ODEBRECHT INFRASTRUCTURE
PROJECT: Pipeline Pascuales – Cuenca
ADDRESS: 12 de Octubre Av.and Luis Cordero. World Trade Center Building. Tower A. 8th Floor. Quito.
Ecuador
POSITION: CIVIL TECHNICAL SPECIALIST II SUPERVISOR: Eng. Edvaldo Alves
LAPSE: 05/2014 – 11/2014 edvaldoa@odebrecht.com
• Features: Construction of 210 km of Pipeline from the town of Pascuales up Cuenca, including pumping
stations and storage terminals and dispatch.
• Achievements: managed revise and update the existing Engineering adapting to recent reviews of
Ecuadorian standards of construction. Runtime is optimized with the implementation of appropriate
construction processes adapted to geomorphology regions.
ODEBRECHT ENGINEERING
PROJECT: Second Crossing over Maracaibo’s Lake. Puente Nigale
ADDRESS: 4 Bella Vista Av. with Falcón. Bancaracas Building. 4th Floor. Maracaibo – Zulia - Venezuela
POSITION: CIVIL ENGINEER I SUPERVISOR: Eng. Johnny Gamboa
LAPSE: 04/2012 –02/2014 jagamboa@odebrecht.com
• Features: Construction of mixed Bridge (viaduct, overpass, cable-stayed main bridge) Road and Rail
approx. 11.60 km long on Lake Maracaibo, 42 km of roads and 7 vials interconnection distributors, plus
100 housing units.
• Achievements: run camps and operational support thanks to the same design quickly and simultaneously
with its construction manner. Was linked in a timely manner the interface between those designing (local
and international entities) responsible for reviewing engineering (own, local and international entities)
simultaneously with its execution. Thanks to the management on initial schedules engineering procurement
and purchasing supplies with consequent optimization of administrative - economic schedules were
optimized. A robust system management and control of documents and information was implemented in
favor of strict compliance with ISO.
INELMECA
ADDRESS: Stadium Av. Novo Centro Mall. 2nd Floor. Puerto La Cruz – Anzoátegui - Venezuela
Civil Engineer. - Curriculum Summary
PERSONAL DATA
− Name: Luimen José Rojas Marín
− Universidad de Oriente / 2005
− Date of Birth: 19/06/80. Caracas. Venezuela
− Current Address: San Francisco. 78 East Street. PH Coco Mar. Tower 100. Panama
City. Panama
− Phone: 00 507 64534684
− Email Address: luimenjrm@gmail.com
SUMMARY OF EXPERIENCE
Professional with 10 years’ experience as a Project Engineer in the development of Conceptual, Basic and
Detail Engineering for the Petroleum Industry, Major Road Works and Drainage Infrastructure, Civil
Engineering Construction. Construction Engineer, Supervision and Inspection Work for the power sector,
transport, transportation, urbanism. Assurance and Quality Control.
ENGINEER ACTIVITIES AS LEADER AND PROJECT COORDINATOR
Preparation, review and control of Basic Engineering, Definition and Detail Engineering. Draws and
Documents Multidisciplinary: Bases and Criteria Design, Construction Specifications, Draws Implantation,
Preliminary Studies, Process Construction, Construction Crossing. Management, Supervision interface
Engineering - Construction. Supervision and execution of construction processes to optimize build times and
guarantee the quality of the design. Fieldwork: General Topography, Earthworks, Roads, Buildings,
Foundations of equipment. Manage budgets and accounting information. Supervision of technical staff and
workers. Materials inventory and equipment placed in custody in stock belonging to projects. Tendering,
contracting and procurement of materials for projects. Reporting of project completion.
April 2015 Page 2 - 2
POSITION: INSPECTOR OF CIVIL WORKS SUPERVISOR: Eng. Rene Sánchez
LAPSE: 03/2011 – 04/2012
POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Jorge Mijares
LAPSE: 03/2008 – 03/2011
• Features: Engineering Consultant. Several projects.
RLG&ASOCIADOS, C.A.
ADDRESS: Nva. Esparta Av. Nva. Esparta Mall. Tower C. 3rd Floor. Puerto La Cruz – Anzoátegui - Venezuela
POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Lissette Cubillán
LAPSE: 12/2006 – 12/2007
• Features: Engineering Consultant. Several projects.
DITECH, S.A.
ADDRESS: Lechería Main Av. with Ruiz Pineda. Ribadeo Mall. Ground Floor. Lechería – Anzoátegui -
Venezuela
POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Lissette Cubillán
LAPSE: 06/2006 – 12/2006
• Features: Engineering Consultant. Several projects.
FUNDAUDO
ADDRESS: Stadium Av. FUNDAUDO Building. Puerto La Cruz – Anzoátegui - Venezuela
POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Hilda Morales
LAPSE: 04/2006 – 06/2006
• Features: University Unit. Engineering Consultant. Several projects.
CONSTRUCTORA 01 DE MARZO, S.A.
ADDRESS: Jorge Rodríguez Av. Cristal Plaza Building. 2nd Floor. Barcelona – Anzoátegui - Venezuela
POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Freddy Mendoza
LAPSE: 05/2005 – 03/2006
COURSES
Staad Pro, ETABS, SAP 2000, Construction Management, Industrial Hygiene and Safety, Industrial Safety
and Maintenance, Inspection of Civil Works, Autocad Basic.
GENERAL KNOWLEDGE
Upper Intermediate English Language Proficiency (read, write, speak).
Mastery Programs in Windows environment.
Ability to work under pressure. Handling and enjoy teamwork. Responsibility, security, patience and personal
stability.

More Related Content

What's hot (19)

CV NDJOCK yannick adonis english
CV NDJOCK yannick adonis englishCV NDJOCK yannick adonis english
CV NDJOCK yannick adonis english
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
Hendawy ragabb cv update 21 6 2015
Hendawy ragabb cv update 21   6   2015Hendawy ragabb cv update 21   6   2015
Hendawy ragabb cv update 21 6 2015
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Edumac Resume part 3333333
Edumac Resume part 3333333Edumac Resume part 3333333
Edumac Resume part 3333333
 
Hady Sawaya CV
Hady Sawaya CVHady Sawaya CV
Hady Sawaya CV
 
Tony achkar cv
Tony achkar cvTony achkar cv
Tony achkar cv
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
CV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles finalCV-MAMOON template Jan 2016 & Roles final
CV-MAMOON template Jan 2016 & Roles final
 
CV-BRANZBURG PETER
CV-BRANZBURG PETERCV-BRANZBURG PETER
CV-BRANZBURG PETER
 
MARIA_ Resume_Material_Engineer_2016 (1)
MARIA_ Resume_Material_Engineer_2016 (1)MARIA_ Resume_Material_Engineer_2016 (1)
MARIA_ Resume_Material_Engineer_2016 (1)
 
Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2
 
CV 2014 WEB UPLOAD
CV 2014 WEB UPLOADCV 2014 WEB UPLOAD
CV 2014 WEB UPLOAD
 

Viewers also liked

Column case study
Column case studyColumn case study
Column case studyJason Bauer
 
10 things to drive your meetings nuts
10 things to drive your meetings nuts10 things to drive your meetings nuts
10 things to drive your meetings nutsAlexey Krivitsky
 
Acordo ponto 21
Acordo ponto 21Acordo ponto 21
Acordo ponto 21tarapeulta
 
Business services that should be considered for startups
Business services that should be considered for startupsBusiness services that should be considered for startups
Business services that should be considered for startupsAnas Abu Tabaneh [APP, ASP]
 
Latest ieee 2016 projects titles in big data@ trichy
Latest ieee 2016 projects titles in big data@ trichyLatest ieee 2016 projects titles in big data@ trichy
Latest ieee 2016 projects titles in big data@ trichyranjith kumar
 

Viewers also liked (8)

Column case study
Column case studyColumn case study
Column case study
 
10 things to drive your meetings nuts
10 things to drive your meetings nuts10 things to drive your meetings nuts
10 things to drive your meetings nuts
 
Acordo ponto 21
Acordo ponto 21Acordo ponto 21
Acordo ponto 21
 
bidwell_soils1
bidwell_soils1bidwell_soils1
bidwell_soils1
 
Business services that should be considered for startups
Business services that should be considered for startupsBusiness services that should be considered for startups
Business services that should be considered for startups
 
Flujogramas
FlujogramasFlujogramas
Flujogramas
 
Latest ieee 2016 projects titles in big data@ trichy
Latest ieee 2016 projects titles in big data@ trichyLatest ieee 2016 projects titles in big data@ trichy
Latest ieee 2016 projects titles in big data@ trichy
 
Elite Certification
Elite CertificationElite Certification
Elite Certification
 

Similar to CS.Eng Civil_Luimen Rojas_042015 (20)

19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version19.2 CV M. Arteaga updated on August, 2015_engl version
19.2 CV M. Arteaga updated on August, 2015_engl version
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
MJDDeuna_CV
MJDDeuna_CVMJDDeuna_CV
MJDDeuna_CV
 
MJDDeuna_CV
MJDDeuna_CVMJDDeuna_CV
MJDDeuna_CV
 
Anatol Dukanov CV
Anatol Dukanov CVAnatol Dukanov CV
Anatol Dukanov CV
 
SR. SITE ENGINEER
SR. SITE ENGINEERSR. SITE ENGINEER
SR. SITE ENGINEER
 
My Resume
My ResumeMy Resume
My Resume
 
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
CURRICULUM VITAE with SIGNATURE - UPDATED 11.29.16
 
Resume Dionicio Jeremy Lopez Galvez
Resume Dionicio Jeremy Lopez GalvezResume Dionicio Jeremy Lopez Galvez
Resume Dionicio Jeremy Lopez Galvez
 
Resume
ResumeResume
Resume
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Resume Miguel A. Soler-Ruiz
Resume Miguel A. Soler-RuizResume Miguel A. Soler-Ruiz
Resume Miguel A. Soler-Ruiz
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe English
 
CV_sharaa
CV_sharaaCV_sharaa
CV_sharaa
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 
Resume of ECP
Resume of ECPResume of ECP
Resume of ECP
 
ENGLISH - José Muñiz
ENGLISH - José MuñizENGLISH - José Muñiz
ENGLISH - José Muñiz
 

CS.Eng Civil_Luimen Rojas_042015

  • 1. April 2015 Page 1 - 2 ODEBRECHT INFRASTRUCTURE PROJECT: Pipeline Pascuales – Cuenca ADDRESS: 12 de Octubre Av.and Luis Cordero. World Trade Center Building. Tower A. 8th Floor. Quito. Ecuador POSITION: CIVIL TECHNICAL SPECIALIST II SUPERVISOR: Eng. Edvaldo Alves LAPSE: 05/2014 – 11/2014 edvaldoa@odebrecht.com • Features: Construction of 210 km of Pipeline from the town of Pascuales up Cuenca, including pumping stations and storage terminals and dispatch. • Achievements: managed revise and update the existing Engineering adapting to recent reviews of Ecuadorian standards of construction. Runtime is optimized with the implementation of appropriate construction processes adapted to geomorphology regions. ODEBRECHT ENGINEERING PROJECT: Second Crossing over Maracaibo’s Lake. Puente Nigale ADDRESS: 4 Bella Vista Av. with Falcón. Bancaracas Building. 4th Floor. Maracaibo – Zulia - Venezuela POSITION: CIVIL ENGINEER I SUPERVISOR: Eng. Johnny Gamboa LAPSE: 04/2012 –02/2014 jagamboa@odebrecht.com • Features: Construction of mixed Bridge (viaduct, overpass, cable-stayed main bridge) Road and Rail approx. 11.60 km long on Lake Maracaibo, 42 km of roads and 7 vials interconnection distributors, plus 100 housing units. • Achievements: run camps and operational support thanks to the same design quickly and simultaneously with its construction manner. Was linked in a timely manner the interface between those designing (local and international entities) responsible for reviewing engineering (own, local and international entities) simultaneously with its execution. Thanks to the management on initial schedules engineering procurement and purchasing supplies with consequent optimization of administrative - economic schedules were optimized. A robust system management and control of documents and information was implemented in favor of strict compliance with ISO. INELMECA ADDRESS: Stadium Av. Novo Centro Mall. 2nd Floor. Puerto La Cruz – Anzoátegui - Venezuela Civil Engineer. - Curriculum Summary PERSONAL DATA − Name: Luimen José Rojas Marín − Universidad de Oriente / 2005 − Date of Birth: 19/06/80. Caracas. Venezuela − Current Address: San Francisco. 78 East Street. PH Coco Mar. Tower 100. Panama City. Panama − Phone: 00 507 64534684 − Email Address: luimenjrm@gmail.com SUMMARY OF EXPERIENCE Professional with 10 years’ experience as a Project Engineer in the development of Conceptual, Basic and Detail Engineering for the Petroleum Industry, Major Road Works and Drainage Infrastructure, Civil Engineering Construction. Construction Engineer, Supervision and Inspection Work for the power sector, transport, transportation, urbanism. Assurance and Quality Control. ENGINEER ACTIVITIES AS LEADER AND PROJECT COORDINATOR Preparation, review and control of Basic Engineering, Definition and Detail Engineering. Draws and Documents Multidisciplinary: Bases and Criteria Design, Construction Specifications, Draws Implantation, Preliminary Studies, Process Construction, Construction Crossing. Management, Supervision interface Engineering - Construction. Supervision and execution of construction processes to optimize build times and guarantee the quality of the design. Fieldwork: General Topography, Earthworks, Roads, Buildings, Foundations of equipment. Manage budgets and accounting information. Supervision of technical staff and workers. Materials inventory and equipment placed in custody in stock belonging to projects. Tendering, contracting and procurement of materials for projects. Reporting of project completion.
  • 2. April 2015 Page 2 - 2 POSITION: INSPECTOR OF CIVIL WORKS SUPERVISOR: Eng. Rene Sánchez LAPSE: 03/2011 – 04/2012 POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Jorge Mijares LAPSE: 03/2008 – 03/2011 • Features: Engineering Consultant. Several projects. RLG&ASOCIADOS, C.A. ADDRESS: Nva. Esparta Av. Nva. Esparta Mall. Tower C. 3rd Floor. Puerto La Cruz – Anzoátegui - Venezuela POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Lissette Cubillán LAPSE: 12/2006 – 12/2007 • Features: Engineering Consultant. Several projects. DITECH, S.A. ADDRESS: Lechería Main Av. with Ruiz Pineda. Ribadeo Mall. Ground Floor. Lechería – Anzoátegui - Venezuela POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Lissette Cubillán LAPSE: 06/2006 – 12/2006 • Features: Engineering Consultant. Several projects. FUNDAUDO ADDRESS: Stadium Av. FUNDAUDO Building. Puerto La Cruz – Anzoátegui - Venezuela POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Hilda Morales LAPSE: 04/2006 – 06/2006 • Features: University Unit. Engineering Consultant. Several projects. CONSTRUCTORA 01 DE MARZO, S.A. ADDRESS: Jorge Rodríguez Av. Cristal Plaza Building. 2nd Floor. Barcelona – Anzoátegui - Venezuela POSITION: PROJECT ENGINEER SUPERVISOR: Eng. Freddy Mendoza LAPSE: 05/2005 – 03/2006 COURSES Staad Pro, ETABS, SAP 2000, Construction Management, Industrial Hygiene and Safety, Industrial Safety and Maintenance, Inspection of Civil Works, Autocad Basic. GENERAL KNOWLEDGE Upper Intermediate English Language Proficiency (read, write, speak). Mastery Programs in Windows environment. Ability to work under pressure. Handling and enjoy teamwork. Responsibility, security, patience and personal stability.