1. Personal Information
Name: Hady Naim Sawaya
Date & Place of Birth: August 17th 1976, Tripoli, Lebanon
Nationality: Lebanese
Status: Married
Address: Amioun, El Koura
Phone: 961-70-154078 (Lebanon – Mobile)
E-mail: hsavoya@gmail.com
Objective Looking to join a reputable company where I can acquire a challenging position within the field of Civil
Engineering and Management
Education 1994 – (1999)
Lebanese University -Branch I- FACULTY OF ENGINEERING - (TRIPOLI)
MASTERS IN CIVIL ENGINEER
1981 – (1994)
School: “College Des Freres” - (DEDDEH-KOURA)
BACCALAUREATE IN MATHEMATICS
Professional
Experience
April 2014 – December 2016 / Zerock For Construction (Congo)
Les Arcades (concrete work completed and finishing activities in progress)
(Comprising of a commercial center and two towers)
- Commercial Center is 3 stories high (3,000 m2 each)
- First tower is 8 stories
- Second tower is 9 stories
- Both towers are 400 m2 per floor
Construction Manager in charge of:
1. Coordination between the concrete, finishing and electro-mechanical tasks
2. Cast of 7,000 m3 of concrete
3. Execution of the finishing work
4. Materials order
5. Preparation of contractors certificate
Pointe Parc (Concrete work in progress)
(Comprising of 1 basement of 900 m2
and 9 stories of 650 m2
each).
Construction Manager in charge of:
1. Cast of 4,500 m3 of concrete
Le Triangle (Project completed in 9 months on March 2016)
(Building comprising of RDC and 2 stories. This project includes 15 studios).
Construction Manager in charge of:
1. Finishing work
2. Coordination between finishing and electro-mechanical works
3. Cost and quality control
4. Material orders
5. Preparation of contractors certificate
2. August 2008 - April 2014 / Polygon sal (Lebanon)
Les Residences Bustros Project – Rmeil, Achrafieh
(Building comprising of 14 high standard finishing Stories and 5 Basements)
- Basements are 900 m2 each used as parking. Floor is Epoxy painted; walls and ceilings are
Roullo painted.
- Building is equipped with external mechanical cladding
- Each floor is one apartment, 560 m2 (VRV HVAC system)
Construction Manager in charge of:
1. Coordination with the consultant, the client and the promoter
2. Coordination between the concrete, finishing and electro-mechanical contractors
3. Inspection and supervision on the executed concrete and finishing works
4. Cost, planning and quality control
5. Material orders
6. Preparation of contractors certificate
Renovation and Extension of St. Elie Catholic Cathedral - Solidere
Construction Manager in charge of:
1- Coordination with the consultant, the client and the promoter
2- Coordination between the concrete, finishing and electro-mechanical contractors
3- Inspection and Supervision on the executed concrete and finishing works
4- Cost, planning and quality control
5- Material orders
6- Preparation of contractors certificate
Renovation of Mme Assouad Residence - Achrafieh
Construction Manager in charge of:
1- Coordination with the consultant, the client and the promoter
2- Coordination between the concrete, finishing and electro-mechanical contractors
3- Supervision on the executed work
4- Cost, planning and quality control
5- Material orders
6- Preparation of contractors certificate
Dec 2007 - Aug 2008 / Arcon (KSA)
Structural warehouse at Sharq project – Khoubar
Construction Manager in charge of:
1- Coordination with the consultant and the client
2- Coordination between the finishing and electro-mechanical contractors
3- Cost and planning control
3. Jan 2004 – July 2007 / ITB Nigeria limited. (Nigeria)
TINAPA HOTEL – Calabar
(5 Stories Building, 2500 m2
each floor)
Project Engineer in charge of:
1- The structure: 8000 m3 of concrete using table system.
2- The finishing works: Block-work, plastering, tiling, paint, false ceiling…
3- Coordination between the structural and the electro-mechanical work on site
GENERAL HOSPITAL – Bayelsa
Project Engineer In charge of:
1. The structure: 20000 m3 of concrete
2. The finishing works: Block-work, plastering, tiling, paint, false ceiling…
Apr 2003 - Jan 2004 / Bauer Foundation Specialists (Lebanon)
FOUR SEASONS HOTEL, Site Engineer – Beirut
The work was execution of secant piles, stressing of anchors and injection of grout.
Sept 2001 – Apr 2003 / Mid Contracting (Lebanon)
LE ROYAL HOTEL, Site Engineer – Dbayeih
In charge of finishing work at the main entrance and the ballroom (block-work, tiling,
paint, plastering, false ceiling, wooden work…).
Training
Sept 2000 - May 2001 / Bauer foundation specialists (Lebanon)
Site engineer
The work included execution of secant piles, stressing of anchors and injection of grout.
Sept 1999 - Sept 2000
Military service
Languages Speaking Writing Reading
Arabic Excellent Excellent Excellent
French Very Good Good Very Good
English Very Good Good Very Good
Software
Knowledge
Autocad
MS Word, Excel, MS Project