1. Anwar Morsi Mohammed Anwar
Amorsi4247638@yahoo.com
Cell no: +2 01020413678 , +2 047 3138503
Cell no: +966 558798609 , +966 532232730
OBJECTIVE
Seeking an engineering position with a multinational firm in operation, maintenance or installation
of electromechanical systems utilizing my international practical experience, theoretical background and
interpersonal skills to build up on my previous experience.
WORK EXPERIENCE
PROGER INTERNATIONAL – SPA (www.proger.it)
Jan 2014 – July 2015
Electrical Engineer (KAP 4 Projects) - Consultant
Company Profile:-
Proger designs and manages projects for large building works through a global approach that integrates
specialized skills, solid experience and a capacity for growth and innovation.
Founded in Italy in 1951 in Pescara and Chieti (Abruzzo), Proger is now an international company
providing Engineering & Management services in a range of civil and industrial engineering sectors.
Proger is currently comprised of the following business units :-
Building & construction.
Infrastructure.
Oil & GAS – Energy.
Key Responsibilities and Specific Accountabilities:
Ensures that the project as per setting out plan.
Ensure that the progress at site is as per approved time schedule.
Inspect work done, samples, materials, workmanship, ensuring compliance with project documents.
Following up and supervising all the inspection requests.
Ensuring that all materials used and work performed are as per specifications, ITP and method of
statement.
Day-to-day supervision of the site, including supervising and monitoring the progress and manpower.
Overseeing quality control, health and safety matters on site; and ensure that construction is performed
as per safety plan.
Coordination between structural, architectural and MEP.
Ensuring that the Contractor performs his work in a manner that does not cause unnecessary or
improper interference to the public, including access to public or private roads and footpaths.
Investigating sites condition to determine any kind of obstacles for the proposed construction during
work progress.
Coordinating for testing of materials, processes or systems related to engineering works.
Assisting all inspection procedures with site inspectors.
2. Reports to Senior Engineer site related issues (Daily submittals, inspection requests, Quality Safety,
Progress, Resources, Risk, Material, and equipment’s delivered to site).
Review and make recommendation to senior engineer of all Shop Drawings and quantities for accuracy.
Keeping detailed record and quantity of work done, the Contractor’s construction equipment, labor
deployment and material usage on a day-to-day basis.
Preparing reports on work progress with respect to project schedules and resources.
Report any difficulties and other problems that may arise at the site.
Review and make recommendations to senior engineer contractor payments, quantities and variations.
Projects: - (King Abdullah Projects – KAP 4)
Dormitories:-
Project Location: - Jeddah – KSA.
Project Owner: - MOI (Ministry of interior- KSA).
Project Contractor:- Al-Rashed Trading & contracting co. LTD ( RTCC)
Project Period: - Two Years.
Total Cost of the project: - 211 Million SAR.
Project description:- The project is a residential compound which will be used as a family
housing for some of MOI team members , the compound consists of 200 apartments divided
on 10 buildings equivalently. There are some of facilities like Mosque, parking areas, internal
roads, landscape & green areas. Also there is a water treatment plant, Deep well, Two automatic
main gates for the compound, four transformers rooms, RMU, complete lighting, power, fire,
intercom, Telephone, MATV, CCTV & public Address systems serving all the compound parts .
Sport Training Center (STC):-
Project Location: - Mecca – KSA.
Project Owner: - MOI (Ministry of interior- KSA).
Project Contractor:- Al-Rashed Trading & contracting co. LTD ( RTCC)
Project Period: - Two Years.
Total Cost of the project: - 121 Million SAR.
Project description:- The Project is a sport center contains a covered building consists of eight
parts having a covered playing areas , football stadium, swimming pools, squash & tennis courts.
All the required systems for lighting, power, MATV, CCTV, Pumping & public Address are
applicable.
-----------------------------------------------------------------------------------------------------------------------------------
ACES Co. (KSA) (www.aces-co.com) April 2012- Dec 2013
Project Manager
3. Company Profile:-
Aces Company (Ranking 8 of the best 100 companies in Saudi Arabia).
Aces (Advanced communication & electronic systems) company is one of the most leader companies in
GSM, electronics & communication systems in KSA.
Working as a projects manager & western region area manager for civil, electromechanical & site
acquisition work in LTE, L+5, L+6, L+8, L+9 & RDS projects with Mobily, Zain, STC GSM networks.
Key Responsibilities and Specific Accountabilities:
Attending all meetings with Customers (Mobily, Zain, STC ….etc.) to discuss all the related subjects in
our projects (Site acquisition, Civil & electromechanical).
Handling all the available teams in our region to satisfy customer & achieve all required targets.
Following up the invoicing process according to the contracts (LOA, LOP ………etc.).
Preparing all the required documents like (FIS, BOQ, PAT, PAC, as built DRW …………etc.).
Monitoring & control each step in the projects, Moreover supporting our team in sites, if there is any
unsolved problem they are facing & follow up their progress.
Following up the projects closing & if we have any delay so it is a must to prepare justification reports &
follow up it.
Adding to the above responsibilities, now I was acting as an Authorized person to issue the required
work permits in SWCC plants for TETRA project (www.swcc.gov.sa).
Following up the execution for the procedures, rules & the safety instructions of SWCC plants.
Following up the work progress according to the planed time schedule & preparing the progress reports.
-----------------------------------------------------------------------------------------------------------------------------------
ACES Co. (KSA) May 2011 –April 2012
Electrical Site Engineer
I was working under Nemo project which can be defined as a project belongs to Saudi Arabia’s ministry
of interior (Border guides), as they were making a separate fiber network to monitor all the KSA borders.
My responsibility in this project was to handle the installation process, teams, materials, & tools to
complete phase 1 in western & southern region.
Doing PAT, PAC, and FAC for all the sites in western & southern regions.
As one team, we were responsible for saving the power & installing all the electromechanical systems in
each site, the electromechanical devices were (HVAC system, rectifiers, Fire systems, generators & ATS,
adding to earthling systems…….etc.).
After finishing our mission in phase 1, we worked as O/M team, responsible about the preventive &
corrective maintenance for western & southern regions.
4. My responsibility was to handle our teams in the regions to cover all our customer requirements
(24hr/7days).
Propose & implement electrical & mechanical guide lines & solutions needed for the project.
Build up the required resources for the project implementation & operation.
-----------------------------------------------------------------------------------------------------------------------------------
ALEX MAR Co. (KSA):- April 2008 - March 2011
Electrical Engineer
Worked as an electrical operation & maintenance engineer in Alex Mar company - Saudi Arabia branch
(southern region, Northern region) (www.alexmar.com)
Al-Masrya for commercial investment (Alex Mar) company is a major telecom service provider for
electromechanical equipment installation, operation & maintenance. We were working for GSM
networks Mobily (www.mobily.com.sa) and Zain (www.zain.com) .
As an Area engineer, I was responsible for following up preventive & corrective maintenance for all sites
in my region, also responsible about controlling the available resources (Cars, generators, technicians,
money ……………..etc.) to achieve all the work requirements in the region.
Follow up the installation, testing & maintenance of DC systems :-
Installation, configuration, & operating of DC systems.
Making complete battery test report.
Following up the required spare parts, fault trouble shooting & maintenance schedule.
On air replacement for batteries banks without switching off the connected load.
Brands (Benning, Delta, EATON, Emerson, Eltek).
Follow up the installation, testing & maintenance of UPS :
Installation, configuration, & maintenance of UPS systems.
UPS system batteries installation & testing.
Following up the required spare parts, fault trouble shooting & maintenance schedule.
Design , installation & commissioning Huge central & HVAC air conditional system
including:-
Civil work preparation.
Electrical connection work & System startup configuration.
Operation, maintenance & fault troubleshooting activities.
Brands ( Liebert , Zamil , Emerson , Carrier ) , Types ( Split , Package , stand ).
PLC systems maintenance & programming.
.
AC Power systems
Design for the LV networks for the GSM site.
Implementation of all LV network equipment’s Includes:-
5. Main distribution boards MDB.
Lighting and emergency systems.
Earthing system installation and earth test according to specific standards.
Diesel generators operation
Installation and operation for Diesel standby generator for shown brands.
SDMO; Volvo; Deutz, Cummins, CAT, Perkins and John Deere.
Generator control panel operation and fault troubleshooting.
ATS control panel operation and fault troubleshooting.
Installation and maintenance for Fire Fighting systems:-
Firefighting main control board operation and fault troubleshooting.
operation for carbon dioxide CO2 extinguishers
Since graduation till April 2008:-
Worked as an instructor in the faculty of engineering in KFS University (1st Term 2007/2008).
Worked as a member of the electrical designing team of the SANT KATRIN water pump stations
(Technical office) (From October 2007 to February 2008).
Also was working in Axon center as a lecturer for AUTOCAD program basics (From September 2007
to February 2008).
Then worked as an electrical installation, operating & maintenance engineer in VOK & BEG companies
(Valley of the Kings is a company in Borg El-Arab city in Alex. Consists of three factories in Egypt and
another three in Qatar working in metal works, Alimental & glass production) (From Jan 2008 till April
2008).
EDUCATION
Alexandria University, Faculty of Engineering. 2000-2000
B.Sc. of Electrical Power Engineering (Electrical Power Department).
Graduation Grade: Very Good (77.8 %).
Project: Complete design for the electrical scheme involving (Cables selection, Protection, Distribution, Load study,
energy management, and illumination selection ….etc.) for residential town, Big Hotel, & some Smart house
applications.
Design of electrical power system (L.V. & M.V.) Under supervision of Prof. Dr. Ashraf Megahed
Studying & preparing for PMP Exam to be PMI certified project manager before the end of
2015.
TRAINING COURSES
Delta Sugar Company (www.deltasugar.com)
Maintenance of Induction motors, winding of Dc-motors, working with PLC systems, Transformers &
practically operation on control circuits. (Summer 2005 & 2006)
6. Electronics Project (Alexandria University)
Electronics & OP-Amp course practically applications such as Alarm circuits. (Summer 2003)
Hard Ware applications (2005/2006 - Alexandria University)
Control system on a mall Air conditioning and lighting systems, Door security system using infrared system,
Temperature control system.
SDMO power system www.sdmo.com (Riyadh Saudi Arabia 2008).
Delta DC power system www.aces-co.com (Riyadh Saudi Arabia 2011).
CONFERENCES
Sidi Krir Thermal Power Plant (two invitations to know more about BOOT system, induction motor ,
boilers , turbines , drives & transformers).(winter 2005/2006)
Alexandria University - Lab (Starting, Braking & Speed control of AC & DC machines).
The Technology & Human Development Conference (at Bibliotheca Alexandria from 9th to 11th
of Feb 2004).
Attending lectures on stress management held by Dr. Ibrahim El-Fiky.
Safety course in SWCC Plants in KSA (March 2013), Certified AP.
Communication skills course at Cairo University by Dr. Ibrahim El-Fiky.
LANGUAGES
Arabic (mother tongue).
English (Fluently written & spoken).
COMPUTER SKILLS
Packages: Computer hardware & software maintenance, Lighting design (CALCULUX – DIALUX),
Power design (POWEREX – ECODIAL) and well experienced in AutoCAD electrical design.
Office Tools: Professional skill using Word, outlook, power point and excel, well knowing of Microsoft
project software.
PERSONAL SKILLS
Capable to cooperate in a team work.
Able to manage multiple tasks and commit to deadlines.
Smoothly adapting with any change in instructions, work flow or management.
Fast learner.
Eager to learn anything and everything that comes in my way.
Excellent attention to details.
Strong analytical and numerical skills.
Excellent oral and written communication skills.
Basketball player & recorded in the Egyptian basketball federation since 1994.
Mobility for traveling.
Have large experience in working under pressure.
7. Good leadership to local & foreign workers & technicians.
Identify & effectively implement client needs & requirements.
Was an IEEE member till 2009
Organizer's team leader for EED in 2007 (Help Desk department) (eed.eg).
Member of Egyptian Engineering Syndicate www.eea.org.eg.
Member of Saudi Engineering council. www.saudieng.sa.
PERSONAL DATA
Date of Birth: 04/11/1984
Marital Status: Married
Nationality: Egyptian
Military State: Exempted.
Driving License: Valid in Egypt & Saudi Arabia.
REFERENCES
References and letters of recommendation are available on request.