High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Tony achkar cv
1. Tony Elachkar
Toledo- OHIO
Nationality: American
Email: tony.elachkar@live.com
Phone Number: +966 59 829 4505(Saudi Arabia)
International Numbers: +1 917-559-7876 (American)
+961 3 073 200(Lebanese)
Page 1 of 3
Education
July 2006-May 2011- Bachelor in Mechanical Engineering- University of Toledo (UT) in OHIO STATE U.S.A.
(GPA 3.2)
- Received the Dean’s award for the high grades achieved in 2008.
- Received an award from the Governor of Ohio for designing a wind turbine on the senior project.
Experience:
1) ALMABANI ENGINEERING AND CONTRACTING (JANUARY 2015- PRESENT)
Project: BACS RIYADH METRO PROJECT. (Bechtel Almabani CCC)
- Responsible for installing and re-locating ductile water pipes with different sizes up to 800 mm.
- Responsible for installing and re-locating underground sewer lines with different sizes up to 800 mm.
- Responsible for re-locating storm water pipe lines for box culverts and gullies.
- Installing manholes pre-cast and cast in situ.
- Establishing Hydro testing for pipes.
- Establishing the dis-infection of the pipe using chemicals and submitting samples to the water company.
- Preparing for shutdowns and doing the tie in for ductile water pipes.
- Dis-locating asbestos pipes and connecting to ductile pipes.
- Water testing for sewer lines.
- De-watering tranches and excavations with pumps and wellpoint system.
- Preparing pipe profiles and coordinating with the water company.
- Level the pipes in the tranches as per the approved profiles with surveyors and asking approval from Water Company.
- Preparing as built drawings and profiles with surveyors and coordinating with draftsman.
- Preparing B.O.Q. based on the as built taken.
- Re-locating the box culverts.
- Ordering all consumable materials, equipment, and permanent materials for the requirement of the site.
- Responsible for a team of 50 workers, charge hands, and foremen. Moreover 4 supervisors and one superintendent.
- Preparing JHA and method of statements and requesting permits for works for the safety of the site.
- Bechtel Safety Inducted.
- Bechtel Quality control inducted.
- Rigging training for cranes and boom trucks.
- First Aider training.
- Tunnelling underground Inducted.
2) Hitek MEP engineering Mechanical- Angola Africa (April 2014- December 2014).
Project: Kilamba 32 floors tower
- Drawing all mechanical shop drawing for the floors.
- Responsible of making all take off of all materials on site (HVAC/ PLUMBING/FIRE) and ordering from outside of Africa.
- Preparing all material submittals for the project
- Responsible for Installing VRV system outdoor and indoor
- Responsible for installing the fire system including (pumps, sprinklers, landing valves).
- Responsible for installing garbage chute + participating in the design.
- Responsible for installing the pre-action valves.
- Worked with the potable and domestic water pumps with all kinds of accessories.
- Attended meetings with the municipality to coordinate all the utilities entering and exiting.
- Installed Air handling units for treated fresh air.
- Installed rectangular and round ducts.
- All plumbing risers, fire risers, duct risers were installed.
- Executing the installation of the pressurization fans, fresh air fans, and exhaust fans.
- Responsible for timesheets and pay rolls for the workers on site.
- Negotiating all sub-contractors on site for prices and giving the approval on them starting.
2. Page 2 of 3
3) Abniah S.A.R.L Engineering and Contracting Mechanical ENGINEER–Lebanon (July 2011–APRIL 2014)
Projects: Delphine Hotel/ Prince Residential Building/ Dar El Sayad Offices Building/ Qraye Residential Compound/ Dorat Lubnan
Towers.
- Drawing mechanical shop drawings ( Fire Fighting, Water Supply, Drainage works, HVAC)
- Responsible for installation of a new fire protection fighting system through VIRITAS.
- Designing and tendering sprinklers and fire alarm systems.
- Designing pipes, ducts, and mechanical equipments.
- Executing design mechanical drawings for several projects.
- Working with Ducts, Chillers, VRV, and spit unit systems.
- Executing as Built Electrical Shop Drawing (Power, Lighting, Low Current, Access Control, and composites).
- Supervising the sub-contractors work.
- Executing all electrical and mechanical works on sites with reference to the specifications.
- Supervising and following all foremen and workers on different sites to make sure they are satisfying the company’s
needs and working on time and controlling the materials in the storage rooms
- Getting in contact with the suppliers in the market for negotiation of prices that will meet the satisfactions of the
company’s profit.
- Attending weekly meetings or other site meetings with the client, consultants, and contractors.
- Quantities take off and variation orders.
- Preparing a bill of quantity.
- Establishing Payment Certificates (from A to Z) for the company and submit it to the client.
- Executing Material Submittals.
- Executing the inspections for all major works: Electrical, Plumbing, and Mechanical.
- Maintain engineering records for the ISO.
- Execution of plans on site.
- Testing and commissioning of Dar El Sayad project and the Prince project.
- Working on making new designs on site for many structures (Generator Exhaust shaft, Pump and boiler rooms, Solar
system, and cable trays).
- Design and execution of Gym, swimming pool, and Jacuzzi.
- Working in ventilation, pressurization, and smoke extract.
- Establishing Purchase orders for all kinds of materials on site.
- Quantities take off and tender for the pricing of projects.
4) James .L Williams (Australian Sub-contractor MEP)- United Arab Emirates [January 2010 – May 2010
/ September 2010 – December 2010 / May 2008 - August 2008/ May 2007 – August 2007]
Projects: City of lights tower (Abu Dhabi)/ NAD El Hammer (Dubai).
- Designing pipe sizing and calculating head loss for better system performance.
- Installing and designing fire systems ( Sprinklers, pumps, and fire alarm systems)
- Design for ducts
- Design fan coil units, chillers, Sizing of fresh air fans, and exhaust fans.
- Participated in establishment of the design of municipal water supply and waste water treatment systems.
- Execution of Auto Cad shop drawings
- Quantities take off for the pricing of projects.
- Support the generation of design improvements for the benefit of the customers.
- Maintain engineering records.
- Establishing quantity take off for the preparation of the payment certificates.
5) ContraCad (MEP Sub-contractor) May 2009- August 2009
- Coordinating architectural design drawings and MEP design drawings.
- Supervision on the contractors on site.
- Attending meetings with the consultants, contractors, and client.
- Checking all payment certificates submitted from the contractors and raising them to the client for approval.
- Preparing minutes of meeting in coordination with the main contractor.
- Inspecting mechanical and electrical works with the MEP consultant.
- Working on designing and installing Mechanical systems(VRV, Chillers, and Firefighting).
3. Page 3 of 3
Languages
English: Native language (written and spoken fluently)
Arabic: Secondary Language (written and spoken fluently)
Portuguese : Spoken
Computer Skills
Excellent use of:
Microsoft Office (Word, Excel, Power Point)
Auto Cad
Matlab
Mathcad
IE Carrier (E-Cat)
Hevacomp
Labview
Extracurricular activities
Society:
Member in the association of Mechanical Engineers of America.
Member in the Saudi Counsel of Engineers.
SAT SUPERVISOR:
Supervising SAT College Exams entrance for AmidEast.
Bus driver/ dispatcher:
Was responsible of driving a bus over the three campuses of the University of Toledo in the U.S.
Worked as a dispatcher and took the responsibility of leading all the buses from Bus Base.
Scout:
Leader of a group for 4 consecutive years.
Supervised children camps to the woods including planning and transportation to and from the camp.
Sports:
Team Leader and captain at Anibal- Zahle Basketball Club for four years for the third level Lebanese League
A wide receiver in an American Football team in the University of Toledo for the engineering class of 2010.
________________________________________________________________________________________________
P.S: References
Available Upon Request