Christopher D. Culpepper, PE
Major Project List - Holman Boiler Works 1992-1998
Uniroyal Tire, Queretaro, Mexico. Coordinates: 20.62567,-100.4267
Complete retube, new refractory front and rear walls, and new #6 oil burner (Coen) for a
Cleaver Brooks D-60, 60,000 lb/hr package water tube boiler. Seven (7) weeks onsite project
engineer.
Chevron Refinery, El Paso, Texas, USA. Coordinates: 31.767549,-106.3959
Turnkey partial retube, new buckstays, waterwalls, ductwork and casing for a Combustion
Engineering CE VU-60, tangentially fired, 350,000 lb/hr 650 psig/750°F superheated steam
boiler. The scope also included four (4) new Holman EDGE LoNOx burners with fuel trains,
firing sour refinery gas @ 600 btu/SCF. Complete rebuild of Ljungstrum air heater. Electrical
installation and new controls. Five (5)months onsite project engineer.
Westlake Polymers, Sulphur, Louisiana, USA. Coordinates: 30.195544,-93.326403
Turnkey supply and installation of two (2) new 60,000 lb/hr Nebraska O-Type boilers. Complete
new RO water treatment system including 40,000 gallon RFP storage tank, deaerator with
feedwater pumps, economizers, structural steel, stacks, Holman EDGE LoNOx burners, FD fans,
fuel trains, and fully metered and cross limited combustion controls. Sold and project managed
sale to startup.
Arco Chemical, Channelview, Texas, USA. Coordinates: 29.816894,-95.107165
Turnkey economizer and breaching replacement for a Babcock & Wilcox B&W 500,000 lb/hr
field erected boiler. The economizer was shipped in two sections and took a 500 ton hydraulic
crane to set into position. Sold and project managed entire project.
Hoechst Celanese, Pasadena, Texas, USA. Coordinates: 29.625301,-95.06356
Complete retube, superheater replacement, and new front and rear refractory walls for a
250,000 lb/hr, 800 psig/950°F Zurn Erie City O-Type watertube boiler. Twelve (12) weeks onsite
project manager. First job that Holman used union labor to supplement its workforce.
Maintained union relations for a successful project.
Warren Petroleum, Mt. Belvieu, Texas, USA. Coordinates: 29.838657,-94.901069
Turnkey, complete retube, including new foundations, for a Combustion Engineering CE 35A-15,
150,000 lb/hr 750 psig/750°F package boiler. Custom designed external steam separator with
new piping, new economizer, structural steel, stack, superheater, and Holman EDGE LoNOx
burner with fuel train, FD fan/motor and fully metered and cross limited combustion controls.
On site project manager, involved from the sale to the startup. Second job to use union labor.
This is just a partial list of major projects that I worked on at Holman Boiler Works.

More Related Content

What's hot

Training Report 7121113526
Training Report 7121113526Training Report 7121113526
Training Report 7121113526Kshitij Sharma
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine SystemPeter Bright
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Power-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion PaperPower-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion PaperBowen
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...GSE Systems, Inc.
 
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFULIN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFULHafiz M .Hamid
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)HARSHIT GUPTA
 
Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916PALANIVEL SUBBIAH
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalRazin Sazzad Molla
 
Options for optimizing combined cycle plants
Options for optimizing combined cycle plantsOptions for optimizing combined cycle plants
Options for optimizing combined cycle plantsHossam Zein
 
C:\fakepath\fossil power basics
C:\fakepath\fossil power basicsC:\fakepath\fossil power basics
C:\fakepath\fossil power basicsguest6a2ec4
 
AAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docxAAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docxJulian Wang
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering ResumeStephen Davidson
 
Progress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneProgress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneA. Rocketeer
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisNikhil Kumar Rai
 
Lanco training
Lanco trainingLanco training
Lanco trainingKSOM
 

What's hot (20)

Training Report 7121113526
Training Report 7121113526Training Report 7121113526
Training Report 7121113526
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Power-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion PaperPower-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion Paper
 
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
Designing a High-Fidelity Full-Scope Training Simulator for a Triple-Pressure...
 
Bfp aspetcs
Bfp aspetcsBfp aspetcs
Bfp aspetcs
 
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFULIN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST  MERCIFUL
IN THE NAME OF ALLAH THE MOST BENIFICIENT AND MOST MERCIFUL
 
GE LMS100
GE LMS100 GE LMS100
GE LMS100
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Adoption of supercritical technology (1)
Adoption of supercritical technology (1)Adoption of supercritical technology (1)
Adoption of supercritical technology (1)
 
Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916Hydroelectricpowerplant 290916
Hydroelectricpowerplant 290916
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine final
 
Options for optimizing combined cycle plants
Options for optimizing combined cycle plantsOptions for optimizing combined cycle plants
Options for optimizing combined cycle plants
 
C:\fakepath\fossil power basics
C:\fakepath\fossil power basicsC:\fakepath\fossil power basics
C:\fakepath\fossil power basics
 
AAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docxAAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docx
 
Steve Davidson Engineering Resume
Steve Davidson Engineering  ResumeSteve Davidson Engineering  Resume
Steve Davidson Engineering Resume
 
Ltd design and construction
Ltd design and constructionLtd design and construction
Ltd design and construction
 
Progress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable SpaceplaneProgress on the SKYLON Reusable Spaceplane
Progress on the SKYLON Reusable Spaceplane
 
Epc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysisEpc proposal 3x660 mw with cost analysis
Epc proposal 3x660 mw with cost analysis
 
Lanco training
Lanco trainingLanco training
Lanco training
 

Viewers also liked (20)

Analgesicos antidepresivos
Analgesicos antidepresivosAnalgesicos antidepresivos
Analgesicos antidepresivos
 
Rubrica
RubricaRubrica
Rubrica
 
trabajo de informatica
trabajo de informaticatrabajo de informatica
trabajo de informatica
 
1
11
1
 
Sumak kawsay
Sumak kawsaySumak kawsay
Sumak kawsay
 
Analisi dei limiti dell'implementazione di Wi-Fi Direct in Android per Reti O...
Analisi dei limiti dell'implementazione di Wi-Fi Direct in Android per Reti O...Analisi dei limiti dell'implementazione di Wi-Fi Direct in Android per Reti O...
Analisi dei limiti dell'implementazione di Wi-Fi Direct in Android per Reti O...
 
Dial Sure
Dial SureDial Sure
Dial Sure
 
бианки отчет
бианки отчетбианки отчет
бианки отчет
 
Lo37
Lo37Lo37
Lo37
 
Mi hoorario
Mi hoorarioMi hoorario
Mi hoorario
 
tp2 mariano rodriguez
tp2 mariano rodrigueztp2 mariano rodriguez
tp2 mariano rodriguez
 
Lo27
Lo27Lo27
Lo27
 
птицы отчет
птицы отчетптицы отчет
птицы отчет
 
Alimentação
AlimentaçãoAlimentação
Alimentação
 
9 мая отчет
9 мая отчет9 мая отчет
9 мая отчет
 
PMP
PMPPMP
PMP
 
中学1年生向け_Skypeを利用した英語授業_第6回講師伝達事項
中学1年生向け_Skypeを利用した英語授業_第6回講師伝達事項中学1年生向け_Skypeを利用した英語授業_第6回講師伝達事項
中学1年生向け_Skypeを利用した英語授業_第6回講師伝達事項
 
Aula Estrutural - 13-05
Aula Estrutural - 13-05 Aula Estrutural - 13-05
Aula Estrutural - 13-05
 
Sistema nervioso
Sistema nerviosoSistema nervioso
Sistema nervioso
 
MICROCONTROLADORES E PLATAFORMAS DE PROTOTIPAGEM
MICROCONTROLADORES E PLATAFORMAS DE PROTOTIPAGEMMICROCONTROLADORES E PLATAFORMAS DE PROTOTIPAGEM
MICROCONTROLADORES E PLATAFORMAS DE PROTOTIPAGEM
 

Similar to Major Project List

Khan Nasir1-6-16
Khan Nasir1-6-16Khan Nasir1-6-16
Khan Nasir1-6-16Nasir Khan
 
Gig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetGig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetLinda Burman
 
Derek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry
 
Promotional Sheet - Grand Mound
Promotional Sheet - Grand MoundPromotional Sheet - Grand Mound
Promotional Sheet - Grand MoundLinda Burman
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael Najarian
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13Moore Sarah
 
Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.Sawan Kumar
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Hitt
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P. Henderson
 
Partial List of Past SAVvy Engineering Projects
Partial List of Past SAVvy Engineering ProjectsPartial List of Past SAVvy Engineering Projects
Partial List of Past SAVvy Engineering ProjectsScott Vierstra
 

Similar to Major Project List (20)

Khan Nasir1-6-16
Khan Nasir1-6-16Khan Nasir1-6-16
Khan Nasir1-6-16
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
Gig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetGig Harbor High School Promotional Sheet
Gig Harbor High School Promotional Sheet
 
Derek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry WEC Biography
Derek Hendry WEC Biography
 
Promotional Sheet - Grand Mound
Promotional Sheet - Grand MoundPromotional Sheet - Grand Mound
Promotional Sheet - Grand Mound
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
Appsolu
AppsoluAppsolu
Appsolu
 
BGJ-CV-2015
BGJ-CV-2015BGJ-CV-2015
BGJ-CV-2015
 
CBorgland resume
CBorgland resumeCBorgland resume
CBorgland resume
 
PARSENEAU resume
PARSENEAU resumePARSENEAU resume
PARSENEAU resume
 
Boiler turbe failores
Boiler turbe failoresBoiler turbe failores
Boiler turbe failores
 
Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016Michael_NAJARIAN_resume_5-2016
Michael_NAJARIAN_resume_5-2016
 
Moore_S_25.10.13
Moore_S_25.10.13Moore_S_25.10.13
Moore_S_25.10.13
 
Wh pwr systems
Wh pwr systemsWh pwr systems
Wh pwr systems
 
Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.Training report- Boiler and Thermal Plants.
Training report- Boiler and Thermal Plants.
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Abhinav Ashutosh
Abhinav Ashutosh Abhinav Ashutosh
Abhinav Ashutosh
 
John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015John Paul Hitt 10-20-2015
John Paul Hitt 10-20-2015
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
Partial List of Past SAVvy Engineering Projects
Partial List of Past SAVvy Engineering ProjectsPartial List of Past SAVvy Engineering Projects
Partial List of Past SAVvy Engineering Projects
 

Major Project List

  • 1. Christopher D. Culpepper, PE Major Project List - Holman Boiler Works 1992-1998 Uniroyal Tire, Queretaro, Mexico. Coordinates: 20.62567,-100.4267 Complete retube, new refractory front and rear walls, and new #6 oil burner (Coen) for a Cleaver Brooks D-60, 60,000 lb/hr package water tube boiler. Seven (7) weeks onsite project engineer. Chevron Refinery, El Paso, Texas, USA. Coordinates: 31.767549,-106.3959 Turnkey partial retube, new buckstays, waterwalls, ductwork and casing for a Combustion Engineering CE VU-60, tangentially fired, 350,000 lb/hr 650 psig/750°F superheated steam boiler. The scope also included four (4) new Holman EDGE LoNOx burners with fuel trains, firing sour refinery gas @ 600 btu/SCF. Complete rebuild of Ljungstrum air heater. Electrical installation and new controls. Five (5)months onsite project engineer. Westlake Polymers, Sulphur, Louisiana, USA. Coordinates: 30.195544,-93.326403 Turnkey supply and installation of two (2) new 60,000 lb/hr Nebraska O-Type boilers. Complete new RO water treatment system including 40,000 gallon RFP storage tank, deaerator with feedwater pumps, economizers, structural steel, stacks, Holman EDGE LoNOx burners, FD fans, fuel trains, and fully metered and cross limited combustion controls. Sold and project managed sale to startup. Arco Chemical, Channelview, Texas, USA. Coordinates: 29.816894,-95.107165 Turnkey economizer and breaching replacement for a Babcock & Wilcox B&W 500,000 lb/hr field erected boiler. The economizer was shipped in two sections and took a 500 ton hydraulic crane to set into position. Sold and project managed entire project. Hoechst Celanese, Pasadena, Texas, USA. Coordinates: 29.625301,-95.06356 Complete retube, superheater replacement, and new front and rear refractory walls for a 250,000 lb/hr, 800 psig/950°F Zurn Erie City O-Type watertube boiler. Twelve (12) weeks onsite project manager. First job that Holman used union labor to supplement its workforce. Maintained union relations for a successful project. Warren Petroleum, Mt. Belvieu, Texas, USA. Coordinates: 29.838657,-94.901069 Turnkey, complete retube, including new foundations, for a Combustion Engineering CE 35A-15, 150,000 lb/hr 750 psig/750°F package boiler. Custom designed external steam separator with new piping, new economizer, structural steel, stack, superheater, and Holman EDGE LoNOx burner with fuel train, FD fan/motor and fully metered and cross limited combustion controls. On site project manager, involved from the sale to the startup. Second job to use union labor. This is just a partial list of major projects that I worked on at Holman Boiler Works.