SlideShare a Scribd company logo
1 of 3
Download to read offline
1


2016
Hossam Hendawi Ibrahim
Address : Assiut, Elnemais Street
Mobile : +20 100 460 0686
Email : Hossam_hendawi@hotmail.com
- KEY QUALIFICATIONS:
 Overall 7 years of experience in Technical office and site work of international projects
divided into 1 year in High way projects, 3 years in Technical office and site work of
Finishing works, 1.5 years in Management of housing Projects, 1.5 years in Technical
office of New Assiut Barrage and Hydropower plant project.
- EDUCATION:
 October 6 University, High Institute of Engineering.
 Bachelor's Degree‫‏‬in Civil Engineering.
 Graduation year : June 2009
- WORK EXPERIENCE:
 January 2014 – present, Quantity surveyor at EFNAB JV
 Project: New Assiut Barrage and Hydropower plant.
 Owner: Ministry of Irrigation & Ministry of Electricity.
 Consultant: ABDC JV (Lahmeyer International- Artelia- RMD Consult)
 Contractor: EFNAB JV (Egyptian-French New Assiut Barrage) (Vinci Grand project,
Orascom Construction Industries, Arab Contractors) joint venture.
 Project Cost: Euro 1.4 billion.
 Location: Assiut 400 Km South of Cairo.
 Project scope: The Barrage has four turbines 8 MW each. It has double
locks to allow navigation on the Nile River and it is designed to maintain a
head of 4 meters to ensure discharge of a minimum 445 m3/s flow into the
Ibrahimia Canal in order to irrigate nearly 700,000 hectares of land
between the dam and Cairo. The structure of the Barrage provides a two-
lane roadway across the Nile River which is the main crossing point at
Assuit city for local residents.
 Duties:
1) Preparing quantities of concrete works, formwork, steel reinforcement,
embedded parts, finishing, and electrical quantities using AUTOCAD and
Excel sheets.
2) Preparing monthly invoices for Sub-contractors & Client.
3) Comparing the new revisions of the drawings with the tender drawings to
calculate the variations (if any).
4) Assisting subcontracts Manager in updating payment status and
subcontractors back charge reports on a weekly basis.
2


2016
5) Prepare variation /change orders and payment certificates for ongoing
Activities.
6) Carry out cost estimates for alternative design solutions.
7) Budget preparation of all trades (concrete, steel reinforcement, embedded
parts, finishing, and electrical quantities).
8) Contract documentation review (Specs., Drawings, BOQ, & correspondence)
for budget preparation.
9) Reviewing the Material Orders insuring that no extra quantities have been
ordered.
10) Resolving disputes between contracting parties.
11) Assist the Contracts Manager with a range of other duties as may be required
from time to time and supply all relevant information for review at the specified
intervals set.
 August 2012 – December 2013, Site Engineer at ATLAS company
PROJECTS:
 34 Buildings Including about 900 Housing unit at Bani-Ghaleb Area.
 37 Buildings Including about 1000 Housing unit at New Assuit City.
 Owner: Ministry of housing.
 Location: 1) Assiut, bani-ghalib.
2) Assiut, new Assiut.
 Project scope: Executing 34 building at Bani-Ghalib and 37 buildings at New
Assuit City Including about 1900 Housing units with all architectural finishing works
& Electrical works .
 Duties:
1) Duties supervision and monitoring all site activities to ensure technical
requirements implemented at site.
2) Preparing all engineering documents (shop drawings, BBS, method of
statement, material submittals, composite design ...etc.) in compliance with
the project specifications and design.
3) Quantity surveying for all structural and architectural works including all items
and finishing accessories.
4) Submitting current & final invoices for subcontractors & client.
5) Overcome and solve any technical problems that may occur during
construction.
 September 2011 – July 2012, Site engineer at Utap-Epot.
PROJECTS:
 Constructions& Finishing works at Alex bank (el-nozha branch & el-korba
branch).
- Contractor: Utab-Epot office for trading and engineering Project.
DUTIES:
Building domes and roof covering using polycarbonate sheets, steel structure
and aluminum sections, construction works and finishing works.
3


2016
 September 2010 – August 2011, Site engineer at Egyptian army.
PROJECTS:
 Upper Egypt free road.
MAIN ACTIVATES:
Executing high way road from Assiut to Elminya with Orascom company.
 June 2008 – July 2010, Site engineer at Utap-Epot.
PROJECTS:
 Senzo mall, Hurghada.
 Borg el-Arab airport, Cairo airport, 6 October airport.
 MSA University.
 Dolphin land, 6 October Mall.
- HIGH LIGHT OF QUALIFICATIONS & SKILLS:
Skill
Skill
Level
practice period
Software
Skills
Auto CAD 2D,3D 2012 Excellent 10 years
CSI SAP 2000 V. 12 Fair Less than a year
Primavera P6.01 Fair Less than a year
Ms-Office Excellent More than 10 years
management Prepare to pass PMP exam
language Skill Skill Level practice period
Languages
Skills
Arabic "Mother Tongue"
English
writing V.Good Developing forward
reading V.Good Developing forward
speaking Good Developing forward
listening Good Developing forward
- PERSONAL DATA:
 BIRTH DATE: 31st
- July - 1984
 MARITAL STATUS: Married
 MILITARY STATUS: Finished
 DRIVING LICENSE: Valid
- OBJECTIVES:
To apply my experiences and educational backgrounds to a civil engineering position
in a pioneer company whereby my skills can be further used and developed.
HOPE MY QUALIFICATIONS MEET YOUR REQUIREMENTS

More Related Content

What's hot

gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.DraftsmanGomaa Tawfik
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Mohamed Sayed
 
Hussam Nassar Q8 full
Hussam Nassar Q8 fullHussam Nassar Q8 full
Hussam Nassar Q8 fullHussam Nassar
 
Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoubGhobrial1
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CVmohamed ezz
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineerHossam Yassin
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileHassan Al-Yami
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)MAHMOUD SAYED
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed Ahmed
 
Gamal Hadad (Architect)
Gamal Hadad (Architect)Gamal Hadad (Architect)
Gamal Hadad (Architect)Gamal Hadad
 

What's hot (20)

yasser radwan
yasser radwanyasser radwan
yasser radwan
 
gomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsmangomaa tawfik.Elec.Draftsman
gomaa tawfik.Elec.Draftsman
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Hussam Nassar Q8 full
Hussam Nassar Q8 fullHussam Nassar Q8 full
Hussam Nassar Q8 full
 
Abanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning EngineerAbanoub Ghobrial, Planning Engineer
Abanoub Ghobrial, Planning Engineer
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
Mina 2016
Mina 2016Mina 2016
Mina 2016
 
Resume_Sherif El-Sherif
Resume_Sherif El-SherifResume_Sherif El-Sherif
Resume_Sherif El-Sherif
 
Hossam yassin cv - technical office engineer
Hossam yassin   cv - technical office engineerHossam yassin   cv - technical office engineer
Hossam yassin cv - technical office engineer
 
9-2016
9-20169-2016
9-2016
 
Planning Engineer CV
Planning Engineer CVPlanning Engineer CV
Planning Engineer CV
 
Al Shatrain Contracting Est Profile
Al Shatrain Contracting Est ProfileAl Shatrain Contracting Est Profile
Al Shatrain Contracting Est Profile
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
Mohamed Magdy
Mohamed MagdyMohamed Magdy
Mohamed Magdy
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
Gamal Hadad (Architect)
Gamal Hadad (Architect)Gamal Hadad (Architect)
Gamal Hadad (Architect)
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 

Similar to Hossam Hendawy 2016

Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWaell Azmy
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastMohamed Sayed
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCEAbdoo Sowar
 
Mohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitaeMohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitaeMohamed Ezzat
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلصMohamed Hablas
 
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016Laith Ayasrah
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)Ahmed Kamal
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Ayman Mitkees
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 

Similar to Hossam Hendawy 2016 (20)

C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
CV - 2017
CV - 2017CV - 2017
CV - 2017
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
haitham cv
haitham cvhaitham cv
haitham cv
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
Mohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitaeMohamed Ezzat - curriculum vitae
Mohamed Ezzat - curriculum vitae
 
CV
CVCV
CV
 
2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص2017 السيره الذاتيه للمهندس محمد حبلص
2017 السيره الذاتيه للمهندس محمد حبلص
 
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
LAITH CV CIVIL ENGINEER 5 YEARS 20-7-2016
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Hesham ELdieushy 2016
Hesham ELdieushy 2016Hesham ELdieushy 2016
Hesham ELdieushy 2016
 

Hossam Hendawy 2016

  • 1. 1   2016 Hossam Hendawi Ibrahim Address : Assiut, Elnemais Street Mobile : +20 100 460 0686 Email : Hossam_hendawi@hotmail.com - KEY QUALIFICATIONS:  Overall 7 years of experience in Technical office and site work of international projects divided into 1 year in High way projects, 3 years in Technical office and site work of Finishing works, 1.5 years in Management of housing Projects, 1.5 years in Technical office of New Assiut Barrage and Hydropower plant project. - EDUCATION:  October 6 University, High Institute of Engineering.  Bachelor's Degree‫‏‬in Civil Engineering.  Graduation year : June 2009 - WORK EXPERIENCE:  January 2014 – present, Quantity surveyor at EFNAB JV  Project: New Assiut Barrage and Hydropower plant.  Owner: Ministry of Irrigation & Ministry of Electricity.  Consultant: ABDC JV (Lahmeyer International- Artelia- RMD Consult)  Contractor: EFNAB JV (Egyptian-French New Assiut Barrage) (Vinci Grand project, Orascom Construction Industries, Arab Contractors) joint venture.  Project Cost: Euro 1.4 billion.  Location: Assiut 400 Km South of Cairo.  Project scope: The Barrage has four turbines 8 MW each. It has double locks to allow navigation on the Nile River and it is designed to maintain a head of 4 meters to ensure discharge of a minimum 445 m3/s flow into the Ibrahimia Canal in order to irrigate nearly 700,000 hectares of land between the dam and Cairo. The structure of the Barrage provides a two- lane roadway across the Nile River which is the main crossing point at Assuit city for local residents.  Duties: 1) Preparing quantities of concrete works, formwork, steel reinforcement, embedded parts, finishing, and electrical quantities using AUTOCAD and Excel sheets. 2) Preparing monthly invoices for Sub-contractors & Client. 3) Comparing the new revisions of the drawings with the tender drawings to calculate the variations (if any). 4) Assisting subcontracts Manager in updating payment status and subcontractors back charge reports on a weekly basis.
  • 2. 2   2016 5) Prepare variation /change orders and payment certificates for ongoing Activities. 6) Carry out cost estimates for alternative design solutions. 7) Budget preparation of all trades (concrete, steel reinforcement, embedded parts, finishing, and electrical quantities). 8) Contract documentation review (Specs., Drawings, BOQ, & correspondence) for budget preparation. 9) Reviewing the Material Orders insuring that no extra quantities have been ordered. 10) Resolving disputes between contracting parties. 11) Assist the Contracts Manager with a range of other duties as may be required from time to time and supply all relevant information for review at the specified intervals set.  August 2012 – December 2013, Site Engineer at ATLAS company PROJECTS:  34 Buildings Including about 900 Housing unit at Bani-Ghaleb Area.  37 Buildings Including about 1000 Housing unit at New Assuit City.  Owner: Ministry of housing.  Location: 1) Assiut, bani-ghalib. 2) Assiut, new Assiut.  Project scope: Executing 34 building at Bani-Ghalib and 37 buildings at New Assuit City Including about 1900 Housing units with all architectural finishing works & Electrical works .  Duties: 1) Duties supervision and monitoring all site activities to ensure technical requirements implemented at site. 2) Preparing all engineering documents (shop drawings, BBS, method of statement, material submittals, composite design ...etc.) in compliance with the project specifications and design. 3) Quantity surveying for all structural and architectural works including all items and finishing accessories. 4) Submitting current & final invoices for subcontractors & client. 5) Overcome and solve any technical problems that may occur during construction.  September 2011 – July 2012, Site engineer at Utap-Epot. PROJECTS:  Constructions& Finishing works at Alex bank (el-nozha branch & el-korba branch). - Contractor: Utab-Epot office for trading and engineering Project. DUTIES: Building domes and roof covering using polycarbonate sheets, steel structure and aluminum sections, construction works and finishing works.
  • 3. 3   2016  September 2010 – August 2011, Site engineer at Egyptian army. PROJECTS:  Upper Egypt free road. MAIN ACTIVATES: Executing high way road from Assiut to Elminya with Orascom company.  June 2008 – July 2010, Site engineer at Utap-Epot. PROJECTS:  Senzo mall, Hurghada.  Borg el-Arab airport, Cairo airport, 6 October airport.  MSA University.  Dolphin land, 6 October Mall. - HIGH LIGHT OF QUALIFICATIONS & SKILLS: Skill Skill Level practice period Software Skills Auto CAD 2D,3D 2012 Excellent 10 years CSI SAP 2000 V. 12 Fair Less than a year Primavera P6.01 Fair Less than a year Ms-Office Excellent More than 10 years management Prepare to pass PMP exam language Skill Skill Level practice period Languages Skills Arabic "Mother Tongue" English writing V.Good Developing forward reading V.Good Developing forward speaking Good Developing forward listening Good Developing forward - PERSONAL DATA:  BIRTH DATE: 31st - July - 1984  MARITAL STATUS: Married  MILITARY STATUS: Finished  DRIVING LICENSE: Valid - OBJECTIVES: To apply my experiences and educational backgrounds to a civil engineering position in a pioneer company whereby my skills can be further used and developed. HOPE MY QUALIFICATIONS MEET YOUR REQUIREMENTS