TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
Table of Contents
1. SCOPE OF WORK
2. ENVIRONMENTAL CONDITIONS
3. RESPONSIBILITIES
4. ROUTE SELECTION ASPECTS
5. GROUND SURFACE SURVEY
6. DRAWINGS
6.1 General Layout Drawings
6.2 Plan and Profile Drawings
6.3 Detail Drawing of Crossings
7. TOWER SPOTTING ON PROFILES
8. SURVEY PRELIMINARY TO ERECTION
9. DOCUMENTS TO BE FURNISHED BY CONTRACTOR
10. ERRORS IN SURVEYING
PAGE NO. 3 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
1.0 SCOPE OF WORK
This standard covers the survey work to establish the route of the transmission line. The
work consists of ascertaining the definite route, making the topographic survey and
recording it on plan and profile drawings.
2.0 ENVIRONMENTAL CONDITIONS
The general standard outdoor atmospheric and climatic conditions prevailing in the line
route are in accordance with those presented in the latest revision of SEC General
Specification No. 01-TMSS-01 , titled “ General Requirements for All Transmission
Equipment / Materials”.
3.0 RESPONSIBILITIES
The contractor will receive along with tender documents a map showing the general line
route. SEC representative will indicate the OHL start and end points, which are usually
located in front of the concerned bay of a departure and receiving substation
respectively. The locations of OHL route angles shown on the above mentioned map
shall be tentative. However, the contractor shall check this line route prior to the actual
ground survey. The ground survey shall be executed along this line route and no
departure from it shall be accepted without prior approval by SEC. Before starting the
detailed survey a walkover survey of the line shall be made, various feasible routes shall
be ascertained and marked on the submitted drawing for approval.
The contractor shall be responsible for all work involved in selecting the transmission
line route including but not limited to:
1. Using the route selection aspects as in Clause 4 below.
2. Furnishing all personnel, material, equipment required to do the work, providing
necessary engineering services together with all the necessary labour, skill, techniques,
tools and facilities. Supplying all other items of whatever nature not specified herein as
required for completion of all work indicated in this specification.
3. Making a preliminary survey between terminal points of the OHL
4. Determining and submitting a tentative line route for SEC approval.
5. Staking of route centre line points, angles and terminal points.
6. Supplying of plan and profile of the line route.
PAGE NO. 4 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
Incase where SEC provide the line route and plan and profile drawings, the
CONTRACTOR shall comply with following responsibilities:
a. The contractor shall verify that the required clearances are obtained as well as the
location and alignment of each structure using his actual survey data in conjunction
with the plan and profile drawings, and then proceed to layout the right-of-way for
clearing requirements.
b. If a proposed structure location conflicts with other construction or existing
obstructions, the CONTRACTOR shall immediately notify the SEC
REPRESENTATIVE before proceeding further.
c. Accepted structure locations shall not be moved without the prior written
authorization of the SEC REPRESENTATIVE.
d. The CONTRACTOR shall verify the line layout interms of adequate conductor
clearance and immediately notify the SEC REPRESENTATIVE of any
descripencies encountered. The rquired conductor ground clearances must be
maintained at all times.
e. The CONTRACTOR shall survey the sites before proceeding with the design, and
any additional utilities such as pipelines (including future utilities) which are not
shown on the plan and profile provided by the SEC shall be considered by the
CONTRACTOR during the design and construction stage of the project.
4.0 ROUTE SELECTION ASPECTS
The contractor shall trace the proposed route so that it is of minimum length, minimum
structure quantity, easy access to their locations, minimum cost of overall construction,
operation and maintenance.
a. The transmission line routes shall have minimal impact on farmland and residential
….or commercial development.
b. The right of way width shall be inaccordance with that given in TES-P-122.09
(Clearances and right of way requirements ).
c. All the angle locations shall be accessible by a four wheel drive vehicle.
d. Routes shall be accessable via an existing roadway or roadway scheduled for
immediate construction. Areas subject to water, erosion or landslide shall be
avoided,.particularly, in the selection of route angle points.
e. The minimum horizontal distance between the route centre line and other overhead
…lines or other obstacles (ie. gas, oil, water pipes, building, trees) shall not be less than
…as stated below:
PAGE NO. 5 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
Min. Distance (metres) of selected line route
to objects for:
Obstacles
380kV
OHL
230kV
OHL
132kV
OHL
115kV
OHL
110kV
OHL
69kV
OHL
1. 380Kv OHL
2. 230Kv OHL
3. 132Kv OHL
4. 115Kv OHL
5. 110Kv OHL
6. 69Kv OHL
7. 33/13.8kV OHL
8. L.V. OHL
9. Telecommunication Line
10. Buildings
11. Pipe with nominal diameter;
Less than 150 mm
Between 150- 450 mm
More than 450 mm
50
50
40
40
40
40
40
40
40
35
40
45
85
50
50
40
40
40
40
40
40
40
35
40
45
85
40
40
35
30
30
30
25
25
25
20
40
45
85
40
40
30
30
30
30
25
25
25
20
40
45
85
40
40
30
30
30
30
25
25
25
20
40
45
85
40
40
30
30
30
30
25
25
25
20
40
45
85
f. At the crossing of OHL route over other features, the following rules shall be applied:
i. Where transmission line route cross pipelines, the angle of intersection is preferably
90 degrees, and if not possible the angle of intersection shall be between 70 to 110
degrees.
ii. Where transmission line route cross overhead transmission lines and communication
lines, the angle of intersection is preferably 90 degrees, and if not possible the angle of
intersection shall be between 70 to 110 degrees.
iii. Where transmission line route cross roads, the angle of intersection is preferably 90
degrees, and if not possible the angle of intersection shall be between 45 to 135 degrees.
Where transmission line route cross major highways, the angle of intersection shall be as
near as possible to 90 degrees.
iv. Where transmission line route cross the railroad tracks, the angle of intersection is
preferably 90 degrees, and if not possible the angle of intersection shall be between 70 to
110 degrees.
v. At wadi crossing the route shall be selected where a single span is possible.
Both banks of the wadi shall be firm soil, the preference solid sound rock.
g. The OHL route shall not cross the approach paths of any airport or near any existing
or presently planned future microwave systems, without written approval of both the
proper authorities and SEC.
PAGE NO. 6 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
5.0 GROUND SURFACE SURVEY
The contractor shall survey and profile the transmission line routes that comply with this
specification and approved by SEC, in order to produce terrain profiles. The control
survey shall be of second order accuracy, the tolerances shall be as stated in the data
schedule.
The survey shall include mainly:
-- Location points of line deviations (angle points) on site according to final, approved
line route maps.
-- Staking of these points with concrete poles (200 x 200mm), 1400mm high of which
400mm buried with a 16mm dia., 300mm long steel bar fixed to the centre.
-- Tying of these points to two or three fixed stable locations by distances and angles,
tying them to the National Grid System and levels be related to National Datum, to
facilitate recovery or re-establishing of angle point in the event of the stake being
destroyed.
-- Setting out the alignment by stakes at measurement stations according to terrain slope
with distances not more than l00m between them, otherwise these stations shall be
located at points where the terrain changes its slope.
-- Measuring of the profile along the centre line.
--Measuring of the side profile parallel to the centre line at a distance of 5m in 132kV,
115kV,. 110kV& 69kV..OHL and 11m in 380kV & 230kV OHL at the uphill side of the
centre line whenever the terrain slope perpendicular to the line axis exceeds 5%.
-- Measuring of angles between adjacent straight line sections.
-- Survey of details and obstacles like houses, waterflow routes, power and
telecommunication lines, ground surface nature (i-e. sand, rocks, etc.), vegetation,
boundary walls, fences and the like for the complete right of way width or 50m to both
sides of the centre line whichever is less of the proposed Transmission Line Route.
-- Survey of power and telephone lines crossing the centre line producing the following
details.
-Voltage
- Structure Number as indicated on the number plates.
-Quantities of crossed telephone wires.
-Material of power and telephone supports.
-Sketch of structure configuration.
-Centre of two nearest structures on the left and on the right side of the centreline, even
when these two structures are further away from the centre line than 50m.
PAGE NO. 7 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
-Elevation of suspension points of conductors and earth wires. Sag of conductors
between the two structures with a temperature at the time of survey.
-Existing elevations of the conductors and overhead ground wires attachment points of
the take-off structures.
-A map using a suitable scale showing the adjacent telephone lines, pipelines,
underground power or telecommunication cables running parallel to the line route, in a
distance of l00m from both sides of centre line.
-The metric system and 360 degrees division shall be used.
The profile drawing shall show the locations of all measured points (or station) and
following information for each point:
-Number of point or station.
-Accumulative distances.
-Partial distances.
-Points altitude.
-Angles magnitude of right of way angle in degrees.
6.0 DRAWINGS
Preparation of drawings shall be in accordance with SEEDS-II.
6.1 General Layout Drawings
The Contractor shall supply a general layout drawing showing the transmission
line location with respect to the terminal installations. An enlarged plan view of
each terminal shall show the departure of all the lines from the substation. In a
tabular form, the drawing shall identify and give the angle points; its coordinates
and the deflection. The length and bearing of all the line sections must also be
included.
In this general layout drawing, the province and tribe lines and limits of cities
should be shown and the centerline tied to the National Grid. The scale of the
drawing shall be such as the line could be shown on an A0 size drawing.
6.2 Plan and Profile Drawings
Plan and Profile drawing depicts the changes of elevation along a given line and
any features crossing that line. The plan view of the Plan & Profile drawing shows
the horizontal layout of the project (scale 1:2000) and the profile view shows the
vertical plane or grade information (scale 1:200). The method of profile data
acquisition by the contractor surveyor may include ground survey with total station
and data recorder. Microstation (drafting package developed and marketed by
Bentley Systems Inc.) shall be adopted as the standard graphics package.
PAGE NO. 8 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
6.2.1 Plan & Profile Computation:
a. The ground profile drawing shall show all relevant details as specified
for ground surface survey in this specification.
b. Profile stationing shall start from the proposed power source increasing
towards the supplied point. Usually, the source is a take-off point, A
first PI or a tap-point.
c. The value of the starting profile stationing shall be selected such that
negative stationing values are avoided in case of adjustments.
d. Horizontal ground distance shall be used in computing profile
stationing. When an identical distance is observed by a control traverse,
the profile stationing shall be adjusted proportionately.
e. Angles at crossing with power lines, pipelines, railroads, fences, etc., if
not measured in the field, shall be computed from the available profile
data.
f. Elevation for instrument stations may be computed using reciprocal
trigonometric observations.
g. Elevation shall be adjusted to previously accepted values for identical
points unless gross errors are evident in the previous survey or
computation.
h. Profile offsets shall be designated left or right, facing towards
increasing profile stationing. The forward direction shall be the
direction of increasing profile stationing.
i. The atmospheric and earth curvature correction shall be applied to
trigonometric elevation computations.
j. Plan data provided in meter and projected into the UTM coordinate
system. The maps used the International 1967 spheroid and the NGN
(Ain Al Abid) Datum. The Mean Sea Level (MSL) datum shall be used
for all vertical computation.
6.2.2 Plan & Profile Drafting:
a. Sheet Format.
i. Vertical lines shall be marked for every 200m at a horizontal scale
of 1:2000.
ii. Horizontal lines shall be drawn every 10m at a vertical scale of
1:200.
iii. The upper part of the sheet shall be left blank to illustrate the plan
layout.
b. Drawing - Plan.
i. Plan layout should be placed on the upper part of the sheet with
scale of 1:2000
ii. Plan layout should be copied from the master file (provided by
COMPANY) and rotated horizontally.
iii. Plotting direction should be from Left to Right.
PAGE NO. 9 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
iv. Plan layout is divided into parts and each part depicts from one
turning point (PI) to next turning point. Each part between two
turning points is always shown as a horizontal line.
v. These Horizontal lines are shifted alternatively (10cm vertically)
at the turning points. The turning point at the end of each line is
the beginning point of the next line.
c. Drawing - Profile.
i. Each sheet has a single profile line job.
ii. Natural ground elevation above MSL should be plotted along the
proposed line with scale 1:200.
iii. The points of elevation along the stations must agree exactly with
the stationing on the plan and vice versa.
6.3 Detail Drawing of Crossings
A drawing of a suitable scale shall be submitted for special crossings (ie. roads,
railroad, wadi, power and telephone lines, etc.) showing the detailed dimensions
and distances including all information to complete the structure distribution
study on the profile.
The elevation of the high of all wires of all aerial lines at the centre line crossing,
at a distance of (d)m right and left of the centre line and at the point of support of
adjacent structures, shall be shown, with the ambient temperature during survey
measurements. (d) equals to 5m in 132kV, 115kV , 110kV , 69kV OHL and l1m
in 380kV & 230kV OHL.
Tying angle points to two or three fixed points drawing showing distances and
angles in detail.
7.0 SURVEY PRELIMINARY TO ERECTION
The Contractor is responsible for the correct alignment and orientation of structures with
the tolerances specified. Structures shall be so directed that the crossarms of straight
line structures will be perpendicular to the line axis. The crossarms of the tension
structures shall bisect the angle.
When looked at by the naked eye, no structure shall be out of line. When checked by a
theodolite, no structure shall be more than 5 cm off the adjacent line which connects the
centers of the two adjacent structures.
8.0 DOCUMENTS TO BE FURNISHED BY CONTRACTOR
1- Two copies of drawing specified in Clause 6 of this specification for total line route.
2- A guaranteed confirmation that the contractor will be responsible for the mistakes in
his work which can be discovered later in OHL conductors stringing stage.
PAGE NO. 10 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
9.0 ERRORS IN SURVEYING
The errors in distances shall not be more than 1m in 500m; the errors in elevation
shall not be more than 0.5m in 1000m.
PAGE NO. 11 OF 11TESP12208R0/MAR
TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0
Date of Approval: February 18, 2007
TECHNICAL DATA SCHEDULE
GROUND SURFACE SURVEY Unit SEC
Requirement
Bidder's
Data
1.
2.
3.
4.
5.
6.
7.
8.
9.
Project Name
Project Number
Contractor's Name/Country
OHL Route Length (approx.)
OHL Voltage
Tolerance of Profile Survey
--Centre line Length
Height
--Auxiliary Points Height
Angles
--Location on Profile Length
Height
Angle
*D = Distance between two
points of intersection in metres.
Is the list of survey crew
names with their experience,
submitted?
Is the list of equipment and
machineries to be used in
ground surface, submitted?
Is the guaranteed confirmation for
ground surface survey work as in
Clause 9.2, submitted.
m
m/k
m/k
Deg.
m/k
m
Deg.
-
-
-
± 5000D*
1000
± 0.5
± 0.5
±0.04
± 0.5
± 0.2
± 0.04
Yes
Yes
Yes

More Related Content

What's hot

Torres ventadas
Torres ventadasTorres ventadas
Torres ventadas
mcesar96
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
ram111eg
 
Phần ii các bước thực hiện thi công piping cho dự án
Phần ii các bước thực hiện thi công piping cho dự ánPhần ii các bước thực hiện thi công piping cho dự án
Phần ii các bước thực hiện thi công piping cho dự án
Nguyen Tung
 
Wind loads calculation
Wind loads calculationWind loads calculation
Wind loads calculation
Henry Kurniadi
 
Annex 4 - Quality Management Plan.pdf
Annex 4 - Quality Management Plan.pdfAnnex 4 - Quality Management Plan.pdf
Annex 4 - Quality Management Plan.pdf
LuisMogrovejo3
 
Presentation Wind and Eurocode UK
Presentation Wind and Eurocode UKPresentation Wind and Eurocode UK
Presentation Wind and Eurocode UK
Abdurahman Ahmed
 

What's hot (20)

design of tower
design of towerdesign of tower
design of tower
 
Saes a-206-pmi
Saes a-206-pmiSaes a-206-pmi
Saes a-206-pmi
 
Thông số kĩ thuật schneider overload relay
Thông số kĩ thuật schneider overload relayThông số kĩ thuật schneider overload relay
Thông số kĩ thuật schneider overload relay
 
Torres ventadas
Torres ventadasTorres ventadas
Torres ventadas
 
Concise_Eurocode_2.pdf
Concise_Eurocode_2.pdfConcise_Eurocode_2.pdf
Concise_Eurocode_2.pdf
 
Insulation-Coordination-Fundamentals.pptx
Insulation-Coordination-Fundamentals.pptxInsulation-Coordination-Fundamentals.pptx
Insulation-Coordination-Fundamentals.pptx
 
Aramco inspection handbook
Aramco inspection handbookAramco inspection handbook
Aramco inspection handbook
 
Cálculo estructural de torres metálicas
Cálculo estructural de torres metálicasCálculo estructural de torres metálicas
Cálculo estructural de torres metálicas
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Cable tray manual
Cable tray manualCable tray manual
Cable tray manual
 
Wind load calculation
Wind load calculationWind load calculation
Wind load calculation
 
Part 2 Self Supporting tower structures
Part 2 Self Supporting tower structures Part 2 Self Supporting tower structures
Part 2 Self Supporting tower structures
 
al59
al59al59
al59
 
Phần ii các bước thực hiện thi công piping cho dự án
Phần ii các bước thực hiện thi công piping cho dự ánPhần ii các bước thực hiện thi công piping cho dự án
Phần ii các bước thực hiện thi công piping cho dự án
 
Tim hieu ve piping
Tim hieu ve pipingTim hieu ve piping
Tim hieu ve piping
 
Wind loads calculation
Wind loads calculationWind loads calculation
Wind loads calculation
 
Classification of cross section
Classification of cross sectionClassification of cross section
Classification of cross section
 
HV tower design 3
HV tower design 3HV tower design 3
HV tower design 3
 
Annex 4 - Quality Management Plan.pdf
Annex 4 - Quality Management Plan.pdfAnnex 4 - Quality Management Plan.pdf
Annex 4 - Quality Management Plan.pdf
 
Presentation Wind and Eurocode UK
Presentation Wind and Eurocode UKPresentation Wind and Eurocode UK
Presentation Wind and Eurocode UK
 

Similar to Tes p-122.08-r0

Similar to Tes p-122.08-r0 (20)

04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
04-3-TS_Vol-II_,Sec-IV,_Pre_Comm_R1.pdf
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
GADFORROB.pdf
GADFORROB.pdfGADFORROB.pdf
GADFORROB.pdf
 
HV Transmission line specifications
HV Transmission line specificationsHV Transmission line specifications
HV Transmission line specifications
 
Entership Presentation (1).pptx
Entership Presentation (1).pptxEntership Presentation (1).pptx
Entership Presentation (1).pptx
 
viewNitPdf_3777461.pdf
viewNitPdf_3777461.pdfviewNitPdf_3777461.pdf
viewNitPdf_3777461.pdf
 
electrical cable crossing.pdf
electrical cable crossing.pdfelectrical cable crossing.pdf
electrical cable crossing.pdf
 
Transmission line Project
Transmission line ProjectTransmission line Project
Transmission line Project
 
Lrr new alignment
Lrr new alignmentLrr new alignment
Lrr new alignment
 
OFC Trenching
OFC TrenchingOFC Trenching
OFC Trenching
 
SCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity SolutionSCT an Advanced Pipeline Integrity Solution
SCT an Advanced Pipeline Integrity Solution
 
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
ILP Scotland CPD Webinar: What should Scotland consider when planning electri...
 
COBRA PRESENTATION
COBRA  PRESENTATIONCOBRA  PRESENTATION
COBRA PRESENTATION
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
Mechanical
Mechanical Mechanical
Mechanical
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
A Complete Guide on Directional Boring
A Complete Guide on Directional BoringA Complete Guide on Directional Boring
A Complete Guide on Directional Boring
 
Construction manual for sub stations
Construction manual for sub stationsConstruction manual for sub stations
Construction manual for sub stations
 
Mohd_Anwarulla
Mohd_AnwarullaMohd_Anwarulla
Mohd_Anwarulla
 
CV_Talgat Turekulov_eng
CV_Talgat Turekulov_engCV_Talgat Turekulov_eng
CV_Talgat Turekulov_eng
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
hublikarsn
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Introduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptxIntroduction to Robotics in Mechanical Engineering.pptx
Introduction to Robotics in Mechanical Engineering.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 

Tes p-122.08-r0

  • 1.
  • 2. PAGE NO. 2 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 Table of Contents 1. SCOPE OF WORK 2. ENVIRONMENTAL CONDITIONS 3. RESPONSIBILITIES 4. ROUTE SELECTION ASPECTS 5. GROUND SURFACE SURVEY 6. DRAWINGS 6.1 General Layout Drawings 6.2 Plan and Profile Drawings 6.3 Detail Drawing of Crossings 7. TOWER SPOTTING ON PROFILES 8. SURVEY PRELIMINARY TO ERECTION 9. DOCUMENTS TO BE FURNISHED BY CONTRACTOR 10. ERRORS IN SURVEYING
  • 3. PAGE NO. 3 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 1.0 SCOPE OF WORK This standard covers the survey work to establish the route of the transmission line. The work consists of ascertaining the definite route, making the topographic survey and recording it on plan and profile drawings. 2.0 ENVIRONMENTAL CONDITIONS The general standard outdoor atmospheric and climatic conditions prevailing in the line route are in accordance with those presented in the latest revision of SEC General Specification No. 01-TMSS-01 , titled “ General Requirements for All Transmission Equipment / Materials”. 3.0 RESPONSIBILITIES The contractor will receive along with tender documents a map showing the general line route. SEC representative will indicate the OHL start and end points, which are usually located in front of the concerned bay of a departure and receiving substation respectively. The locations of OHL route angles shown on the above mentioned map shall be tentative. However, the contractor shall check this line route prior to the actual ground survey. The ground survey shall be executed along this line route and no departure from it shall be accepted without prior approval by SEC. Before starting the detailed survey a walkover survey of the line shall be made, various feasible routes shall be ascertained and marked on the submitted drawing for approval. The contractor shall be responsible for all work involved in selecting the transmission line route including but not limited to: 1. Using the route selection aspects as in Clause 4 below. 2. Furnishing all personnel, material, equipment required to do the work, providing necessary engineering services together with all the necessary labour, skill, techniques, tools and facilities. Supplying all other items of whatever nature not specified herein as required for completion of all work indicated in this specification. 3. Making a preliminary survey between terminal points of the OHL 4. Determining and submitting a tentative line route for SEC approval. 5. Staking of route centre line points, angles and terminal points. 6. Supplying of plan and profile of the line route.
  • 4. PAGE NO. 4 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 Incase where SEC provide the line route and plan and profile drawings, the CONTRACTOR shall comply with following responsibilities: a. The contractor shall verify that the required clearances are obtained as well as the location and alignment of each structure using his actual survey data in conjunction with the plan and profile drawings, and then proceed to layout the right-of-way for clearing requirements. b. If a proposed structure location conflicts with other construction or existing obstructions, the CONTRACTOR shall immediately notify the SEC REPRESENTATIVE before proceeding further. c. Accepted structure locations shall not be moved without the prior written authorization of the SEC REPRESENTATIVE. d. The CONTRACTOR shall verify the line layout interms of adequate conductor clearance and immediately notify the SEC REPRESENTATIVE of any descripencies encountered. The rquired conductor ground clearances must be maintained at all times. e. The CONTRACTOR shall survey the sites before proceeding with the design, and any additional utilities such as pipelines (including future utilities) which are not shown on the plan and profile provided by the SEC shall be considered by the CONTRACTOR during the design and construction stage of the project. 4.0 ROUTE SELECTION ASPECTS The contractor shall trace the proposed route so that it is of minimum length, minimum structure quantity, easy access to their locations, minimum cost of overall construction, operation and maintenance. a. The transmission line routes shall have minimal impact on farmland and residential ….or commercial development. b. The right of way width shall be inaccordance with that given in TES-P-122.09 (Clearances and right of way requirements ). c. All the angle locations shall be accessible by a four wheel drive vehicle. d. Routes shall be accessable via an existing roadway or roadway scheduled for immediate construction. Areas subject to water, erosion or landslide shall be avoided,.particularly, in the selection of route angle points. e. The minimum horizontal distance between the route centre line and other overhead …lines or other obstacles (ie. gas, oil, water pipes, building, trees) shall not be less than …as stated below:
  • 5. PAGE NO. 5 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 Min. Distance (metres) of selected line route to objects for: Obstacles 380kV OHL 230kV OHL 132kV OHL 115kV OHL 110kV OHL 69kV OHL 1. 380Kv OHL 2. 230Kv OHL 3. 132Kv OHL 4. 115Kv OHL 5. 110Kv OHL 6. 69Kv OHL 7. 33/13.8kV OHL 8. L.V. OHL 9. Telecommunication Line 10. Buildings 11. Pipe with nominal diameter; Less than 150 mm Between 150- 450 mm More than 450 mm 50 50 40 40 40 40 40 40 40 35 40 45 85 50 50 40 40 40 40 40 40 40 35 40 45 85 40 40 35 30 30 30 25 25 25 20 40 45 85 40 40 30 30 30 30 25 25 25 20 40 45 85 40 40 30 30 30 30 25 25 25 20 40 45 85 40 40 30 30 30 30 25 25 25 20 40 45 85 f. At the crossing of OHL route over other features, the following rules shall be applied: i. Where transmission line route cross pipelines, the angle of intersection is preferably 90 degrees, and if not possible the angle of intersection shall be between 70 to 110 degrees. ii. Where transmission line route cross overhead transmission lines and communication lines, the angle of intersection is preferably 90 degrees, and if not possible the angle of intersection shall be between 70 to 110 degrees. iii. Where transmission line route cross roads, the angle of intersection is preferably 90 degrees, and if not possible the angle of intersection shall be between 45 to 135 degrees. Where transmission line route cross major highways, the angle of intersection shall be as near as possible to 90 degrees. iv. Where transmission line route cross the railroad tracks, the angle of intersection is preferably 90 degrees, and if not possible the angle of intersection shall be between 70 to 110 degrees. v. At wadi crossing the route shall be selected where a single span is possible. Both banks of the wadi shall be firm soil, the preference solid sound rock. g. The OHL route shall not cross the approach paths of any airport or near any existing or presently planned future microwave systems, without written approval of both the proper authorities and SEC.
  • 6. PAGE NO. 6 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 5.0 GROUND SURFACE SURVEY The contractor shall survey and profile the transmission line routes that comply with this specification and approved by SEC, in order to produce terrain profiles. The control survey shall be of second order accuracy, the tolerances shall be as stated in the data schedule. The survey shall include mainly: -- Location points of line deviations (angle points) on site according to final, approved line route maps. -- Staking of these points with concrete poles (200 x 200mm), 1400mm high of which 400mm buried with a 16mm dia., 300mm long steel bar fixed to the centre. -- Tying of these points to two or three fixed stable locations by distances and angles, tying them to the National Grid System and levels be related to National Datum, to facilitate recovery or re-establishing of angle point in the event of the stake being destroyed. -- Setting out the alignment by stakes at measurement stations according to terrain slope with distances not more than l00m between them, otherwise these stations shall be located at points where the terrain changes its slope. -- Measuring of the profile along the centre line. --Measuring of the side profile parallel to the centre line at a distance of 5m in 132kV, 115kV,. 110kV& 69kV..OHL and 11m in 380kV & 230kV OHL at the uphill side of the centre line whenever the terrain slope perpendicular to the line axis exceeds 5%. -- Measuring of angles between adjacent straight line sections. -- Survey of details and obstacles like houses, waterflow routes, power and telecommunication lines, ground surface nature (i-e. sand, rocks, etc.), vegetation, boundary walls, fences and the like for the complete right of way width or 50m to both sides of the centre line whichever is less of the proposed Transmission Line Route. -- Survey of power and telephone lines crossing the centre line producing the following details. -Voltage - Structure Number as indicated on the number plates. -Quantities of crossed telephone wires. -Material of power and telephone supports. -Sketch of structure configuration. -Centre of two nearest structures on the left and on the right side of the centreline, even when these two structures are further away from the centre line than 50m.
  • 7. PAGE NO. 7 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 -Elevation of suspension points of conductors and earth wires. Sag of conductors between the two structures with a temperature at the time of survey. -Existing elevations of the conductors and overhead ground wires attachment points of the take-off structures. -A map using a suitable scale showing the adjacent telephone lines, pipelines, underground power or telecommunication cables running parallel to the line route, in a distance of l00m from both sides of centre line. -The metric system and 360 degrees division shall be used. The profile drawing shall show the locations of all measured points (or station) and following information for each point: -Number of point or station. -Accumulative distances. -Partial distances. -Points altitude. -Angles magnitude of right of way angle in degrees. 6.0 DRAWINGS Preparation of drawings shall be in accordance with SEEDS-II. 6.1 General Layout Drawings The Contractor shall supply a general layout drawing showing the transmission line location with respect to the terminal installations. An enlarged plan view of each terminal shall show the departure of all the lines from the substation. In a tabular form, the drawing shall identify and give the angle points; its coordinates and the deflection. The length and bearing of all the line sections must also be included. In this general layout drawing, the province and tribe lines and limits of cities should be shown and the centerline tied to the National Grid. The scale of the drawing shall be such as the line could be shown on an A0 size drawing. 6.2 Plan and Profile Drawings Plan and Profile drawing depicts the changes of elevation along a given line and any features crossing that line. The plan view of the Plan & Profile drawing shows the horizontal layout of the project (scale 1:2000) and the profile view shows the vertical plane or grade information (scale 1:200). The method of profile data acquisition by the contractor surveyor may include ground survey with total station and data recorder. Microstation (drafting package developed and marketed by Bentley Systems Inc.) shall be adopted as the standard graphics package.
  • 8. PAGE NO. 8 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 6.2.1 Plan & Profile Computation: a. The ground profile drawing shall show all relevant details as specified for ground surface survey in this specification. b. Profile stationing shall start from the proposed power source increasing towards the supplied point. Usually, the source is a take-off point, A first PI or a tap-point. c. The value of the starting profile stationing shall be selected such that negative stationing values are avoided in case of adjustments. d. Horizontal ground distance shall be used in computing profile stationing. When an identical distance is observed by a control traverse, the profile stationing shall be adjusted proportionately. e. Angles at crossing with power lines, pipelines, railroads, fences, etc., if not measured in the field, shall be computed from the available profile data. f. Elevation for instrument stations may be computed using reciprocal trigonometric observations. g. Elevation shall be adjusted to previously accepted values for identical points unless gross errors are evident in the previous survey or computation. h. Profile offsets shall be designated left or right, facing towards increasing profile stationing. The forward direction shall be the direction of increasing profile stationing. i. The atmospheric and earth curvature correction shall be applied to trigonometric elevation computations. j. Plan data provided in meter and projected into the UTM coordinate system. The maps used the International 1967 spheroid and the NGN (Ain Al Abid) Datum. The Mean Sea Level (MSL) datum shall be used for all vertical computation. 6.2.2 Plan & Profile Drafting: a. Sheet Format. i. Vertical lines shall be marked for every 200m at a horizontal scale of 1:2000. ii. Horizontal lines shall be drawn every 10m at a vertical scale of 1:200. iii. The upper part of the sheet shall be left blank to illustrate the plan layout. b. Drawing - Plan. i. Plan layout should be placed on the upper part of the sheet with scale of 1:2000 ii. Plan layout should be copied from the master file (provided by COMPANY) and rotated horizontally. iii. Plotting direction should be from Left to Right.
  • 9. PAGE NO. 9 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 iv. Plan layout is divided into parts and each part depicts from one turning point (PI) to next turning point. Each part between two turning points is always shown as a horizontal line. v. These Horizontal lines are shifted alternatively (10cm vertically) at the turning points. The turning point at the end of each line is the beginning point of the next line. c. Drawing - Profile. i. Each sheet has a single profile line job. ii. Natural ground elevation above MSL should be plotted along the proposed line with scale 1:200. iii. The points of elevation along the stations must agree exactly with the stationing on the plan and vice versa. 6.3 Detail Drawing of Crossings A drawing of a suitable scale shall be submitted for special crossings (ie. roads, railroad, wadi, power and telephone lines, etc.) showing the detailed dimensions and distances including all information to complete the structure distribution study on the profile. The elevation of the high of all wires of all aerial lines at the centre line crossing, at a distance of (d)m right and left of the centre line and at the point of support of adjacent structures, shall be shown, with the ambient temperature during survey measurements. (d) equals to 5m in 132kV, 115kV , 110kV , 69kV OHL and l1m in 380kV & 230kV OHL. Tying angle points to two or three fixed points drawing showing distances and angles in detail. 7.0 SURVEY PRELIMINARY TO ERECTION The Contractor is responsible for the correct alignment and orientation of structures with the tolerances specified. Structures shall be so directed that the crossarms of straight line structures will be perpendicular to the line axis. The crossarms of the tension structures shall bisect the angle. When looked at by the naked eye, no structure shall be out of line. When checked by a theodolite, no structure shall be more than 5 cm off the adjacent line which connects the centers of the two adjacent structures. 8.0 DOCUMENTS TO BE FURNISHED BY CONTRACTOR 1- Two copies of drawing specified in Clause 6 of this specification for total line route. 2- A guaranteed confirmation that the contractor will be responsible for the mistakes in his work which can be discovered later in OHL conductors stringing stage.
  • 10. PAGE NO. 10 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 9.0 ERRORS IN SURVEYING The errors in distances shall not be more than 1m in 500m; the errors in elevation shall not be more than 0.5m in 1000m.
  • 11. PAGE NO. 11 OF 11TESP12208R0/MAR TRANSMISSION ENGINEERING STANDARD TES-P-122.08, Rev. 0 Date of Approval: February 18, 2007 TECHNICAL DATA SCHEDULE GROUND SURFACE SURVEY Unit SEC Requirement Bidder's Data 1. 2. 3. 4. 5. 6. 7. 8. 9. Project Name Project Number Contractor's Name/Country OHL Route Length (approx.) OHL Voltage Tolerance of Profile Survey --Centre line Length Height --Auxiliary Points Height Angles --Location on Profile Length Height Angle *D = Distance between two points of intersection in metres. Is the list of survey crew names with their experience, submitted? Is the list of equipment and machineries to be used in ground surface, submitted? Is the guaranteed confirmation for ground surface survey work as in Clause 9.2, submitted. m m/k m/k Deg. m/k m Deg. - - - ± 5000D* 1000 ± 0.5 ± 0.5 ±0.04 ± 0.5 ± 0.2 ± 0.04 Yes Yes Yes