Transformer Specification
Quote. Ref. :
Customer :
Project :
Rated power ...KVA. 2000
Type of transformer - Oil immersed (Hermetically sealed)
Standard - IEC 60076
Cooling System - ONAN
No. of phase - 3
Frequency ...Hz. 50
Rate of voltage : Primary ...V. 22000
: Secondary ...V. 386,386
Vector group - Dy11y11
Tapping Type - Off circuit tap changer
No. of steps - 4
Percentage of tapping - +/- 2 x 2.5 %
Impedance voltage at 75 oC ...% 6.00
No - Load current ...% 0.85
Ambient temperature …oC 40
Average Temperature rise of winding …oC 65
Average Temperature rise of top oil …oC 60
Noise level not more than ...dB 61
No - Load loss ...Watt 2500
Load loss at 75 oC ...Watt 17500
: 25% of rate power ...% 99
Efficiency : 50% of rate power ...% 99.32
at P.F. = 1 : 75% of rate power ...% 99.18
: 100% of rate power ...% 99.01
Voltage regulation : at P.F. = 0.8 ...% 4.35
: at P.F. = 0.9 ...% 3.50
: at P.F. = 1 ...% 1.05
Impulse withstand : Primary winding ...KV. 125
Voltage : Secondary winding ...KV. -
Power frequency : Primary winding ...KV. 50
: Secondary winding ...KV. 3
Terminal arrangement H.V. side Cable
L.V. side Cable
Installation on Concrete foundation
01-07-15 Page1 of 2 File:Spec 2000kVA_22000_386,386_Dy11y11.xls_DGPT2.xls
BL
Transformer Specification
Quote. Ref. :
Customer :
Project :
Rated power ...KVA. 2000
Type of transformer - Oil immersed (Hermetically sealed)
Accessories :
H.V. bushing with terminal connector Included
L.V. bushing with terminal connector Included
Grounding pad or earth terminal Included
Lifting lug Included
Upper filter press connection Included
Oil drain, filter press sampling valve Included
Name plate Included
Arcing Horn Included
Skid Base Included
Mechanical pressure relief device Included
DGPT2 Included
Oil level indicator Included
MCCB 63 A. Included
Cable box for HV and LV Included
Testing :
- Routine test
Ratio test at each position of tap Included
Polarity and phase relation test Included
Resistance measurement Included
No-load loss and exciting current test Included
Impedance and load loss test Included
Applied potential test Included
Induced potential test Included
Insulation resistance test Included
Oil test Included
01-07-15 Page2 of 2 File:Spec 2000kVA_22000_386,386_Dy11y11.xls_DGPT2.xls

More Related Content

What's hot

Analog Electronics TIMER IC 555
Analog Electronics TIMER IC 555Analog Electronics TIMER IC 555
Analog Electronics TIMER IC 555Prabhat Matang
 
Low dropout regulator(ldo)
Low dropout regulator(ldo)Low dropout regulator(ldo)
Low dropout regulator(ldo)altaf423
 
Converter Fed DC Motor MATLAB Simulation
Converter Fed DC Motor  MATLAB SimulationConverter Fed DC Motor  MATLAB Simulation
Converter Fed DC Motor MATLAB SimulationSajid Sheikh
 
Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.SARAVANAN A
 
Buck boost converter
Buck boost converterBuck boost converter
Buck boost converterNazmushSakib7
 
Buck boost converter
Buck boost converterBuck boost converter
Buck boost converterSaumya Pandey
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
Original MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F New
Original MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F NewOriginal MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F New
Original MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F NewAUTHELECTRONIC
 
Short notes on digital electronics for specialist officer it exam by das sir,...
Short notes on digital electronics for specialist officer it exam by das sir,...Short notes on digital electronics for specialist officer it exam by das sir,...
Short notes on digital electronics for specialist officer it exam by das sir,...Tamal Kumar Das
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, IndiaRajuMondal18
 
Original N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHI
Original N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHIOriginal N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHI
Original N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHIAUTHELECTRONIC
 
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSARAVANAN A
 
Inertia dynamics controls_d2550_specsheet
Inertia dynamics controls_d2550_specsheetInertia dynamics controls_d2550_specsheet
Inertia dynamics controls_d2550_specsheetElectromate
 
KEMET Webinar - Measuring capacitors properties correct
KEMET Webinar - Measuring capacitors properties correctKEMET Webinar - Measuring capacitors properties correct
KEMET Webinar - Measuring capacitors properties correctMarkus Trautz
 
Original P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 New
Original P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 NewOriginal P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 New
Original P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 NewAUTHELECTRONIC
 
8 ee362_l_dc_dc_buckboost_ppt (1)
 8 ee362_l_dc_dc_buckboost_ppt (1) 8 ee362_l_dc_dc_buckboost_ppt (1)
8 ee362_l_dc_dc_buckboost_ppt (1)balaji kumar
 
Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformersayyadurai SHANMUGAM
 
Advanced motion controls mbl3416e2
Advanced motion controls mbl3416e2Advanced motion controls mbl3416e2
Advanced motion controls mbl3416e2Electromate
 

What's hot (20)

Analog Electronics TIMER IC 555
Analog Electronics TIMER IC 555Analog Electronics TIMER IC 555
Analog Electronics TIMER IC 555
 
Low dropout regulator(ldo)
Low dropout regulator(ldo)Low dropout regulator(ldo)
Low dropout regulator(ldo)
 
Converter Fed DC Motor MATLAB Simulation
Converter Fed DC Motor  MATLAB SimulationConverter Fed DC Motor  MATLAB Simulation
Converter Fed DC Motor MATLAB Simulation
 
Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.Simple Current Transformer (CT) Testing for Switchyard Equipment.
Simple Current Transformer (CT) Testing for Switchyard Equipment.
 
Transformer Site test
Transformer Site testTransformer Site test
Transformer Site test
 
Buck boost converter
Buck boost converterBuck boost converter
Buck boost converter
 
Buck boost converter
Buck boost converterBuck boost converter
Buck boost converter
 
Phase locked loop
Phase locked loopPhase locked loop
Phase locked loop
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Original MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F New
Original MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F NewOriginal MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F New
Original MOSFET P-CHANNEL 2SJ406 J406 12V 200V TO-220F New
 
Short notes on digital electronics for specialist officer it exam by das sir,...
Short notes on digital electronics for specialist officer it exam by das sir,...Short notes on digital electronics for specialist officer it exam by das sir,...
Short notes on digital electronics for specialist officer it exam by das sir,...
 
Distribution Transformer testing, West Bengal, India
Distribution Transformer testing,  West Bengal, IndiaDistribution Transformer testing,  West Bengal, India
Distribution Transformer testing, West Bengal, India
 
Original N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHI
Original N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHIOriginal N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHI
Original N-Channel Mosfet SMK630 SMK630D 9A 200V SOT-252 New KODENSHI
 
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
 
Inertia dynamics controls_d2550_specsheet
Inertia dynamics controls_d2550_specsheetInertia dynamics controls_d2550_specsheet
Inertia dynamics controls_d2550_specsheet
 
KEMET Webinar - Measuring capacitors properties correct
KEMET Webinar - Measuring capacitors properties correctKEMET Webinar - Measuring capacitors properties correct
KEMET Webinar - Measuring capacitors properties correct
 
Original P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 New
Original P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 NewOriginal P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 New
Original P-Channel Mosfet AP4435GM 4435 4435GM SOP-8 New
 
8 ee362_l_dc_dc_buckboost_ppt (1)
 8 ee362_l_dc_dc_buckboost_ppt (1) 8 ee362_l_dc_dc_buckboost_ppt (1)
8 ee362_l_dc_dc_buckboost_ppt (1)
 
Pre commissioning checks & periodic inspection on power transformers
Pre commissioning checks & periodic inspection  on power transformersPre commissioning checks & periodic inspection  on power transformers
Pre commissioning checks & periodic inspection on power transformers
 
Advanced motion controls mbl3416e2
Advanced motion controls mbl3416e2Advanced motion controls mbl3416e2
Advanced motion controls mbl3416e2
 

Similar to Dwg 2000k va 386,386_22000 v_final

Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsSumeet Ratnawat
 
2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revbVan Phuong Pham
 
Padmounted transformer
Padmounted transformerPadmounted transformer
Padmounted transformerJoeChueng
 
ELG4139DCtoACConverters.pdf
ELG4139DCtoACConverters.pdfELG4139DCtoACConverters.pdf
ELG4139DCtoACConverters.pdfBekirTalat
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004michaeljmack
 
Power u ps hpm3300
Power u ps hpm3300Power u ps hpm3300
Power u ps hpm3300siulun0525
 
Delta drp024 power_supply_catalog
Delta drp024 power_supply_catalogDelta drp024 power_supply_catalog
Delta drp024 power_supply_catalogElectromate
 
Hdd15 5-ag-power-one
Hdd15 5-ag-power-oneHdd15 5-ag-power-one
Hdd15 5-ag-power-onePawar Chander
 
Catalog mikro mikro mk203a-dienhathe.vn
Catalog mikro mikro mk203a-dienhathe.vnCatalog mikro mikro mk203a-dienhathe.vn
Catalog mikro mikro mk203a-dienhathe.vnDien Ha The
 
6-Control Components
6-Control Components6-Control Components
6-Control ComponentsLinn Liu
 
Power ups hpm presentation-r2
Power ups   hpm presentation-r2Power ups   hpm presentation-r2
Power ups hpm presentation-r2rickyhwk
 
Original Digital Transistor KRC105 C105M C105 100mA 50V TO-92 New
Original Digital Transistor KRC105 C105M C105 100mA 50V TO-92 NewOriginal Digital Transistor KRC105 C105M C105 100mA 50V TO-92 New
Original Digital Transistor KRC105 C105M C105 100mA 50V TO-92 NewAUTHELECTRONIC
 
Original NPN Transistor KRC106M C106 106 TO-92 New KEC
Original NPN Transistor KRC106M C106 106 TO-92 New KECOriginal NPN Transistor KRC106M C106 106 TO-92 New KEC
Original NPN Transistor KRC106M C106 106 TO-92 New KECAUTHELECTRONIC
 
Catalog mikro mikro mk201a-dienhathe.vn
Catalog mikro mikro mk201a-dienhathe.vnCatalog mikro mikro mk201a-dienhathe.vn
Catalog mikro mikro mk201a-dienhathe.vnDien Ha The
 

Similar to Dwg 2000k va 386,386_22000 v_final (20)

Testing and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation EquipmentsTesting and Condition Monitoring of Substation Equipments
Testing and Condition Monitoring of Substation Equipments
 
2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb2. station transformer 100 mva 230kv-datasheet revb
2. station transformer 100 mva 230kv-datasheet revb
 
Transformer
TransformerTransformer
Transformer
 
Transformer ppt.
Transformer ppt.Transformer ppt.
Transformer ppt.
 
Padmounted transformer
Padmounted transformerPadmounted transformer
Padmounted transformer
 
ELG4139DCtoACConverters.pdf
ELG4139DCtoACConverters.pdfELG4139DCtoACConverters.pdf
ELG4139DCtoACConverters.pdf
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004Service cabinetandtransformerbreakersizing1082004
Service cabinetandtransformerbreakersizing1082004
 
Power u ps hpm3300
Power u ps hpm3300Power u ps hpm3300
Power u ps hpm3300
 
Delta drp024 power_supply_catalog
Delta drp024 power_supply_catalogDelta drp024 power_supply_catalog
Delta drp024 power_supply_catalog
 
Al tech scvs & it
Al tech scvs & itAl tech scvs & it
Al tech scvs & it
 
Hdd15 5-ag-power-one
Hdd15 5-ag-power-oneHdd15 5-ag-power-one
Hdd15 5-ag-power-one
 
Catalog mikro mikro mk203a-dienhathe.vn
Catalog mikro mikro mk203a-dienhathe.vnCatalog mikro mikro mk203a-dienhathe.vn
Catalog mikro mikro mk203a-dienhathe.vn
 
6-Control Components
6-Control Components6-Control Components
6-Control Components
 
Power ups hpm presentation-r2
Power ups   hpm presentation-r2Power ups   hpm presentation-r2
Power ups hpm presentation-r2
 
Original Digital Transistor KRC105 C105M C105 100mA 50V TO-92 New
Original Digital Transistor KRC105 C105M C105 100mA 50V TO-92 NewOriginal Digital Transistor KRC105 C105M C105 100mA 50V TO-92 New
Original Digital Transistor KRC105 C105M C105 100mA 50V TO-92 New
 
Original NPN Transistor KRC106M C106 106 TO-92 New KEC
Original NPN Transistor KRC106M C106 106 TO-92 New KECOriginal NPN Transistor KRC106M C106 106 TO-92 New KEC
Original NPN Transistor KRC106M C106 106 TO-92 New KEC
 
Datasheet
DatasheetDatasheet
Datasheet
 
Catalog mikro mikro mk201a-dienhathe.vn
Catalog mikro mikro mk201a-dienhathe.vnCatalog mikro mikro mk201a-dienhathe.vn
Catalog mikro mikro mk201a-dienhathe.vn
 
Lm324
Lm324Lm324
Lm324
 

Recently uploaded

KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationDr. Radhey Shyam
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Krakówbim.edu.pl
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Aimil Ltd
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdfKamal Acharya
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDrGurudutt
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGKOUSTAV SARKAR
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfPipe Restoration Solutions
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdfKamal Acharya
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfKamal Acharya
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdfKamal Acharya
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdfKamal Acharya
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfKamal Acharya
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Aryaabh.arya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineJulioCesarSalazarHer1
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdfKamal Acharya
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringC Sai Kiran
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and VisualizationKIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
KIT-601 Lecture Notes-UNIT-5.pdf Frame Works and Visualization
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
Soil Testing Instruments by aimil ltd.- California Bearing Ratio apparatus, c...
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Paint shop management system project report.pdf
Paint shop management system project report.pdfPaint shop management system project report.pdf
Paint shop management system project report.pdf
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Pharmacy management system project report..pdf
Pharmacy management system project report..pdfPharmacy management system project report..pdf
Pharmacy management system project report..pdf
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 
Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-5 Notes for II-II Mechanical Engineering
 

Dwg 2000k va 386,386_22000 v_final

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. BL Transformer Specification Quote. Ref. : Customer : Project : Rated power ...KVA. 2000 Type of transformer - Oil immersed (Hermetically sealed) Standard - IEC 60076 Cooling System - ONAN No. of phase - 3 Frequency ...Hz. 50 Rate of voltage : Primary ...V. 22000 : Secondary ...V. 386,386 Vector group - Dy11y11 Tapping Type - Off circuit tap changer No. of steps - 4 Percentage of tapping - +/- 2 x 2.5 % Impedance voltage at 75 oC ...% 6.00 No - Load current ...% 0.85 Ambient temperature …oC 40 Average Temperature rise of winding …oC 65 Average Temperature rise of top oil …oC 60 Noise level not more than ...dB 61 No - Load loss ...Watt 2500 Load loss at 75 oC ...Watt 17500 : 25% of rate power ...% 99 Efficiency : 50% of rate power ...% 99.32 at P.F. = 1 : 75% of rate power ...% 99.18 : 100% of rate power ...% 99.01 Voltage regulation : at P.F. = 0.8 ...% 4.35 : at P.F. = 0.9 ...% 3.50 : at P.F. = 1 ...% 1.05 Impulse withstand : Primary winding ...KV. 125 Voltage : Secondary winding ...KV. - Power frequency : Primary winding ...KV. 50 : Secondary winding ...KV. 3 Terminal arrangement H.V. side Cable L.V. side Cable Installation on Concrete foundation 01-07-15 Page1 of 2 File:Spec 2000kVA_22000_386,386_Dy11y11.xls_DGPT2.xls
  • 7. BL Transformer Specification Quote. Ref. : Customer : Project : Rated power ...KVA. 2000 Type of transformer - Oil immersed (Hermetically sealed) Accessories : H.V. bushing with terminal connector Included L.V. bushing with terminal connector Included Grounding pad or earth terminal Included Lifting lug Included Upper filter press connection Included Oil drain, filter press sampling valve Included Name plate Included Arcing Horn Included Skid Base Included Mechanical pressure relief device Included DGPT2 Included Oil level indicator Included MCCB 63 A. Included Cable box for HV and LV Included Testing : - Routine test Ratio test at each position of tap Included Polarity and phase relation test Included Resistance measurement Included No-load loss and exciting current test Included Impedance and load loss test Included Applied potential test Included Induced potential test Included Insulation resistance test Included Oil test Included 01-07-15 Page2 of 2 File:Spec 2000kVA_22000_386,386_Dy11y11.xls_DGPT2.xls