1. ISAGANI M. PORCINA
E-mail Address: g_porcina@yahoo.com
Mobile Phone No.: +971-50-708-8934
U.A.E. Drivers License No. : 1534523
PERSONAL DATA
Gender : Male
Date of Birth : February 11, 1967
Citizenship : Filipino
Profession : Registered Electrical Engineer
CAREER HISTORY
Employer :
Position :
Project :
JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI
Dubai, UAE
E&M Construction Manager & Preventive Maintenance Manager (June 2013 - Present)
Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes.
Responsibilities: - Does review and ensures that sub-contractor’s maintenance report is in line with
Maintenance Periodic Task requirements.
- Issuing monthly W.O. to sub-contractor which is generated from MMS for their PM
activity.
- Conducts regular meeting with subs-contractor for the schedule of some parts that
requires rectification or replacement, information update and queries.
- Ensures and monitor task are executed in a proper manner and in accordance to task
plan.
- Collecting all PM reports and upload to the MMS.
Employer :
Position :
Project :
JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI
Dubai, UAE
E&M Construction Manager (April 2010 – May 2013)
Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes.
Employer :
Position :
Project :
JTMJV ( Japan-Turkey Metro Joint Ventures ) OBAYASHI-KAJIMA-YAPI MERKEZI
Dubai, UAE
E&M Deputy Construction Manager (April 2008 to March 2010)
Dubai Metro Project, Red Line & Green Line Underground Station, Tunnel & Annexes.
Responsibilities: Project Management for MEP works
- Construction Planning and Detailed site activities.
- E&M Design coordination and shop drawing production, with coordination of MEP
with other trades.
- Reviewed the design drawings and shop drawings for Power Single Lines Diagram for
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle,
lightning arrester, grounding system and Auxiliary System like Fire Alarm System,
ECS-OCS & TVS-OCS. Ventilation and Plumbing Systems.
- Attend Meeting with the Designer for the queries and Drawing Coordination.
- Attend Meeting with the different trades for site coordination.
- Conduct Sub-con meeting for proper site coordination and site work monitoring.
- Prepare work schedule and target date of completion.
- Checked the Detailed Shop Drawing prior to site implementation.
- Prepared manpower report and safety program.
- Review E&M Construction Methodology.
- Ensure of sub-contractor compliance with project quality plan and HSE policy.
2. - Attended site inspection by the Consultant.
- Monitored the status of punch-list and rectification works.
- Review the As-built drawing, Operation and Maintenance Manual.
- Prepared hand over documents.
Employer :
Position :
Project :
KHI-Gtech (Kawasaki Heavy Industries-G Technology Joint Ventures)
Ho Chi Minh City, Vietnam.
Electrical Construction Manager (October 2007-April 2008)
Saigon East & West Tunnel Highway Project
Employer :
Position :
Project :
TAISEI Vietnam (VINATA)
Ho Chi Minh City, Vietnam.
Electrical In-Charge (Aug. 2007 to Oct. 2007)
Intel Plant.Vietnam.
Responsibilities: - Site Management.
- Office Documentation and checking of Electrical Design Drawing,
Contract and Specification.
- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle,
lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone
System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable
Antenna Television (CATV)
- Review the documents and samples of Materials for Approval.
- Prepared work schedule and target date of completion.
- Checked the Detailed Shop Drawing prior to site implementation.
- Prepared manpower report and safety program.
- Review Electrical Construction Methodology for roughing-ins materials like Cable tray,
conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board.
- Attended site inspection by the Consultant.
- Monitored the status of punch-list and rectification works.
- Review the As-built drawing, Operation and Maintenance Manual.
- Prepared hand over documents.
Employer :
Position :
Project :
KTOM JV (Kajima,Taisei,Obayashi & Maeda Joint Venture)
Tan Son Nhat Airport, Hong Ha St.,Ward 2, Tan Binh Dist.Ho Chi Minh City,
Vietnam
CHIEF ELECTRICAL ENGINEER December 2005 to Aug. 2007
TAN SON NHAT INTERNATIONAL AIRPORT TERMINAL
Responsibilities: - Project Managements
- Office Documentation and checking of Electrical Design Drawing,Contract and
specification.
- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle,
lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone
System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable
Antenna Television (CATV), Master Clock System, Flight Information Display System
( FIDS ) and other telecommunication system in the Airport.
- Review the documents and samples of Materials for Approval.
- Prepared work schedule and target date of completion.
- Checked the Detailed Shop Drawing prior to site implementation.
- Prepared manpower report and safety program.
- Review Electrical Construction Methodology for roughing-ins materials like Cable
tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board and
3. other auxiliary system at different building in the airport like Passenger Terminal Bldg
- Attended site inspection by the Consultant.
- Monitored the status of punch-list and rectification works.
- Review the As-built drawing, Operation and Maintenance Manual.
- Prepared hand over documents.
Employer :
Position :
Project/s :
SUMISETSU PHILIPPINES, INC. (SPI)
6F The Pearl Bank Centre. 146 Valero St. Salcedo Village, Makati City
E&M SITE MANAGER
NEW ILOILO AIRPORT DEV’T PROJECT
Barangay Duyan-Duyan, Cabatuan, Iloilo
Jan. 2005- December 2005
SANYO SEMICONDUCTOR MANUFACTURING
Luisita Industrial Park, San Miguel, Tarlac
May 2004- December 2004
AJINOMOTO BULACAN
Barangay Tabang, Guiguinto, Bulacan
September 2003-April 2004
NANOX PHASE II
Clarkfield, Pampanga
March 2003-August 2003
ESTABLISHMENT OF LABORATORY FACILITIES FOR ADVANCED
AQUACULTURE TECHNOLOGIES IN THE REPUBLIC OF THE PHILIPPINES.
SEAFDEC, Tigbauan, Iloilo
April 2002-March 2003
TEXAS INSTRUMENT PHASE 3C EXT. BUILDING
Loakan Road, Baguio City
August 2000-March 2002
BENGUET GENERAL HOSPITAL (BGH)- JICA PROJECT
Benguet, Baguio City
January 1999 – June 2000
Responsibilities: - Project Managements
- Office Documentation and checking of Electrical Design Drawing,
Contract and specification.
- Preparing Budget Plan for Project site expenses.
- Reviewed the design drawings for Power Single Lines Diagram for High Voltage and
Low Voltage power feeder lines, Panel boards, controllers , Lighting, receptacle,
lightning arrester, grounding system and Auxiliary System like MDF/ PABX Telephone
System, Fire Alarm System, Public Address, Close Circuit Television (CCTV), Cable
Antenna Television (CATV), Master Clock System, Flight Information Display System
( FIDS ) and other telecommunication system in the Airport.
- Review the documents and samples of Materials for Approval.
- Prepared work schedule and target date of completion.
- Checked the Detailed Shop Drawing prior to site implementation.
- Prepared manpower report and safety program.
- Prepared Electrical Construction Methodology for roughing-ins materials like Cable
tray, conduit piping, boxes setting, wiring devices, lighting fixtures, LV panel board and
other auxiliary system at different building in the airport like Passenger Terminal Bldg.,
4. Control Tower and Operation Bldg., Administration Bldg. Cargo Terminal Bldg,
Central Plant Electrical, Central Plant Mechanical, Maintenance Bldg., Fire Station
Bldg., Sewage Treatment Plant, Underground Service Link, VOR, Glide Slope,
Localizer Bldg. and other Airport facilities included in the contract.
- Reviewed the Voltages Drop Calculation and revised the Single line diagram.
- Prepared materials Take-off for Procurements, both local and imported base in
Specification, Approved materials and Quantities.
- Reviewed the Suppliers and Sub-con quotation and progress billing.
- Prepared progress billing.
- Prepared quotation for any additional works.
- Attended site inspection by the Consultant.
- Monitored the status of punch-list and rectification works.
- Prepared the As-built drawing, Operation and Maintenance Manual.
- Prepared hand over documents.
Employer :
Position :
Project :
EEI CONSTRUCTION CORPORATION
Bagumbayan Libis, Quezon Cit
ELECTRICAL SITE ENGINEER (January 1998-December 1998)
: PACIFIC PLAZA TOWER Fort Bonifacio, Makati City
Responsibilities: - Direct supervision of Mechanical and Electrical contractors.
- Identify and solving conflicts in plans and actual construction.
- Cost control, assessment of contractor’s progress payments.
- Implement and follow-up on installation of electrical system at site.
- Directs and performs at-site electrical construction inspections and records
management.
- Performs miscellaneous job-related duties as assigned.
-Report to Project Manger.
Employer :
Position :
Project :
PHILIPPINE COMPAK BOARDS INC.
Lapasan, Clarin, Misamis Occidental
PRODUCTION SUPERVISOR June 1, 1995-October 15, 1997
Employer :
Position :
Project :
EDISON ELECTRIC INTEGRATED INC.
25 Pacific St., T.S. Cruz Subd. Baesa, Quezon City
COMMISSIONING & SERVICE ENGINEER October 1990-December 1993
CONCORD TEXTILE
Calamba, Laguna
ASIA BREWERY GLASS PLANT II
Cabuyao, Laguna
EVER DEPARTMENT STORE
Las Pinas, Metro Manila
ISETANN DEPARTMENT STORE
C. M. Recto Ave., M. M.
HONDA CARS PHILIPPINES
Sta. Rosa Industrial Park, Laguna
TOYOTA AUTO PARTS
Sta. Rosa, Laguna
5. EDUCATION
SILLIMAN UNIVERSITY
Dumaguete City
Bachelor of Science in Electrical Engineering
EAST VISAYAS SCHOOL OF ARTS AND TRADE
Dumaguete City
Secondary Education-
WEST CITY ELEMENTARY SCHOOL
Dumaguete City
Elementary Education-
GOVERNMENT EXAMINATION TAKEN AND PASSED
(June 1990) Registered Electrical Engineering Licensure Examination
(September 1996) National Telecommunications Commission Amateur Examination
CAREER HIGHLIGHTS
Recipient: Special Perfomance Award – Roads and Transport Authority , Dubai , UAE (May 2010)