCV_2016
 
CV at 2015 Aug
CV at 2015 AugCV at 2015 Aug
CV at 2015 Aug
 
Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017Philip Harrison Personal Resume 2017
Philip Harrison Personal Resume 2017
 
Vause Wayne - 6829
Vause Wayne - 6829Vause Wayne - 6829
Vause Wayne - 6829
 
Terence Alan Kelly CV 1
Terence Alan Kelly CV 1Terence Alan Kelly CV 1
Terence Alan Kelly CV 1
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016
 
CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014 CV Sigve Hamilton Aspelund 092014
CV Sigve Hamilton Aspelund 092014
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
CV_ Dec-2014_Final
CV_ Dec-2014_FinalCV_ Dec-2014_Final
CV_ Dec-2014_Final
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power Station
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
Ahmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedinAhmad mousa cv consulting jun 2016 for linkedin
Ahmad mousa cv consulting jun 2016 for linkedin
 

Viewers also liked

CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_externalKen Loh
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEloisa Zuniga-Bonavente
 
WB K4 Geert Smits Structural Engineer-GS
WB K4 Geert Smits Structural Engineer-GSWB K4 Geert Smits Structural Engineer-GS
WB K4 Geert Smits Structural Engineer-GSSmits Geert
 
CV-Civil engineer (Highway Engineer)
CV-Civil engineer (Highway Engineer)CV-Civil engineer (Highway Engineer)
CV-Civil engineer (Highway Engineer)ahmed heif
 
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossameldin Ahmed
 

Viewers also liked (8)

CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
KARTHIK CV - TSS
KARTHIK CV - TSSKARTHIK CV - TSS
KARTHIK CV - TSS
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
WB K4 Geert Smits Structural Engineer-GS
WB K4 Geert Smits Structural Engineer-GSWB K4 Geert Smits Structural Engineer-GS
WB K4 Geert Smits Structural Engineer-GS
 
CV-Civil engineer (Highway Engineer)
CV-Civil engineer (Highway Engineer)CV-Civil engineer (Highway Engineer)
CV-Civil engineer (Highway Engineer)
 
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
 
Highway Engineer
Highway EngineerHighway Engineer
Highway Engineer
 
Jhobert CV (Sept 2016)
Jhobert CV (Sept 2016)Jhobert CV (Sept 2016)
Jhobert CV (Sept 2016)
 

Similar to OMN_CV_2014_eng (1)

Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund
 
CV-WalterPriotti1-Mar2016
CV-WalterPriotti1-Mar2016CV-WalterPriotti1-Mar2016
CV-WalterPriotti1-Mar2016Walter Priotti
 
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leaderCV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leaderSigve Hamilton Aspelund
 
Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016Tor Johan Brobak
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandSverre Viland
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionSigve Hamilton Aspelund
 

Similar to OMN_CV_2014_eng (1) (20)

CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Dines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - GeneralDines Haslund 01 12 2016 - General
Dines Haslund 01 12 2016 - General
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
 
CV Sigve Hamilton Aspelund 022015
CV Sigve Hamilton Aspelund 022015CV Sigve Hamilton Aspelund 022015
CV Sigve Hamilton Aspelund 022015
 
CV Sigve Hamilton Aspelund 012015
CV Sigve Hamilton Aspelund 012015CV Sigve Hamilton Aspelund 012015
CV Sigve Hamilton Aspelund 012015
 
cv_overview
cv_overviewcv_overview
cv_overview
 
CV-WalterPriotti1-Mar2016
CV-WalterPriotti1-Mar2016CV-WalterPriotti1-Mar2016
CV-WalterPriotti1-Mar2016
 
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leaderCV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
CV Sigve Hamilton Aspelund 122014, Petroleum engineering team leader
 
CV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 bCV Sigve Hamilton Aspelund 042015 b
CV Sigve Hamilton Aspelund 042015 b
 
Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016Tor Johan Brobak CV 11.2.2016
Tor Johan Brobak CV 11.2.2016
 
CV Sigve Hamilton Aspelund 052019
CV Sigve Hamilton Aspelund 052019CV Sigve Hamilton Aspelund 052019
CV Sigve Hamilton Aspelund 052019
 
CV Sigve Hamilton Aspelund 092015
CV Sigve Hamilton Aspelund 092015CV Sigve Hamilton Aspelund 092015
CV Sigve Hamilton Aspelund 092015
 
CV Sigve Hamilton Aspelund 102015 SV
CV Sigve Hamilton Aspelund 102015 SVCV Sigve Hamilton Aspelund 102015 SV
CV Sigve Hamilton Aspelund 102015 SV
 
Cv sigve hamilton aspelund 052019 v2
Cv sigve hamilton aspelund 052019 v2Cv sigve hamilton aspelund 052019 v2
Cv sigve hamilton aspelund 052019 v2
 
CV Sigve Hamilton Aspelund 022015 SV
CV Sigve Hamilton Aspelund 022015 SVCV Sigve Hamilton Aspelund 022015 SV
CV Sigve Hamilton Aspelund 022015 SV
 
CV Sigve Hamilton Aspelund 012015 SV
CV Sigve Hamilton Aspelund 012015 SVCV Sigve Hamilton Aspelund 012015 SV
CV Sigve Hamilton Aspelund 012015 SV
 
Curriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. VilandCurriculum Vitae-Sverre W. Viland
Curriculum Vitae-Sverre W. Viland
 
CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015CV Sigve Hamilton Aspelund 042015
CV Sigve Hamilton Aspelund 042015
 
CV Sigve Hamilton Aspelund 102015 SV
CV Sigve Hamilton Aspelund 102015 SVCV Sigve Hamilton Aspelund 102015 SV
CV Sigve Hamilton Aspelund 102015 SV
 
CV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short versionCV Sigve Hamilton Aspelund 112014 short version
CV Sigve Hamilton Aspelund 112014 short version
 

OMN_CV_2014_eng (1)

  • 1. Curriculum Vitae Name: Ole Martin Nag Date of Birth: 17.05.1965 Nationality: Norwegian Profession: Project manager, Senior Structural Engineer Languages: Norwegian, English, some German KEY QUALIFICATIONS 25 years total engineering experience from offshore oil and gas industry. 3,5 years as Project Engineer for subsea installation contractor (SCS as), over 9 years as Senior Structural Engineer for Umoe/ABB and 12 years as Staff engineer and project leader at Statoil Asa. EDUCATION 1984 - 1987 HSR (Rogaland Regional University), Stavanger. Civil engineering, structural division. 1988 - 1990 NTH (Norwegian Institute of Technology), Trondheim. Division of structural engineering. COURSES 1992 Design of offshore steel structures in accordance with OD regulations, Stavanger. Leiro basic safety and emergency preparedness training (Offshore safety course). 1993 Fatigue analysis of offshore steel structures, Gol. Offshore Marine Operations, NIF conference, Oslo. Static and dynamic analysis of flexible pipelines. ORCINA FEM software. One week "in-house" course. 1994 MS Project, Autosketch, Powerpoint, CIMTEX software courses. 1995 NORSOK standards for steel structures, Oslo 22.11. 1996 SESAM FEM. One day introduction course at DNV, Høvik Negotiation techniques, NIF two day course. Organisation knowledge, NIF two day course. SESAM FEM. Two days inhouse course. Decommissioning Offshore Structures. IIR two day course, London. 1997 ENS, Stavanger. 1998 SESAM user association meeting, London. 1999 Offshore Safety Course – refreshment, sert. Valid to 12/03. 2000 Moses inhouse 2 days course NIF – Design of offshore steel structures, 2 days course, Oslo. 2001 Microsoft Word, Excel and Powerpoint courses 2002 – 2014 (Various pipeline- and project management courses.) EMPLOYEE REPRESENTATIONS 1994 Deputy Chairman for NIF at SCS. 1996-1998 Chairman for NIF at Umoe olje og gass Rev.: Date: 12/28/15 CV for Ole Martin Nag Sign.: Ref.: H:DATASHEASCVomncv99 Page 1 of 6 Statoil asa
  • 2. PRACTICE STATOIL ASA 2011 – 2014 STATOIL KÅRSTØ Project Manager, Early Phase studies and modifications - Responsible for study management of internal early phase studies and modifications in early phases up to Statoil DG2. - List of managed studies; PIGGY (LRA long time storage), New building-extensions at site, Johan Sverdrup to Kårstø study and finally New fuelgas system for gas compressors (ongoing study). 2002 – 2011 STATOIL PIPELINE OPERATIONS Staff Engineer, Pipeline Operations Technical and professional responsible for various oil and gas transportation pipelines. Establishment of risk based structural integrity management. - Responsible for the structural professional group evaluating risk based integrity for Statoil- and Gassco operated transportation pipelines - System responsible for various gas and oil pipelines over the years. Including coordination and management of various stakeholders internal and external, authority contact and management of external studies concerning pipeline integrity and development of risk based external inspection management. - Study management, i.e. SOW definition, budget, cost, plan, follow up, recommendations and implementation. A large variations of studies and calculations followed up and managed (new technology development, geotechnical stability issues, freespan evaluations, trawling and anchor impact, new pig development and capacity studies …) - Established Statoil internal guideline for risk based structural integrity evaluation. - Management of internal structural team, arranged courses and seminars regarding structural integrity - The latest years especially focused on handling external threats to pipeline integrity. Focused typically on trawling and anchor threats. Initiated and followed up research and development to establish risk and mitigating actions. Rev.: Date: 12/28/15 CV for Ole Martin Nag Sign.: Ref.: H:DATASHEASCVomncv99 Page 2 of 6 Statoil asa
  • 3. ABB OFFSHORE SYSTEMS AS, Aug. 00 – 2002 Marine and Structural engineering department Senior Engineer, Structural Analyses Aug 01 – feb 02 TotalFinaElf, Frøy removal project Engineering coordinator Removal of Frøy Topside. Coordination of engineering relating to Topside preparation for removal by HMC. June 01 – feb 02 Statoil, Kvitebjørn. Various tasks in connection with design of Utility Module - Design and calculation of aluminium stairtower - Calculation of equipment- and pipe supports Apr 01- May 01 Sesam FEM modelling, Statoil Moddeling in PREFEM of barge CASTORO for use in sea transportation analyses for Kvitebjørn deck structure. Feb. 01 – Mar. 01 Norsk Hydro as, M&M project Calculation of new monorail extensions Troll C. Dec. 00 – Mar. 01 Statoil, Kårstø - Calculation of new Davit. - Calculation of new access platform Oct. 00 Participating in tender for upgrading of Petrojarl. Apr. 00 – Dec. 00 Various M&M projects - Reinforcement of gateway for truck at Njord platform, Norsk Hydro - Kvitebjørn fabrication supports. Pre- study on possibility for reuse of existing support beams. Sept. 00 – Oct. 00 Norsk Hydro as, M&M project Calculation of Muffler on top of seawater caisson, Troll C. A new muffler was designed to prevent warm, blowing seawater to escape through top of seawater caisson. Aug. 00 – Feb. 01 Norsk Hydro as, M&M projects Protection structures at main deck, Troll C. Evaluation of options for protectiong against falling and swinging crane loads. Responsible pre-conseptual and main study and finally calculation report. UMOE OLJE OG GASS AS, Mar. 95 – Aug. 00 Marine and Structural engineering department Apr. 00 – Aug. 00 Norsk Hydro as, M&M project Protection structure over piperack, Visund FPU Responsible for design, global and local calculations of protection structure for securing piperack against falling crane boom. Mar. 00 - Apr. 00 One month at home, father-permission Feb.00- Mar. 00 ELF. Tender for removal and disposal of East Frigg, Lille Frigg, Flare base and Frøy installations. Tender Manager CV for Ole Martin Nag Page 1
  • 4. Okt 99 - Mar 00 Statoil Gullfaks A modification project (GAM2), hired to Oslo office. Responsible for Installation and offshore transportation analyses. Offshore during installation. Sep 99 - Dec 99 Umoe Design Manual Coordinator for development of Umoe Design Manual for Lotus Notes. Also responsible for steel/structural design input Mar 99 - Sept 99 Study - removal of Frigg DP2 and TP1 for Elf Study coordinator for Topside Preparations work within the HUB alliance. Feb. 99 - May 99 Kårstø Inner Area Project Responsible for lifting installation analyses and transportation of two Condenser modules at Kaarstoe. Feb 99 - Mar 99 Study of removal of Frøy platform for Elf Study coordinator for Topside Preparations work within the HUB alliance. July 98 - Jan 99 Phillips Norway - Ekofisk I Cessation Project. Topsides Preparations Leader The HUB alliance (Heerema, Umoe, Bres). Responsible for the topside preparation activitie in regard to developing Method Statements and Cost Estimates for the Removal and Dispo of the Ekofisk I platforms as input to PPCoN’s cessation plan. Mar 98 - Nov 98 Statoil - Kårstø Tie-in and Inner Area Projects Disipline coordinator Responsible for coordination of the engineering group performing the detail design of the structural connections at the Kårstø terminal. Including lifting, turning and transportation arrangements. Mar 98 - Jun 98 Norsk Hydro - Troll C FPU Lifting, handling and transportation calculations for pipe rack modules. Dec 97 - Feb 98 Statoil - Veslefrikk B modifications - conceptual study. Study coordinator Responsible for the study; concept development, coordination and SESAM structural and dynamic analysis. Oct 97 - Nov 97 Norsk Hydro - VISUND FPU - Mating Participating in the Mating operations. Sep 97 - Oct 97 PPCoN - Eldfisk Water Injection Platform Responsible for the marine operation method evaluation during the tender phase. Aug 97 PPCoN - Ekofisk North Complex Removal, Pre Qualification. Umoe representative in the HUB (Heeremac, Umoe and Bres) alliance. Apr. 97 - Jun 97 Norsk Hydro - Troll C - Umoe Pipe Support Standard Responsible for development of Umoe’s Pipe Support Standard. Calculation of strength of pipe supports. Co-ordination and calculation. Feb 97 - Jun 97 Lifting design for temporary removal of 430 Tonn Molde Crane. Responsible for co- ordination, design and calculation. Nov 96 - Jan 97 Statoil - Pre-engineering study. Constructability and method study for the Åsgard terminal a Kårstø. CV for Ole Martin Nag Page 2
  • 5. Oct 96 Saga - Pre engineering study for Saga PL199. Method and cost evaluations of the marine operations. Apr 96 - 98 Removal of offshore installations Responsible for all technical aspects concerning removal, decommissioning and onshore disposal of offshore installations at Umoe. Apr - July 96 Brent Spar Decommissioning Project, Pre-Qualification for Shell Pre-qualification co-ordinator Responsible for the pre-qualification, which includes technical solutions, co-ordination of a personnel involved, contact with partners and sub-contractors, calculations and studies involved. July 96 Maureen Alpha, Pre-qualification for Phillips Pre-qualification Co-ordinator Responsible for the pre-qualification. 1996 Visund Floating Production Unit (FPU) Feasibility study - "Mating" of the Visund FPU. Load transfer and deflections during the various stages of the assembly. 1996 Ekofisk 2/4-J Separation module Responsible for the co-ordination of the personnel involved in transport and lifting calculations and all structural analyses in connection with temporary phases, such as fabrication and erection. Preparation of design reports according to DNV, NS 3472 and OD specifications. 1995 Ekofisk 2/4-X Wellhead and Mud module Structural analyses by means of STAAD III and hand calculations concerning internal transport and lifting of sections and modules at HMV. 1995 Tjeldbergodden Methanol Plant Preparation of lifting and transport arrangement. Internal transport and lifting calculations by means of STAAD III and hand calculations. 1995 Miscellaneous Design and strength calculations on a general basis, e.g. - design of module fabrication supports. - design of foundation for crane pedestal onboard the supply boat "Sira Supporter". - Pressure Vessel design acc. to BS5500. - new "coffe-bar" on "Polyconfidence". Structural design calculations of module strength acc. to DNV rules. - general design and strength calculations of equipment and structures used fo yard production activities. 01.12.94 - 01.03.95 Rogaland Consultants Hired by Kværner Rosenberg as consultant to participate in tender calculations for product of the Norne Turret. Lifting, grillage and transportation analyses. 09.11.92 Stolt Comex Seaway A/S Project Engineer 01.10.94 - 01.12.94 Design study for Statoil on field design and installation for the Gullfaks Sør and Rimfaks development. CV for Ole Martin Nag Page 3
  • 6. 10.08.94 - 01.10.94 Heidrun Tether Installation Project Calculation and design verification of the Temporary Buoyancy Modules (TBMs) to be use for installation of the Heidrun tethers. 25.04.94 - 10.08.94 Veslefrikk Jumper Installation Project Responsible for steel design and structural calculations connected to modification on DSV Seaway Osprey. Transport, sea fastening and grillage analysis. Offshore 28.07 - 05.08. 01.08.93 - 25.04.94 Troll olje project Flexible pipelines installation. Static and dynamic lay analysis of flexible pipelines using ORCINA FEM software (Orca -flex, hose and pull). Involved in all aspects of the flexible pipe installation analyses. 01.06.93 - 01.08.93 Statfjord Satellite Project Contingency calculations. Spool lifting and installation. ANSYS 50 flexible pipeline analyses Tender calculations for Europipe, Frøy and Troll Tie-ins. 09.11.92 - 01.06.93 Draugen Templates Installation Development, design, calculation and fabrication control of subsea installation equipment. Contact and follow-up of construction subcontractors. Offshore 11.05 - 23.05. 03.04.91 – 09.11.92 Comex Norway A/S Project Engineer 18.11.91 - 09.11.92 Zeepipe Development Project Structural design calculations on various subsea welding equipment. Seafastening and transportation analysis. Lifting, transportation and pipe manipulation analysis (FEM, spreadsheet and hand calculations). Design calculations and planning. Offshore during installation in November. 03.04.91 - 18.11.91 Oseberg 2 MTS Project Junior Project Engineer Production of design manuals.Calculations ( hand and computer) of lifting, pipe manipulati seafastening, transportation and subsea equipment. Software development within Lotus, Excel and Mathcad. FEM analysis using ANSYS43.Procedure development. Offshore during installation phase. 01.01.91 - 01.04.91 S.O.T. Stavanger Bus driver. Drove bus for public transportation in Stavanger. 1987 - 1988 F.B.T (Forsvarets Bygningstjeneste) ,Sola. Engineer. Civil engineering related tasks during stay in army. 1983 - 1984 Kværner Rosenberg A/S Practicant on shipyard CV for Ole Martin Nag Page 4
  • 7. 10.08.94 - 01.10.94 Heidrun Tether Installation Project Calculation and design verification of the Temporary Buoyancy Modules (TBMs) to be use for installation of the Heidrun tethers. 25.04.94 - 10.08.94 Veslefrikk Jumper Installation Project Responsible for steel design and structural calculations connected to modification on DSV Seaway Osprey. Transport, sea fastening and grillage analysis. Offshore 28.07 - 05.08. 01.08.93 - 25.04.94 Troll olje project Flexible pipelines installation. Static and dynamic lay analysis of flexible pipelines using ORCINA FEM software (Orca -flex, hose and pull). Involved in all aspects of the flexible pipe installation analyses. 01.06.93 - 01.08.93 Statfjord Satellite Project Contingency calculations. Spool lifting and installation. ANSYS 50 flexible pipeline analyses Tender calculations for Europipe, Frøy and Troll Tie-ins. 09.11.92 - 01.06.93 Draugen Templates Installation Development, design, calculation and fabrication control of subsea installation equipment. Contact and follow-up of construction subcontractors. Offshore 11.05 - 23.05. 03.04.91 – 09.11.92 Comex Norway A/S Project Engineer 18.11.91 - 09.11.92 Zeepipe Development Project Structural design calculations on various subsea welding equipment. Seafastening and transportation analysis. Lifting, transportation and pipe manipulation analysis (FEM, spreadsheet and hand calculations). Design calculations and planning. Offshore during installation in November. 03.04.91 - 18.11.91 Oseberg 2 MTS Project Junior Project Engineer Production of design manuals.Calculations ( hand and computer) of lifting, pipe manipulati seafastening, transportation and subsea equipment. Software development within Lotus, Excel and Mathcad. FEM analysis using ANSYS43.Procedure development. Offshore during installation phase. 01.01.91 - 01.04.91 S.O.T. Stavanger Bus driver. Drove bus for public transportation in Stavanger. 1987 - 1988 F.B.T (Forsvarets Bygningstjeneste) ,Sola. Engineer. Civil engineering related tasks during stay in army. 1983 - 1984 Kværner Rosenberg A/S Practicant on shipyard CV for Ole Martin Nag Page 4