SlideShare a Scribd company logo
1 of 6
ISAGANI M. PORCINA 
E-mail Address: g_porcina@yahoo.com 
Mobile Phone No.: +971-50-708-8934 
U.A.E. Drivers License No. : 1534523 
PERSONAL DATA 
Gender : Male 
Date of Birth : February 11, 1967 
Citizenship : Filipino 
Profession : Registered Electrical Engineer 
CAREER HISTORY 
Employer : 
Position : 
Project : 
JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI 
Dubai, UAE 
E&M Construction Manager & Preventive Maintenance Manager (June 2013 - Present) 
Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. 
Responsibilities: - Does review and ensures that sub-contractor’s maintenance report is in line with 
Maintenance Periodic Task requirements. 
- Issuing monthly W.O. to sub-contractor which is generated from MMS for their PM 
activity. 
- Conducts regular meeting with subs-contractor for the schedule of some parts that 
requires rectification or replacement, information update and queries. 
- Ensures and monitor task are executed in a proper manner and in accordance to task 
plan. 
- Collecting all PM reports and upload to the MMS. 
Employer : 
Position : 
Project : 
JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI 
Dubai, UAE 
E&M Construction Manager (April 2010 – May 2013) 
Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. 
Employer : 
Position : 
Project : 
JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI 
Dubai, UAE 
E&M Deputy Construction Manager (April 2008 to March 2010) 
Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. 
Responsibilities: Project Management for MEP works 
- Construction Planning and Detailed site activities. 
- E&M Design coordination and shop drawing production, with coordination of MEP 
with other trades. 
- Reviewed the design drawings and shop drawings for Power Single Lines Diagram for 
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, 
lightning arrester, grounding system and Auxiliary System like Fire Alarm System, 
ECS-OCS & TVS-OCS. Ventilation and Plumbing Systems. 
- Attend Meeting with the Designer for the queries and Drawing Coordination. 
- Attend Meeting with the different trades for site coordination. 
- Conduct Sub-con meeting for proper site coordination and site work monitoring. 
- Prepare work schedule and target date of completion. 
- Checked the Detailed Shop Drawing prior to site implementation. 
- Prepared manpower report and safety program. 
- Review E&M Construction Methodology. 
- Ensure of sub-contractor compliance with project quality plan and HSE policy.
- Attended site inspection by the Consultant. 
- Monitored the status of punch-list and rectification works. 
- Review the As-built drawing, Operation and Maintenance Manual. 
- Prepared hand over documents. 
Employer : 
Position : 
Project : 
KHI-Gtech (Kawasaki Heavy Industries-G Technology Joint Ventures) 
Ho Chi Minh City, Vietnam. 
Electrical Construction Manager (October 2007-April 2008) 
Saigon East & West Tunnel Highway Project 
Employer : 
Position : 
Project : 
TAISEI Vietnam (VINATA) 
Ho Chi Minh City, Vietnam. 
Electrical In-Charge (Aug. 2007 to Oct. 2007) 
Intel Plant.Vietnam. 
Responsibilities: - Site Management. 
- Office Documentation and checking of Electrical Design Drawing, 
Contract and Specification. 
- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and 
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, 
lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone 
System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable 
Antenna Television (CATV) 
- Review the documents and samples of Materials for Approval. 
- Prepared work schedule and target date of completion. 
- Checked the Detailed Shop Drawing prior to site implementation. 
- Prepared manpower report and safety program. 
- Review Electrical Construction Methodology for roughing-ins materials like Cable tray, 
conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board. 
- Attended site inspection by the Consultant. 
- Monitored the status of punch-list and rectification works. 
- Review the As-built drawing, Operation and Maintenance Manual. 
- Prepared hand over documents. 
Employer : 
Position : 
Project : 
KTOM JV (Kajima,Taisei,Obayashi & Maeda Joint Venture) 
Tan Son Nhat Airport, Hong Ha St.,Ward 2, Tan Binh Dist.Ho Chi Minh City, 
Vietnam 
CHIEF ELECTRICAL ENGINEER December 2005 to Aug. 2007 
TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL 
Responsibilities: - Project Managements 
- Office Documentation and checking of Electrical Design Drawing,Contract and 
specification. 
- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and 
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, 
lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone 
System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable 
Antenna Television (CATV), Master Clock System, Flight Information Display System 
( FIDS ) and other telecommunication system in the Airport. 
- Review the documents and samples of Materials for Approval. 
- Prepared work schedule and target date of completion. 
- Checked the Detailed Shop Drawing prior to site implementation. 
- Prepared manpower report and safety program. 
- Review Electrical Construction Methodology for roughing-ins materials like Cable 
tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board and
other auxiliary system at different building in the airport like Passenger Terminal Bldg 
- Attended site inspection by the Consultant. 
- Monitored the status of punch-list and rectification works. 
- Review the As-built drawing, Operation and Maintenance Manual. 
- Prepared hand over documents. 
Employer : 
Position : 
Project/s : 
SUMISETSU PHILIPPINES, INC. (SPI) 
6F The Pearl Bank Centre. 146 Valero St. Salcedo Village, Makati City 
E&M SITE MANAGER 
NEW ILOILO AIRPORT DEV’T PROJECT 
Barangay Duyan-Duyan, Cabatuan, Iloilo 
Jan. 2005- December 2005 
SANYO SEMICONDUCTOR MANUFACTURING 
Luisita Industrial Park, San Miguel, Tarlac 
May 2004- December 2004 
AJINOMOTO BULACAN 
Barangay Tabang, Guiguinto, Bulacan 
September 2003-April 2004 
NANOX PHASE II 
Clarkfield, Pampanga 
March 2003-August 2003 
ESTABLISHMENT OF LABORATORY FACILITIES FOR ADVANCED 
AQUACULTURE TECHNOLOGIES IN THE REPUBLIC OF THE PHILIPPINES. 
SEAFDEC, Tigbauan, Iloilo 
April 2002-March 2003 
TEXAS INSTRUMENT PHASE 3C EXT. BUILDING 
Loakan Road, Baguio City 
August 2000-March 2002 
BENGUET GENERAL HOSPITAL (BGH)- JICA PROJECT 
Benguet, Baguio City 
January 1999 – June 2000 
Responsibilities: - Project Managements 
- Office Documentation and checking of Electrical Design Drawing, 
Contract and specification. 
- Preparing Budget Plan for Project site expenses. 
- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and 
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, 
lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone 
System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable 
Antenna Television (CATV), Master Clock System, Flight Information Display System 
( FIDS ) and other telecommunication system in the Airport. 
- Review the documents and samples of Materials for Approval. 
- Prepared work schedule and target date of completion. 
- Checked the Detailed Shop Drawing prior to site implementation. 
- Prepared manpower report and safety program. 
- Prepared Electrical Construction Methodology for roughing-ins materials like Cable 
tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board and 
other auxiliary system at different building in the airport like Passenger Terminal Bldg.,
Control Tower and Operation Bldg., Administration Bldg. Cargo Terminal Bldg, 
Central Plant Electrical, Central Plant Mechanical, Maintenance Bldg., Fire Station 
Bldg., Sewage Treatment Plant, Underground Service Link, VOR, Glide Slope, 
Localizer Bldg. and other Airport facilities included in the contract. 
- Reviewed the Voltages Drop Calculation and revised the Single line diagram. 
- Prepared materials Take-off for Procurements, both local and imported base in 
Specification, Approved materials and Quantities. 
- Reviewed the Suppliers and Sub-con quotation and progress billing. 
- Prepared progress billing. 
- Prepared quotation for any additional works. 
- Attended site inspection by the Consultant. 
- Monitored the status of punch-list and rectification works. 
- Prepared the As-built drawing, Operation and Maintenance Manual. 
- Prepared hand over documents. 
Employer : 
Position : 
Project : 
EEI CONSTRUCTION CORPORATION 
Bagumbayan Libis, Quezon Cit 
ELECTRICAL SITE ENGINEER (January 1998-December 1998) 
: PACIFIC PLAZA TOWER Fort Bonifacio, Makati City 
Responsibilities: - Direct supervision of Mechanical and Electrical contractors. 
- Identify and solving conflicts in plans and actual construction. 
- Cost control, assessment of contractor’s progress payments. 
- Implement and follow-up on installation of electrical system at site. 
- Directs and performs at-site electrical construction inspections and records 
management. 
- Performs miscellaneous job-related duties as assigned. 
-Report to Project Manger. 
Employer : 
Position : 
Project : 
PHILIPPINE COMPAK BOARDS INC. 
Lapasan, Clarin, Misamis Occidental 
PRODUCTION SUPERVISOR June 1, 1995-October 15, 1997 
Employer : 
Position : 
Project : 
EDISON ELECTRIC INTEGRATED INC. 
25 Pacific St., T.S. Cruz Subd. Baesa, Quezon City 
COMMISSIONING & SERVICE ENGINEER October 1990-December 1993 
CONCORD TEXTILE 
Calamba, Laguna 
ASIA BREWERY GLASS PLANT II 
Cabuyao, Laguna 
EVER DEPARTMENT STORE 
Las Pinas, Metro Manila 
ISETANN DEPARTMENT STORE 
C. M. Recto Ave., M. M. 
HONDA CARS PHILIPPINES 
Sta. Rosa Industrial Park, Laguna 
TOYOTA AUTO PARTS 
Sta. Rosa, Laguna
EDUCATION 
SILLIMAN UNIVERSITY 
Dumaguete City 
Bachelor of Science in Electrical Engineering 
EAST VISAYAS SCHOOL OF ARTS AND TRADE 
Dumaguete City 
Secondary Education- 
WEST CITY ELEMENTARY SCHOOL 
Dumaguete City 
Elementary Education- 
GOVERNMENT EXAMINATION TAKEN AND PASSED 
(June 1990) Registered Electrical Engineering Licensure Examination 
(September 1996) National Telecommunications Commission Amateur Examination 
CAREER HIGHLIGHTS 
Recipient: Special Perfomance Award – Roads and Transport Authority , Dubai , UAE (May 2010)
Isagani M  Porcina14

More Related Content

What's hot

Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Jimmy Crooks
 
Resume of Eric Garvin
Resume of Eric GarvinResume of Eric Garvin
Resume of Eric GarvinEric Garvin
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EEwaseem odeh
 
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015Rodney Brown
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-Stevie Nimmo
 
Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece
 
Rob stringer cv_feb_16
Rob stringer cv_feb_16Rob stringer cv_feb_16
Rob stringer cv_feb_16Rob Stringer
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerTerence Anderson (BSEE & MBA)
 
John Lozada Resume
John Lozada ResumeJohn Lozada Resume
John Lozada Resumejohn lozada
 
Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English Carlos A Gonzalez
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)amr gamal
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) BriefSally Al-Gazzar
 
Scott Foret Resume 1-10-17
Scott Foret Resume 1-10-17Scott Foret Resume 1-10-17
Scott Foret Resume 1-10-17Scott Foret
 

What's hot (19)

Ed white resume
Ed white resumeEd white resume
Ed white resume
 
Hussein Ahmad Salem-CV
Hussein Ahmad Salem-CVHussein Ahmad Salem-CV
Hussein Ahmad Salem-CV
 
Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015Resume_jcrooks_12-15-2015
Resume_jcrooks_12-15-2015
 
Resume of Eric Garvin
Resume of Eric GarvinResume of Eric Garvin
Resume of Eric Garvin
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
CV-M.Hamza-KSA..
CV-M.Hamza-KSA.. CV-M.Hamza-KSA..
CV-M.Hamza-KSA..
 
noorCV
noorCVnoorCV
noorCV
 
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15Trevor Reece - CV 30.1.15
Trevor Reece - CV 30.1.15
 
Rob stringer cv_feb_16
Rob stringer cv_feb_16Rob stringer cv_feb_16
Rob stringer cv_feb_16
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
 
John Lozada Resume
John Lozada ResumeJohn Lozada Resume
John Lozada Resume
 
P._Perehinec_3-30-16
P._Perehinec_3-30-16P._Perehinec_3-30-16
P._Perehinec_3-30-16
 
Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English Carlos A. Gonzalez CV English
Carlos A. Gonzalez CV English
 
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
___CV of Senior ELV%2c Special & Electrical Systems Engineer (Amr Gamal) (1) (2)
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
 
Scott Foret Resume 1-10-17
Scott Foret Resume 1-10-17Scott Foret Resume 1-10-17
Scott Foret Resume 1-10-17
 

Viewers also liked

Viewers also liked (20)

Jessica Anderson Resume 1.docx-1
Jessica Anderson Resume 1.docx-1Jessica Anderson Resume 1.docx-1
Jessica Anderson Resume 1.docx-1
 
Resume from GA Dept. of Labor
Resume from GA Dept. of LaborResume from GA Dept. of Labor
Resume from GA Dept. of Labor
 
RESUME JOAQUIN GONZALEZ
RESUME JOAQUIN GONZALEZRESUME JOAQUIN GONZALEZ
RESUME JOAQUIN GONZALEZ
 
Marc._Hinton_Resume
Marc._Hinton_ResumeMarc._Hinton_Resume
Marc._Hinton_Resume
 
Resume of Stacey A. Martin-2
Resume of Stacey A. Martin-2Resume of Stacey A. Martin-2
Resume of Stacey A. Martin-2
 
KendallStaton (1)
KendallStaton (1)KendallStaton (1)
KendallStaton (1)
 
Luke Joseph Resume (3)
Luke Joseph Resume (3)Luke Joseph Resume (3)
Luke Joseph Resume (3)
 
kevin RESUME
kevin RESUMEkevin RESUME
kevin RESUME
 
jovy resume
jovy resumejovy resume
jovy resume
 
Justin Andersen Resume
Justin Andersen ResumeJustin Andersen Resume
Justin Andersen Resume
 
diana kemper
diana kemperdiana kemper
diana kemper
 
kraigs new resume 2017
kraigs new resume 2017kraigs new resume 2017
kraigs new resume 2017
 
James_Hahn_ResumeApril2016
James_Hahn_ResumeApril2016James_Hahn_ResumeApril2016
James_Hahn_ResumeApril2016
 
GW M Resume
GW M ResumeGW M Resume
GW M Resume
 
update resume
update resumeupdate resume
update resume
 
My First Resume-2
My First Resume-2My First Resume-2
My First Resume-2
 
Emily Knecht Resume 2016
Emily Knecht Resume 2016Emily Knecht Resume 2016
Emily Knecht Resume 2016
 
Cheri's resume 2016-1B
Cheri's resume 2016-1BCheri's resume 2016-1B
Cheri's resume 2016-1B
 
Colby-Odom
Colby-OdomColby-Odom
Colby-Odom
 
Resume - James D Bigley v2
Resume - James D  Bigley v2Resume - James D  Bigley v2
Resume - James D Bigley v2
 

Similar to Isagani M Porcina14

Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza Aljabour
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16mujahid nawaz
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar SyedAmmar Syed
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMahmed effat
 

Similar to Isagani M Porcina14 (20)

Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
F. CV
F. CVF. CV
F. CV
 
MCV
MCVMCV
MCV
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Profile (1).pdf
Profile (1).pdfProfile (1).pdf
Profile (1).pdf
 
Bill resume
Bill resumeBill resume
Bill resume
 
Hamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATORHamza El Gabour cv MEP CORDINATOR
Hamza El Gabour cv MEP CORDINATOR
 
Sathish Kumar-Resume.
Sathish Kumar-Resume.Sathish Kumar-Resume.
Sathish Kumar-Resume.
 
Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16Nawaz CV as of 10-Jan- 16
Nawaz CV as of 10-Jan- 16
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
CV - Ammar Syed
CV - Ammar SyedCV - Ammar Syed
CV - Ammar Syed
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 
Basim resume (3)
Basim resume (3)Basim resume (3)
Basim resume (3)
 
CV_Mahesh Prajapati
CV_Mahesh PrajapatiCV_Mahesh Prajapati
CV_Mahesh Prajapati
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
nestor
nestornestor
nestor
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORM
 

Isagani M Porcina14

  • 1. ISAGANI M. PORCINA E-mail Address: g_porcina@yahoo.com Mobile Phone No.: +971-50-708-8934 U.A.E. Drivers License No. : 1534523 PERSONAL DATA Gender : Male Date of Birth : February 11, 1967 Citizenship : Filipino Profession : Registered Electrical Engineer CAREER HISTORY Employer : Position : Project : JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI Dubai, UAE E&M Construction Manager & Preventive Maintenance Manager (June 2013 - Present) Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. Responsibilities: - Does review and ensures that sub-contractor’s maintenance report is in line with Maintenance Periodic Task requirements. - Issuing monthly W.O. to sub-contractor which is generated from MMS for their PM activity. - Conducts regular meeting with subs-contractor for the schedule of some parts that requires rectification or replacement, information update and queries. - Ensures and monitor task are executed in a proper manner and in accordance to task plan. - Collecting all PM reports and upload to the MMS. Employer : Position : Project : JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI Dubai, UAE E&M Construction Manager (April 2010 – May 2013) Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. Employer : Position : Project : JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI Dubai, UAE E&M Deputy Construction Manager (April 2008 to March 2010) Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes. Responsibilities: Project Management for MEP works - Construction Planning and Detailed site activities. - E&M Design coordination and shop drawing production, with coordination of MEP with other trades. - Reviewed the design drawings and shop drawings for Power Single Lines Diagram for Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like Fire Alarm System, ECS-OCS & TVS-OCS. Ventilation and Plumbing Systems. - Attend Meeting with the Designer for the queries and Drawing Coordination. - Attend Meeting with the different trades for site coordination. - Conduct Sub-con meeting for proper site coordination and site work monitoring. - Prepare work schedule and target date of completion. - Checked the Detailed Shop Drawing prior to site implementation. - Prepared manpower report and safety program. - Review E&M Construction Methodology. - Ensure of sub-contractor compliance with project quality plan and HSE policy.
  • 2. - Attended site inspection by the Consultant. - Monitored the status of punch-list and rectification works. - Review the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents. Employer : Position : Project : KHI-Gtech (Kawasaki Heavy Industries-G Technology Joint Ventures) Ho Chi Minh City, Vietnam. Electrical Construction Manager (October 2007-April 2008) Saigon East & West Tunnel Highway Project Employer : Position : Project : TAISEI Vietnam (VINATA) Ho Chi Minh City, Vietnam. Electrical In-Charge (Aug. 2007 to Oct. 2007) Intel Plant.Vietnam. Responsibilities: - Site Management. - Office Documentation and checking of Electrical Design Drawing, Contract and Specification. - Reviewed the design drawings for Power Single Lines Diagram for High Voltage and Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable Antenna Television (CATV) - Review the documents and samples of Materials for Approval. - Prepared work schedule and target date of completion. - Checked the Detailed Shop Drawing prior to site implementation. - Prepared manpower report and safety program. - Review Electrical Construction Methodology for roughing-ins materials like Cable tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board. - Attended site inspection by the Consultant. - Monitored the status of punch-list and rectification works. - Review the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents. Employer : Position : Project : KTOM JV (Kajima,Taisei,Obayashi & Maeda Joint Venture) Tan Son Nhat Airport, Hong Ha St.,Ward 2, Tan Binh Dist.Ho Chi Minh City, Vietnam CHIEF ELECTRICAL ENGINEER December 2005 to Aug. 2007 TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL Responsibilities: - Project Managements - Office Documentation and checking of Electrical Design Drawing,Contract and specification. - Reviewed the design drawings for Power Single Lines Diagram for High Voltage and Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable Antenna Television (CATV), Master Clock System, Flight Information Display System ( FIDS ) and other telecommunication system in the Airport. - Review the documents and samples of Materials for Approval. - Prepared work schedule and target date of completion. - Checked the Detailed Shop Drawing prior to site implementation. - Prepared manpower report and safety program. - Review Electrical Construction Methodology for roughing-ins materials like Cable tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board and
  • 3. other auxiliary system at different building in the airport like Passenger Terminal Bldg - Attended site inspection by the Consultant. - Monitored the status of punch-list and rectification works. - Review the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents. Employer : Position : Project/s : SUMISETSU PHILIPPINES, INC. (SPI) 6F The Pearl Bank Centre. 146 Valero St. Salcedo Village, Makati City E&M SITE MANAGER NEW ILOILO AIRPORT DEV’T PROJECT Barangay Duyan-Duyan, Cabatuan, Iloilo Jan. 2005- December 2005 SANYO SEMICONDUCTOR MANUFACTURING Luisita Industrial Park, San Miguel, Tarlac May 2004- December 2004 AJINOMOTO BULACAN Barangay Tabang, Guiguinto, Bulacan September 2003-April 2004 NANOX PHASE II Clarkfield, Pampanga March 2003-August 2003 ESTABLISHMENT OF LABORATORY FACILITIES FOR ADVANCED AQUACULTURE TECHNOLOGIES IN THE REPUBLIC OF THE PHILIPPINES. SEAFDEC, Tigbauan, Iloilo April 2002-March 2003 TEXAS INSTRUMENT PHASE 3C EXT. BUILDING Loakan Road, Baguio City August 2000-March 2002 BENGUET GENERAL HOSPITAL (BGH)- JICA PROJECT Benguet, Baguio City January 1999 – June 2000 Responsibilities: - Project Managements - Office Documentation and checking of Electrical Design Drawing, Contract and specification. - Preparing Budget Plan for Project site expenses. - Reviewed the design drawings for Power Single Lines Diagram for High Voltage and Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle, lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable Antenna Television (CATV), Master Clock System, Flight Information Display System ( FIDS ) and other telecommunication system in the Airport. - Review the documents and samples of Materials for Approval. - Prepared work schedule and target date of completion. - Checked the Detailed Shop Drawing prior to site implementation. - Prepared manpower report and safety program. - Prepared Electrical Construction Methodology for roughing-ins materials like Cable tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board and other auxiliary system at different building in the airport like Passenger Terminal Bldg.,
  • 4. Control Tower and Operation Bldg., Administration Bldg. Cargo Terminal Bldg, Central Plant Electrical, Central Plant Mechanical, Maintenance Bldg., Fire Station Bldg., Sewage Treatment Plant, Underground Service Link, VOR, Glide Slope, Localizer Bldg. and other Airport facilities included in the contract. - Reviewed the Voltages Drop Calculation and revised the Single line diagram. - Prepared materials Take-off for Procurements, both local and imported base in Specification, Approved materials and Quantities. - Reviewed the Suppliers and Sub-con quotation and progress billing. - Prepared progress billing. - Prepared quotation for any additional works. - Attended site inspection by the Consultant. - Monitored the status of punch-list and rectification works. - Prepared the As-built drawing, Operation and Maintenance Manual. - Prepared hand over documents. Employer : Position : Project : EEI CONSTRUCTION CORPORATION Bagumbayan Libis, Quezon Cit ELECTRICAL SITE ENGINEER (January 1998-December 1998) : PACIFIC PLAZA TOWER Fort Bonifacio, Makati City Responsibilities: - Direct supervision of Mechanical and Electrical contractors. - Identify and solving conflicts in plans and actual construction. - Cost control, assessment of contractor’s progress payments. - Implement and follow-up on installation of electrical system at site. - Directs and performs at-site electrical construction inspections and records management. - Performs miscellaneous job-related duties as assigned. -Report to Project Manger. Employer : Position : Project : PHILIPPINE COMPAK BOARDS INC. Lapasan, Clarin, Misamis Occidental PRODUCTION SUPERVISOR June 1, 1995-October 15, 1997 Employer : Position : Project : EDISON ELECTRIC INTEGRATED INC. 25 Pacific St., T.S. Cruz Subd. Baesa, Quezon City COMMISSIONING & SERVICE ENGINEER October 1990-December 1993 CONCORD TEXTILE Calamba, Laguna ASIA BREWERY GLASS PLANT II Cabuyao, Laguna EVER DEPARTMENT STORE Las Pinas, Metro Manila ISETANN DEPARTMENT STORE C. M. Recto Ave., M. M. HONDA CARS PHILIPPINES Sta. Rosa Industrial Park, Laguna TOYOTA AUTO PARTS Sta. Rosa, Laguna
  • 5. EDUCATION SILLIMAN UNIVERSITY Dumaguete City Bachelor of Science in Electrical Engineering EAST VISAYAS SCHOOL OF ARTS AND TRADE Dumaguete City Secondary Education- WEST CITY ELEMENTARY SCHOOL Dumaguete City Elementary Education- GOVERNMENT EXAMINATION TAKEN AND PASSED (June 1990) Registered Electrical Engineering Licensure Examination (September 1996) National Telecommunications Commission Amateur Examination CAREER HIGHLIGHTS Recipient: Special Perfomance Award – Roads and Transport Authority , Dubai , UAE (May 2010)