SlideShare a Scribd company logo
1 of 7
Download to read offline
Cottagesettlement(woodenhouse-building)
2016
Investmentproject
Brief project description
Project information
List of infrastructure facilities
Sources of project financing
Project efficiency indices
Risks and ways to minimize them
Investor’s interests protection
Project strategy
Ecological aspects of project
Private investment unitary enterprise “Shales”
+375 29 6650981
sbbb@tut.by
2
BRIEF PROJECT DESCRIPTION
This project presentation is aimed to show economic, social and ecological sides. By the way, pos-
itive psychological aspect of human perception of favorable environment and other details is very im-
portant and sometimes even decisive.
Most of wooden house proposals on the country market are buildings which are either cheap and
situated in locality with poor infrastructure and partial communications or very expensive and made of
laminated veneer lumber. But today there is a real opportunity to combine high-quality, environmental
friendliness and comfort of wooden house with full accommodation and its low cost.
Such buildings can reach high level of competitiveness due to many factors. The most important
factors are machining of parts at all stages of manufacturing and thermal pre-treatment of wood. They
contribute to preservation of parts proportions till the moment of installation, accuracy of parts uniting,
absence of necessity to keep time after installation to start finishing works, effective and perfect appear-
ance.
Moreover, there is a significant factor that the initiator of project takes part into the process of
main manufacturing of wooden-house parts. It allows to minimize total cost without high added value
and with income level that is enough for simply reproduction. That’s why the main labor intensive and
expensive stages of wood primary processing are excluded and the manufacturing chain consists only of
technical drying of purchased bars, their longitudinal profiling and production of angular and technical
joins. The main factor of project effectiveness such as low and stable price for sets of wooden houses
can be ensured due to initiator’s 22-year experience in wood processing, not numerous but at the same
time highly professional staff and optimal use of manufacturing capacity that provides production of not
less than 4 house sets a month.
A special feature of the project is the possibility to choose purpose of object use such as private
households, single hotel and recreation complex or mixed type.
Main difference between wooden buildings and buildings from brick and concrete:
- more favorable thermal conditions in wooden building because of natural low thermal
conductivity as a wooden wall with thickness of 200 mm equals to a brick or concrete wall with
thickness from 500 to 650 mm.;
- lower use of fuel resources in comparison with brick or concrete buildings in winter;
- absence of harmful effects from walls covering and thermal insulating materials (cements,
adhesives, petrochemicals, etc.);
- high level of natural humidity control in the room without heat loss due to porous tubular wood
structure;
- minimal load of wooden building on the base as such structure has multiply less weight in
comparison with brick or concrete one;
- low total cost of buildings due to absence of necessity in additional expensive indoor and
outdoor decoration;
- short building term due to modern technologies;
- original architectural solutions due to high strength and light weight of buildings ;
- perfect appearance.
The investment project is a complex of activities aimed at building of hotel type settlement con-
sisting of 32 wooden two-storied cottages with the area from 150 to 250 square meters, 10 two-storied
townhouses with the total area from 400 to 800 square meters providing flats of the area from 40 to 100
square meters each, building for sport & SPA center with the area of 1200 square meters, buildings of
bath complex with the area of 150 square meters and buildings of service organization with the area of
150 square meters.
All buildings are connected to central communications.
3
internal funds
loan funds
investor's funds
Individual buildings can get additional effect and attractiveness using such modern interior
decoration things as follows:
- equipping first floors of cottages and townhouses with fireplaces;
- equipping first floors of cottages and townhouses with water floors with possibility of
automatic temperature control;
- equipping first floors of cottages with mini hydro isolated winter gardens;
- equipping of wiring and heating technologically hidden in wooden walls.
PROJECT INFORMATION
Place of project implementation is Minsk region.
Implementation period of project is from 2016 till 2019 years inclusive.
Total investment is 3,802,000.00 EUR.
Defining of the plot and development of business plan are completed.
LIST OF INFRASTRUCTURE OBJECTS COSTS
- Design 88,200.00 EUR
- Acquiring of property (first floors of townhouses that are
to be reconstructed) and building for sport center 632,200.00 EUR
- Cottages 1265,500.00 EUR
- Townhouses 945,700.00 EUR
- Sport center 205,500.00 EUR
- Communications (gas, sewage, storm drainage, plumbing, electricity) 147,500.00 EUR
- Landscaping 168,600.00 EUR
- Equipment 374,100.00 EUR
SOURCES OF PROJECT FINANCING
Sources of financing 2016 2017 2018 2016-2019
Internal funds, thousand
EUR
163,7 535,5 - 699,2
Loan funds, thousand
EUR
799,4 179,1 - 1978,5
Investor’s
funds,thousand EUR
- 773,4 350,9 1124,3
Total, thousand EUR 1963,1 1488,1 350,9 3802,0
18%
52%
30%
4
Financial aspect of the project is the possibility to use different types of financing, including
combined ones.
In the base of project financial model we envisage the most harsh variant which is lending
with 9% annual rate. But the most favorable variant is participation in project with partial or full
investment with minimum loan funds.
PROJECT EFFICIENCY INDICES
Variant of using hotel and recreation complex type:
Indices 2016 2017 2018 2019
Capacity of hotel rooms - 24 374 524
Number of visits, people (50% of filling) - 4390 68440 95800
Capacity of sport center (people) - 80 80 80
Number of visits, hours (50% of filling) - 58560 58560 58560
Volume of hotel service, thousand EUR - 30,730.00 479,080.00 670,600.00
Volume of wellness service, thousand
EUR
- 117,120.00 117,120.00 117,120.00
Variant 1 implementation according to business plan under negative conditions:
Simple payback period of the project - 25 months;
Discounted payback period - 30 months;
Internal rate of profitability - 28,53%;
Profitability index - 1,10;
Discounted net profit - 274,500.00 EUR‫٭‬
Variant 2 implementation according to market research results under real conditions:
Simple payback period of the project - 24 months;
Discounted payback period - 27 months;
Internal rate of profitability - 96,44%;
Profitability index - 1,56;
Discounted net profit - 927,900.00 EUR‫٭‬
‫٭‬Indices are presented taking into account costs for lending of 258,800.00 EUR.
Calculations of variant 1 were carried out according to minimum selling price of 1 square me-
ter taking into account 100% pre-payment by the buyer is at stage of design and survey work.
Calculations of variant 2 were carried out according to average market price for the objects
with the same or worse characteristics.
One of the factors that provide effectiveness of project realization is low price for wood and
especially for products of its deep processing.
Due to this fact woodworking products occupy a significant place in Belarusian export. At the
same time, modern wooden houses are cheaper than brick or concrete ones in Belarus and visa
versa in Europe, where they are much more expensive.
5
Factors and conditions providing the level of object perception by the buyers and guests:
RISKS AND WAYS TO MINIMIZE THEM
Generally, project risks are minimized at the stage of preliminary preparation of main
components such as place of building, structure and form of particular objects.
Project risks, connected with overdraft of project costs and terms are minimized with:
- cooperation with contracting organizations that have experience in cottage house-building
with implementation of construction and installation work;
- attraction of contracting organizations through tender;
- providing additional quality control at place of wooden houses manufacturing;
- annual accounting audit.
Project risks connected with demand volume are minimized with:
- flexible pricing policy;
- bonuses in the form of free additional architectural design and shape;
- additional improvement in the form of central summer fountain and walking paths;
- possibility to use open sport and leisure objects of infrastructure free of charges (football and
other sport playgrounds, forest running and skiing tracks, open barbeque bowers);
- equipping of playground;
- equipping of playroom in cafe.
INVESTOR’SINTERESTSPROTECTION
Investment protection mechanism provides:
- control over the current activity of enterprise;
- control over the expenditure of funds in accordance with the purpose;
- the right to use tangible and intangible assets that will be acquired during the project
implementation as a security for return on investment;
- legislative guarantee of returning on investment in the country.
0 2 4 6 8negative assessment positive assessment
6
All cooperation between the investor and the initiator of the project should be built based on
trust and openness. It means that investor or his/her representative can check the documentation,
progress of construction and installation process at any time he/she wants. The initiator of the pro-
ject from his side fully provides these possibilities for the investor.
PROJECT STRATEGY
Successful implementation of project involves the mutual interest of the parties as it will serve
as positive reference point of project implementation in general that provides the construction of
three similar settlements in Minsk region.
Today the investors and initiators can choose more favorable place of building and as a result
total cost for project implementation. In the near future this selection will be considerably narrower.
That’s why such projects will be implemented either by supposed participants or by other
interested in this people.
At the same time much more significant effect from similar projects can be reached during
their realization on the territory of Western Europe countries, where the interest to modern wooden
building as ecologically favorable for living and recreation is always high.
This is confirmed by some special inquiries to the initiator of the project, as the head of
woodworking company, from the Czech Republic, Slovenia and Spain during the last few years.
However, the single supply of few buildings is of little commercial interest because of some instal-
lation obligations and long payment period.
In case of constant cooperation with local contractors of construction and preparation works
in Europe the implementation of projects on wooden house-building as small settlements or sepa-
rate houses with modern facilities is qualitatively different.
In this situation one of profitability conditions is the need for manufacturing house sets at
functioning production using cheap Belarusian raw materials, cheap local labor, with limited profit-
ability implying low cost of finished product at the rate og no more than 200 EUR for cubic meter.
The overall success of business in this direction is provided by combination with such factors
as high price for objects in this real estate segment in Europe, flexibility of individual orders per-
formance and pricing policy.
ECOLOGICAL ASPECT OF PROJECT
Nowadays more and more people in big cities think about ecological safety of their living.
During the last years big cities of the republic were overbuilt with multi-storied residential
complexes constantly increasing population density per unit of area.
There is a tendency among middle-aged and elderly residents tochange living in flats for
living in individual houses. This tendency is stable in spite of the fact that, as a rule, individual
houses don’t have connection to the main central communications, are expensive in repairs and
landscaping, don’t have convenient paved access roads and are situated far from big cities and
objects of social infrastructure.
The reason for this is not only the genetic attraction to the rural life of the indigenous
population laid by previous generation, but also negative factors of urban conditions increased with
urbanization level and overbuilding density of population.
At the same time, in Minsk surrounding forests ecological situation is the most favorable for
this because of freeness from industrial enterprises and high-rise buildings.
The aim of the project is to provide high quality of life and leisure for Minsk citizens willing
compensate working time in the city with leisure time in natural environment.
7
Main ecological aspects of project as complex:
- low rise buildings (not more than 2 stories);
- forestry environment(coniferous trees of the age of 100-120 years);
- maximum preservation of greenery during the building process;
- maximum preservation of landscape and binding the buildings to surface undulation;
- maximum preservation of forestry environment outside the territory of the complex;
- interior landscaping with tiled pavements and park lighting;
- reconstruction and improvement of fountain;
- equipping of central lawn and flower beds with automatic watering system;
- equipping of central sanitary sewage;
- equipping of storm water drain;
- providing centralized waste collection with its division.
Main ecological aspects of individual buildings:
- ecologically pure material of the softwood used as a basis for the construction of cottages
and second floors of townhouses;
- thermal treatment of wood with soft technical drying of blanks to the level close to natural
one as 14-15%;
- using of ecologically pure jute canvas as technological cushioning material;
- absence of necessity in addition insulating of wall joints with artificial fillers due to minimal
hogging of technically dried elements in course of time;
- using of ecologically pure overhead and septum insulating material on the base of basalt
fiber;
- using of ecologically pure protective finish coat both inside and outside of the room.
Initiator of the project:
Bortich Sergey Nikolaevich,
Mobile phone. +375 29 6650981,
E-mail: sbbb@tut.by

More Related Content

What's hot

BRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUS
BRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUSBRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUS
BRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUSVietnam Green Building Council
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetBenjamin Leavy
 
Presentation1 Kol3 Maisonette
Presentation1 Kol3 MaisonettePresentation1 Kol3 Maisonette
Presentation1 Kol3 MaisonetteVikychar
 
San marino ppt (email)
San marino ppt (email)San marino ppt (email)
San marino ppt (email)Janmck Hilado
 
Villa realtors NRI'S TOWER IN JAYPEE GREENS
Villa realtors NRI'S TOWER IN JAYPEE GREENS Villa realtors NRI'S TOWER IN JAYPEE GREENS
Villa realtors NRI'S TOWER IN JAYPEE GREENS Villa Realtors
 
Brandon liaw individual
Brandon liaw individualBrandon liaw individual
Brandon liaw individualbrandonliaw97
 
Vajram tiara, yelahanka, bangalore
Vajram tiara, yelahanka, bangaloreVajram tiara, yelahanka, bangalore
Vajram tiara, yelahanka, bangaloreNet Beaver
 
Présentation USIHOME ENGLISH
Présentation USIHOME ENGLISHPrésentation USIHOME ENGLISH
Présentation USIHOME ENGLISHSimon Blondeau
 

What's hot (13)

Skies Sta. Mesa
Skies Sta. MesaSkies Sta. Mesa
Skies Sta. Mesa
 
LPC-App
LPC-AppLPC-App
LPC-App
 
BRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUS
BRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUSBRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUS
BRITISH INTERNATIONAL SCHOOL EYFS - Dự án Công trình xanh LOTUS
 
Skirm
SkirmSkirm
Skirm
 
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-BudgetClear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
Clear-Construction-QLD-SAMPLE-Initial-Cost-Plan-Budget
 
Project description
Project descriptionProject description
Project description
 
Brochure-V07
Brochure-V07Brochure-V07
Brochure-V07
 
Presentation1 Kol3 Maisonette
Presentation1 Kol3 MaisonettePresentation1 Kol3 Maisonette
Presentation1 Kol3 Maisonette
 
San marino ppt (email)
San marino ppt (email)San marino ppt (email)
San marino ppt (email)
 
Villa realtors NRI'S TOWER IN JAYPEE GREENS
Villa realtors NRI'S TOWER IN JAYPEE GREENS Villa realtors NRI'S TOWER IN JAYPEE GREENS
Villa realtors NRI'S TOWER IN JAYPEE GREENS
 
Brandon liaw individual
Brandon liaw individualBrandon liaw individual
Brandon liaw individual
 
Vajram tiara, yelahanka, bangalore
Vajram tiara, yelahanka, bangaloreVajram tiara, yelahanka, bangalore
Vajram tiara, yelahanka, bangalore
 
Présentation USIHOME ENGLISH
Présentation USIHOME ENGLISHPrésentation USIHOME ENGLISH
Présentation USIHOME ENGLISH
 

Viewers also liked

Processing a Arduino
Processing a ArduinoProcessing a Arduino
Processing a ArduinoJuraj Bednar
 
Brochure-RadEye-SPRD-1
Brochure-RadEye-SPRD-1Brochure-RadEye-SPRD-1
Brochure-RadEye-SPRD-1Bill Gately
 
Portafolio de fisiologia
Portafolio de fisiologiaPortafolio de fisiologia
Portafolio de fisiologiaPao Ashqui
 
How to create people-centric services enabled by personal data
How to create people-centric services enabled by personal dataHow to create people-centric services enabled by personal data
How to create people-centric services enabled by personal dataClaro Partners Inc.
 
1QTR FY14 SIGINT Quarterly Training Brief (20140924)
1QTR FY14 SIGINT Quarterly Training Brief (20140924)1QTR FY14 SIGINT Quarterly Training Brief (20140924)
1QTR FY14 SIGINT Quarterly Training Brief (20140924)Christopher Farnsworth
 
Managing respiratory symptoms in advanced MS
Managing respiratory symptoms in advanced MSManaging respiratory symptoms in advanced MS
Managing respiratory symptoms in advanced MSMS Trust
 
Service with a smile made sweeter - SEE UK - 2016
Service with a smile made sweeter - SEE UK - 2016Service with a smile made sweeter - SEE UK - 2016
Service with a smile made sweeter - SEE UK - 2016TOPdesk
 
OPORD tactical foot march garision
OPORD tactical foot march garisionOPORD tactical foot march garision
OPORD tactical foot march garisionjoel dillabough
 
MS nurses skills development workshop
MS nurses skills development workshopMS nurses skills development workshop
MS nurses skills development workshopMS Trust
 
Electronic Patient Record Development following GEMSS 2 - Will Lusher
Electronic Patient Record Development following GEMSS 2 - Will LusherElectronic Patient Record Development following GEMSS 2 - Will Lusher
Electronic Patient Record Development following GEMSS 2 - Will LusherMS Trust
 
OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"
OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"
OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"Naoto MATSUMOTO
 
Communication and swallowing in MS: What works?
Communication and swallowing in MS: What works?Communication and swallowing in MS: What works?
Communication and swallowing in MS: What works?MS Trust
 
MWC2016を歩いて分かったコト
MWC2016を歩いて分かったコトMWC2016を歩いて分かったコト
MWC2016を歩いて分かったコトNaoto MATSUMOTO
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structuresKrishnagnr
 
Geodesic dome{rishabh mishra}
Geodesic dome{rishabh mishra}Geodesic dome{rishabh mishra}
Geodesic dome{rishabh mishra}Rishabh Mishra
 
Operation Keep Up The Fire - M9 Range CONOP-updated
Operation Keep Up The Fire - M9 Range CONOP-updatedOperation Keep Up The Fire - M9 Range CONOP-updated
Operation Keep Up The Fire - M9 Range CONOP-updatedChristopher Farnsworth
 

Viewers also liked (20)

Processing a Arduino
Processing a ArduinoProcessing a Arduino
Processing a Arduino
 
Brochure-RadEye-SPRD-1
Brochure-RadEye-SPRD-1Brochure-RadEye-SPRD-1
Brochure-RadEye-SPRD-1
 
Portafolio de fisiologia
Portafolio de fisiologiaPortafolio de fisiologia
Portafolio de fisiologia
 
How to create people-centric services enabled by personal data
How to create people-centric services enabled by personal dataHow to create people-centric services enabled by personal data
How to create people-centric services enabled by personal data
 
Educabe the Portfolio
Educabe the PortfolioEducabe the Portfolio
Educabe the Portfolio
 
1QTR FY14 SIGINT Quarterly Training Brief (20140924)
1QTR FY14 SIGINT Quarterly Training Brief (20140924)1QTR FY14 SIGINT Quarterly Training Brief (20140924)
1QTR FY14 SIGINT Quarterly Training Brief (20140924)
 
Managing respiratory symptoms in advanced MS
Managing respiratory symptoms in advanced MSManaging respiratory symptoms in advanced MS
Managing respiratory symptoms in advanced MS
 
Service with a smile made sweeter - SEE UK - 2016
Service with a smile made sweeter - SEE UK - 2016Service with a smile made sweeter - SEE UK - 2016
Service with a smile made sweeter - SEE UK - 2016
 
OPORD tactical foot march garision
OPORD tactical foot march garisionOPORD tactical foot march garision
OPORD tactical foot march garision
 
Biodegradable with the Green Plastic IDM7
Biodegradable with the Green Plastic IDM7Biodegradable with the Green Plastic IDM7
Biodegradable with the Green Plastic IDM7
 
MS nurses skills development workshop
MS nurses skills development workshopMS nurses skills development workshop
MS nurses skills development workshop
 
OFFICIAL STATISTICS
OFFICIAL STATISTICSOFFICIAL STATISTICS
OFFICIAL STATISTICS
 
Electronic Patient Record Development following GEMSS 2 - Will Lusher
Electronic Patient Record Development following GEMSS 2 - Will LusherElectronic Patient Record Development following GEMSS 2 - Will Lusher
Electronic Patient Record Development following GEMSS 2 - Will Lusher
 
OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"
OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"
OUR GOAL AND FOCUS FOR "OPEN FOG CONSORTIUM"
 
Communication and swallowing in MS: What works?
Communication and swallowing in MS: What works?Communication and swallowing in MS: What works?
Communication and swallowing in MS: What works?
 
MWC2016を歩いて分かったコト
MWC2016を歩いて分かったコトMWC2016を歩いて分かったコト
MWC2016を歩いて分かったコト
 
Interim BCT Organization
Interim BCT OrganizationInterim BCT Organization
Interim BCT Organization
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
Geodesic dome{rishabh mishra}
Geodesic dome{rishabh mishra}Geodesic dome{rishabh mishra}
Geodesic dome{rishabh mishra}
 
Operation Keep Up The Fire - M9 Range CONOP-updated
Operation Keep Up The Fire - M9 Range CONOP-updatedOperation Keep Up The Fire - M9 Range CONOP-updated
Operation Keep Up The Fire - M9 Range CONOP-updated
 

Similar to 1пр а

BIPV Double Façade Module & Thermochromic Glass
BIPV Double Façade Module  &  Thermochromic GlassBIPV Double Façade Module  &  Thermochromic Glass
BIPV Double Façade Module & Thermochromic GlassRINNO
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering PresentationTehmas Saeed
 
News from BRICKER - May 2014
News from BRICKER - May 2014News from BRICKER - May 2014
News from BRICKER - May 2014BRICKERProject
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5RevistaBiz
 
Promoting Economy in the Built Environment
Promoting Economy in the Built Environment Promoting Economy in the Built Environment
Promoting Economy in the Built Environment JIT KUMAR GUPTA
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)RAINBOW by ECS-3.COM
 
EnergyGlass Company Profile - EN
EnergyGlass Company Profile - ENEnergyGlass Company Profile - EN
EnergyGlass Company Profile - ENRenato Macconi
 
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Armani Ferdaous
 
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONIRJET Journal
 
Residential sector and italian national policies 2020
Residential sector and italian national policies 2020Residential sector and italian national policies 2020
Residential sector and italian national policies 2020REbuilding Network
 
Biobased EPDM Pipes & K-Box
Biobased EPDM Pipes  & K-BoxBiobased EPDM Pipes  & K-Box
Biobased EPDM Pipes & K-BoxRINNO
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentationLin Hui
 
Workshop8_Mumme.pptx
Workshop8_Mumme.pptxWorkshop8_Mumme.pptx
Workshop8_Mumme.pptxbambang819101
 
01 case study
01 case study01 case study
01 case studyArchitect
 
Erlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacherErlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacherLocal Renewables
 

Similar to 1пр а (20)

BIPV Double Façade Module & Thermochromic Glass
BIPV Double Façade Module  &  Thermochromic GlassBIPV Double Façade Module  &  Thermochromic Glass
BIPV Double Façade Module & Thermochromic Glass
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering Presentation
 
News from BRICKER - May 2014
News from BRICKER - May 2014News from BRICKER - May 2014
News from BRICKER - May 2014
 
Willbrook greenbiz5
Willbrook greenbiz5Willbrook greenbiz5
Willbrook greenbiz5
 
Promoting Economy in the Built Environment
Promoting Economy in the Built Environment Promoting Economy in the Built Environment
Promoting Economy in the Built Environment
 
Ubs business details pdf
Ubs business details pdfUbs business details pdf
Ubs business details pdf
 
1) UBS full Details PDF
1) UBS full Details PDF1) UBS full Details PDF
1) UBS full Details PDF
 
RAINBOW by ECS-3.COM: Eco-district (english version)
RAINBOW by ECS-3.COM:  Eco-district (english version)RAINBOW by ECS-3.COM:  Eco-district (english version)
RAINBOW by ECS-3.COM: Eco-district (english version)
 
EnergyGlass Company Profile - EN
EnergyGlass Company Profile - ENEnergyGlass Company Profile - EN
EnergyGlass Company Profile - EN
 
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
Value Engineering: An Intersection of Economics, Engineering Design, and Arch...
 
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATIONZERO ENERGY BUILDING; DESIGN AND SIMULATION
ZERO ENERGY BUILDING; DESIGN AND SIMULATION
 
Sb05
Sb05Sb05
Sb05
 
Low Cost Housing
Low Cost HousingLow Cost Housing
Low Cost Housing
 
Residential sector and italian national policies 2020
Residential sector and italian national policies 2020Residential sector and italian national policies 2020
Residential sector and italian national policies 2020
 
Biobased EPDM Pipes & K-Box
Biobased EPDM Pipes  & K-BoxBiobased EPDM Pipes  & K-Box
Biobased EPDM Pipes & K-Box
 
Measurement 4 presentation
Measurement 4 presentationMeasurement 4 presentation
Measurement 4 presentation
 
Workshop8_Mumme.pptx
Workshop8_Mumme.pptxWorkshop8_Mumme.pptx
Workshop8_Mumme.pptx
 
Damian Trevor - Materials and Methods of Construction
Damian Trevor - Materials and Methods  of ConstructionDamian Trevor - Materials and Methods  of Construction
Damian Trevor - Materials and Methods of Construction
 
01 case study
01 case study01 case study
01 case study
 
Erlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacherErlenmatt tour Basel, priska sacher
Erlenmatt tour Basel, priska sacher
 

Recently uploaded

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 

Recently uploaded (20)

7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 

1пр а

  • 1. Cottagesettlement(woodenhouse-building) 2016 Investmentproject Brief project description Project information List of infrastructure facilities Sources of project financing Project efficiency indices Risks and ways to minimize them Investor’s interests protection Project strategy Ecological aspects of project Private investment unitary enterprise “Shales” +375 29 6650981 sbbb@tut.by
  • 2. 2 BRIEF PROJECT DESCRIPTION This project presentation is aimed to show economic, social and ecological sides. By the way, pos- itive psychological aspect of human perception of favorable environment and other details is very im- portant and sometimes even decisive. Most of wooden house proposals on the country market are buildings which are either cheap and situated in locality with poor infrastructure and partial communications or very expensive and made of laminated veneer lumber. But today there is a real opportunity to combine high-quality, environmental friendliness and comfort of wooden house with full accommodation and its low cost. Such buildings can reach high level of competitiveness due to many factors. The most important factors are machining of parts at all stages of manufacturing and thermal pre-treatment of wood. They contribute to preservation of parts proportions till the moment of installation, accuracy of parts uniting, absence of necessity to keep time after installation to start finishing works, effective and perfect appear- ance. Moreover, there is a significant factor that the initiator of project takes part into the process of main manufacturing of wooden-house parts. It allows to minimize total cost without high added value and with income level that is enough for simply reproduction. That’s why the main labor intensive and expensive stages of wood primary processing are excluded and the manufacturing chain consists only of technical drying of purchased bars, their longitudinal profiling and production of angular and technical joins. The main factor of project effectiveness such as low and stable price for sets of wooden houses can be ensured due to initiator’s 22-year experience in wood processing, not numerous but at the same time highly professional staff and optimal use of manufacturing capacity that provides production of not less than 4 house sets a month. A special feature of the project is the possibility to choose purpose of object use such as private households, single hotel and recreation complex or mixed type. Main difference between wooden buildings and buildings from brick and concrete: - more favorable thermal conditions in wooden building because of natural low thermal conductivity as a wooden wall with thickness of 200 mm equals to a brick or concrete wall with thickness from 500 to 650 mm.; - lower use of fuel resources in comparison with brick or concrete buildings in winter; - absence of harmful effects from walls covering and thermal insulating materials (cements, adhesives, petrochemicals, etc.); - high level of natural humidity control in the room without heat loss due to porous tubular wood structure; - minimal load of wooden building on the base as such structure has multiply less weight in comparison with brick or concrete one; - low total cost of buildings due to absence of necessity in additional expensive indoor and outdoor decoration; - short building term due to modern technologies; - original architectural solutions due to high strength and light weight of buildings ; - perfect appearance. The investment project is a complex of activities aimed at building of hotel type settlement con- sisting of 32 wooden two-storied cottages with the area from 150 to 250 square meters, 10 two-storied townhouses with the total area from 400 to 800 square meters providing flats of the area from 40 to 100 square meters each, building for sport & SPA center with the area of 1200 square meters, buildings of bath complex with the area of 150 square meters and buildings of service organization with the area of 150 square meters. All buildings are connected to central communications.
  • 3. 3 internal funds loan funds investor's funds Individual buildings can get additional effect and attractiveness using such modern interior decoration things as follows: - equipping first floors of cottages and townhouses with fireplaces; - equipping first floors of cottages and townhouses with water floors with possibility of automatic temperature control; - equipping first floors of cottages with mini hydro isolated winter gardens; - equipping of wiring and heating technologically hidden in wooden walls. PROJECT INFORMATION Place of project implementation is Minsk region. Implementation period of project is from 2016 till 2019 years inclusive. Total investment is 3,802,000.00 EUR. Defining of the plot and development of business plan are completed. LIST OF INFRASTRUCTURE OBJECTS COSTS - Design 88,200.00 EUR - Acquiring of property (first floors of townhouses that are to be reconstructed) and building for sport center 632,200.00 EUR - Cottages 1265,500.00 EUR - Townhouses 945,700.00 EUR - Sport center 205,500.00 EUR - Communications (gas, sewage, storm drainage, plumbing, electricity) 147,500.00 EUR - Landscaping 168,600.00 EUR - Equipment 374,100.00 EUR SOURCES OF PROJECT FINANCING Sources of financing 2016 2017 2018 2016-2019 Internal funds, thousand EUR 163,7 535,5 - 699,2 Loan funds, thousand EUR 799,4 179,1 - 1978,5 Investor’s funds,thousand EUR - 773,4 350,9 1124,3 Total, thousand EUR 1963,1 1488,1 350,9 3802,0 18% 52% 30%
  • 4. 4 Financial aspect of the project is the possibility to use different types of financing, including combined ones. In the base of project financial model we envisage the most harsh variant which is lending with 9% annual rate. But the most favorable variant is participation in project with partial or full investment with minimum loan funds. PROJECT EFFICIENCY INDICES Variant of using hotel and recreation complex type: Indices 2016 2017 2018 2019 Capacity of hotel rooms - 24 374 524 Number of visits, people (50% of filling) - 4390 68440 95800 Capacity of sport center (people) - 80 80 80 Number of visits, hours (50% of filling) - 58560 58560 58560 Volume of hotel service, thousand EUR - 30,730.00 479,080.00 670,600.00 Volume of wellness service, thousand EUR - 117,120.00 117,120.00 117,120.00 Variant 1 implementation according to business plan under negative conditions: Simple payback period of the project - 25 months; Discounted payback period - 30 months; Internal rate of profitability - 28,53%; Profitability index - 1,10; Discounted net profit - 274,500.00 EUR‫٭‬ Variant 2 implementation according to market research results under real conditions: Simple payback period of the project - 24 months; Discounted payback period - 27 months; Internal rate of profitability - 96,44%; Profitability index - 1,56; Discounted net profit - 927,900.00 EUR‫٭‬ ‫٭‬Indices are presented taking into account costs for lending of 258,800.00 EUR. Calculations of variant 1 were carried out according to minimum selling price of 1 square me- ter taking into account 100% pre-payment by the buyer is at stage of design and survey work. Calculations of variant 2 were carried out according to average market price for the objects with the same or worse characteristics. One of the factors that provide effectiveness of project realization is low price for wood and especially for products of its deep processing. Due to this fact woodworking products occupy a significant place in Belarusian export. At the same time, modern wooden houses are cheaper than brick or concrete ones in Belarus and visa versa in Europe, where they are much more expensive.
  • 5. 5 Factors and conditions providing the level of object perception by the buyers and guests: RISKS AND WAYS TO MINIMIZE THEM Generally, project risks are minimized at the stage of preliminary preparation of main components such as place of building, structure and form of particular objects. Project risks, connected with overdraft of project costs and terms are minimized with: - cooperation with contracting organizations that have experience in cottage house-building with implementation of construction and installation work; - attraction of contracting organizations through tender; - providing additional quality control at place of wooden houses manufacturing; - annual accounting audit. Project risks connected with demand volume are minimized with: - flexible pricing policy; - bonuses in the form of free additional architectural design and shape; - additional improvement in the form of central summer fountain and walking paths; - possibility to use open sport and leisure objects of infrastructure free of charges (football and other sport playgrounds, forest running and skiing tracks, open barbeque bowers); - equipping of playground; - equipping of playroom in cafe. INVESTOR’SINTERESTSPROTECTION Investment protection mechanism provides: - control over the current activity of enterprise; - control over the expenditure of funds in accordance with the purpose; - the right to use tangible and intangible assets that will be acquired during the project implementation as a security for return on investment; - legislative guarantee of returning on investment in the country. 0 2 4 6 8negative assessment positive assessment
  • 6. 6 All cooperation between the investor and the initiator of the project should be built based on trust and openness. It means that investor or his/her representative can check the documentation, progress of construction and installation process at any time he/she wants. The initiator of the pro- ject from his side fully provides these possibilities for the investor. PROJECT STRATEGY Successful implementation of project involves the mutual interest of the parties as it will serve as positive reference point of project implementation in general that provides the construction of three similar settlements in Minsk region. Today the investors and initiators can choose more favorable place of building and as a result total cost for project implementation. In the near future this selection will be considerably narrower. That’s why such projects will be implemented either by supposed participants or by other interested in this people. At the same time much more significant effect from similar projects can be reached during their realization on the territory of Western Europe countries, where the interest to modern wooden building as ecologically favorable for living and recreation is always high. This is confirmed by some special inquiries to the initiator of the project, as the head of woodworking company, from the Czech Republic, Slovenia and Spain during the last few years. However, the single supply of few buildings is of little commercial interest because of some instal- lation obligations and long payment period. In case of constant cooperation with local contractors of construction and preparation works in Europe the implementation of projects on wooden house-building as small settlements or sepa- rate houses with modern facilities is qualitatively different. In this situation one of profitability conditions is the need for manufacturing house sets at functioning production using cheap Belarusian raw materials, cheap local labor, with limited profit- ability implying low cost of finished product at the rate og no more than 200 EUR for cubic meter. The overall success of business in this direction is provided by combination with such factors as high price for objects in this real estate segment in Europe, flexibility of individual orders per- formance and pricing policy. ECOLOGICAL ASPECT OF PROJECT Nowadays more and more people in big cities think about ecological safety of their living. During the last years big cities of the republic were overbuilt with multi-storied residential complexes constantly increasing population density per unit of area. There is a tendency among middle-aged and elderly residents tochange living in flats for living in individual houses. This tendency is stable in spite of the fact that, as a rule, individual houses don’t have connection to the main central communications, are expensive in repairs and landscaping, don’t have convenient paved access roads and are situated far from big cities and objects of social infrastructure. The reason for this is not only the genetic attraction to the rural life of the indigenous population laid by previous generation, but also negative factors of urban conditions increased with urbanization level and overbuilding density of population. At the same time, in Minsk surrounding forests ecological situation is the most favorable for this because of freeness from industrial enterprises and high-rise buildings. The aim of the project is to provide high quality of life and leisure for Minsk citizens willing compensate working time in the city with leisure time in natural environment.
  • 7. 7 Main ecological aspects of project as complex: - low rise buildings (not more than 2 stories); - forestry environment(coniferous trees of the age of 100-120 years); - maximum preservation of greenery during the building process; - maximum preservation of landscape and binding the buildings to surface undulation; - maximum preservation of forestry environment outside the territory of the complex; - interior landscaping with tiled pavements and park lighting; - reconstruction and improvement of fountain; - equipping of central lawn and flower beds with automatic watering system; - equipping of central sanitary sewage; - equipping of storm water drain; - providing centralized waste collection with its division. Main ecological aspects of individual buildings: - ecologically pure material of the softwood used as a basis for the construction of cottages and second floors of townhouses; - thermal treatment of wood with soft technical drying of blanks to the level close to natural one as 14-15%; - using of ecologically pure jute canvas as technological cushioning material; - absence of necessity in addition insulating of wall joints with artificial fillers due to minimal hogging of technically dried elements in course of time; - using of ecologically pure overhead and septum insulating material on the base of basalt fiber; - using of ecologically pure protective finish coat both inside and outside of the room. Initiator of the project: Bortich Sergey Nikolaevich, Mobile phone. +375 29 6650981, E-mail: sbbb@tut.by