LAHORE RING ROAD PROJECT, (REVISED ALIGNMENT / SOUTHERN LOOP)
INVITATION FOR INSTALLATION OF CONCRETE ROW PEGS
All registered Survey & Mapping companies are hereby invited to submit their competitive
quotations for Lahore Ring Road Project, (Revised Alignment / Southern Loop) for the
following Scope of Works in accordance with attached Specifications / sketch:-
1) Setting out of centre line / ROW Limits at 25 m intervals including main points of
curves i.e. TS/PC/ST/PT for a length of approx. 60 km.
2) Fixing of ROW concrete pegs ~5000 Nos.
The rates for setting out of centre line / ROW Limits plus fixing of ROW concrete pegs shall
include compensation for supply, transportation of all material, fixing of precast ROW
concrete pegs including excavation / backfilling (compacted) and salary of staff, costs of
labour, tools, profit, overhead, taxes and incidental charges necessary to complete the
work in all respect to the entire satisfaction of Nespak.
All survey activities shall be supervised by Nespak Surveyors at no extra cost to the
Contractor.
The item one is optional and it may be carried out by Nespak surveyors depending upon
the availability of staff.
Sealed quotation will be received on the following address by June 1, 2009 at 10:30 hours
and will be opened on the same date at 11:30 hours..
Vice President,
H&TE Division, NESPAK House,
1-C, Block-N, Model Town Extension,
Lahore.
(Download) Invitation for fixing of ROW Concrete Pegs for Lahore Ring Road Project,
(Revised Alignment / Southern Loop) and sketch
SETTING OUT OF CENTER LINE / ROW LIMITS AND INSTALLATION
OF CONCRETE ROW PEGS ON LAHORE RING ROAD PROJECT
ALONG REVISED ALIGNMENT AND SOUTHERN LOOP (~ 60 KM)
1.0 SPECIFICATIONS
1.1 General
The setting out of center line and subsequently ROW limits shall be the basic
requirement for installation of concrete ROW pegs at 25m intervals and main
points (i.e. start and end points) of all curves. Nespak desires to hire the services
of reputed and experienced registered private parties (Contractors / Survey
Company (ies). The work shall be carried out using modern instruments operated
by experienced surveyors and assisted by other technical staff to fix the quality
concrete Pegs.
The setting out of center line is optional and it may be carried by Nespak
surveyors.
All field works shall be carried out under the supervision of Nespak surveyor(s) at
no extra cost to the Contractor.
1.2 Location of Project
The project alignment follows an entirely new route in the suburb of Lahore
metropolis. The location map is attached for guidance of the bidders to acquaint
themselves with the project area and check the accessibility of site.
1.3 Scope of Works
The required Scope of Works shall mainly comprise the following items:-
♦ Setting out of centre line & ROW limits / boundaries at 25 m intervals
including main points of curve i.e. PC and PT for a length of approx. 60 km.
♦ Fixing of ROW concrete pegs of the required concrete ~5,000
Nos.
strength of 2400 psi
Note: - The project shall be executed in stages according to finalized design of
different packages comprising each about 10 to 20 km each. If there is some
delay in finalization of design of any package, no extra cost towards mobilization
/ demobilized (if any) shall be entertained for such temporary stoppage of work.
1.4 Methodology of Work
The procedure to be adopted by the Contractor / Surveying Company for Scope
of Works shall require the following tasks:
1.4.1 Setting out of Centerline and Fixing of Concrete Pegs
The setting out of centerline and ROW limits shall be carried out by using modern
equipment in accordance with setting out data of horizontal alignment of the
project utilizing horizontal controls. The Contractor / Survey Company will set out
center line and fix ROW limits with wooden pegs at site or alternatively location of
pegs may be provided by Nespak Surveyor. The Contractor shall replace the
wooden pegs with precast concrete Pegs as per given Sketch / Plate No.1. The
area around concrete peg shall be filled back with common material and
compacted well to the satisfaction of the supervisor.
1.4.2 Handing over of Concrete Pegs
The completed work of concrete pegs shall be handed over to PMU’s
Representative on weekly basis or as agreed at site.
The concrete pegs with defects in fabrication or installation shall be removed and
replaced with accepted one at no extra cost to NESPAK.
1.4.3 Remedy of Defective Work and Maintenance of Concrete Pegs
The Contractor shall be responsible for all defective work and to replace Peg(s) if
required. The Contractor shall maintain his work for a period of one month from
the last date of handed over all the pegs are to PMU’s Representative. At the
time of final handing over, any concrete peg if found missing shall again be
installed by the Contractor at his own cost.
1.5 Payment of Advance
No advance payment shall be made.
1.6 Mode of Payment
The following payments will be made for ROW concrete pegs installed and
accepted by the Employer’s Representative:-
- On completion of work of any Package (may be
comprised 10 to 20 km each) i.e. No of concrete pegs fixed
at site and accepted / approved by the Consultant /
Client in accordance with agreed rate. 90%
- On issuance of completion Certificate 10%
1.7 Performance Bond
The successful bidder shall have to submit performance bond from any
scheduled bank of Pakistan equivalent to 10% of the contract value.
1.8 Certificate of Site Visit
A statement in writing shall be submitted by the bidder certifying that he has
visited the site and familiarized himself with all conditions which may affect his
quotation / bid and that he has no query whatsoever such as access to site, etc.
1.9 Document to be Submitted with the Bid
1. Registration Certificate of the company
2. Details of available technical / non-technical staff
3. List of similar Jobs completed and in-hands
4. Rate analysis along with break up calculations
1.10 Bill of Quantities
Item
No.
Description Unit Quantity Rate
Rs.
Amount
Rs.
1 Setting out of center line /
Row limits @ 25 m intervals
+ main points of curve.
km 60
2 Installation of concrete pegs
along ROW limits at 25 m
intervals as per attached
Sketch / Plate No.1
N0. 5,000
Note: Item No.1 is optional and it may or may not be awarded as part of the
Scope of Work.
Lrr new alignment
Lrr new alignment

More Related Content

What's hot

Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
Wael Nafad
 
Freelance Preview
Freelance PreviewFreelance Preview
Freelance Preview
ahmed mohie
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
Ahmed Hikal
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
Sylvain Legat
 
CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_
Victor Momoh
 
D Boyd Resume 2015
D Boyd Resume 2015D Boyd Resume 2015
D Boyd Resume 2015
Darin Boyd
 

What's hot (20)

Project Controller
Project ControllerProject Controller
Project Controller
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Shahmeer Resume2-3
Shahmeer Resume2-3Shahmeer Resume2-3
Shahmeer Resume2-3
 
Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015Shahmeer resum 16 years 22 11-2015
Shahmeer resum 16 years 22 11-2015
 
MADHU CV
MADHU CVMADHU CV
MADHU CV
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
Freelance Preview
Freelance PreviewFreelance Preview
Freelance Preview
 
CV WAQAR.
CV WAQAR.CV WAQAR.
CV WAQAR.
 
VAIBHAV RESUME
VAIBHAV RESUMEVAIBHAV RESUME
VAIBHAV RESUME
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
LAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legatLAND SURVEYOR Resume 2013 legat
LAND SURVEYOR Resume 2013 legat
 
CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_CASING SOLUTIONS_OBEN_FIELD_
CASING SOLUTIONS_OBEN_FIELD_
 
CV_Muhammad Iqbal
CV_Muhammad IqbalCV_Muhammad Iqbal
CV_Muhammad Iqbal
 
Lugo Marine Wind Cargo Presentation 2011
Lugo Marine Wind Cargo Presentation 2011Lugo Marine Wind Cargo Presentation 2011
Lugo Marine Wind Cargo Presentation 2011
 
walid abou lhaf CV
walid abou lhaf  CVwalid abou lhaf  CV
walid abou lhaf CV
 
C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016 C.V.-Mohamed Alsharkawy-2016
C.V.-Mohamed Alsharkawy-2016
 
Neramel cv1
Neramel cv1Neramel cv1
Neramel cv1
 
cv mohamed mostafa 6
cv mohamed mostafa 6cv mohamed mostafa 6
cv mohamed mostafa 6
 
Cv 01
Cv 01Cv 01
Cv 01
 
D Boyd Resume 2015
D Boyd Resume 2015D Boyd Resume 2015
D Boyd Resume 2015
 

Similar to Lrr new alignment

CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
Nazir Ahmed
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
NANDLAL PRASAD
 
INFRA CIVIL EPC Presentation -NAIR 22.12.2015.ppt
INFRA CIVIL EPC Presentation -NAIR  22.12.2015.pptINFRA CIVIL EPC Presentation -NAIR  22.12.2015.ppt
INFRA CIVIL EPC Presentation -NAIR 22.12.2015.ppt
GogreenFields
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
ahmed mansour
 

Similar to Lrr new alignment (20)

Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Tes p-122.08-r0
Tes p-122.08-r0Tes p-122.08-r0
Tes p-122.08-r0
 
Railway sidings 017
Railway sidings 017Railway sidings 017
Railway sidings 017
 
hidayath cv 2016
hidayath cv 2016hidayath cv 2016
hidayath cv 2016
 
Railway Siding
Railway SidingRailway Siding
Railway Siding
 
CV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -OverseesCV - NAZEER AHMED -Oversees
CV - NAZEER AHMED -Oversees
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016Ghazawi-CV updat - April 2016
Ghazawi-CV updat - April 2016
 
INFRA CIVIL EPC Presentation -NAIR 22.12.2015.ppt
INFRA CIVIL EPC Presentation -NAIR  22.12.2015.pptINFRA CIVIL EPC Presentation -NAIR  22.12.2015.ppt
INFRA CIVIL EPC Presentation -NAIR 22.12.2015.ppt
 
Methodology for DPR & PMC Road works.pdf
Methodology  for DPR & PMC Road works.pdfMethodology  for DPR & PMC Road works.pdf
Methodology for DPR & PMC Road works.pdf
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
GADFORROB.pdf
GADFORROB.pdfGADFORROB.pdf
GADFORROB.pdf
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
 
Shiraz nawaz cv.
Shiraz nawaz cv.Shiraz nawaz cv.
Shiraz nawaz cv.
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 

Recently uploaded

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Lrr new alignment

  • 1. LAHORE RING ROAD PROJECT, (REVISED ALIGNMENT / SOUTHERN LOOP) INVITATION FOR INSTALLATION OF CONCRETE ROW PEGS All registered Survey & Mapping companies are hereby invited to submit their competitive quotations for Lahore Ring Road Project, (Revised Alignment / Southern Loop) for the following Scope of Works in accordance with attached Specifications / sketch:- 1) Setting out of centre line / ROW Limits at 25 m intervals including main points of curves i.e. TS/PC/ST/PT for a length of approx. 60 km. 2) Fixing of ROW concrete pegs ~5000 Nos. The rates for setting out of centre line / ROW Limits plus fixing of ROW concrete pegs shall include compensation for supply, transportation of all material, fixing of precast ROW concrete pegs including excavation / backfilling (compacted) and salary of staff, costs of labour, tools, profit, overhead, taxes and incidental charges necessary to complete the work in all respect to the entire satisfaction of Nespak. All survey activities shall be supervised by Nespak Surveyors at no extra cost to the Contractor. The item one is optional and it may be carried out by Nespak surveyors depending upon the availability of staff. Sealed quotation will be received on the following address by June 1, 2009 at 10:30 hours and will be opened on the same date at 11:30 hours.. Vice President, H&TE Division, NESPAK House, 1-C, Block-N, Model Town Extension, Lahore. (Download) Invitation for fixing of ROW Concrete Pegs for Lahore Ring Road Project, (Revised Alignment / Southern Loop) and sketch
  • 2. SETTING OUT OF CENTER LINE / ROW LIMITS AND INSTALLATION OF CONCRETE ROW PEGS ON LAHORE RING ROAD PROJECT ALONG REVISED ALIGNMENT AND SOUTHERN LOOP (~ 60 KM) 1.0 SPECIFICATIONS 1.1 General The setting out of center line and subsequently ROW limits shall be the basic requirement for installation of concrete ROW pegs at 25m intervals and main points (i.e. start and end points) of all curves. Nespak desires to hire the services of reputed and experienced registered private parties (Contractors / Survey Company (ies). The work shall be carried out using modern instruments operated by experienced surveyors and assisted by other technical staff to fix the quality concrete Pegs. The setting out of center line is optional and it may be carried by Nespak surveyors. All field works shall be carried out under the supervision of Nespak surveyor(s) at no extra cost to the Contractor. 1.2 Location of Project The project alignment follows an entirely new route in the suburb of Lahore metropolis. The location map is attached for guidance of the bidders to acquaint themselves with the project area and check the accessibility of site. 1.3 Scope of Works The required Scope of Works shall mainly comprise the following items:- ♦ Setting out of centre line & ROW limits / boundaries at 25 m intervals including main points of curve i.e. PC and PT for a length of approx. 60 km. ♦ Fixing of ROW concrete pegs of the required concrete ~5,000 Nos. strength of 2400 psi
  • 3. Note: - The project shall be executed in stages according to finalized design of different packages comprising each about 10 to 20 km each. If there is some delay in finalization of design of any package, no extra cost towards mobilization / demobilized (if any) shall be entertained for such temporary stoppage of work. 1.4 Methodology of Work The procedure to be adopted by the Contractor / Surveying Company for Scope of Works shall require the following tasks: 1.4.1 Setting out of Centerline and Fixing of Concrete Pegs The setting out of centerline and ROW limits shall be carried out by using modern equipment in accordance with setting out data of horizontal alignment of the project utilizing horizontal controls. The Contractor / Survey Company will set out center line and fix ROW limits with wooden pegs at site or alternatively location of pegs may be provided by Nespak Surveyor. The Contractor shall replace the wooden pegs with precast concrete Pegs as per given Sketch / Plate No.1. The area around concrete peg shall be filled back with common material and compacted well to the satisfaction of the supervisor. 1.4.2 Handing over of Concrete Pegs The completed work of concrete pegs shall be handed over to PMU’s Representative on weekly basis or as agreed at site. The concrete pegs with defects in fabrication or installation shall be removed and replaced with accepted one at no extra cost to NESPAK. 1.4.3 Remedy of Defective Work and Maintenance of Concrete Pegs The Contractor shall be responsible for all defective work and to replace Peg(s) if required. The Contractor shall maintain his work for a period of one month from the last date of handed over all the pegs are to PMU’s Representative. At the time of final handing over, any concrete peg if found missing shall again be installed by the Contractor at his own cost.
  • 4. 1.5 Payment of Advance No advance payment shall be made. 1.6 Mode of Payment The following payments will be made for ROW concrete pegs installed and accepted by the Employer’s Representative:- - On completion of work of any Package (may be comprised 10 to 20 km each) i.e. No of concrete pegs fixed at site and accepted / approved by the Consultant / Client in accordance with agreed rate. 90% - On issuance of completion Certificate 10% 1.7 Performance Bond The successful bidder shall have to submit performance bond from any scheduled bank of Pakistan equivalent to 10% of the contract value. 1.8 Certificate of Site Visit A statement in writing shall be submitted by the bidder certifying that he has visited the site and familiarized himself with all conditions which may affect his quotation / bid and that he has no query whatsoever such as access to site, etc. 1.9 Document to be Submitted with the Bid 1. Registration Certificate of the company 2. Details of available technical / non-technical staff 3. List of similar Jobs completed and in-hands 4. Rate analysis along with break up calculations
  • 5. 1.10 Bill of Quantities Item No. Description Unit Quantity Rate Rs. Amount Rs. 1 Setting out of center line / Row limits @ 25 m intervals + main points of curve. km 60 2 Installation of concrete pegs along ROW limits at 25 m intervals as per attached Sketch / Plate No.1 N0. 5,000 Note: Item No.1 is optional and it may or may not be awarded as part of the Scope of Work.