Personal Information
Name: Hady Naim Sawaya
Date & Place of Birth: August 17th 1976, Tripoli, Lebanon
Nationality: Lebanese
Status: Married
Address: Amioun, El Koura
Phone: 961-70-154078 (Lebanon – Mobile)
E-mail: hsavoya@gmail.com
Objective Looking to join a reputable company where I can acquire a challenging position within the field of Civil
Engineering and Management
Education 1994 – (1999)
 Lebanese University -Branch I- FACULTY OF ENGINEERING - (TRIPOLI)
MASTERS IN CIVIL ENGINEER
1981 – (1994)
 School: “College Des Freres” - (DEDDEH-KOURA)
BACCALAUREATE IN MATHEMATICS
Professional
Experience
April 2014 – December 2016 / Zerock For Construction (Congo)
 Les Arcades (concrete work completed and finishing activities in progress)
(Comprising of a commercial center and two towers)
- Commercial Center is 3 stories high (3,000 m2 each)
- First tower is 8 stories
- Second tower is 9 stories
- Both towers are 400 m2 per floor
Construction Manager in charge of:
1. Coordination between the concrete, finishing and electro-mechanical tasks
2. Cast of 7,000 m3 of concrete
3. Execution of the finishing work
4. Materials order
5. Preparation of contractors certificate
 Pointe Parc (Concrete work in progress)
(Comprising of 1 basement of 900 m2
and 9 stories of 650 m2
each).
Construction Manager in charge of:
1. Cast of 4,500 m3 of concrete
 Le Triangle (Project completed in 9 months on March 2016)
(Building comprising of RDC and 2 stories. This project includes 15 studios).
Construction Manager in charge of:
1. Finishing work
2. Coordination between finishing and electro-mechanical works
3. Cost and quality control
4. Material orders
5. Preparation of contractors certificate
August 2008 - April 2014 / Polygon sal (Lebanon)
 Les Residences Bustros Project – Rmeil, Achrafieh
(Building comprising of 14 high standard finishing Stories and 5 Basements)
- Basements are 900 m2 each used as parking. Floor is Epoxy painted; walls and ceilings are
Roullo painted.
- Building is equipped with external mechanical cladding
- Each floor is one apartment, 560 m2 (VRV HVAC system)
Construction Manager in charge of:
1. Coordination with the consultant, the client and the promoter
2. Coordination between the concrete, finishing and electro-mechanical contractors
3. Inspection and supervision on the executed concrete and finishing works
4. Cost, planning and quality control
5. Material orders
6. Preparation of contractors certificate
 Renovation and Extension of St. Elie Catholic Cathedral - Solidere
Construction Manager in charge of:
1- Coordination with the consultant, the client and the promoter
2- Coordination between the concrete, finishing and electro-mechanical contractors
3- Inspection and Supervision on the executed concrete and finishing works
4- Cost, planning and quality control
5- Material orders
6- Preparation of contractors certificate
 Renovation of Mme Assouad Residence - Achrafieh
Construction Manager in charge of:
1- Coordination with the consultant, the client and the promoter
2- Coordination between the concrete, finishing and electro-mechanical contractors
3- Supervision on the executed work
4- Cost, planning and quality control
5- Material orders
6- Preparation of contractors certificate
Dec 2007 - Aug 2008 / Arcon (KSA)
 Structural warehouse at Sharq project – Khoubar
Construction Manager in charge of:
1- Coordination with the consultant and the client
2- Coordination between the finishing and electro-mechanical contractors
3- Cost and planning control
Jan 2004 – July 2007 / ITB Nigeria limited. (Nigeria)
 TINAPA HOTEL – Calabar
(5 Stories Building, 2500 m2
each floor)
Project Engineer in charge of:
1- The structure: 8000 m3 of concrete using table system.
2- The finishing works: Block-work, plastering, tiling, paint, false ceiling…
3- Coordination between the structural and the electro-mechanical work on site
 GENERAL HOSPITAL – Bayelsa
Project Engineer In charge of:
1. The structure: 20000 m3 of concrete
2. The finishing works: Block-work, plastering, tiling, paint, false ceiling…
Apr 2003 - Jan 2004 / Bauer Foundation Specialists (Lebanon)
 FOUR SEASONS HOTEL, Site Engineer – Beirut
The work was execution of secant piles, stressing of anchors and injection of grout.
Sept 2001 – Apr 2003 / Mid Contracting (Lebanon)
 LE ROYAL HOTEL, Site Engineer – Dbayeih
In charge of finishing work at the main entrance and the ballroom (block-work, tiling,
paint, plastering, false ceiling, wooden work…).
Training
Sept 2000 - May 2001 / Bauer foundation specialists (Lebanon)
 Site engineer
The work included execution of secant piles, stressing of anchors and injection of grout.
Sept 1999 - Sept 2000
 Military service
Languages Speaking Writing Reading
Arabic Excellent Excellent Excellent
French Very Good Good Very Good
English Very Good Good Very Good
Software
Knowledge
 Autocad
 MS Word, Excel, MS Project

More Related Content

What's hot

S. Palo interior Architect
S. Palo interior ArchitectS. Palo interior Architect
S. Palo interior ArchitectSimona Palo
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2Syafiq Zariful
 
مهندس احمدتركي السيرة الذاتيه c.v
مهندس احمدتركي السيرة الذاتيه c.vمهندس احمدتركي السيرة الذاتيه c.v
مهندس احمدتركي السيرة الذاتيه c.vahmed torky
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics PresentationLin Hui
 
Illumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCI
Illumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCIIllumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCI
Illumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCI3rd Mind Realty
 
Resume2015updatejuan.
Resume2015updatejuan.Resume2015updatejuan.
Resume2015updatejuan.Juan Diaz
 
Hotel design considerations
Hotel design considerationsHotel design considerations
Hotel design considerationsSubrata Mandal
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation SlidesMelvin Lim
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015Hassan gariesh
 

What's hot (20)

Resume_Daniel_Wangari
Resume_Daniel_WangariResume_Daniel_Wangari
Resume_Daniel_Wangari
 
Skies Sta. Mesa
Skies Sta. MesaSkies Sta. Mesa
Skies Sta. Mesa
 
fpbcurrent1
fpbcurrent1fpbcurrent1
fpbcurrent1
 
S. Palo interior Architect
S. Palo interior ArchitectS. Palo interior Architect
S. Palo interior Architect
 
Building economics presentation 3 2
Building economics presentation 3 2Building economics presentation 3 2
Building economics presentation 3 2
 
CV (aug15).Rev1
CV (aug15).Rev1CV (aug15).Rev1
CV (aug15).Rev1
 
Babel company profile
Babel company profileBabel company profile
Babel company profile
 
مهندس احمدتركي السيرة الذاتيه c.v
مهندس احمدتركي السيرة الذاتيه c.vمهندس احمدتركي السيرة الذاتيه c.v
مهندس احمدتركي السيرة الذاتيه c.v
 
1пр а
1пр а1пр а
1пр а
 
Building Economics Presentation
Building Economics PresentationBuilding Economics Presentation
Building Economics Presentation
 
C.V.Updated
C.V.UpdatedC.V.Updated
C.V.Updated
 
Illumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCI
Illumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCIIllumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCI
Illumina Residences Manila - Condo for Sale in Sta. Mesa, Manila by DMCI
 
C.V. Z. Zografos
C.V.   Z. ZografosC.V.   Z. Zografos
C.V. Z. Zografos
 
wayne prescott cv
wayne prescott cvwayne prescott cv
wayne prescott cv
 
Resume2015updatejuan.
Resume2015updatejuan.Resume2015updatejuan.
Resume2015updatejuan.
 
Hotel design considerations
Hotel design considerationsHotel design considerations
Hotel design considerations
 
Building Economics Group Presentation Slides
Building Economics Group Presentation SlidesBuilding Economics Group Presentation Slides
Building Economics Group Presentation Slides
 
construction manager 2015
construction manager 2015construction manager 2015
construction manager 2015
 
CV
CVCV
CV
 
PORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANOPORTFOLIO-DCASSIANO
PORTFOLIO-DCASSIANO
 

Viewers also liked (19)

HSophia-cv
HSophia-cvHSophia-cv
HSophia-cv
 
CV-- Ayan
CV-- AyanCV-- Ayan
CV-- Ayan
 
abdallc New
abdallc Newabdallc New
abdallc New
 
Cv Sulaiman Alnaimat cv (oct 2016) doc
Cv Sulaiman Alnaimat cv (oct 2016) docCv Sulaiman Alnaimat cv (oct 2016) doc
Cv Sulaiman Alnaimat cv (oct 2016) doc
 
Dana_Avotina_CV
Dana_Avotina_CVDana_Avotina_CV
Dana_Avotina_CV
 
PJ CV's
PJ CV'sPJ CV's
PJ CV's
 
Sudhir_Resume (1)
Sudhir_Resume (1)Sudhir_Resume (1)
Sudhir_Resume (1)
 
Short Eng CV- Nov 2014
Short Eng CV- Nov 2014Short Eng CV- Nov 2014
Short Eng CV- Nov 2014
 
Khalid IT Manager
Khalid IT ManagerKhalid IT Manager
Khalid IT Manager
 
CV - Nizar Suyyagh
CV - Nizar SuyyaghCV - Nizar Suyyagh
CV - Nizar Suyyagh
 
Resume - Hanna Nassif
Resume - Hanna NassifResume - Hanna Nassif
Resume - Hanna Nassif
 
Dana_Dawod_CV
Dana_Dawod_CVDana_Dawod_CV
Dana_Dawod_CV
 
CV
CVCV
CV
 
M.Faroun CV
M.Faroun CVM.Faroun CV
M.Faroun CV
 
Shafie
ShafieShafie
Shafie
 
C.V
C.VC.V
C.V
 
Ahmed Moawad
Ahmed MoawadAhmed Moawad
Ahmed Moawad
 
Emira CV 3
Emira CV 3Emira CV 3
Emira CV 3
 
Mohamed zayed elkashif 555
Mohamed zayed elkashif 555Mohamed zayed elkashif 555
Mohamed zayed elkashif 555
 

Similar to Hady Sawaya CV

Similar to Hady Sawaya CV (20)

Resume of Civil Engineer -Layal Sayah
Resume of Civil Engineer -Layal SayahResume of Civil Engineer -Layal Sayah
Resume of Civil Engineer -Layal Sayah
 
HASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMPHASSAN ELESAYED ELEMAM PMP
HASSAN ELESAYED ELEMAM PMP
 
Samy Gaber CV sep18
Samy Gaber CV sep18Samy Gaber CV sep18
Samy Gaber CV sep18
 
Tony achkar cv
Tony achkar cvTony achkar cv
Tony achkar cv
 
Carlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_ENCarlos A Reparaz CV Hill Formated 170516_EN
Carlos A Reparaz CV Hill Formated 170516_EN
 
cv1[1]
cv1[1]cv1[1]
cv1[1]
 
Mazen ALoud-CV-7916
Mazen ALoud-CV-7916Mazen ALoud-CV-7916
Mazen ALoud-CV-7916
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Marwan Bou Antoun
Marwan Bou AntounMarwan Bou Antoun
Marwan Bou Antoun
 
Sabah Jereige CV 2016
Sabah Jereige CV 2016Sabah Jereige CV 2016
Sabah Jereige CV 2016
 
C.V HOSSAM
C.V HOSSAMC.V HOSSAM
C.V HOSSAM
 
Hossam Hendawy 2016
Hossam Hendawy 2016Hossam Hendawy 2016
Hossam Hendawy 2016
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -CV - CIVIL ENGINEER-KHODR Maen -
CV - CIVIL ENGINEER-KHODR Maen -
 
eng. nabih cv
eng. nabih cveng. nabih cv
eng. nabih cv
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
Hendawy ragabb cv update 21 6 2015
Hendawy ragabb cv update 21   6   2015Hendawy ragabb cv update 21   6   2015
Hendawy ragabb cv update 21 6 2015
 

Hady Sawaya CV

  • 1. Personal Information Name: Hady Naim Sawaya Date & Place of Birth: August 17th 1976, Tripoli, Lebanon Nationality: Lebanese Status: Married Address: Amioun, El Koura Phone: 961-70-154078 (Lebanon – Mobile) E-mail: hsavoya@gmail.com Objective Looking to join a reputable company where I can acquire a challenging position within the field of Civil Engineering and Management Education 1994 – (1999)  Lebanese University -Branch I- FACULTY OF ENGINEERING - (TRIPOLI) MASTERS IN CIVIL ENGINEER 1981 – (1994)  School: “College Des Freres” - (DEDDEH-KOURA) BACCALAUREATE IN MATHEMATICS Professional Experience April 2014 – December 2016 / Zerock For Construction (Congo)  Les Arcades (concrete work completed and finishing activities in progress) (Comprising of a commercial center and two towers) - Commercial Center is 3 stories high (3,000 m2 each) - First tower is 8 stories - Second tower is 9 stories - Both towers are 400 m2 per floor Construction Manager in charge of: 1. Coordination between the concrete, finishing and electro-mechanical tasks 2. Cast of 7,000 m3 of concrete 3. Execution of the finishing work 4. Materials order 5. Preparation of contractors certificate  Pointe Parc (Concrete work in progress) (Comprising of 1 basement of 900 m2 and 9 stories of 650 m2 each). Construction Manager in charge of: 1. Cast of 4,500 m3 of concrete  Le Triangle (Project completed in 9 months on March 2016) (Building comprising of RDC and 2 stories. This project includes 15 studios). Construction Manager in charge of: 1. Finishing work 2. Coordination between finishing and electro-mechanical works 3. Cost and quality control 4. Material orders 5. Preparation of contractors certificate
  • 2. August 2008 - April 2014 / Polygon sal (Lebanon)  Les Residences Bustros Project – Rmeil, Achrafieh (Building comprising of 14 high standard finishing Stories and 5 Basements) - Basements are 900 m2 each used as parking. Floor is Epoxy painted; walls and ceilings are Roullo painted. - Building is equipped with external mechanical cladding - Each floor is one apartment, 560 m2 (VRV HVAC system) Construction Manager in charge of: 1. Coordination with the consultant, the client and the promoter 2. Coordination between the concrete, finishing and electro-mechanical contractors 3. Inspection and supervision on the executed concrete and finishing works 4. Cost, planning and quality control 5. Material orders 6. Preparation of contractors certificate  Renovation and Extension of St. Elie Catholic Cathedral - Solidere Construction Manager in charge of: 1- Coordination with the consultant, the client and the promoter 2- Coordination between the concrete, finishing and electro-mechanical contractors 3- Inspection and Supervision on the executed concrete and finishing works 4- Cost, planning and quality control 5- Material orders 6- Preparation of contractors certificate  Renovation of Mme Assouad Residence - Achrafieh Construction Manager in charge of: 1- Coordination with the consultant, the client and the promoter 2- Coordination between the concrete, finishing and electro-mechanical contractors 3- Supervision on the executed work 4- Cost, planning and quality control 5- Material orders 6- Preparation of contractors certificate Dec 2007 - Aug 2008 / Arcon (KSA)  Structural warehouse at Sharq project – Khoubar Construction Manager in charge of: 1- Coordination with the consultant and the client 2- Coordination between the finishing and electro-mechanical contractors 3- Cost and planning control
  • 3. Jan 2004 – July 2007 / ITB Nigeria limited. (Nigeria)  TINAPA HOTEL – Calabar (5 Stories Building, 2500 m2 each floor) Project Engineer in charge of: 1- The structure: 8000 m3 of concrete using table system. 2- The finishing works: Block-work, plastering, tiling, paint, false ceiling… 3- Coordination between the structural and the electro-mechanical work on site  GENERAL HOSPITAL – Bayelsa Project Engineer In charge of: 1. The structure: 20000 m3 of concrete 2. The finishing works: Block-work, plastering, tiling, paint, false ceiling… Apr 2003 - Jan 2004 / Bauer Foundation Specialists (Lebanon)  FOUR SEASONS HOTEL, Site Engineer – Beirut The work was execution of secant piles, stressing of anchors and injection of grout. Sept 2001 – Apr 2003 / Mid Contracting (Lebanon)  LE ROYAL HOTEL, Site Engineer – Dbayeih In charge of finishing work at the main entrance and the ballroom (block-work, tiling, paint, plastering, false ceiling, wooden work…). Training Sept 2000 - May 2001 / Bauer foundation specialists (Lebanon)  Site engineer The work included execution of secant piles, stressing of anchors and injection of grout. Sept 1999 - Sept 2000  Military service Languages Speaking Writing Reading Arabic Excellent Excellent Excellent French Very Good Good Very Good English Very Good Good Very Good Software Knowledge  Autocad  MS Word, Excel, MS Project