SlideShare a Scribd company logo
1 of 13
Preventive Maintenance Introduction
For Centrifugal Pump Systems
Prepared by: Eng. Amer Hamdan
General Maintenance Dept.
Building Maintenance and Facilities Section.
Pump rooms, Pumps and their accessories, Valves, Pressure Gauges , Pipe works, Control Panels,
Pressure Tanks, Filters, Waters Tanks, suction lines, Discharge lines , all of mentioned items have
been tested and concluded the following:
1-Pump room covers are not sealed enough from dangerous insects, and same the concrete under the
cover is broken, which is not safe of technicians and staff.
2- Vision is not clear at some pump rooms (Lights Missing).
3- Submersible pumps at pump rooms and other open areas are not covered and exposed to
sediments and clay accumulation the thing that harms the submersible pump.
4- Some Pumps are leaking.
5- Some suction and discharge valves are leaking
6- Corrosion has been noticed in pump, base plate, pipes, valves and elbows
7-Some pumps are connected to operate directly on manual mode
8- In many cases there are a lot of tees and elbows and valves on suction lines.
Overview:
9- Discharge and suction valves are not positioned as per operation instruction on certain
throttling degree and end user staff changing it while pump operating, which harms the pump.
10- Pumps in some sites are over sized and are not matching system requirements, which results
in poor duty point. ( pipes: type, length ,elevation, diameter)
11- float switch is not positioned to maintain recommended minimum fluid level at tanks
12-Noise and vibration are above normal levels in many pump sets.
13- Electrical motors need to be cleaned from sand and dust
14- Concrete base (Foundation) and base plate need renewing and leveling.
15- Pump are misaligned with respect to base plate and foundation.
16- There is no cautions lists describing DO’s and DON’T’s to be considered while dealing with
the pump
17- In many sites pump name plate are painted ,so it is not possible to identify the pump
specifications and serial number on the name plate.
Main Failure Causes:
1-Manufacturers defects : Negligible, almost misalignment of the internal parts of the pump
2- System Design:
a- Pump will be affected if the minimum liquid level makes NPSHa < NPSHr
(NPSH: Net Positive Suction Head)
b- Pipes level ( Suction, Discharge) is not matching pump level.
c- Pump is oversized or smaller capacity pump has been selected.
d- Pump selection is not matching system requirements : Pipe– size ,type ,length are not matching the
system or the required duty point.
e- Suction side full of tees and elbows and valves
f- Submersible pump is exposed to clay accumulation and sediments without adding screen to protect
the pump
g- Using smaller size bolts for base plate.
h- misalignment of pump ,motor ,Concrete Foundation and base plate.
3- - Operational faults:
a-To keep the pump operation on manual mode until it pumps all water from tank and runs on dry
conditions
b- Pump to exceed daily recommended operational time
c- To keep stand by pump without operation for long time
d- In case of not cleaning tanks –especially- open tanks, then sands ,clay, solid contents and salt
with accumulate at the tank and will harm pump internal parts
e- Changing throttling degree of the discharge and suction valves
f- Changing the float switch position below the minimum required liquid level
g- Forget to grease pump for long time.
Solutions:
1- Apply safety standards to all pump rooms including double sealing covers for all underground pump
rooms, and contact pits control dept. for routine site visits.
2- Attach operation instruction by manufacturer to each pump set.
3- Routine cleaning for tanks.
4- Using special non-clogging impeller submersible pumps or cover the pit with a screen for pump
protection.
5-Performing periodical fluid analysis and solid contents analysis
6- Changing mechanical seal in case of leakage
7- replacing bearing upon manufacturer recommendation or when noise and vibration exceed certain
limits
8-Aligning the pump and motor to pump foundation and base plate.
9- Check suction and discharge lines from blockage.
10- Check float switch position as per pump manufacturer recommendations and project
engineering design.
11- In charge staff to use instrumentation of flow meter, Pressure gauges, Vibration meter, noise
meter, Volt and Amber meters.
12- Data base for all pumps including the following:
a- Pump type, Manufacturer and Serial number; for correct spares request
b- Hydraulic design specifications
c- Data sheet (Manufacturer)
d- Maintenance and operation manual
e- Dimensional pump drawing including parts and its codes
f- Spare Parts list
g- Inspection and maintenance historical data book
Preventive Maintenance System
CP
Preventive Maintenance CP:
The aim of this study is to activate PM routine check list to reduce pump failure and guarantee
that operate smoothly without any problem, the thing that will be reflected on maintenance costs.
Actions to activate PM for CP:
1- Contractual agreement with specialized hydraulic works contractor to perform PM activities.
2-Location survey to all pumps at Municipality sites.
3-Establishing Pumps data base and update it with cooperation with the contractor
4- Performing PM inspection and services according to a periodic schedule, and record repeated
pump failures
5- Provide PM schedule sheet near each pump set ,describes all test performed by contractor and
inspection dates.
Technical Aspects to be monitored (PM):
1- Pump performance (Head H, Flow Q) and check if it is matching with manufacturer data sheet:
a- Suction pressure Ps b-Discharge pressure Pd c- Motor Speed rpm d- Power Hp, KW.
2- Vibration & Noise
3- System Characteristic analysis (Pipes + Suction & Discharge Valves)
4- Monitor pump leakage
5- Monitor the motor (Voltage, Amber, Temperature), and keep it clean, make sure motor speed is
ok with pump performance and duty point
6- Check Pump parts temperature (Bearing)
7-Monitor oil or grease leakage
8-Check suction and discharge lines blockage
9-Check pressure gauges, pressure switch and pressure tank
10-Monitor float switch and float valve
12-Record fluid analysis results ,salinity and solid contents especially for open tanks
13- Check Automatic operation mode circuit ,operate stand by pump for 5 minutes
Benefits of PM for Centrifugal Pumps
If preventive maintenance considered as a major part of comprehensive maintenance works for
centrifugal pumps within a time frame, so the results will be as following:
1- Protecting CP from the following:
a-Pump performance problems
(Head and pressure resulting)
b- Motor malfunctions
c-Bearing breakage
d-Mechanical seal breakage
e-Shaft problems
f- Impeller problems
g-Pump casing corrosion or pits
h- System problems( Pipes + Valves)
i- Float switch and float valve problems
2- Reduction of corrective maintenance actions
3-Reducing spare parts replacement requests
4-Reducing complains and service cut off
5-Saving 35%-40% of total maintenance cost for
centrifugal pumps
Periodical PM testsPeriod
Monitoring Water level in TanksDaily
Monitoring Noise & VibrationDaily
Monitoring water leakageDaily
Pets control serviceMonthly
Check pressure gauges & Pressure TankMonthly
Monitoring Pressure SwitchMonthly
Check float valve and float switchMonthly
Monitoring oil or grease leakage from bearing boxMonthly
Monitoring pump parts temp. (Bearing temp.)Monthly
Clean the pump and pump roomMonthly
Make sure that motor performance is matching pump duty pointMonthly
Monitoring electrical motor temp.Monthly
Check automatic operating mode circuit +operate stand by pump 5
minutes.
Monthly
Check valves throttling position degreeMonthly
Preventive Maintenance Check list
Measure Motor performanceQuarterly
Measure Pump PerformanceQuarterly
Keep tanks cleanQuarterly
Check suction and discharge line if blockedQuarterly
System characteristic analysisHalf year
Perform Fluid analysis, salinity and solid contentsYearly
Greasing Pump
OEM
Recommendation
Painting Pump ,base plate, valves and elbows and renew concrete
foundation
When needed
Prepared by: Eng. Amer Ismail
General Maintenance Dept.
Building Maintenance and Facilities Section.

More Related Content

What's hot

Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingVijay Sarathy
 
Commissioning &amp; Interface With Engineering
Commissioning &amp; Interface With EngineeringCommissioning &amp; Interface With Engineering
Commissioning &amp; Interface With Engineeringasim569
 
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIALCENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIALVijay Sarathy
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operationNitin Patel
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Overpressure scenarios overview final
Overpressure scenarios overview finalOverpressure scenarios overview final
Overpressure scenarios overview finalRajiv Natkar
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsManohar Tatwawadi
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedureABVSAI
 
VARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROL
VARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROLVARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROL
VARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROLVijay Sarathy
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineRAVI PAL SINGH
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and designHéctor Nguema Ondo
 
MTA GENERATOR PROTECTION .PPT.pptx
MTA GENERATOR PROTECTION .PPT.pptxMTA GENERATOR PROTECTION .PPT.pptx
MTA GENERATOR PROTECTION .PPT.pptxrajkumarmaurya31
 
Gas turbine driven compressors
Gas turbine driven compressorsGas turbine driven compressors
Gas turbine driven compressorsManish Kumar
 

What's hot (20)

Design Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve SizingDesign Considerations for Antisurge Valve Sizing
Design Considerations for Antisurge Valve Sizing
 
psv specifications
psv specificationspsv specifications
psv specifications
 
Wgp4205 turbine
Wgp4205 turbineWgp4205 turbine
Wgp4205 turbine
 
Turbine safety protection
Turbine safety protectionTurbine safety protection
Turbine safety protection
 
Commissioning &amp; Interface With Engineering
Commissioning &amp; Interface With EngineeringCommissioning &amp; Interface With Engineering
Commissioning &amp; Interface With Engineering
 
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIALCENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
CENTRIFUGAL COMPRESSOR SETTLE OUT CONDITIONS TUTORIAL
 
Unit shutdown procedure operation
Unit shutdown procedure operationUnit shutdown procedure operation
Unit shutdown procedure operation
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Boiler light up & loading
Boiler light up & loadingBoiler light up & loading
Boiler light up & loading
 
Overpressure scenarios overview final
Overpressure scenarios overview finalOverpressure scenarios overview final
Overpressure scenarios overview final
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Boiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power StationsBoiler Drum level measurement in Thermal Power Stations
Boiler Drum level measurement in Thermal Power Stations
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
VARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROL
VARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROLVARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROL
VARIOUS METHODS OF CENTRIFUGAL COMPRESSOR SURGE CONTROL
 
Drun level control
Drun level controlDrun level control
Drun level control
 
HP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam TurbineHP LP Bypass system of 110 MW Steam Turbine
HP LP Bypass system of 110 MW Steam Turbine
 
Pressure Relief valve sizing and design
Pressure Relief valve sizing and designPressure Relief valve sizing and design
Pressure Relief valve sizing and design
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
MTA GENERATOR PROTECTION .PPT.pptx
MTA GENERATOR PROTECTION .PPT.pptxMTA GENERATOR PROTECTION .PPT.pptx
MTA GENERATOR PROTECTION .PPT.pptx
 
Gas turbine driven compressors
Gas turbine driven compressorsGas turbine driven compressors
Gas turbine driven compressors
 

Viewers also liked

Viewers also liked (20)

Maintenance of Pumps
Maintenance of PumpsMaintenance of Pumps
Maintenance of Pumps
 
Plat heat exchanger
Plat heat exchangerPlat heat exchanger
Plat heat exchanger
 
Mi ebook
Mi ebookMi ebook
Mi ebook
 
Strategy maintenance 2
Strategy maintenance 2Strategy maintenance 2
Strategy maintenance 2
 
Double pipe heat exchanger
Double pipe heat exchangerDouble pipe heat exchanger
Double pipe heat exchanger
 
Heat Exchanger (Shell and tubes) by sujan kharel..
Heat Exchanger (Shell and tubes) by sujan kharel..Heat Exchanger (Shell and tubes) by sujan kharel..
Heat Exchanger (Shell and tubes) by sujan kharel..
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
Weekly air compressor check list
Weekly air compressor check listWeekly air compressor check list
Weekly air compressor check list
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat Exchangers
 
Plate type heat exchanger
Plate type heat exchangerPlate type heat exchanger
Plate type heat exchanger
 
Power Plant Boiler feed pump
Power Plant Boiler feed pump Power Plant Boiler feed pump
Power Plant Boiler feed pump
 
HEAT EXCHANGERS
HEAT EXCHANGERSHEAT EXCHANGERS
HEAT EXCHANGERS
 
Heat exchangers and types
Heat exchangers and typesHeat exchangers and types
Heat exchangers and types
 
Pumps and types of pumps in detail
Pumps and types of pumps in detailPumps and types of pumps in detail
Pumps and types of pumps in detail
 
Double Pipe Heat Excanger
Double Pipe Heat ExcangerDouble Pipe Heat Excanger
Double Pipe Heat Excanger
 
Electrostatic precipitator EPS Maintenance
Electrostatic precipitator EPS MaintenanceElectrostatic precipitator EPS Maintenance
Electrostatic precipitator EPS Maintenance
 
Basics of pump
Basics of pump Basics of pump
Basics of pump
 
Heat Exchangers
Heat ExchangersHeat Exchangers
Heat Exchangers
 
PUMPS
 PUMPS PUMPS
PUMPS
 
pumps and its types-ppt
pumps and its types-pptpumps and its types-ppt
pumps and its types-ppt
 

Similar to Preventive Maintenance for CP by Eng. Amer Hamdan

Resume technician
Resume technicianResume technician
Resume technicianRaja paul
 
Axial Thrust Failure investigation
Axial Thrust Failure investigationAxial Thrust Failure investigation
Axial Thrust Failure investigationRory McKay
 
API Pumps design, application and selection
API Pumps design, application and selectionAPI Pumps design, application and selection
API Pumps design, application and selectionAlireza Bagherian
 
Centrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case StudyCentrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case StudySiewert Equipment
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfchintanraval24
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfIsmailKatun1
 
submersible pumps.pdf
submersible pumps.pdfsubmersible pumps.pdf
submersible pumps.pdfHaroonMurshed
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validationjpegd
 
IRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station PipelineIRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station PipelineIRJET Journal
 
Maximize Intrinsic Reliability, through focus in early project phases - Uptim...
Maximize Intrinsic Reliability, through focus in early project phases - Uptim...Maximize Intrinsic Reliability, through focus in early project phases - Uptim...
Maximize Intrinsic Reliability, through focus in early project phases - Uptim...Mohammad Naseer Uddin
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.pptssuser9e9be71
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticVibropac
 
Improving Energy Efficiency of Pumps and Fans
Improving Energy Efficiency of Pumps and FansImproving Energy Efficiency of Pumps and Fans
Improving Energy Efficiency of Pumps and Fanseecfncci
 
Operation & Maintenance Manual
Operation & Maintenance ManualOperation & Maintenance Manual
Operation & Maintenance ManualAnivarya pumps
 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7homeworkping3
 

Similar to Preventive Maintenance for CP by Eng. Amer Hamdan (20)

Resume technician
Resume technicianResume technician
Resume technician
 
Axial Thrust Failure investigation
Axial Thrust Failure investigationAxial Thrust Failure investigation
Axial Thrust Failure investigation
 
How to Avoid Those Common Site Troubles During Commissioning
How to Avoid Those Common Site Troubles During CommissioningHow to Avoid Those Common Site Troubles During Commissioning
How to Avoid Those Common Site Troubles During Commissioning
 
API Pumps design, application and selection
API Pumps design, application and selectionAPI Pumps design, application and selection
API Pumps design, application and selection
 
Centrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case StudyCentrifugal Water Treatment Pump Repair Case Study
Centrifugal Water Treatment Pump Repair Case Study
 
steam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdfsteam-turbine-generator-overhaul-and-inspection-epri.pdf
steam-turbine-generator-overhaul-and-inspection-epri.pdf
 
Resume
ResumeResume
Resume
 
Artificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdfArtificial-Lift-System-N production engineering.pdf
Artificial-Lift-System-N production engineering.pdf
 
Pump system
Pump systemPump system
Pump system
 
MPF PUMPS OGM5
MPF PUMPS OGM5MPF PUMPS OGM5
MPF PUMPS OGM5
 
submersible pumps.pdf
submersible pumps.pdfsubmersible pumps.pdf
submersible pumps.pdf
 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
 
IRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station PipelineIRJET- CFD Flow Analysis of Station Pipeline
IRJET- CFD Flow Analysis of Station Pipeline
 
At6702 uw
At6702 uwAt6702 uw
At6702 uw
 
Maximize Intrinsic Reliability, through focus in early project phases - Uptim...
Maximize Intrinsic Reliability, through focus in early project phases - Uptim...Maximize Intrinsic Reliability, through focus in early project phases - Uptim...
Maximize Intrinsic Reliability, through focus in early project phases - Uptim...
 
171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt171839416-commissioning-of-hydro-ppt.ppt
171839416-commissioning-of-hydro-ppt.ppt
 
Bombas de Refrigeração Hermetic
Bombas de Refrigeração HermeticBombas de Refrigeração Hermetic
Bombas de Refrigeração Hermetic
 
Improving Energy Efficiency of Pumps and Fans
Improving Energy Efficiency of Pumps and FansImproving Energy Efficiency of Pumps and Fans
Improving Energy Efficiency of Pumps and Fans
 
Operation & Maintenance Manual
Operation & Maintenance ManualOperation & Maintenance Manual
Operation & Maintenance Manual
 
237978847 pipin-study-7
237978847 pipin-study-7237978847 pipin-study-7
237978847 pipin-study-7
 

Preventive Maintenance for CP by Eng. Amer Hamdan

  • 1. Preventive Maintenance Introduction For Centrifugal Pump Systems Prepared by: Eng. Amer Hamdan General Maintenance Dept. Building Maintenance and Facilities Section.
  • 2. Pump rooms, Pumps and their accessories, Valves, Pressure Gauges , Pipe works, Control Panels, Pressure Tanks, Filters, Waters Tanks, suction lines, Discharge lines , all of mentioned items have been tested and concluded the following: 1-Pump room covers are not sealed enough from dangerous insects, and same the concrete under the cover is broken, which is not safe of technicians and staff. 2- Vision is not clear at some pump rooms (Lights Missing). 3- Submersible pumps at pump rooms and other open areas are not covered and exposed to sediments and clay accumulation the thing that harms the submersible pump. 4- Some Pumps are leaking. 5- Some suction and discharge valves are leaking 6- Corrosion has been noticed in pump, base plate, pipes, valves and elbows 7-Some pumps are connected to operate directly on manual mode 8- In many cases there are a lot of tees and elbows and valves on suction lines. Overview:
  • 3. 9- Discharge and suction valves are not positioned as per operation instruction on certain throttling degree and end user staff changing it while pump operating, which harms the pump. 10- Pumps in some sites are over sized and are not matching system requirements, which results in poor duty point. ( pipes: type, length ,elevation, diameter) 11- float switch is not positioned to maintain recommended minimum fluid level at tanks 12-Noise and vibration are above normal levels in many pump sets. 13- Electrical motors need to be cleaned from sand and dust 14- Concrete base (Foundation) and base plate need renewing and leveling. 15- Pump are misaligned with respect to base plate and foundation. 16- There is no cautions lists describing DO’s and DON’T’s to be considered while dealing with the pump 17- In many sites pump name plate are painted ,so it is not possible to identify the pump specifications and serial number on the name plate.
  • 4. Main Failure Causes: 1-Manufacturers defects : Negligible, almost misalignment of the internal parts of the pump 2- System Design: a- Pump will be affected if the minimum liquid level makes NPSHa < NPSHr (NPSH: Net Positive Suction Head) b- Pipes level ( Suction, Discharge) is not matching pump level. c- Pump is oversized or smaller capacity pump has been selected. d- Pump selection is not matching system requirements : Pipe– size ,type ,length are not matching the system or the required duty point. e- Suction side full of tees and elbows and valves f- Submersible pump is exposed to clay accumulation and sediments without adding screen to protect the pump g- Using smaller size bolts for base plate. h- misalignment of pump ,motor ,Concrete Foundation and base plate.
  • 5. 3- - Operational faults: a-To keep the pump operation on manual mode until it pumps all water from tank and runs on dry conditions b- Pump to exceed daily recommended operational time c- To keep stand by pump without operation for long time d- In case of not cleaning tanks –especially- open tanks, then sands ,clay, solid contents and salt with accumulate at the tank and will harm pump internal parts e- Changing throttling degree of the discharge and suction valves f- Changing the float switch position below the minimum required liquid level g- Forget to grease pump for long time.
  • 6. Solutions: 1- Apply safety standards to all pump rooms including double sealing covers for all underground pump rooms, and contact pits control dept. for routine site visits. 2- Attach operation instruction by manufacturer to each pump set. 3- Routine cleaning for tanks. 4- Using special non-clogging impeller submersible pumps or cover the pit with a screen for pump protection. 5-Performing periodical fluid analysis and solid contents analysis 6- Changing mechanical seal in case of leakage 7- replacing bearing upon manufacturer recommendation or when noise and vibration exceed certain limits 8-Aligning the pump and motor to pump foundation and base plate.
  • 7. 9- Check suction and discharge lines from blockage. 10- Check float switch position as per pump manufacturer recommendations and project engineering design. 11- In charge staff to use instrumentation of flow meter, Pressure gauges, Vibration meter, noise meter, Volt and Amber meters. 12- Data base for all pumps including the following: a- Pump type, Manufacturer and Serial number; for correct spares request b- Hydraulic design specifications c- Data sheet (Manufacturer) d- Maintenance and operation manual e- Dimensional pump drawing including parts and its codes f- Spare Parts list g- Inspection and maintenance historical data book
  • 9. Preventive Maintenance CP: The aim of this study is to activate PM routine check list to reduce pump failure and guarantee that operate smoothly without any problem, the thing that will be reflected on maintenance costs. Actions to activate PM for CP: 1- Contractual agreement with specialized hydraulic works contractor to perform PM activities. 2-Location survey to all pumps at Municipality sites. 3-Establishing Pumps data base and update it with cooperation with the contractor 4- Performing PM inspection and services according to a periodic schedule, and record repeated pump failures 5- Provide PM schedule sheet near each pump set ,describes all test performed by contractor and inspection dates.
  • 10. Technical Aspects to be monitored (PM): 1- Pump performance (Head H, Flow Q) and check if it is matching with manufacturer data sheet: a- Suction pressure Ps b-Discharge pressure Pd c- Motor Speed rpm d- Power Hp, KW. 2- Vibration & Noise 3- System Characteristic analysis (Pipes + Suction & Discharge Valves) 4- Monitor pump leakage 5- Monitor the motor (Voltage, Amber, Temperature), and keep it clean, make sure motor speed is ok with pump performance and duty point 6- Check Pump parts temperature (Bearing) 7-Monitor oil or grease leakage 8-Check suction and discharge lines blockage 9-Check pressure gauges, pressure switch and pressure tank 10-Monitor float switch and float valve 12-Record fluid analysis results ,salinity and solid contents especially for open tanks 13- Check Automatic operation mode circuit ,operate stand by pump for 5 minutes
  • 11. Benefits of PM for Centrifugal Pumps If preventive maintenance considered as a major part of comprehensive maintenance works for centrifugal pumps within a time frame, so the results will be as following: 1- Protecting CP from the following: a-Pump performance problems (Head and pressure resulting) b- Motor malfunctions c-Bearing breakage d-Mechanical seal breakage e-Shaft problems f- Impeller problems g-Pump casing corrosion or pits h- System problems( Pipes + Valves) i- Float switch and float valve problems 2- Reduction of corrective maintenance actions 3-Reducing spare parts replacement requests 4-Reducing complains and service cut off 5-Saving 35%-40% of total maintenance cost for centrifugal pumps
  • 12. Periodical PM testsPeriod Monitoring Water level in TanksDaily Monitoring Noise & VibrationDaily Monitoring water leakageDaily Pets control serviceMonthly Check pressure gauges & Pressure TankMonthly Monitoring Pressure SwitchMonthly Check float valve and float switchMonthly Monitoring oil or grease leakage from bearing boxMonthly Monitoring pump parts temp. (Bearing temp.)Monthly Clean the pump and pump roomMonthly Make sure that motor performance is matching pump duty pointMonthly Monitoring electrical motor temp.Monthly Check automatic operating mode circuit +operate stand by pump 5 minutes. Monthly Check valves throttling position degreeMonthly Preventive Maintenance Check list
  • 13. Measure Motor performanceQuarterly Measure Pump PerformanceQuarterly Keep tanks cleanQuarterly Check suction and discharge line if blockedQuarterly System characteristic analysisHalf year Perform Fluid analysis, salinity and solid contentsYearly Greasing Pump OEM Recommendation Painting Pump ,base plate, valves and elbows and renew concrete foundation When needed Prepared by: Eng. Amer Ismail General Maintenance Dept. Building Maintenance and Facilities Section.