SlideShare a Scribd company logo
1 of 7
Download to read offline
1
M A Z E N Z O U H E I R O U D
Address: Beirut, Lebanon
Mobile: +9613957289
Mazen.oud@acw.com.lb,
Mazen.oud@hotmail.com
OBJECTIVE
Senior executive in Project Management
NATIONALITY
Lebanese
DATE OF BIRTH
28/8/1982
EDUCATION
Master’s Degree in Project Management
Cardiff Metropolitan University 2015/2016
Western Avenue, Cardiff, South Glamorgan CF5 2YB, United
Kingdom
B.E In Electrical Engineering, Communications & Electronics
BEIRUT ARAB UNIVERSITY 2004/2005
Member, Order of Engineers and Architects-Beirut Under No.
30491
LANGUAGES
Arabic & English
2
PROFESSIONAL EXPERIENCE
Nov. 2006 - Present Project Manager
ACW – Arabian Civil Works Company – Verdun, Beirut
Worked on the construction of the following Projects:
1. Verdun Residential Towers (Verdun – Beirut) 2012-2016
Owner: Al Baraka Bank
Consultant: SETS International
Contractor: Arabian Civil Works Company
New built ‘luxury living’ residential towers to replace two existing buildings for a new total built-
up area of 9,625 m². The building consists of two towers; one of 14-stories and the second of 9-
stories linked at their first 5 levels. Also the building comprises four basement levels, having a total
built-up area of 4,000 m² of a construction value of 12 million US dollars.
My responsibilities in the project included the following:
 Material Procurement (Architectural & Electromechanical Items).
 Subcontractors Payments Certificate Preparation.
 Planning & Management, Generating cash flows & Reports (using Primavera Software).
 Monitoring Site Progress, Cost Control & Budgeting.
 Coordinating Material Submittal & Drawing Transmittals.
 Supervision on Purchase Order & RFQ Preparation.
2. Hilltop Complex Project (Tallet Al- Khayat – Beirut) 2010-2016
Owner: Makassed Philanthropic Islamic Association- Mohammad Ghanem Al Chammaa
Consultant: Spectrum Engineering Consultants
Contractor: Arabian Civil Works Company
A luxurious residential complex composed of 6 residential blocks, 11 stories each with 1 apartment
per floor, underground parking and amenities, external landscaping, and modern design
commercial center, with a total of 63,000 m2 of built-up area and a construction value of 40 million
us dollars.
My responsibilities in the project included the following:
 Material Procurement & Pricing.
 Subcontractors Payments Certificate Preparation.
 Planning & Management, Generating cash flows & Reports (using Primavera Software).
 Monitoring Site Progress, Cost Control & Budgeting.
 Monitoring Inventory reports.
 Resource allocation and sharing.
 Supervision on Material Submittals & Drawing Transmittals.
 Supervision on Purchase Order & RFQ Preparation.
3
3. Stratum (DT - Beirut) 2011-2012
Owner: Premium Projects
Consultant: R & K Consultants & IPEC
Contractor: Arabian Civil Works Company
Concrete construction, mechanical & electrical works for luxurious offices & commercial complex
My responsibilities in the project included the following:
 Planning
 Subcontractors Payments Certificate Preparation.
4. Site Manager -TMA Cargo – Rehabilitation Project 2009-2011
Owner: TMA
Consultant: ASYA Architect
Contractor: Arabian Civil Works Company
Executing the full rehabilitation of the office building, the aircraft maintenance hangar, the storage
hangar and the full installation of two refrigerating units with a total area of 3000 square meters.
My responsibilities in the project included the following:
 Management of all project.
 Leading a team of engineers.
 Cost Control & Budgeting
 Subcontractors Payments Certificate Preparation.
5. Vega Residence (Ain Mraisy – Beirut) 2008-2012
Owner: Mohammad Ghanem Chammaa / Moumneih Brothers
Consultant: Spectrum Engineering Consultant
Contractor: Arabian Civil Works Company
Unique building consisting of; A ground floor, 13 stories, and two underground basements for car
parks, technical rooms, and amenities. Each floor contains a single spacious and distinctive
apartment of around 460 m2 total floor area with 2.8 meter floor to ceiling clear height, composed
of 3 opened salons, a large and elegant dining room, a family sitting room, a private section
comprising 3 master bedrooms, a wide kitchen with a breakfast area, maid's room and bath, and
laundry area.
My responsibilities in the project included the following:
 Material Procurement (Architectural & Electromechanical Items).
 Subcontractors Payments Certificate Preparation.
 Preparing Schedule of works.
4
6. Nova Towers (Koraytem – Beirut) 2008-2012
Owner: Mohammad Ghanem Chammaa / Chattila Brothers
Consultant: Spectrum Engineering Consultant
Contractor: Arabian Civil Works Company
Unique independent Twin Towers consisting of; a ground floor, 22 stories, and five underground
basements for car parks, technical rooms, and amenities. Each floor contains a single spacious and
distinctive apartment of 612 m2 total floor area with 2.8 meters floor to ceiling clear height,
composed of 3 opened salons, a large and elegant dining room, a family sitting room, a private
section comprising 4 master bedrooms, a wide kitchen with a breakfast area, maid's room and bath,
and laundry area.
My responsibilities in the project included the following:
 Material Procurement (Architectural & Electromechanical Items).
 Subcontractors Payments Certificate Preparation.
7. Alshayaa Private Residence (Baalchmeih-Mt Lebanon) 2006-2010
Owner: AL Chayyaa
Consultant: IDEP Consult.
Contractor: Arabian Civil Works Company
A luxurious Villa in Baalchmieh
My responsibilities in the project included the following:
 Subcontractors Payments Certificate Preparation.
 Planning & Monitoring Schedule of works
8. Traffic Management Center TMC 2006-2010
Owner : Lebanese Government
Consultant: CDR / Team –IBI
Contractor: Arabian Civil Works Company
A five story building for offices and control rooms including auditorium and one basement for car
park to accommodate the control center of all traffic management systems in Beirut.
My responsibilities in the project included the following:
 Material Procurement (Architectural & Electromechanical Items).
 Subcontractors Payments Certificate Preparation.
 Planning & Monitoring Schedule of works
5
May. 2010- Till Venus Real Estate Development (Venus Project):
Present
As Part time I have worked in Venus Real Estate Development a sister company to ACW located in
a nearby office on the construction of a unique three towers project which includes a residential
and commercial area, the project cost Is around 120 million USD.
Presently working the:
 Procurement & Pricing.
 Planning & Management, Generating cash flows & Reports (using
Primavera Software).
 Subcontractors Payments Preparation & Monitoring.
I have also Participated in the preparation of construction Plans and Pricing for the following:
Salah Nafisi Project
Yakoub Nafisi Project
Speakers House Location Project
South Schools Project
Le Chateau
Damac Towers
Sama Beirut Project
Qatar Airways Headquarter
Oct. 2005- Ramco. Trading & Contracting – Hamra, Beirut
Oct. 2006
Worked on the construction of the following Projects:
1) Manara 587 Luxury Building
Al Manara- Beirut
2) Rabih Ammach Villa
Aynab-Lebanon
Responsibilities Comprised:
 Execution of related Electrical Works
 Project Planning Using Primavera Software
 Preparation of Electrical Shop & As-Built Drawings
6
Additional Experience:
 Manage information technology and computer systems.
 Mobile Retail Shop Manager & Owner (experience in market & technology)
 Handled technical troubleshooting within an enterprise environment, including system
crashes, slow-downs and data recoveries.
 Network Trouble shooting and support.
 Troubleshooting & fixing all computer problems (software & hardware).
 Plan, organize, control and evaluate IT and electronic data operations.
 Design, develop, implement and coordinate systems, policies and procedures.
 Ensure security of data and backup systems.
 Act in alignment with user needs and system functionality to contribute to organizational
policy.
 Preserve assets, information security and control structures & resources.
 Handle annual budget and ensure cost effectiveness for technological equipment.
 Professional in Microsoft Excel, Project, Primavera Project Planner & Internet.
7
References:
Engineer Mohammad Kassem
ACW – General Manager
1982-2016
Mobile: +9613656668
Engineer George Baaklini
Man Enterprise
Head of Contract Department
Mobile: +9613512881
Engineer Mohammad Ezzeddine
Khatib & Alami
Senior Projects Manager
Mobile: +9613858008
Engineer Hassan Jaafar
ACW – Deputy Manager
Mobile: +9613796178

More Related Content

What's hot

السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترibrahim shukri el-eter
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
 
project reference and details
project reference and detailsproject reference and details
project reference and detailsCliff Leung
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015mohammed bataiha
 
CV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 LatestCV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 LatestKhaled Al-Doghry
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resumeAlaa Attiya
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFYahia Albehairy
 
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkehadham daradkeh
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat
 
Portfolio 27.06.16
Portfolio 27.06.16Portfolio 27.06.16
Portfolio 27.06.16Ziad Francis
 
Yehia Helmy - CV
Yehia Helmy - CVYehia Helmy - CV
Yehia Helmy - CVyehia helmy
 
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael Cruz
 

What's hot (19)

السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
zk resume
zk resumezk resume
zk resume
 
Moin Resume
Moin ResumeMoin Resume
Moin Resume
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
project reference and details
project reference and detailsproject reference and details
project reference and details
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
CV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 LatestCV Khaled-JULY 2014 Latest
CV Khaled-JULY 2014 Latest
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
 
yahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDFyahia albehairy CV- Addendum - PDF
yahia albehairy CV- Addendum - PDF
 
Adham mohammad Daradkeh
Adham mohammad DaradkehAdham mohammad Daradkeh
Adham mohammad Daradkeh
 
Mohamed Barakat Updated CV
Mohamed Barakat Updated CVMohamed Barakat Updated CV
Mohamed Barakat Updated CV
 
Resumé
ResuméResumé
Resumé
 
Cv stephanie
Cv stephanieCv stephanie
Cv stephanie
 
Portfolio 27.06.16
Portfolio 27.06.16Portfolio 27.06.16
Portfolio 27.06.16
 
last c v 1-1-15
last c v 1-1-15last c v 1-1-15
last c v 1-1-15
 
Yehia Helmy - CV
Yehia Helmy - CVYehia Helmy - CV
Yehia Helmy - CV
 
Michael E. Cruz - C.V.
Michael E. Cruz - C.V.Michael E. Cruz - C.V.
Michael E. Cruz - C.V.
 

Viewers also liked

Vacature kinderverpleegkundige (oproep)
Vacature kinderverpleegkundige (oproep)Vacature kinderverpleegkundige (oproep)
Vacature kinderverpleegkundige (oproep)cvsteekeleburg
 
The Status of Acquitted Persons and the Exclusion Paradox
The Status of Acquitted Persons and the Exclusion ParadoxThe Status of Acquitted Persons and the Exclusion Paradox
The Status of Acquitted Persons and the Exclusion ParadoxCarmel Shenkar
 
The Rise of East Europe in Outsourcing
The Rise of East Europe in OutsourcingThe Rise of East Europe in Outsourcing
The Rise of East Europe in OutsourcingProteams
 
Upday - Medientage München
Upday - Medientage MünchenUpday - Medientage München
Upday - Medientage MünchenMedia Lab Bayern
 
Venture Capital Project for NASA Technology
Venture Capital Project for NASA TechnologyVenture Capital Project for NASA Technology
Venture Capital Project for NASA TechnologyBaozheng (Michael) Ge
 
Manual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95ep
Manual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95epManual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95ep
Manual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95epСергій Кравець
 
Valuing Mutually Exclusive Capital Projects
Valuing Mutually Exclusive Capital ProjectsValuing Mutually Exclusive Capital Projects
Valuing Mutually Exclusive Capital ProjectsBaozheng (Michael) Ge
 
Financial Modeling and Valuation about Nike, Inc
Financial Modeling and Valuation about Nike, IncFinancial Modeling and Valuation about Nike, Inc
Financial Modeling and Valuation about Nike, IncBaozheng (Michael) Ge
 
Sing youth hub initiative 2016
Sing youth hub initiative 2016Sing youth hub initiative 2016
Sing youth hub initiative 2016Ankesh Khandelwal
 
Qu'est-ce qu'un schéma d'aménagement et de développement
Qu'est-ce qu'un schéma d'aménagement et de développementQu'est-ce qu'un schéma d'aménagement et de développement
Qu'est-ce qu'un schéma d'aménagement et de développementVille de Laval
 
Brand content et evenementiel : pari gagnant
Brand content et evenementiel : pari gagnantBrand content et evenementiel : pari gagnant
Brand content et evenementiel : pari gagnantLabCom
 
Programmaboekje werkconferentie de Rechtspraak 19 mei
Programmaboekje werkconferentie de Rechtspraak 19 meiProgrammaboekje werkconferentie de Rechtspraak 19 mei
Programmaboekje werkconferentie de Rechtspraak 19 meiPeter Beerten PhDc
 

Viewers also liked (20)

Jibu CV
Jibu CVJibu CV
Jibu CV
 
Vacature kinderverpleegkundige (oproep)
Vacature kinderverpleegkundige (oproep)Vacature kinderverpleegkundige (oproep)
Vacature kinderverpleegkundige (oproep)
 
CaseForHGv4
CaseForHGv4CaseForHGv4
CaseForHGv4
 
The Status of Acquitted Persons and the Exclusion Paradox
The Status of Acquitted Persons and the Exclusion ParadoxThe Status of Acquitted Persons and the Exclusion Paradox
The Status of Acquitted Persons and the Exclusion Paradox
 
Bicheng Han
Bicheng HanBicheng Han
Bicheng Han
 
FWL Company Profile
FWL Company ProfileFWL Company Profile
FWL Company Profile
 
The Rise of East Europe in Outsourcing
The Rise of East Europe in OutsourcingThe Rise of East Europe in Outsourcing
The Rise of East Europe in Outsourcing
 
Colour nature
Colour natureColour nature
Colour nature
 
Upday - Medientage München
Upday - Medientage MünchenUpday - Medientage München
Upday - Medientage München
 
02 pengenalan ti
02 pengenalan ti02 pengenalan ti
02 pengenalan ti
 
Venture Capital Project for NASA Technology
Venture Capital Project for NASA TechnologyVenture Capital Project for NASA Technology
Venture Capital Project for NASA Technology
 
Resume
ResumeResume
Resume
 
Manual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95ep
Manual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95epManual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95ep
Manual ideal 4810-95_4810-95_ep_4850-95_4850-95ep_6550-95ep_5221-95ep
 
Valuing Mutually Exclusive Capital Projects
Valuing Mutually Exclusive Capital ProjectsValuing Mutually Exclusive Capital Projects
Valuing Mutually Exclusive Capital Projects
 
Financial Modeling and Valuation about Nike, Inc
Financial Modeling and Valuation about Nike, IncFinancial Modeling and Valuation about Nike, Inc
Financial Modeling and Valuation about Nike, Inc
 
Sing youth hub initiative 2016
Sing youth hub initiative 2016Sing youth hub initiative 2016
Sing youth hub initiative 2016
 
Qu'est-ce qu'un schéma d'aménagement et de développement
Qu'est-ce qu'un schéma d'aménagement et de développementQu'est-ce qu'un schéma d'aménagement et de développement
Qu'est-ce qu'un schéma d'aménagement et de développement
 
Brand content et evenementiel : pari gagnant
Brand content et evenementiel : pari gagnantBrand content et evenementiel : pari gagnant
Brand content et evenementiel : pari gagnant
 
Programmaboekje werkconferentie de Rechtspraak 19 mei
Programmaboekje werkconferentie de Rechtspraak 19 meiProgrammaboekje werkconferentie de Rechtspraak 19 mei
Programmaboekje werkconferentie de Rechtspraak 19 mei
 
Kennis mobiliseren - okt16
Kennis mobiliseren - okt16Kennis mobiliseren - okt16
Kennis mobiliseren - okt16
 

Similar to Mazen ALoud-CV-7916

Similar to Mazen ALoud-CV-7916 (20)

Hatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCEHatem El Karnshawy . BSc, PMP, MASCE
Hatem El Karnshawy . BSc, PMP, MASCE
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
C.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCMC.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCM
 
Ahmed cv 2014-1
Ahmed cv  2014-1Ahmed cv  2014-1
Ahmed cv 2014-1
 
A.Hussein - C.V
A.Hussein - C.VA.Hussein - C.V
A.Hussein - C.V
 
Oct. -2015-CV
Oct. -2015-CVOct. -2015-CV
Oct. -2015-CV
 
c v english
c v englishc v english
c v english
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
 
CV MZ
CV MZCV MZ
CV MZ
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
NASEER CV JUNE 2015
NASEER CV JUNE 2015NASEER CV JUNE 2015
NASEER CV JUNE 2015
 
Zaid abu khater cv
Zaid abu khater cvZaid abu khater cv
Zaid abu khater cv
 
Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00Mustafa Hatem Kadry -CV-00
Mustafa Hatem Kadry -CV-00
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
Ehab A-Azeem C V
Ehab A-Azeem C VEhab A-Azeem C V
Ehab A-Azeem C V
 
MAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdfMAYAD_RAZOOK_CV__2022.pdf
MAYAD_RAZOOK_CV__2022.pdf
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 

Mazen ALoud-CV-7916

  • 1. 1 M A Z E N Z O U H E I R O U D Address: Beirut, Lebanon Mobile: +9613957289 Mazen.oud@acw.com.lb, Mazen.oud@hotmail.com OBJECTIVE Senior executive in Project Management NATIONALITY Lebanese DATE OF BIRTH 28/8/1982 EDUCATION Master’s Degree in Project Management Cardiff Metropolitan University 2015/2016 Western Avenue, Cardiff, South Glamorgan CF5 2YB, United Kingdom B.E In Electrical Engineering, Communications & Electronics BEIRUT ARAB UNIVERSITY 2004/2005 Member, Order of Engineers and Architects-Beirut Under No. 30491 LANGUAGES Arabic & English
  • 2. 2 PROFESSIONAL EXPERIENCE Nov. 2006 - Present Project Manager ACW – Arabian Civil Works Company – Verdun, Beirut Worked on the construction of the following Projects: 1. Verdun Residential Towers (Verdun – Beirut) 2012-2016 Owner: Al Baraka Bank Consultant: SETS International Contractor: Arabian Civil Works Company New built ‘luxury living’ residential towers to replace two existing buildings for a new total built- up area of 9,625 m². The building consists of two towers; one of 14-stories and the second of 9- stories linked at their first 5 levels. Also the building comprises four basement levels, having a total built-up area of 4,000 m² of a construction value of 12 million US dollars. My responsibilities in the project included the following:  Material Procurement (Architectural & Electromechanical Items).  Subcontractors Payments Certificate Preparation.  Planning & Management, Generating cash flows & Reports (using Primavera Software).  Monitoring Site Progress, Cost Control & Budgeting.  Coordinating Material Submittal & Drawing Transmittals.  Supervision on Purchase Order & RFQ Preparation. 2. Hilltop Complex Project (Tallet Al- Khayat – Beirut) 2010-2016 Owner: Makassed Philanthropic Islamic Association- Mohammad Ghanem Al Chammaa Consultant: Spectrum Engineering Consultants Contractor: Arabian Civil Works Company A luxurious residential complex composed of 6 residential blocks, 11 stories each with 1 apartment per floor, underground parking and amenities, external landscaping, and modern design commercial center, with a total of 63,000 m2 of built-up area and a construction value of 40 million us dollars. My responsibilities in the project included the following:  Material Procurement & Pricing.  Subcontractors Payments Certificate Preparation.  Planning & Management, Generating cash flows & Reports (using Primavera Software).  Monitoring Site Progress, Cost Control & Budgeting.  Monitoring Inventory reports.  Resource allocation and sharing.  Supervision on Material Submittals & Drawing Transmittals.  Supervision on Purchase Order & RFQ Preparation.
  • 3. 3 3. Stratum (DT - Beirut) 2011-2012 Owner: Premium Projects Consultant: R & K Consultants & IPEC Contractor: Arabian Civil Works Company Concrete construction, mechanical & electrical works for luxurious offices & commercial complex My responsibilities in the project included the following:  Planning  Subcontractors Payments Certificate Preparation. 4. Site Manager -TMA Cargo – Rehabilitation Project 2009-2011 Owner: TMA Consultant: ASYA Architect Contractor: Arabian Civil Works Company Executing the full rehabilitation of the office building, the aircraft maintenance hangar, the storage hangar and the full installation of two refrigerating units with a total area of 3000 square meters. My responsibilities in the project included the following:  Management of all project.  Leading a team of engineers.  Cost Control & Budgeting  Subcontractors Payments Certificate Preparation. 5. Vega Residence (Ain Mraisy – Beirut) 2008-2012 Owner: Mohammad Ghanem Chammaa / Moumneih Brothers Consultant: Spectrum Engineering Consultant Contractor: Arabian Civil Works Company Unique building consisting of; A ground floor, 13 stories, and two underground basements for car parks, technical rooms, and amenities. Each floor contains a single spacious and distinctive apartment of around 460 m2 total floor area with 2.8 meter floor to ceiling clear height, composed of 3 opened salons, a large and elegant dining room, a family sitting room, a private section comprising 3 master bedrooms, a wide kitchen with a breakfast area, maid's room and bath, and laundry area. My responsibilities in the project included the following:  Material Procurement (Architectural & Electromechanical Items).  Subcontractors Payments Certificate Preparation.  Preparing Schedule of works.
  • 4. 4 6. Nova Towers (Koraytem – Beirut) 2008-2012 Owner: Mohammad Ghanem Chammaa / Chattila Brothers Consultant: Spectrum Engineering Consultant Contractor: Arabian Civil Works Company Unique independent Twin Towers consisting of; a ground floor, 22 stories, and five underground basements for car parks, technical rooms, and amenities. Each floor contains a single spacious and distinctive apartment of 612 m2 total floor area with 2.8 meters floor to ceiling clear height, composed of 3 opened salons, a large and elegant dining room, a family sitting room, a private section comprising 4 master bedrooms, a wide kitchen with a breakfast area, maid's room and bath, and laundry area. My responsibilities in the project included the following:  Material Procurement (Architectural & Electromechanical Items).  Subcontractors Payments Certificate Preparation. 7. Alshayaa Private Residence (Baalchmeih-Mt Lebanon) 2006-2010 Owner: AL Chayyaa Consultant: IDEP Consult. Contractor: Arabian Civil Works Company A luxurious Villa in Baalchmieh My responsibilities in the project included the following:  Subcontractors Payments Certificate Preparation.  Planning & Monitoring Schedule of works 8. Traffic Management Center TMC 2006-2010 Owner : Lebanese Government Consultant: CDR / Team –IBI Contractor: Arabian Civil Works Company A five story building for offices and control rooms including auditorium and one basement for car park to accommodate the control center of all traffic management systems in Beirut. My responsibilities in the project included the following:  Material Procurement (Architectural & Electromechanical Items).  Subcontractors Payments Certificate Preparation.  Planning & Monitoring Schedule of works
  • 5. 5 May. 2010- Till Venus Real Estate Development (Venus Project): Present As Part time I have worked in Venus Real Estate Development a sister company to ACW located in a nearby office on the construction of a unique three towers project which includes a residential and commercial area, the project cost Is around 120 million USD. Presently working the:  Procurement & Pricing.  Planning & Management, Generating cash flows & Reports (using Primavera Software).  Subcontractors Payments Preparation & Monitoring. I have also Participated in the preparation of construction Plans and Pricing for the following: Salah Nafisi Project Yakoub Nafisi Project Speakers House Location Project South Schools Project Le Chateau Damac Towers Sama Beirut Project Qatar Airways Headquarter Oct. 2005- Ramco. Trading & Contracting – Hamra, Beirut Oct. 2006 Worked on the construction of the following Projects: 1) Manara 587 Luxury Building Al Manara- Beirut 2) Rabih Ammach Villa Aynab-Lebanon Responsibilities Comprised:  Execution of related Electrical Works  Project Planning Using Primavera Software  Preparation of Electrical Shop & As-Built Drawings
  • 6. 6 Additional Experience:  Manage information technology and computer systems.  Mobile Retail Shop Manager & Owner (experience in market & technology)  Handled technical troubleshooting within an enterprise environment, including system crashes, slow-downs and data recoveries.  Network Trouble shooting and support.  Troubleshooting & fixing all computer problems (software & hardware).  Plan, organize, control and evaluate IT and electronic data operations.  Design, develop, implement and coordinate systems, policies and procedures.  Ensure security of data and backup systems.  Act in alignment with user needs and system functionality to contribute to organizational policy.  Preserve assets, information security and control structures & resources.  Handle annual budget and ensure cost effectiveness for technological equipment.  Professional in Microsoft Excel, Project, Primavera Project Planner & Internet.
  • 7. 7 References: Engineer Mohammad Kassem ACW – General Manager 1982-2016 Mobile: +9613656668 Engineer George Baaklini Man Enterprise Head of Contract Department Mobile: +9613512881 Engineer Mohammad Ezzeddine Khatib & Alami Senior Projects Manager Mobile: +9613858008 Engineer Hassan Jaafar ACW – Deputy Manager Mobile: +9613796178