1. M O H A M E D A B O U - M E S A L A M H A S S A N
Mobile: 00201012864575
:00966565059695
E-mail: mmesalem@yahoo.com Skype: mmesalem82
Whats-App: 00966(0)565059695
PERSONAL INFORMATION
Date of Birth: 14/09/1982.
Marital Status: Married.
Military Status: Completed, as a Reserve officer.
Driver license: Egyptian and Saudi licenses are available.
OBJECTIVE
* Seeking a challenging position in a reputable multinational company where my academic
background and interpersonal skills are well developed and utilized.
* Seek new responsibilities and use initiative, self-sufficient individual
* Team-player devoted and determined to achieve success.
EDUCATION
B.Sc. Electrical department of Engineering.
Zagazig University, Faculty of Engineering.
General Grade: Good.
Graduation year: may -2004.
Graduation project: Autonomous Underwater Vehicle (AUV).
Grade of project: Excellent (96%).
SKILLS
Computer Skills:
• Windows (98 – Me – XP –Vista –NT4-Seven) & DOS operating system.
• Computer maintaining & Hardware.
• Microsoft Office (Word – Power Point FrontPage–access–excel).
• Little bit C, C++.
• Network protocols.
• Circuit maker PCB design and simulation programs.
• Introduction to programming logic control (P.L.C).
• Auto cad 2 D.
• Dialux distribution light program.
Language Skills:
• Native language: Arabic.
• Fluent of both written and spoken English.
• Good of both written and spoken French.
• A little bit Urdu.
1
2. EXPERIENCE
Training (before graduation):
• Duration: June 2004 to August 2004
Place: IEEE branch.
• Position: Exhibitor in EED August 2004 and minister
“ Ahmed darweesh” thanks our project team for our
Efforts in this research and project.
• Lighting roads.
• Building lighting design.
PREVIOUS COURSES
• PMP training course.
• Damping Study and spacer installation precautions Training from DAMP Co., Italy.
• GZTASCR Conductor Installation Training from LS Cable and Sys. LTD.
• Electrical distribution panels.
• Auto cad 2 D.
• Instrument devices &control.
• Protection of power system.
• Commissioning & trouble shooting all types of Automatic energy meter Reading (AMR).
• Introduction to programming logic control (P.L.C).
• Introduction to steam power stations.
• Building Electrical systems design.
• Vibration, adjust coordinates &detection of crack.
• Explosion of boilers pipes line.
• Water treatment.
• Industrial Safety.
• English courses.
• PRESENT WORK
• (SEC Representative- as an Electrical project Engineer Consultant) for
EHV 380 KV OHTL from: 10/2013 until now, at (Saudi Electricity
Company projects department - Western Region) Via SEGI.
Scope of work and Experience:
• (SWCC Project – Via SEC )as a representative of SEC .
“ Contract #: 20312” (YANBU-Madinah):-
• CONSTRUCTION OF 380kV& 110 kV OHTL D/C YANBU-MADINAH Water
Transmission System, the entire D/C overhead transmission line shall be shielded
with two (2), composite optical overhead wires (48 Core OPGW).
By USING ERS structure for shifting the conductor during Towers structure
Erection at the cut off points to shut down one circuit only.
• Portion II: 380 KV D/C OHTL on lattice steel structure vertical configuration
from NEW YANBU-3 SWCC 380 KV S/S to Cut-off point at existing YANBU-
RABIGH 380 KV LINE.
• Portion III: 380 KV D/C OHTL on lattice steel structure vertical configuration
from NEW YANBU-3 SWCC 380 KV S/S to Existing YANBU-1 S/S.
2
3. • Portion IV: 380 KV OHTL from YANBU-3 SWCC 380 KV S/S to Cut-off point at
existing YANBU- MADINAH E/MS J 380 KV LINE.
• After Accomplishment of project Portion III, it shall establish the following.
• New YANBU-3 SWCC S/S –Madinah East S/S.
• New YANBU-3 SWCC S/S –Madinah East S/S.
• SEC Representative Via SEGI as Project Engineer at (YANBU-UMLUJJ)Project
Contract #: 21131164/00 :-
• Part(1): New Installation of 380 KV double Circuit with route length 216Km with
No. of 547 Towers ,three phase ,vertical configuration with Two (2)shield
wires, overhead transmission line on Latticed steel structures AAAC Conductor
4x500mm*2 ,dia. :29.1mm with 400mm sub conductor spacing spacer damper
per phase in square configuration .
• The entire D/C overhead transmission line shall be shielded with two (2),
composite optical overhead wires (48 Core OPGW).
• Transposition: Fully transposition the OHTL.
• Phasing: Reversed phasing shall be used, arrangement of one circuit shall be
reversed order for the other circuit of each segment of the transposed TL.
• Part (2): LOOPING works constructing of Two (2) D/C overhead transmission
lines each 110 KV D/C line having 11.9Km &12Km route length, 110KV D/C 3 phase,
vertical configuration, using (2 )500 mm*2 AAAC Conductors per phase from 110KV
take off structures at 380/110kv Umlujj BSP to looping point of existing 110KV
OHTL between 380/110 KV Umlujj BSP and 110/13.8 KV UMLUJJ S/S and
110/13.8kv Al Ais S/S.
• The entire D/C overhead transmission line shall be shielded with one (1),
composite optical overhead wires (48 Core OPGW) & One (1) OGW (AACSR/AW).
Job description & responsibilities:
• Responsible for the supervision, inspection, monitoring and implementation of
approved projects. Prepares task schedules for efficient of works/ Activities.
• Prepares materials purchase orders, and request letters for the approved and
budgeted projects prior for approval of management before the projects execution
and implementation.
• Prepares materials purchase orders, and request letters for the approved and
budgeted projects prior for approval of management before the projects execution
and implementation.
• Revising the contractor change request/order and TCC plane date of the project
to the client.
• Analyze Contractor’s progress bills, escalation invoices, claims and requests for
payment and make revising of the payment to the Client in accordance with the
Contract Documents.
• Prepares the Damping Study to the client (Aeolian oscillations, Sub-span
oscillations) for the proper spans and with the suitable vibration recorders and
monitoring the execution at site.
• Prepares project/Accomplishment reports for Accounting reference every
invoices of the contractors that have rendered services to company.
• Monitoring the project schedule, execution as per milestones, support PM& Team
leader for their timely invoice.
• Coordination with project manager for the site works.
• Coordination with the contractors & customers, periodical feed back to the team
members about the project status.
3
4. • Managing & monitoring the third party resources.
• Monitoring the OHS requirement, periodical SOT. Update the safety document.
• Checking & reviewing all the Documents/Drawings for the site installation and
further conveying comments to the design office for modifications as per the scope
of site.
• Inspection of Towers parts materials, and the OPGW & conductor’s H/W and
Fittings.
• Revising the setup plan of conductor/shield wire over all the pulling section prior to
start activity.
• Monitor the Stacking of Towers parts, Towers Assemblies and Towers Erections
procedures.
• Inspection of the Erected Towers parts and its tightening.
• Inspection of the Earth resistance measurement prior to shield wire pulling.
• Using ERS (Emergency Restoration System Towers).
• Monitoring & inspecting Access road & structure pad installation activities.
• Monitoring & inspecting First stage & 2nd stages foundation.
• Follow Company’s quality processes and documents Control procedures to ensure
the project flow smooth and accurate.
• Follow the Design drawings as (Plane & profile drawing and outline drawing for
clearance measurements, fabrications and erection drawings …Etc.), and Technical
Data descriptions required for (hardware & fittings assembly ,Sag &tension chart,
spacer distributions, Grounding details...etc.).
• Monitoring and managing Fiber Optic Cable installation as OPGW and U/G NFOC.
• Monitoring & Inspection of the Stringing, Sagging and clipping activities of ASCR
Conductor, GZTASCR (Gapped -Type Conductor) and OPGW and its trouble
shooting.
• Trouble shoots the Tower Erection and Conductor/OPGW Stringing.
• Supervision Expert for RTV Rubber silicon insulators Coating for the below
3 projects:
• Yanbu – Umlujj :- Construction of 380 KV OHTL project:
Suspension :19972 No’s Tension: 3464 No’s
• Shoaiba – AlLith :- Construction of 380 KV OHTL project:
Suspension :9738 No’s Tension: 1505 No’s
• Petro Rabigh – Madina East :- Construction of 380 KV OHTL project:
Suspension :6095 No’s Tension: 3363 No’s
• PREVIOUS WORK : (4)
• Electrical Consultant Engineer for OHTL 132 KV in SEGI Company (Saudi
Engineering Group international), Full Time From: 04 /2012 until 10/2013.
• As a Representative of SEC (Saudi Electricity Company) Southern Area.
• Client :( SEC.) Saudi Electricity Company Southern area: as an Electrical
Consultant Engineer for OHTL 132 KV through from: 4/2012 till 10/2013.
• Scope of work and Experience:
• Part(1): New Construction of 132KV From SALAMA S/S to ISKAN S/S,
D/C ,three phase ,vertical configuration with Two (2)shield wires, overhead
transmission line on Latticed steel structures using two (2)ACSR/AW “Drake “795
kcmil ,Conductor per phase.
• The entire D/C overhead transmission line shall be shielded with two (2),
composite optical overhead wires (36 Core OPGW).
4
5. • Part (2): Reconductoring works From JIZAN BSP S/S to AL SALAMA S/S by
replace the existing Conductor ACSR/AW ”Drake” rated at 850A with anew
special conductor GZTASCR “ Gapped “ rated 1700 A minimum.
• And Replacement the materials such as (special conductor, insulator string,
vibration campers, all other line H/W and fittings.
• GZTASCR Conductor Installation Training from LS Cable and Sys. LTD.
• PREVIOUS WORK (3)
• Protection, control, testing& commissioning Engineer, Full Time From: 03-
2010
Until 04-2012.
• Protection & Control Engineer in (CCED) CANAL COMPANY FOR
ELECTRICITY DISTRIBUTION.
Testing, commissioning& protection engineer responsible to make all types of test for all
protection relays, maintenance of all C.B & trouble shooting in all of M.V / L.V substation &distribution.
• Testing all types of protection relays (directional &non directional) as secondary
injection.
• Do all required function test for different schemes &commissioning for control
&protection circuits.
• C.B analyzer (contact resistance measurement &timing).
• Carry out required tests at different types of protection relays
• Familiar with maintains activities and trouble shooting of protection & control.
• Familiar with different types of latest protection.
• Earth resistance measurement.
• Battery test & discharger.
• Test, commissioning & trouble shooting all (AMR) Energy meter.
• PREVIOUS WORK (2)
• Instruments & Control Engineer, Full Time From: 04-2007 until 03-
2010.
• Instruments & Control Engineer in ATAKA POWER GENERATION (4 Units with
900 MVA, 220/500 KV,50 HZ)
• Planning organization, Constructing new instruments & Executing, and Supervision
of versatile I&C instruments & activities and arranging the required RFIs.
• I&C [Troubleshooting of Problems within instruments for oil ,Gas & fluid such
as( Valves, Pressure/Flow/Level Transmitter, Temperature/Pressure/Flow/Level
Switches, Speed/Temperature Sensors) Routine ,AMS program & Hart calibration,
Maintenance, Preventive maintenance, spare parts specification, Laboratory].
• Electromagnetic and Electro pneumatic valves calibration at site.
• Make sure that all new construction activities going as per quality and standards.
• Implement all new wiring work activities from DCS room to field instruments
5
6. locations using the wiring diagrams.
• Accommodations, System Improvement Studies Including Modifications
Execution.
• Also install new equipment and Supervision of routine maintenance for units
upgrade in ATAKA Power Plant.
• Maintenance, installation and configuration Network component (CISCO Switches,
Controller
• Cabinets, Marshaling cabinets, printers).
• PREVIOUS WORK (1)
Site OHTL Engineer 220 KV - 500 KV Full Times From: 06/2004 until
04/2007 at (EETC) Egypt Electricity Transmission Company.
• Job description: New construction OHTL Managing & lead the stringing Team
during the Stringing Set up, pulling activity and Sag Calculations activities of ASCR
& AAAC Conductor, and OPGW and its trouble shooting.
• Prepares the Invoice & bills for the projects.
• Manage the segregation & Stacking process of Towers parts at store and site, and
Towers Assemblies and Towers Erections procedures.
• Manage and Supervise the Towers Erection activity, Assembly and Tightening of
Nut and Bolts for back bolting and inspect the missing parts for implementation.
• Inspect the Tower parts material for avoiding any critical missing before stringing
activity.
• Prepare Conductor set up plan with the proper drums length.
• Measure all Safety precautions during Tower Erection and Stringing activities.
• Manage the insulator assembling, fitting and hoisting activity as per H/W assembly
drawing and as per standard.
• As an Electrical Engineer supervised the stringing of OPGW, Work at site includes
Pulling of OPGW, Sagging, and clipping of OPGW and Splicing of Joint for OPGW
of 220 KV,500 KV line
• As a Site Engineer, responsible for the construction supervision work including
concreting of all types of foundations i.e. Piling, Pile cap and conventional
foundation of Suspension, Angle & Dead end towers in dry, semi submerged, water
logged areas.
• Lead the Towers Grounding material installation team and do the required resistance
measurements before OPGW or OGW stringing activity.
• Manage the Vibration damper installing as per damping study, and spacer distribution
as per design schedule.
• Insulator RTV rubber Silicon Coating and storing process, handling,
loading/Unloading to site with its all H.W & fittings as per assembly drawing.
• Supervise the pressing machines by its required dies with all components before
starting the site activities.
• Prepares project/Accomplishment reports to the project manager.
• Coordination with project manager for the site works, tools purchases and hiring the
required machines and equipments for site activity.
• Familiar with the new TESMEC Tensioner & Puller machines operation.
• Coordinate with project Team to clear all Comments, Punch list & bending work
before delivering the project.
• Follow the OHS requirement, periodical SOT. Update the safety document.
6
7. • HOBBIES & SPECIAL SKILLS
• Football, Swimming (practice sport) to reduce stress.
• Drawing, Crafting and watching scientific /horror movies.
• Willingness to work hard and learn new Skills.
• High-speed learner in high –tech and business subject.
• Ability to research and find information about any branch of engineering in the Internet.
• Ability to work well individually or in a team environment.
• Ability to apply scientific knowledge to research in order to solve technical problem.
• My long term goals involve growing with a company where I can continue to learn take on
additional responsibilities as much as I can.
SKILLS GAINED FROM MILITARY SERVICE
• Respect all my managers.
• Work hard under any Pressure and I have found that, I enjoy working in a Challenging
Environment.
• How to lead my team and all workers under my steering to achieve works.
• EXPERIENCE IN MY MILITARY SERVICE
• Worked as a leader in an electrical distribution panel &telephone exchange location.
• Maintenance, testing, troubleshooting and exchange programming, which I learned a lot.
• Things about Electrical distribution panel & Fiber Techniques and Microwaves applications.
References Furnished Upon Request
7