1. Curriculum Vitae
Ahmed Mohamed Maher Shafik Mohamed Moursi
Personal Information
Name: Ahmed Mohamed Maher Shafik
Address Alex: 33 Alfred Lian Stanly, Alex.
Address Cairo: square 1145 Sheraton, Building 3.
Telephone: 00201282153842 -00201003410264
E-mail:ahmedmaher1980@hotmail.com
Nationality: Egyptian
Date of birth: 15-5-1980
Marital status: Married
I have a valid international driving license
Member of the Association of Egyptian Engineers
Have about 13 years' experience in various complex
projects (swimming pools- steel structure factories-
construction industry - water treatment plant- piling
system- dewatering system- isolation system for very
specialized projects).
Education
2016 PMP course certificate no.016-11
2013 MBA (master of business administration) from the Arab Academy for
science & technology.
2002 Bachelor of Civil engineering department – Alexandria University.
All Evaluated by WES
2. Career summery
• Ability to work in high pressure environments and also a good team player.
• Ensured that the project should be implemented as per specification and
complete in stipulated time with quality.
• Expertise in latest engineering tools and cost evaluation techniques.
• Highly professional with 14 years of experience in Civil engineering.
• Managed critical and challenging projects from design stage to
implementation stage.
Key Skills
• Ability to work in complex environments.
• Excellent Ability to handle variety of tasks and shift priorities
simultaneously.
• Highly experienced in using various project management tools for
scheduling, delegating responsibilities and collecting information.
• Skilled in budget management, forecast, cost estimation and goal setting.
• Effectively work with Microsoft office tools.
• Efficient management and organizational abilities.
• Dealing with contractors, suppliers and consultants.
• Excellent ability of estimating the value of a property.
Personality Traits
• Excellent communication and interpersonal skills.
• Excellent Leadership quality.
• Strong in reconciling problems and resolve conflict.
3. Work experience
1/October 2016 till now working as a project civil manger AlPha for
construction www.alphainco.com
Future Zizinia compound
1/Jan2011-June 2016 working as a project manager ETC for trading
and construction www.etcgroup-eg.com
Constructing of Cleopatra business trading building Cairo
Constructing of Cultural Center of College of the Air Defense for Egyptian
army
Constructing in Alex west villas compound
Constructing of swimming pools
Constructing of Headquarters of Alexandria Businessmen Association in
Kfr elzyat -Talaa – shupraket and Ash moon
Future Zizenia new Cairo
Responsibilities
• Supervise subcontractors and coordinate between suppliers and vendors.
• Provide changes in design according to customer requirement and also
maintain budget and schedule.
• Perform site inspection and prepare reports on it.
• Coordinate with construction team and administration department.
• Ensure project completion within scheduled time.
2/Jan2006-dec 2010 worked as a Civil Engineer Etc for trading and
construction
Constructing of Uni World factory as steel structure building.
Constructing of Villas and buildings in Mena 4 resort
Constructing of Water treatment plant sewage in Mena 4 resort
Constructing of green towers building
Responsibilities
• Develop designs to satisfy technical specifications.
• Check design calculations of designers and other engineers within the
team.
• Lead design reviews, risk assessments from a technical standpoint.
4. • Ensure quality of design documentation throughout the design process.
• Conduct technical analyses of survey and field data for development of
topographic, soil, hydrological or other information and prepare reports.
• Deliver risk assessments, technical files and other technical
documentation required by safety legislation and procedures.
• Allocate work to other members of team in order to ensure delivery of
design to quality, time and budget.
• Select and strategize allocation of work to sub-contractors.
• Prepare contract documents and review and evaluate tenders for
construction projects.
• Supervise technicians, technologists and other engineers and review and
approve designs, calculations and cost estimates.
• Act as project or site supervisor for land survey and construction work.
3/Jan2004-dec2005 worked as consultant Al ghamdy consultants Saudi
Arabia
construction of aroma café & el shattae mall, in Gedaa
Responsibilities
Analyzed the proposed terms like construction cost, technical requirements,
sustainability and quality.
Deliver the assigned task related to design & infrastructure development
projects.
Review the designs and drawings.
Prepare and review documentation for regulatory approvals and contract
issues.
Maintain client relationships and developing new business.
4/Jan 2002 – Dec 2004 Site Engineer Etc for trading and constructions
Construction of Mena 3 resort
Construction of Stanley class building
Bianky Crooke building(A building with six floors and 36 apartments)
Responsibilities
• Designed and prepared engineering designs, plans, drawings, specifications,
and cost estimates.
5. • Prepared preliminary design studies.
• Performed complex calculations and prepared estimates of time and material
costs.
• Prepared engineering studies and reports
Hint about projects :
1. Cleopatra business trading building. it is about 15 floors with 3 floors
underground garage)
2. Cultural Center of College of the Air Defense for Egyptian. army (it is a
one floor building – it had a smart rooms to serve students of College of
the Air Defense for Egyptian army).
3. Alex west villas compound. (it a about 1200000 m2 area with 700
various villas , also various swimming pools , hotels and serves center)
4. Headquarters of Alexandria Businessmen Association in (Talaa ,
shupraket ,kafrelzyat, kfreldwar ,and Ash moon )
5. Uni World factory (it is a factory of 450 m2 steel structure and 2400m2
business building.
6. Mena 4 resort (it a about 160000m2 area with 450 various villas , also
various swimming pools )
7. green towers building ( it is a 6 buildings, every building has two
underground floor , three business floors and 12 floors )
8. aroma café & el shattae mall, in Gedaa (it is trading mall of 20000 m2
with café shops, market and shopping area )
9. Mena 3 resort (it a about 80000 m2
area with 200 various villas , also
various swimming pools )
10.Future Zizinia ( compound of 294000 m2 area with a budget of 312
million Egyptian pound )
Key Responsibilities Handled
• Materials & Resources forecasting & procurement process.
• Project planning assistance – support to planning engineer to make
reports.
• Lineout to execute entire project construction activities.
Checking Levels & survey works as per needed.
• Daily, Weekly & Monthly Progress Reports preparation & submissions.
6. • Monitor for safe working procedures.
• Using Techniques & Motivating Manpower to reduce the waste & increase
cost efficiency.
• Professional team leader.
Achievements
• Recognized for providing support & complete the project before the
deadline.
• Awarded for making a perfect cost analysis in 2009
• Awarded for being a professional project manager in 2013
COURSES
In the Arab academy for science & technology (in diploma of business
administration ) 2014-2015.
• Icdl cource
• Autocad 2D
• Revit
Computer skills and competences
Name Proficiency
• MS Office - 2007 – good
• Auto CAD - 2011 –v. good
• Primavera - good
• Revit-Good
Languages
Mother language (Arabic), V.Good (English) writing & speaking