SlideShare a Scribd company logo
1 of 7
Download to read offline
Anwar Morsi Mohammed Anwar
Amorsi4247638@yahoo.com
Cell no: +2 01020413678 , +2 047 3138503
Cell no: +966 558798609 , +966 532232730
OBJECTIVE
Seeking an engineering position with a multinational firm in operation, maintenance or installation
of electromechanical systems utilizing my international practical experience, theoretical background and
interpersonal skills to build up on my previous experience.
WORK EXPERIENCE
PROGER INTERNATIONAL – SPA (www.proger.it)
Jan 2014 – July 2015
Electrical Engineer (KAP 4 Projects) - Consultant
Company Profile:-
 Proger designs and manages projects for large building works through a global approach that integrates
specialized skills, solid experience and a capacity for growth and innovation.
 Founded in Italy in 1951 in Pescara and Chieti (Abruzzo), Proger is now an international company
providing Engineering & Management services in a range of civil and industrial engineering sectors.
 Proger is currently comprised of the following business units :-
 Building & construction.
 Infrastructure.
 Oil & GAS – Energy.
Key Responsibilities and Specific Accountabilities:
 Ensures that the project as per setting out plan.
 Ensure that the progress at site is as per approved time schedule.
 Inspect work done, samples, materials, workmanship, ensuring compliance with project documents.
 Following up and supervising all the inspection requests.
 Ensuring that all materials used and work performed are as per specifications, ITP and method of
statement.
 Day-to-day supervision of the site, including supervising and monitoring the progress and manpower.
 Overseeing quality control, health and safety matters on site; and ensure that construction is performed
as per safety plan.
 Coordination between structural, architectural and MEP.
 Ensuring that the Contractor performs his work in a manner that does not cause unnecessary or
improper interference to the public, including access to public or private roads and footpaths.
 Investigating sites condition to determine any kind of obstacles for the proposed construction during
work progress.
 Coordinating for testing of materials, processes or systems related to engineering works.
 Assisting all inspection procedures with site inspectors.
 Reports to Senior Engineer site related issues (Daily submittals, inspection requests, Quality Safety,
Progress, Resources, Risk, Material, and equipment’s delivered to site).
 Review and make recommendation to senior engineer of all Shop Drawings and quantities for accuracy.
 Keeping detailed record and quantity of work done, the Contractor’s construction equipment, labor
deployment and material usage on a day-to-day basis.
 Preparing reports on work progress with respect to project schedules and resources.
 Report any difficulties and other problems that may arise at the site.
 Review and make recommendations to senior engineer contractor payments, quantities and variations.
Projects: - (King Abdullah Projects – KAP 4)
 Dormitories:-
 Project Location: - Jeddah – KSA.
 Project Owner: - MOI (Ministry of interior- KSA).
 Project Contractor:- Al-Rashed Trading & contracting co. LTD ( RTCC)
 Project Period: - Two Years.
 Total Cost of the project: - 211 Million SAR.
 Project description:- The project is a residential compound which will be used as a family
housing for some of MOI team members , the compound consists of 200 apartments divided
on 10 buildings equivalently. There are some of facilities like Mosque, parking areas, internal
roads, landscape & green areas. Also there is a water treatment plant, Deep well, Two automatic
main gates for the compound, four transformers rooms, RMU, complete lighting, power, fire,
intercom, Telephone, MATV, CCTV & public Address systems serving all the compound parts .
 Sport Training Center (STC):-
 Project Location: - Mecca – KSA.
 Project Owner: - MOI (Ministry of interior- KSA).
 Project Contractor:- Al-Rashed Trading & contracting co. LTD ( RTCC)
 Project Period: - Two Years.
 Total Cost of the project: - 121 Million SAR.
 Project description:- The Project is a sport center contains a covered building consists of eight
parts having a covered playing areas , football stadium, swimming pools, squash & tennis courts.
All the required systems for lighting, power, MATV, CCTV, Pumping & public Address are
applicable.
-----------------------------------------------------------------------------------------------------------------------------------
ACES Co. (KSA) (www.aces-co.com) April 2012- Dec 2013
Project Manager
Company Profile:-
 Aces Company (Ranking 8 of the best 100 companies in Saudi Arabia).
 Aces (Advanced communication & electronic systems) company is one of the most leader companies in
GSM, electronics & communication systems in KSA.
 Working as a projects manager & western region area manager for civil, electromechanical & site
acquisition work in LTE, L+5, L+6, L+8, L+9 & RDS projects with Mobily, Zain, STC GSM networks.
Key Responsibilities and Specific Accountabilities:
 Attending all meetings with Customers (Mobily, Zain, STC ….etc.) to discuss all the related subjects in
our projects (Site acquisition, Civil & electromechanical).
 Handling all the available teams in our region to satisfy customer & achieve all required targets.
 Following up the invoicing process according to the contracts (LOA, LOP ………etc.).
 Preparing all the required documents like (FIS, BOQ, PAT, PAC, as built DRW …………etc.).
 Monitoring & control each step in the projects, Moreover supporting our team in sites, if there is any
unsolved problem they are facing & follow up their progress.
 Following up the projects closing & if we have any delay so it is a must to prepare justification reports &
follow up it.
 Adding to the above responsibilities, now I was acting as an Authorized person to issue the required
work permits in SWCC plants for TETRA project (www.swcc.gov.sa).
 Following up the execution for the procedures, rules & the safety instructions of SWCC plants.
 Following up the work progress according to the planed time schedule & preparing the progress reports.
-----------------------------------------------------------------------------------------------------------------------------------
ACES Co. (KSA) May 2011 –April 2012
Electrical Site Engineer
 I was working under Nemo project which can be defined as a project belongs to Saudi Arabia’s ministry
of interior (Border guides), as they were making a separate fiber network to monitor all the KSA borders.
 My responsibility in this project was to handle the installation process, teams, materials, & tools to
complete phase 1 in western & southern region.
 Doing PAT, PAC, and FAC for all the sites in western & southern regions.
 As one team, we were responsible for saving the power & installing all the electromechanical systems in
each site, the electromechanical devices were (HVAC system, rectifiers, Fire systems, generators & ATS,
adding to earthling systems…….etc.).
 After finishing our mission in phase 1, we worked as O/M team, responsible about the preventive &
corrective maintenance for western & southern regions.
 My responsibility was to handle our teams in the regions to cover all our customer requirements
(24hr/7days).
 Propose & implement electrical & mechanical guide lines & solutions needed for the project.
 Build up the required resources for the project implementation & operation.
-----------------------------------------------------------------------------------------------------------------------------------
ALEX MAR Co. (KSA):- April 2008 - March 2011
Electrical Engineer
 Worked as an electrical operation & maintenance engineer in Alex Mar company - Saudi Arabia branch
(southern region, Northern region) (www.alexmar.com)
 Al-Masrya for commercial investment (Alex Mar) company is a major telecom service provider for
electromechanical equipment installation, operation & maintenance. We were working for GSM
networks Mobily (www.mobily.com.sa) and Zain (www.zain.com) .
 As an Area engineer, I was responsible for following up preventive & corrective maintenance for all sites
in my region, also responsible about controlling the available resources (Cars, generators, technicians,
money ……………..etc.) to achieve all the work requirements in the region.
 Follow up the installation, testing & maintenance of DC systems :-
 Installation, configuration, & operating of DC systems.
 Making complete battery test report.
 Following up the required spare parts, fault trouble shooting & maintenance schedule.
 On air replacement for batteries banks without switching off the connected load.
 Brands (Benning, Delta, EATON, Emerson, Eltek).
 Follow up the installation, testing & maintenance of UPS :
 Installation, configuration, & maintenance of UPS systems.
 UPS system batteries installation & testing.
 Following up the required spare parts, fault trouble shooting & maintenance schedule.
 Design , installation & commissioning Huge central & HVAC air conditional system
including:-
 Civil work preparation.
 Electrical connection work & System startup configuration.
 Operation, maintenance & fault troubleshooting activities.
 Brands ( Liebert , Zamil , Emerson , Carrier ) , Types ( Split , Package , stand ).
 PLC systems maintenance & programming.
.
 AC Power systems
 Design for the LV networks for the GSM site.
 Implementation of all LV network equipment’s Includes:-
 Main distribution boards MDB.
 Lighting and emergency systems.
 Earthing system installation and earth test according to specific standards.
 Diesel generators operation
 Installation and operation for Diesel standby generator for shown brands.
 SDMO; Volvo; Deutz, Cummins, CAT, Perkins and John Deere.
 Generator control panel operation and fault troubleshooting.
 ATS control panel operation and fault troubleshooting.
 Installation and maintenance for Fire Fighting systems:-
 Firefighting main control board operation and fault troubleshooting.
 operation for carbon dioxide CO2 extinguishers
Since graduation till April 2008:-
 Worked as an instructor in the faculty of engineering in KFS University (1st Term 2007/2008).
 Worked as a member of the electrical designing team of the SANT KATRIN water pump stations
(Technical office) (From October 2007 to February 2008).
 Also was working in Axon center as a lecturer for AUTOCAD program basics (From September 2007
to February 2008).
 Then worked as an electrical installation, operating & maintenance engineer in VOK & BEG companies
(Valley of the Kings is a company in Borg El-Arab city in Alex. Consists of three factories in Egypt and
another three in Qatar working in metal works, Alimental & glass production) (From Jan 2008 till April
2008).
EDUCATION
 Alexandria University, Faculty of Engineering. 2000-2000
 B.Sc. of Electrical Power Engineering (Electrical Power Department).
 Graduation Grade: Very Good (77.8 %).
Project: Complete design for the electrical scheme involving (Cables selection, Protection, Distribution, Load study,
energy management, and illumination selection ….etc.) for residential town, Big Hotel, & some Smart house
applications.
Design of electrical power system (L.V. & M.V.) Under supervision of Prof. Dr. Ashraf Megahed
 Studying & preparing for PMP Exam to be PMI certified project manager before the end of
2015.
TRAINING COURSES
 Delta Sugar Company (www.deltasugar.com)
Maintenance of Induction motors, winding of Dc-motors, working with PLC systems, Transformers &
practically operation on control circuits. (Summer 2005 & 2006)
 Electronics Project (Alexandria University)
Electronics & OP-Amp course practically applications such as Alarm circuits. (Summer 2003)
 Hard Ware applications (2005/2006 - Alexandria University)
Control system on a mall Air conditioning and lighting systems, Door security system using infrared system,
Temperature control system.
 SDMO power system www.sdmo.com (Riyadh Saudi Arabia 2008).
 Delta DC power system www.aces-co.com (Riyadh Saudi Arabia 2011).
CONFERENCES
 Sidi Krir Thermal Power Plant (two invitations to know more about BOOT system, induction motor ,
boilers , turbines , drives & transformers).(winter 2005/2006)
 Alexandria University - Lab (Starting, Braking & Speed control of AC & DC machines).
 The Technology & Human Development Conference (at Bibliotheca Alexandria from 9th to 11th
of Feb 2004).
 Attending lectures on stress management held by Dr. Ibrahim El-Fiky.
 Safety course in SWCC Plants in KSA (March 2013), Certified AP.
 Communication skills course at Cairo University by Dr. Ibrahim El-Fiky.
LANGUAGES
 Arabic (mother tongue).
 English (Fluently written & spoken).
COMPUTER SKILLS
 Packages: Computer hardware & software maintenance, Lighting design (CALCULUX – DIALUX),
Power design (POWEREX – ECODIAL) and well experienced in AutoCAD electrical design.
 Office Tools: Professional skill using Word, outlook, power point and excel, well knowing of Microsoft
project software.
PERSONAL SKILLS
 Capable to cooperate in a team work.
 Able to manage multiple tasks and commit to deadlines.
 Smoothly adapting with any change in instructions, work flow or management.
 Fast learner.
 Eager to learn anything and everything that comes in my way.
 Excellent attention to details.
 Strong analytical and numerical skills.
 Excellent oral and written communication skills.
 Basketball player & recorded in the Egyptian basketball federation since 1994.
 Mobility for traveling.
 Have large experience in working under pressure.
 Good leadership to local & foreign workers & technicians.
 Identify & effectively implement client needs & requirements.
 Was an IEEE member till 2009
 Organizer's team leader for EED in 2007 (Help Desk department) (eed.eg).
 Member of Egyptian Engineering Syndicate www.eea.org.eg.
 Member of Saudi Engineering council. www.saudieng.sa.
PERSONAL DATA
 Date of Birth: 04/11/1984
 Marital Status: Married
 Nationality: Egyptian
 Military State: Exempted.
 Driving License: Valid in Egypt & Saudi Arabia.
REFERENCES
 References and letters of recommendation are available on request.

More Related Content

What's hot (20)

Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
Syed C.V
Syed C.VSyed C.V
Syed C.V
 
Ramin resume
Ramin resumeRamin resume
Ramin resume
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
Bill resume
Bill resumeBill resume
Bill resume
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
2016 Samir A. Fattah CV
2016 Samir A. Fattah CV2016 Samir A. Fattah CV
2016 Samir A. Fattah CV
 
Isagani M Porcina14
Isagani M  Porcina14Isagani M  Porcina14
Isagani M Porcina14
 
Lee Scholes MEP manager.
Lee Scholes MEP manager.Lee Scholes MEP manager.
Lee Scholes MEP manager.
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
Monitoring Programme Review
 
gassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resumegassim-al-gassim-revision-2-resume
gassim-al-gassim-revision-2-resume
 
gassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resumegassim-al-gassim-revision-1-resume
gassim-al-gassim-revision-1-resume
 
DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
DAMAC Heights Project
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 
John Castoro 091212
John Castoro 091212John Castoro 091212
John Castoro 091212
 
engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016engineer_Mohamed_Gamal Projects' control_CV-016
engineer_Mohamed_Gamal Projects' control_CV-016
 
Resume
ResumeResume
Resume
 

Similar to Anwar Morsi _________July 2015

Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Qahtan Adnan
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar SyedAmmar Syed
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.TOM VAN WYK
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad Ehab Saad
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad Ehab Saad
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammedahmed ali
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Islam Elshoura
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Rengasamy
 
Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy
 

Similar to Anwar Morsi _________July 2015 (20)

Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016Chief engineer Qahtan adnan CV 20-8-2016
Chief engineer Qahtan adnan CV 20-8-2016
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar Syed
 
cv resume
cv resumecv resume
cv resume
 
Khubaib Khan_CV Instrument
Khubaib Khan_CV InstrumentKhubaib Khan_CV Instrument
Khubaib Khan_CV Instrument
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
Deputy Manager Electrical
Deputy Manager ElectricalDeputy Manager Electrical
Deputy Manager Electrical
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 
Rev2 Indetails LC EhabSaad
Rev2 Indetails  LC EhabSaad Rev2 Indetails  LC EhabSaad
Rev2 Indetails LC EhabSaad
 
Profile (1).pdf
Profile (1).pdfProfile (1).pdf
Profile (1).pdf
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2Ahmed Elrassas CV_11_2015-rev2
Ahmed Elrassas CV_11_2015-rev2
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
Basim resume (3)
Basim resume (3)Basim resume (3)
Basim resume (3)
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project manager
 
Ahmed-shawky
Ahmed-shawkyAhmed-shawky
Ahmed-shawky
 
Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy Mohamed
 

Anwar Morsi _________July 2015

  • 1. Anwar Morsi Mohammed Anwar Amorsi4247638@yahoo.com Cell no: +2 01020413678 , +2 047 3138503 Cell no: +966 558798609 , +966 532232730 OBJECTIVE Seeking an engineering position with a multinational firm in operation, maintenance or installation of electromechanical systems utilizing my international practical experience, theoretical background and interpersonal skills to build up on my previous experience. WORK EXPERIENCE PROGER INTERNATIONAL – SPA (www.proger.it) Jan 2014 – July 2015 Electrical Engineer (KAP 4 Projects) - Consultant Company Profile:-  Proger designs and manages projects for large building works through a global approach that integrates specialized skills, solid experience and a capacity for growth and innovation.  Founded in Italy in 1951 in Pescara and Chieti (Abruzzo), Proger is now an international company providing Engineering & Management services in a range of civil and industrial engineering sectors.  Proger is currently comprised of the following business units :-  Building & construction.  Infrastructure.  Oil & GAS – Energy. Key Responsibilities and Specific Accountabilities:  Ensures that the project as per setting out plan.  Ensure that the progress at site is as per approved time schedule.  Inspect work done, samples, materials, workmanship, ensuring compliance with project documents.  Following up and supervising all the inspection requests.  Ensuring that all materials used and work performed are as per specifications, ITP and method of statement.  Day-to-day supervision of the site, including supervising and monitoring the progress and manpower.  Overseeing quality control, health and safety matters on site; and ensure that construction is performed as per safety plan.  Coordination between structural, architectural and MEP.  Ensuring that the Contractor performs his work in a manner that does not cause unnecessary or improper interference to the public, including access to public or private roads and footpaths.  Investigating sites condition to determine any kind of obstacles for the proposed construction during work progress.  Coordinating for testing of materials, processes or systems related to engineering works.  Assisting all inspection procedures with site inspectors.
  • 2.  Reports to Senior Engineer site related issues (Daily submittals, inspection requests, Quality Safety, Progress, Resources, Risk, Material, and equipment’s delivered to site).  Review and make recommendation to senior engineer of all Shop Drawings and quantities for accuracy.  Keeping detailed record and quantity of work done, the Contractor’s construction equipment, labor deployment and material usage on a day-to-day basis.  Preparing reports on work progress with respect to project schedules and resources.  Report any difficulties and other problems that may arise at the site.  Review and make recommendations to senior engineer contractor payments, quantities and variations. Projects: - (King Abdullah Projects – KAP 4)  Dormitories:-  Project Location: - Jeddah – KSA.  Project Owner: - MOI (Ministry of interior- KSA).  Project Contractor:- Al-Rashed Trading & contracting co. LTD ( RTCC)  Project Period: - Two Years.  Total Cost of the project: - 211 Million SAR.  Project description:- The project is a residential compound which will be used as a family housing for some of MOI team members , the compound consists of 200 apartments divided on 10 buildings equivalently. There are some of facilities like Mosque, parking areas, internal roads, landscape & green areas. Also there is a water treatment plant, Deep well, Two automatic main gates for the compound, four transformers rooms, RMU, complete lighting, power, fire, intercom, Telephone, MATV, CCTV & public Address systems serving all the compound parts .  Sport Training Center (STC):-  Project Location: - Mecca – KSA.  Project Owner: - MOI (Ministry of interior- KSA).  Project Contractor:- Al-Rashed Trading & contracting co. LTD ( RTCC)  Project Period: - Two Years.  Total Cost of the project: - 121 Million SAR.  Project description:- The Project is a sport center contains a covered building consists of eight parts having a covered playing areas , football stadium, swimming pools, squash & tennis courts. All the required systems for lighting, power, MATV, CCTV, Pumping & public Address are applicable. ----------------------------------------------------------------------------------------------------------------------------------- ACES Co. (KSA) (www.aces-co.com) April 2012- Dec 2013 Project Manager
  • 3. Company Profile:-  Aces Company (Ranking 8 of the best 100 companies in Saudi Arabia).  Aces (Advanced communication & electronic systems) company is one of the most leader companies in GSM, electronics & communication systems in KSA.  Working as a projects manager & western region area manager for civil, electromechanical & site acquisition work in LTE, L+5, L+6, L+8, L+9 & RDS projects with Mobily, Zain, STC GSM networks. Key Responsibilities and Specific Accountabilities:  Attending all meetings with Customers (Mobily, Zain, STC ….etc.) to discuss all the related subjects in our projects (Site acquisition, Civil & electromechanical).  Handling all the available teams in our region to satisfy customer & achieve all required targets.  Following up the invoicing process according to the contracts (LOA, LOP ………etc.).  Preparing all the required documents like (FIS, BOQ, PAT, PAC, as built DRW …………etc.).  Monitoring & control each step in the projects, Moreover supporting our team in sites, if there is any unsolved problem they are facing & follow up their progress.  Following up the projects closing & if we have any delay so it is a must to prepare justification reports & follow up it.  Adding to the above responsibilities, now I was acting as an Authorized person to issue the required work permits in SWCC plants for TETRA project (www.swcc.gov.sa).  Following up the execution for the procedures, rules & the safety instructions of SWCC plants.  Following up the work progress according to the planed time schedule & preparing the progress reports. ----------------------------------------------------------------------------------------------------------------------------------- ACES Co. (KSA) May 2011 –April 2012 Electrical Site Engineer  I was working under Nemo project which can be defined as a project belongs to Saudi Arabia’s ministry of interior (Border guides), as they were making a separate fiber network to monitor all the KSA borders.  My responsibility in this project was to handle the installation process, teams, materials, & tools to complete phase 1 in western & southern region.  Doing PAT, PAC, and FAC for all the sites in western & southern regions.  As one team, we were responsible for saving the power & installing all the electromechanical systems in each site, the electromechanical devices were (HVAC system, rectifiers, Fire systems, generators & ATS, adding to earthling systems…….etc.).  After finishing our mission in phase 1, we worked as O/M team, responsible about the preventive & corrective maintenance for western & southern regions.
  • 4.  My responsibility was to handle our teams in the regions to cover all our customer requirements (24hr/7days).  Propose & implement electrical & mechanical guide lines & solutions needed for the project.  Build up the required resources for the project implementation & operation. ----------------------------------------------------------------------------------------------------------------------------------- ALEX MAR Co. (KSA):- April 2008 - March 2011 Electrical Engineer  Worked as an electrical operation & maintenance engineer in Alex Mar company - Saudi Arabia branch (southern region, Northern region) (www.alexmar.com)  Al-Masrya for commercial investment (Alex Mar) company is a major telecom service provider for electromechanical equipment installation, operation & maintenance. We were working for GSM networks Mobily (www.mobily.com.sa) and Zain (www.zain.com) .  As an Area engineer, I was responsible for following up preventive & corrective maintenance for all sites in my region, also responsible about controlling the available resources (Cars, generators, technicians, money ……………..etc.) to achieve all the work requirements in the region.  Follow up the installation, testing & maintenance of DC systems :-  Installation, configuration, & operating of DC systems.  Making complete battery test report.  Following up the required spare parts, fault trouble shooting & maintenance schedule.  On air replacement for batteries banks without switching off the connected load.  Brands (Benning, Delta, EATON, Emerson, Eltek).  Follow up the installation, testing & maintenance of UPS :  Installation, configuration, & maintenance of UPS systems.  UPS system batteries installation & testing.  Following up the required spare parts, fault trouble shooting & maintenance schedule.  Design , installation & commissioning Huge central & HVAC air conditional system including:-  Civil work preparation.  Electrical connection work & System startup configuration.  Operation, maintenance & fault troubleshooting activities.  Brands ( Liebert , Zamil , Emerson , Carrier ) , Types ( Split , Package , stand ).  PLC systems maintenance & programming. .  AC Power systems  Design for the LV networks for the GSM site.  Implementation of all LV network equipment’s Includes:-
  • 5.  Main distribution boards MDB.  Lighting and emergency systems.  Earthing system installation and earth test according to specific standards.  Diesel generators operation  Installation and operation for Diesel standby generator for shown brands.  SDMO; Volvo; Deutz, Cummins, CAT, Perkins and John Deere.  Generator control panel operation and fault troubleshooting.  ATS control panel operation and fault troubleshooting.  Installation and maintenance for Fire Fighting systems:-  Firefighting main control board operation and fault troubleshooting.  operation for carbon dioxide CO2 extinguishers Since graduation till April 2008:-  Worked as an instructor in the faculty of engineering in KFS University (1st Term 2007/2008).  Worked as a member of the electrical designing team of the SANT KATRIN water pump stations (Technical office) (From October 2007 to February 2008).  Also was working in Axon center as a lecturer for AUTOCAD program basics (From September 2007 to February 2008).  Then worked as an electrical installation, operating & maintenance engineer in VOK & BEG companies (Valley of the Kings is a company in Borg El-Arab city in Alex. Consists of three factories in Egypt and another three in Qatar working in metal works, Alimental & glass production) (From Jan 2008 till April 2008). EDUCATION  Alexandria University, Faculty of Engineering. 2000-2000  B.Sc. of Electrical Power Engineering (Electrical Power Department).  Graduation Grade: Very Good (77.8 %). Project: Complete design for the electrical scheme involving (Cables selection, Protection, Distribution, Load study, energy management, and illumination selection ….etc.) for residential town, Big Hotel, & some Smart house applications. Design of electrical power system (L.V. & M.V.) Under supervision of Prof. Dr. Ashraf Megahed  Studying & preparing for PMP Exam to be PMI certified project manager before the end of 2015. TRAINING COURSES  Delta Sugar Company (www.deltasugar.com) Maintenance of Induction motors, winding of Dc-motors, working with PLC systems, Transformers & practically operation on control circuits. (Summer 2005 & 2006)
  • 6.  Electronics Project (Alexandria University) Electronics & OP-Amp course practically applications such as Alarm circuits. (Summer 2003)  Hard Ware applications (2005/2006 - Alexandria University) Control system on a mall Air conditioning and lighting systems, Door security system using infrared system, Temperature control system.  SDMO power system www.sdmo.com (Riyadh Saudi Arabia 2008).  Delta DC power system www.aces-co.com (Riyadh Saudi Arabia 2011). CONFERENCES  Sidi Krir Thermal Power Plant (two invitations to know more about BOOT system, induction motor , boilers , turbines , drives & transformers).(winter 2005/2006)  Alexandria University - Lab (Starting, Braking & Speed control of AC & DC machines).  The Technology & Human Development Conference (at Bibliotheca Alexandria from 9th to 11th of Feb 2004).  Attending lectures on stress management held by Dr. Ibrahim El-Fiky.  Safety course in SWCC Plants in KSA (March 2013), Certified AP.  Communication skills course at Cairo University by Dr. Ibrahim El-Fiky. LANGUAGES  Arabic (mother tongue).  English (Fluently written & spoken). COMPUTER SKILLS  Packages: Computer hardware & software maintenance, Lighting design (CALCULUX – DIALUX), Power design (POWEREX – ECODIAL) and well experienced in AutoCAD electrical design.  Office Tools: Professional skill using Word, outlook, power point and excel, well knowing of Microsoft project software. PERSONAL SKILLS  Capable to cooperate in a team work.  Able to manage multiple tasks and commit to deadlines.  Smoothly adapting with any change in instructions, work flow or management.  Fast learner.  Eager to learn anything and everything that comes in my way.  Excellent attention to details.  Strong analytical and numerical skills.  Excellent oral and written communication skills.  Basketball player & recorded in the Egyptian basketball federation since 1994.  Mobility for traveling.  Have large experience in working under pressure.
  • 7.  Good leadership to local & foreign workers & technicians.  Identify & effectively implement client needs & requirements.  Was an IEEE member till 2009  Organizer's team leader for EED in 2007 (Help Desk department) (eed.eg).  Member of Egyptian Engineering Syndicate www.eea.org.eg.  Member of Saudi Engineering council. www.saudieng.sa. PERSONAL DATA  Date of Birth: 04/11/1984  Marital Status: Married  Nationality: Egyptian  Military State: Exempted.  Driving License: Valid in Egypt & Saudi Arabia. REFERENCES  References and letters of recommendation are available on request.