Analytical Profile Zografos Zografos
-1-
Zografos
Zografos
MECHANICAL & ELECTRICAL ENGINEER
Email: zkz22557@gmail.com
Phone: (+30) 694 4513009
DoB: 22 May, 1957
Professional
Profile
Highly versatile Mechanical & Electrical engineer, with over 37 years of professional
experience in large government and private-sector construction projects. Extensive
management and coordination experience combined with applied field knowledge.
Comfortable working in international environments, respects diverse cultures and
specificities.
Key Skills
− Construction/Demolition Projects
− Infrastructure Improvement Projects
− Environmental Remediation Projects
− Budgeting & Cost Controls
− Bidding/Estimating/Proposals
− Subcontractor/Crew Supervision
Work
Experience
Freelance Constructor & Consultant
FEBRUARY 1993 – PRESENT : Full-Time
Subcontracting large Public & Private construction projects with respect to electro-
mechanical installations, such as:
− Building of electromechanical installations
− Startup and commissioning of electromechanical installations
Undertaking light construction work such as:
− Plasterboard
− Iron and aluminum constructions, Stainless Steel construction
− Glazing
− Carpentry (cabinets, doors etc)
− Special constructions for banks (e.g. vaults)
− Water supply (irrigation, drainage)
− Steam networks.
− Pump stations.
− Sewage treatment plants.
− Air conditioning - heating.
− Automation.
− Industrial and commercial refrigeration.
− Electrical networks of high & low voltage.
− Electric power substations - Electrical Generators.
− Grounding.
− DATA - VOICE networks.
− Elevators and escalators.
− B.M.S.
− Firefighting systems with special requirements ( INERGEN , FM – 200 ,
CO2 ).
− Special constructions: Hospitals – Theaters - Banks
Analytical Profile Zografos Zografos
-2-
Technical Consultant
JUNE 1993 - JANUARY 1995 : E.PSY. S.A., Part-Time
Technical Consultant to E.PSY’s manufacturing activities (industrial chillers and air-
conditioners).
Providing consultation to the Division of R&D, regarding the development of new
products.
successfully completed the ISO 9001 Certification In cooperation with BUREAU
VERITAS.
General Manager
OCTOBER 1984 – MAY 1987 : ELMEX S.A. , Full-Time
ELMEX , a member of INTERKLIMA Group of companies with international
presence , manufactures top class heat exchangers , exported a number of to
countries around Europe.
Production Manager & Assistant Director
FEBRUARY 1978 – SEPTEMBER 1984 : INTERKLIMA S.A. , Full-Time
INTERKLIMA , Air-conditioning equipment manufacturers with international
presence
Education National Technical University, Athens SEPT 1975– SEPT 1983
Mechanical & Electrical Engineering
Thesis subject: Finned Heat Exchangers - Thermal Resistance and Performance.
Spoken
Languages
Greek ( native ) , English ( proficient ) , Italian ( very good )
Other
Information
ASHRAE Member since 1994
Analytical Profile Zografos Zografos
-3-
Major
Projects
Tunnel Ventilation and Air conditioning at Athens METRO
Installing the tunnel ventilation and air conditioning infrastructure, for the stations
Ag. Dimitrios to Elliniko.
−Budget: 1,827,000 €
−Duration: 26/3/2009 – 31/07/2011
Fire Resistant Jet Fans « Ilioupoli » Station
Air Ducts
Escalators’ installation at Athens METRO
Construction and installation of escalators’ exterior cladding and glass lift
houses of Athens METRO stations: St Dimitrios – Elliniko, Cholargos – Ag.
Paraskevi, Peristeri – Anthoupoli, Ag. Marina
−Budget: 1,650,000 €
−Duration: 30/10/2008 – 31/10/2010
Escalators’ installation of all Athens METRO stations
Construction and installation of escalators’ exterior cladding and glass lift
houses of all Athens METRO stations in four (4) phases:
−Budget: 1,750,000 €
−Duration: 27/12/1998 – 31/05/2007
E / M installations in buildings LI.S.D.E. & Ro - Ro at
Astakos port.
−Budget: 150,000 €
−Duration: 13/12/2005 – 30/06/2006
Analytical Profile Zografos Zografos
-4-
Athens
Olympic
Games 2004
Projects
Electromechanical installations at Schinias’ Olympic
Rowing and Canoeing / Kayaking venues.
−Budget: 1,200,000 €
−Duration: 27/02/2002 – 31/05/2004
Classic Marathon’s Starting Point Configuration.
−Budget: 1,000,000 €
−Duration: 15/11/2003 – 31/07/2004
Gymnasium Starting Point Building Telecom Building
Listed
Buildings
National Theatre Restoration
−Budget: 3,585,000 €
−Duration: 26/11/2006 – 31/05/2009 €
Analytical Profile Zografos Zografos
-5-
Technical University of Athens – Central Building
Renovation
−Budget: 203,000 €
−Duration: 26/11/2004 – 31/08/2009
Deutschland Archeological Institute - Air Conditioning
−Budget: 150,000 €
−Duration: 05/01/2010 – 31/01/2010
Cycladic Art Museum - Renovation and Configuration of
the New Ward.
−Budget: 220,000 €
−Duration: 05/08/2005 – 30/11/2005
Analytical Profile Zografos Zografos
-6-
Offices
Attiki Odos - Control & Maintenance Center E/M Installation
−Budget: 1,100,000 €
−Duration: 27/10/2000 – 30/09/2001
Construction of the City Hall of the Municipality of Rafina
−Budget: 555,000 €
−Duration: 28/11/1998 – 31/07/2000
Athens Olympic Village - IGME Building
−Budget: 370,000 €
−Duration: 01/01/2004 – 30/04/2007
Renovation and Configuration OTIS HELLAS Head Offices in
Athens
−Budget: 750,000 €
−Duration: 22/11/2006 – 31/03/2007
Samos Headquarters – 1st
Phase Completion
−Budget: 150,000 €
−Duration: 16/06/2005 – 30/06/2006
Analytical Profile Zografos Zografos
-7-
Malls - Shops
Peristeri EMPOLI OUTLET Mall - E/M Installation
−Budget: 1,080,000 €
−Duration: 14/12/2005 – 31/08/2006
Athens BOUTIQUE CARTIER - E/M Installation
−Budget: 130,000 €
−Duration: 22/04/2005 – 31/07/2005
Hospitals
Evangelismos General Hospital of Athens
• Bone Marrow Transplant Unit Construction
• AIDS Unit Construction
• Renovation of 9th & 10th floor of AHEPA Wards
− Budget: 400,000 €
− Duration: 20/03/2003 – 30/06/2004
“ KAT “ General Hospital of Athens
• Emergency Unit Construction
• Renovation of 2nd
& 6th
floor of the Main Building -
E / M Installation
− Budget: 250,000 €
− Duration: 28/03/2003 – 31/05/2004
Healthcare Unit in Athens Olympic Village
− Budget: 200,000 €
− Duration: 28/03/2003 – 30/06/2004
Operating Rooms in a privet clinic “ GENESIS ATHENS “
− Budget: 220,000 €
− Duration: 28/12/2011 – 30/06/2012
Analytical Profile Zografos Zografos
-8-
Bank -
Buildings
and
Branches
Agriculture Bank of Greece - Domokos Branch (Building Construction )
−Budget: 250,000 €
−Duration: 10/09/1993 – 18/10/1995
Agriculture Bank of Greece - Molai Branch ( Building Construction )
−Budget: 150,000 €
−Duration: 18/11/1994 – 15/11/1996
Agriculture Bank of Greece - Holargos Branch (Internal Reform )
−Budget: 235,000 €
−Duration: 18/12/1996 – 15/02/1998
Agriculture Bank of Greece - Hagikiriakio Branch ( Internal Reform )
−Budget: 120,000 €
−Duration: 10/05/1995 – 15/07/1996
Agriculture Bank of Greece - Kranidi Branch ( Building Construction )
−Budget: 137,500 €
−Duration: 01/03/2000 – 15/03/2001
ATTICA BANK 113 Vouliagmenis Av , Athens ( Building Renovation )
−Budget: 185,000 €
−Duration: 10/12/2009 – 15/03/2010
ATTICA BANK Central Fund 23 Omirou ( Building Renovation )
−Budget: 120,000 €
−Duration: 10/12/2010 – 25/02/2011
Analytical Profile Zografos Zografos
-9-
Agriculture Bank of Greece - Milos Branch (Internal Reform )
−Budget: 75,000 €
−Duration: 22/03/2010 – 15/07/2010
Agriculture Bank of Greece - Leros Branch (Internal Reform )
−Budget: 95,000 €
−Duration: 28/05/2010 – 15/09/2010
Agriculture Bank of Greece - Halkida Branch (Internal Reform )
−Budget: 105,000 €
−Duration: 23/05/2010 – 15/09/2010
Agriculture Bank of Greece - Karpathos Branch (Internal Reform )
−Budget: 45,000 €
−Duration: 18/08/2010 – 15/10/2010
Agriculture Bank of Greece IT Center – Marousi BMS extension
−Budget: 200,000 €
−Duration: 10/05/2011 – 25/02/2012
Agriculture Bank of Greece IT Center – Marousi
Air conditioning and compressed air network
−Budget: 60,000 €
−Duration: 21/04/2010 – 31/07/2010
Agriculture Bank of Greece IT Center – Marousi
Vault Construction
−Budget: 160,000 €
−Duration: 29/05/2010 – 31/08/2010
ATTICA BANK Head Offices 54 , Akadimias St (Internal Reform )
−Budget: 60,000 €
−Duration: 29/11/2010 – 31/05/2012
Analytical Profile Zografos Zografos
-10-
Special
Projects
Agricultural University of Athens : Library Construction
−Budget: 500,000 €
−Duration: 24/11/1995 – 30/04/1998
Athens Veterinary Clinic : Air Conditioning
−Budget: 65,000 €
−Duration: 25/12/1997 – 13/07/1998
KARAMOLEGOS Company : Design and Construction Bread’s
Cooling Tower
−Budget: 103,000 €
−Duration: 25/01/2001 – 31/05/2001
GONEOS Super Market in Andros Island : Power Substation
400 kVA
−Budget: 88,000 €
−Duration: 01/07/2001 – 31/08/2001
“ SOFITEL” Hotel - Athens International Airport :
Air – Conditioning Systems Commissioning
−Budget: 44.000 €
−Duration: 25/08/2001 – 31/12/2001
German School of Athens :
• Upgrade of Central Heating Installation
• Hot Water Installation
• Internal Swimming Pool Heating Water System
−Budget: 207,000 €
− Duration: 10/08/2011 – 31/10/2011
Central Machine Room
Swimming Pool Machine Room Solar Collectors Battery

More Related Content

What's hot

18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)Sawsan Ali
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design engahmed hasien
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment reportlucaschinsheng
 
M. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERM. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERMohammed El Sawey
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015mohammed bataiha
 
FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERAYMAN NAWAM
 
Building economic
Building economicBuilding economic
Building economictfkc1212
 

What's hot (9)

18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
18-Year Experience Civil Engineering Project Manager CV (TRANSLATION)
 
Ahmed as Road design eng
Ahmed as Road design engAhmed as Road design eng
Ahmed as Road design eng
 
Ahmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-BakyAhmed Kamal Mohammed Abd El-Baky
Ahmed Kamal Mohammed Abd El-Baky
 
Building economics final assignment report
Building economics final assignment reportBuilding economics final assignment report
Building economics final assignment report
 
M. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERM. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEER
 
re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015re mohammed bataiha cv 20082015
re mohammed bataiha cv 20082015
 
FINISHING QA/QC MANAGER
FINISHING QA/QC MANAGERFINISHING QA/QC MANAGER
FINISHING QA/QC MANAGER
 
CV[1]_(1)[1]
CV[1]_(1)[1]CV[1]_(1)[1]
CV[1]_(1)[1]
 
Building economic
Building economicBuilding economic
Building economic
 

Viewers also liked (7)

Lavdas Dimitrios CV
Lavdas Dimitrios CVLavdas Dimitrios CV
Lavdas Dimitrios CV
 
Photography
PhotographyPhotography
Photography
 
Master Clinical Psychology
Master Clinical PsychologyMaster Clinical Psychology
Master Clinical Psychology
 
Thesis power point dream
Thesis power point dreamThesis power point dream
Thesis power point dream
 
CV Kostogiannis G. Anastasios
CV Kostogiannis G. AnastasiosCV Kostogiannis G. Anastasios
CV Kostogiannis G. Anastasios
 
CRIMINOLOGY: An Introduction and Overview
CRIMINOLOGY: An Introduction and OverviewCRIMINOLOGY: An Introduction and Overview
CRIMINOLOGY: An Introduction and Overview
 
CV-Vasilios Kairis
CV-Vasilios KairisCV-Vasilios Kairis
CV-Vasilios Kairis
 

Similar to C.V. Z. Zografos

Similar to C.V. Z. Zografos (20)

CV_Svetoslav_Georgiev_ENG_Dec2016
CV_Svetoslav_Georgiev_ENG_Dec2016CV_Svetoslav_Georgiev_ENG_Dec2016
CV_Svetoslav_Georgiev_ENG_Dec2016
 
c.v hamada hassan
c.v hamada hassanc.v hamada hassan
c.v hamada hassan
 
Cv & projects updated
Cv & projects updatedCv & projects updated
Cv & projects updated
 
CU_VI_YANNHS_EN
CU_VI_YANNHS_ENCU_VI_YANNHS_EN
CU_VI_YANNHS_EN
 
Syntosis Vasileios.
Syntosis Vasileios.Syntosis Vasileios.
Syntosis Vasileios.
 
Syntosis vasileios.
Syntosis vasileios.Syntosis vasileios.
Syntosis vasileios.
 
Curriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major ProjectsCurriculum Vitae Papastamatis+Major Projects
Curriculum Vitae Papastamatis+Major Projects
 
2016.06 CV DELERNIAS_N_GBR
2016.06  CV DELERNIAS_N_GBR2016.06  CV DELERNIAS_N_GBR
2016.06 CV DELERNIAS_N_GBR
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
CV-Marianthi-Kotsina_2015_12_26
CV-Marianthi-Kotsina_2015_12_26CV-Marianthi-Kotsina_2015_12_26
CV-Marianthi-Kotsina_2015_12_26
 
M.Ashraf
M.AshrafM.Ashraf
M.Ashraf
 
cv Murat Dulger_2015_eng
cv Murat Dulger_2015_engcv Murat Dulger_2015_eng
cv Murat Dulger_2015_eng
 
Curriculum Vita
Curriculum Vita Curriculum Vita
Curriculum Vita
 
cv eng.Abdelaleem Badran
cv eng.Abdelaleem Badrancv eng.Abdelaleem Badran
cv eng.Abdelaleem Badran
 
C.V 17-S
C.V 17-SC.V 17-S
C.V 17-S
 
CURRICULUM VITAE - JRO Inglês Fev_2016 Rev. 16
CURRICULUM VITAE - JRO Inglês Fev_2016 Rev. 16CURRICULUM VITAE - JRO Inglês Fev_2016 Rev. 16
CURRICULUM VITAE - JRO Inglês Fev_2016 Rev. 16
 
The use of renewable energy in production pricess
The use of renewable energy in production pricessThe use of renewable energy in production pricess
The use of renewable energy in production pricess
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
I Platteeuw CVaug2016 Eng
I Platteeuw CVaug2016 EngI Platteeuw CVaug2016 Eng
I Platteeuw CVaug2016 Eng
 
Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015Eng. Muhammad Hegazy Resume #11-2015
Eng. Muhammad Hegazy Resume #11-2015
 

C.V. Z. Zografos

  • 1. Analytical Profile Zografos Zografos -1- Zografos Zografos MECHANICAL & ELECTRICAL ENGINEER Email: zkz22557@gmail.com Phone: (+30) 694 4513009 DoB: 22 May, 1957 Professional Profile Highly versatile Mechanical & Electrical engineer, with over 37 years of professional experience in large government and private-sector construction projects. Extensive management and coordination experience combined with applied field knowledge. Comfortable working in international environments, respects diverse cultures and specificities. Key Skills − Construction/Demolition Projects − Infrastructure Improvement Projects − Environmental Remediation Projects − Budgeting & Cost Controls − Bidding/Estimating/Proposals − Subcontractor/Crew Supervision Work Experience Freelance Constructor & Consultant FEBRUARY 1993 – PRESENT : Full-Time Subcontracting large Public & Private construction projects with respect to electro- mechanical installations, such as: − Building of electromechanical installations − Startup and commissioning of electromechanical installations Undertaking light construction work such as: − Plasterboard − Iron and aluminum constructions, Stainless Steel construction − Glazing − Carpentry (cabinets, doors etc) − Special constructions for banks (e.g. vaults) − Water supply (irrigation, drainage) − Steam networks. − Pump stations. − Sewage treatment plants. − Air conditioning - heating. − Automation. − Industrial and commercial refrigeration. − Electrical networks of high & low voltage. − Electric power substations - Electrical Generators. − Grounding. − DATA - VOICE networks. − Elevators and escalators. − B.M.S. − Firefighting systems with special requirements ( INERGEN , FM – 200 , CO2 ). − Special constructions: Hospitals – Theaters - Banks
  • 2. Analytical Profile Zografos Zografos -2- Technical Consultant JUNE 1993 - JANUARY 1995 : E.PSY. S.A., Part-Time Technical Consultant to E.PSY’s manufacturing activities (industrial chillers and air- conditioners). Providing consultation to the Division of R&D, regarding the development of new products. successfully completed the ISO 9001 Certification In cooperation with BUREAU VERITAS. General Manager OCTOBER 1984 – MAY 1987 : ELMEX S.A. , Full-Time ELMEX , a member of INTERKLIMA Group of companies with international presence , manufactures top class heat exchangers , exported a number of to countries around Europe. Production Manager & Assistant Director FEBRUARY 1978 – SEPTEMBER 1984 : INTERKLIMA S.A. , Full-Time INTERKLIMA , Air-conditioning equipment manufacturers with international presence Education National Technical University, Athens SEPT 1975– SEPT 1983 Mechanical & Electrical Engineering Thesis subject: Finned Heat Exchangers - Thermal Resistance and Performance. Spoken Languages Greek ( native ) , English ( proficient ) , Italian ( very good ) Other Information ASHRAE Member since 1994
  • 3. Analytical Profile Zografos Zografos -3- Major Projects Tunnel Ventilation and Air conditioning at Athens METRO Installing the tunnel ventilation and air conditioning infrastructure, for the stations Ag. Dimitrios to Elliniko. −Budget: 1,827,000 € −Duration: 26/3/2009 – 31/07/2011 Fire Resistant Jet Fans « Ilioupoli » Station Air Ducts Escalators’ installation at Athens METRO Construction and installation of escalators’ exterior cladding and glass lift houses of Athens METRO stations: St Dimitrios – Elliniko, Cholargos – Ag. Paraskevi, Peristeri – Anthoupoli, Ag. Marina −Budget: 1,650,000 € −Duration: 30/10/2008 – 31/10/2010 Escalators’ installation of all Athens METRO stations Construction and installation of escalators’ exterior cladding and glass lift houses of all Athens METRO stations in four (4) phases: −Budget: 1,750,000 € −Duration: 27/12/1998 – 31/05/2007 E / M installations in buildings LI.S.D.E. & Ro - Ro at Astakos port. −Budget: 150,000 € −Duration: 13/12/2005 – 30/06/2006
  • 4. Analytical Profile Zografos Zografos -4- Athens Olympic Games 2004 Projects Electromechanical installations at Schinias’ Olympic Rowing and Canoeing / Kayaking venues. −Budget: 1,200,000 € −Duration: 27/02/2002 – 31/05/2004 Classic Marathon’s Starting Point Configuration. −Budget: 1,000,000 € −Duration: 15/11/2003 – 31/07/2004 Gymnasium Starting Point Building Telecom Building Listed Buildings National Theatre Restoration −Budget: 3,585,000 € −Duration: 26/11/2006 – 31/05/2009 €
  • 5. Analytical Profile Zografos Zografos -5- Technical University of Athens – Central Building Renovation −Budget: 203,000 € −Duration: 26/11/2004 – 31/08/2009 Deutschland Archeological Institute - Air Conditioning −Budget: 150,000 € −Duration: 05/01/2010 – 31/01/2010 Cycladic Art Museum - Renovation and Configuration of the New Ward. −Budget: 220,000 € −Duration: 05/08/2005 – 30/11/2005
  • 6. Analytical Profile Zografos Zografos -6- Offices Attiki Odos - Control & Maintenance Center E/M Installation −Budget: 1,100,000 € −Duration: 27/10/2000 – 30/09/2001 Construction of the City Hall of the Municipality of Rafina −Budget: 555,000 € −Duration: 28/11/1998 – 31/07/2000 Athens Olympic Village - IGME Building −Budget: 370,000 € −Duration: 01/01/2004 – 30/04/2007 Renovation and Configuration OTIS HELLAS Head Offices in Athens −Budget: 750,000 € −Duration: 22/11/2006 – 31/03/2007 Samos Headquarters – 1st Phase Completion −Budget: 150,000 € −Duration: 16/06/2005 – 30/06/2006
  • 7. Analytical Profile Zografos Zografos -7- Malls - Shops Peristeri EMPOLI OUTLET Mall - E/M Installation −Budget: 1,080,000 € −Duration: 14/12/2005 – 31/08/2006 Athens BOUTIQUE CARTIER - E/M Installation −Budget: 130,000 € −Duration: 22/04/2005 – 31/07/2005 Hospitals Evangelismos General Hospital of Athens • Bone Marrow Transplant Unit Construction • AIDS Unit Construction • Renovation of 9th & 10th floor of AHEPA Wards − Budget: 400,000 € − Duration: 20/03/2003 – 30/06/2004 “ KAT “ General Hospital of Athens • Emergency Unit Construction • Renovation of 2nd & 6th floor of the Main Building - E / M Installation − Budget: 250,000 € − Duration: 28/03/2003 – 31/05/2004 Healthcare Unit in Athens Olympic Village − Budget: 200,000 € − Duration: 28/03/2003 – 30/06/2004 Operating Rooms in a privet clinic “ GENESIS ATHENS “ − Budget: 220,000 € − Duration: 28/12/2011 – 30/06/2012
  • 8. Analytical Profile Zografos Zografos -8- Bank - Buildings and Branches Agriculture Bank of Greece - Domokos Branch (Building Construction ) −Budget: 250,000 € −Duration: 10/09/1993 – 18/10/1995 Agriculture Bank of Greece - Molai Branch ( Building Construction ) −Budget: 150,000 € −Duration: 18/11/1994 – 15/11/1996 Agriculture Bank of Greece - Holargos Branch (Internal Reform ) −Budget: 235,000 € −Duration: 18/12/1996 – 15/02/1998 Agriculture Bank of Greece - Hagikiriakio Branch ( Internal Reform ) −Budget: 120,000 € −Duration: 10/05/1995 – 15/07/1996 Agriculture Bank of Greece - Kranidi Branch ( Building Construction ) −Budget: 137,500 € −Duration: 01/03/2000 – 15/03/2001 ATTICA BANK 113 Vouliagmenis Av , Athens ( Building Renovation ) −Budget: 185,000 € −Duration: 10/12/2009 – 15/03/2010 ATTICA BANK Central Fund 23 Omirou ( Building Renovation ) −Budget: 120,000 € −Duration: 10/12/2010 – 25/02/2011
  • 9. Analytical Profile Zografos Zografos -9- Agriculture Bank of Greece - Milos Branch (Internal Reform ) −Budget: 75,000 € −Duration: 22/03/2010 – 15/07/2010 Agriculture Bank of Greece - Leros Branch (Internal Reform ) −Budget: 95,000 € −Duration: 28/05/2010 – 15/09/2010 Agriculture Bank of Greece - Halkida Branch (Internal Reform ) −Budget: 105,000 € −Duration: 23/05/2010 – 15/09/2010 Agriculture Bank of Greece - Karpathos Branch (Internal Reform ) −Budget: 45,000 € −Duration: 18/08/2010 – 15/10/2010 Agriculture Bank of Greece IT Center – Marousi BMS extension −Budget: 200,000 € −Duration: 10/05/2011 – 25/02/2012 Agriculture Bank of Greece IT Center – Marousi Air conditioning and compressed air network −Budget: 60,000 € −Duration: 21/04/2010 – 31/07/2010 Agriculture Bank of Greece IT Center – Marousi Vault Construction −Budget: 160,000 € −Duration: 29/05/2010 – 31/08/2010 ATTICA BANK Head Offices 54 , Akadimias St (Internal Reform ) −Budget: 60,000 € −Duration: 29/11/2010 – 31/05/2012
  • 10. Analytical Profile Zografos Zografos -10- Special Projects Agricultural University of Athens : Library Construction −Budget: 500,000 € −Duration: 24/11/1995 – 30/04/1998 Athens Veterinary Clinic : Air Conditioning −Budget: 65,000 € −Duration: 25/12/1997 – 13/07/1998 KARAMOLEGOS Company : Design and Construction Bread’s Cooling Tower −Budget: 103,000 € −Duration: 25/01/2001 – 31/05/2001 GONEOS Super Market in Andros Island : Power Substation 400 kVA −Budget: 88,000 € −Duration: 01/07/2001 – 31/08/2001 “ SOFITEL” Hotel - Athens International Airport : Air – Conditioning Systems Commissioning −Budget: 44.000 € −Duration: 25/08/2001 – 31/12/2001 German School of Athens : • Upgrade of Central Heating Installation • Hot Water Installation • Internal Swimming Pool Heating Water System −Budget: 207,000 € − Duration: 10/08/2011 – 31/10/2011 Central Machine Room Swimming Pool Machine Room Solar Collectors Battery