BARUN DUTTA
Contact No.: 91-7602021363/91-8130587477 E-Mail:- barundutta2004@gmail.com, barun_ee2004@yahoo.co.in
Seeking Meddle level assignments to gain valuable exposure in Strategic and Operational areas of Electrical Engineering So as
to deliver best of my efforts and skills for the progress and development of the organization.
PROFILE SUMMARY
 A dynamic professional with 10 years of experience in:
~ Operations & Maintenance
~ Project Management
~ Erection & Commissioning
~ Automation Engineering
~ Operation Management
 Maintenance, Automation, Instrumentation, Erection, Commissioning & Project Management.
 Possess experience across Electrical Operations, Maintenance, Power Supply, Installation and Plant Utilities.
 Effectively implemented various Process Control Projects & Automation Projects.
 Adept at conducting fault diagnosis and failure analysis to promptly overcome operational bottlenecks with demonstrated
capabilities in handling the entire range of project management activities.
 Well versed in Planning and Execution of Erection & Commissioning, Testing and Inspection activities in reducing
downtime and enhancing effectiveness of Electrical equipments.
 Proficiency planning & implementing the preventive, predictive & breakdown maintenance schedules for improving the
overall reliability and safety of plant equipments & machinery.
 Possessing Core engineering competencies in installation, commissioning & services of field instrumentation system &
supporting activities in erection & commissioning of press machines at site.
 Acknowledged for independently designing, developing the controls of the machines & coordinating the Process Planning
activities for various Important & Prestigious Projects.
 Hands on experience in Allen Bradley (Micrologix) & Siemens PLC, HMI & Drive in Control Automation & Service.
CORE COMPETENCIES:-
Project Management Personnel Oversight Customer Service
Documentation Safety Compliance Project Scheduling
Project Development Cross-functional Collaborations Cost Controls
Electrical Design Electrical Testing / Analysis Quality Controls
Project Funding Outsourcing / Contracted Services Purchasing
Report Preparation Process Improvements
EXPERIENCE:-
February 2012 till date with ITD-ITD CEM JV as a Sr. Electrical Engineer
Key Result Areas:-
 T.B.M in ITD-ITD CEM JV, Kolkata Metro Project
 Installation of 1010kva D.G. in ITD-ITD CEM JV
 Installation and maintenance of 2000kva transformer in ITD-ITD CEM JV
 Installation of grout plant in ITD-ITD CEM JV
Project Handling:-
Project Name: - Delhi Metro Rail Project CC-32 Duration: - Jan’14- Till Date
Project Details: - Working with two 6.66 diameter Tunnel Boring Machines (E.P.B. type) Herrenknechet made S-615 & S-616.
Assembly, commissioning and troubleshooting of all the TBM systems and site related equipment (cooling towers, grout plant,
ventilation system, DG sync panel and HV transformers). Managing TBM initial drive and main drive conversion activities.
Applying & inspecting periodic (daily, weekly, monthly, quarterly) basis preventive maintenance of TBM and other equipment.
Control and supervision electrical team for site activities. Prepare site related documentations.
Project Name: - Kolkata Metro Rail Project UG-2 Duration: - Feb’12- Jan’14
Project Details: -Managing Installation and commissioning of 6.66 meter diameter Tunnel Boring Machine (E.P.B. type)
Herrenknechet made(S-616) in initial drive & main drive as well as taking care of operation & maintenance of same. Handling
installation & commissioning of D.G. Sync. Panel & 1010Kva D.G. sets, 2000kva transformers. Involve in distribution of power
supply and site activities.
March 2011 to February 2012 with LEROY INFRA PVT LTD as an Electrical Engineer.
Key Result Areas:-
 Handled maintenance & operation of Batching Plant,
 Crusher Plant, DGS, motors & other equipment in Conventional Tunnel Project of Northern Frontier Railway in
Manipur (2.80km long); involve in power distribution at site,
 Laying of power cable, selection of proper switchgears & maintaining safety norms.
March 2010 to February 2011 with CONTROL AUTOMATION & SERVICES as an Automation Engineer.
Key Result Areas:-
 Developed Control philosophy of the process and HMI Pages for various projects like Iron Ore washing plant,
 Chemical Factory and hand on experience on Rockwell (Micrologix, SLC5), Siemens(S7-300) &
Drives(MM420,MM430)
 ABB Drives. Efficiently handled Micrologix, Panel View 400 & 400+, and S7 300 & OP 77A.
 Participated in installation, erection, commissioning & servicing of field instrumentation system, press machines.
Handled calibration of instruments as per schemes/ interface with systems like hydraulic pumps of Rexroth and
parker with variable flow and pressure.
August 2006 to June 2009 with PREMIER INFRASTRUCTURE as an Electrical Engineer
Key Result Areas:-
 Deftly handled Infra Work, Site excavation, tower foundation, tower erection, shelter erection for BTS sites. Managed
Erection & Commissioning of Electrical & Electronics Equipments like SMPS, UPS, Power Plant,
 Battery Bank (Up to 600 AH), PIU (Up to30 KVA), DG (Up to 30 KVA), and their maintenance. Requested for
Quotations (RFQs), Price Evaluation & Negotiation,
 Vendor allocation for Infra/EB. Maintained communication with Govt Organization to get EB connections in proper
time.
February 2006 to August 2006 with ASTER TELESERVICE PVT LTD as a Maintenance Engineer.
Key Result Areas:-
 Designing maintenance strategies, procedures and methods;
 Carrying out routine scheduled maintenance work and responding to equipment faults;
 Diagnosing breakdown problems;
 Fitting new parts and making sure equipment is working correctly;
 Carrying out quality inspections on jobs;
 Liaising with client departments, customers and other engineering and production colleagues;
 Arranging specialist procurement of fixtures, fittings or components;
 Controlling maintenance tools, stores and equipment;
 Monitoring and controlling maintenance costs;
 Dealing with emergencies, unplanned problems and repairs;
 Improving health and safety policies and procedures;
 Working with specialist equipment, such as programmable logic controllers (PLC), which control machinery on
factory assembly lines;
 Writing maintenance strategies to help with installation and commissioning guidelines;
 Ensuring there is continuous cover of the machinery and equipment in case of breakdowns.
August 2004 to February 2006 with Bisco Sponge Iron Private Limited as a Shift In charge.
Key Result Areas:-
 Effectively handling project planning, scheduling and handling the projects on time also monitoring & followed up
with customer, vendors and different internal departments for step-by-step activities getting done during execution of
project.
 Managing operation and maintenance of all major electrical equipments and ensuring maximum operational
availability thereof.
 Handling preventive and predictive maintenance of all major equipment; carrying out failure analysis and
troubleshooting.
 Monitoring and analyzing the equipments to avoid unexpected breakdown and efficiently handle breakdown &
modification by applying various efforts.
 Ensuring materials management and inventory control to maintain smooth flow of materials with minimum inventory
holding.
 Executing cost saving techniques and modifications to achieve substantial reduction in various expenditures.
 Responsible for Erection, Testing & Commissioning of electrical system and handling projects which includes
designing of all system, testing client inspection, commissioning, servicing and Fault finding.
 Interacting with the Electricity Board for round the clock grid availability at site
 Maintaining stores for necessary spare and accessories. Ensured Housekeeping & Daily inspections for all the
equipments
 Ensuring adherence to safety standards in all functional areas and implementing measures for enhancing safety levels
 Accountable for order finalization equipments, BOQ finalization, documentation of all Electrical equipments.
 Ensuring records are maintained across the entire course of project execution and also handling documentation of
Drawings, LOIs, Operation and maintenance manuals.
 Responsible for scheduling and monitoring continuous power supply to all critical equipments; effectively working on
different level of distribution systems
 Handling the processes of techno-commercial bid preparation/evaluation, vendor development, negotiations,
inventory management.
Training Handling:-
 Industrial safety on electrical equipments; Kolkata Port Trust (Haldia Dock Complex)
 PLC, SCADA, AC/DC Drives; Institute of Automation and Technology, Kolkata
ACADEMIC DETAILS:-
2004 Diploma in Electrical Engineering from Iswar Chandra Vidyasagar Polytechnic (Govt.)
IT SKILLS:-
Well versed with Oracle, basic knowledge of MS-Office (Word, Excel, PowerPoint)
PERSONAL DETAILS:-
Date of Birth 26 August 1980
Sex Male
Marital Status Married
Permanent Address Ranapur, Nimtala (Ghatal), District West Midnapore 721212, West Bengal, India
Declaration: I hereby declare that above mentioned information is true and fair to the best of my knowledge and belief.
Date: - 07/08/2015
Place: Kolkata (Barun Dutta)

More Related Content

What's hot

Facebook 1 abb
Facebook 1 abbFacebook 1 abb
Facebook 1 abb
Bhenoisky
 
waseem cv word document
waseem cv word documentwaseem cv word document
waseem cv word document
waseem yaqub
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
IQBAL KHAN
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
Jon MacInnis
 

What's hot (18)

FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 
RESUME C&I
RESUME C&IRESUME C&I
RESUME C&I
 
Facebook 1 abb
Facebook 1 abbFacebook 1 abb
Facebook 1 abb
 
My final resume
My final resumeMy final resume
My final resume
 
Abdelmouizz Mahfouz
Abdelmouizz MahfouzAbdelmouizz Mahfouz
Abdelmouizz Mahfouz
 
Geoffrey Rowling CV
Geoffrey Rowling CVGeoffrey Rowling CV
Geoffrey Rowling CV
 
waseem cv word document
waseem cv word documentwaseem cv word document
waseem cv word document
 
PankajKPrajapati
PankajKPrajapatiPankajKPrajapati
PankajKPrajapati
 
dovil jacildo cv
dovil jacildo cvdovil jacildo cv
dovil jacildo cv
 
CV
CVCV
CV
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
Cv of yasser_alammari
Cv of yasser_alammari Cv of yasser_alammari
Cv of yasser_alammari
 
RESUME october 2016 F
RESUME october 2016 FRESUME october 2016 F
RESUME october 2016 F
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
 
Resume j
Resume jResume j
Resume j
 
Latest resume
Latest resumeLatest resume
Latest resume
 
Latest resume
Latest resumeLatest resume
Latest resume
 

Similar to Barun Dutta Resume

PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
MAHMOOD AHMED
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
Syed Raza
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
Dileep Kumar
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
mohammed zameel zainudheen
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
usman ahmed
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
Shetteppa Najjarad
 

Similar to Barun Dutta Resume (20)

Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
PROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CVPROJECTS-RELAIBILITY-MAINTENANCE CV
PROJECTS-RELAIBILITY-MAINTENANCE CV
 
syed Raza _CV
syed Raza _CVsyed Raza _CV
syed Raza _CV
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
USMAN RESUME.doc 2
USMAN RESUME.doc 2USMAN RESUME.doc 2
USMAN RESUME.doc 2
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
resume 04092015
resume 04092015resume 04092015
resume 04092015
 
Resume avinash 142015
Resume avinash 142015Resume avinash 142015
Resume avinash 142015
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
arghadip
arghadiparghadip
arghadip
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
saif.resume dxb
saif.resume dxbsaif.resume dxb
saif.resume dxb
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2Joseph A K Effah Resume -rev2
Joseph A K Effah Resume -rev2
 
New - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year ExpNew - Shetteppa Najjarad BE with 5 Year Exp
New - Shetteppa Najjarad BE with 5 Year Exp
 

Barun Dutta Resume

  • 1. BARUN DUTTA Contact No.: 91-7602021363/91-8130587477 E-Mail:- barundutta2004@gmail.com, barun_ee2004@yahoo.co.in Seeking Meddle level assignments to gain valuable exposure in Strategic and Operational areas of Electrical Engineering So as to deliver best of my efforts and skills for the progress and development of the organization. PROFILE SUMMARY  A dynamic professional with 10 years of experience in: ~ Operations & Maintenance ~ Project Management ~ Erection & Commissioning ~ Automation Engineering ~ Operation Management  Maintenance, Automation, Instrumentation, Erection, Commissioning & Project Management.  Possess experience across Electrical Operations, Maintenance, Power Supply, Installation and Plant Utilities.  Effectively implemented various Process Control Projects & Automation Projects.  Adept at conducting fault diagnosis and failure analysis to promptly overcome operational bottlenecks with demonstrated capabilities in handling the entire range of project management activities.  Well versed in Planning and Execution of Erection & Commissioning, Testing and Inspection activities in reducing downtime and enhancing effectiveness of Electrical equipments.  Proficiency planning & implementing the preventive, predictive & breakdown maintenance schedules for improving the overall reliability and safety of plant equipments & machinery.  Possessing Core engineering competencies in installation, commissioning & services of field instrumentation system & supporting activities in erection & commissioning of press machines at site.  Acknowledged for independently designing, developing the controls of the machines & coordinating the Process Planning activities for various Important & Prestigious Projects.  Hands on experience in Allen Bradley (Micrologix) & Siemens PLC, HMI & Drive in Control Automation & Service. CORE COMPETENCIES:- Project Management Personnel Oversight Customer Service Documentation Safety Compliance Project Scheduling Project Development Cross-functional Collaborations Cost Controls Electrical Design Electrical Testing / Analysis Quality Controls Project Funding Outsourcing / Contracted Services Purchasing Report Preparation Process Improvements EXPERIENCE:- February 2012 till date with ITD-ITD CEM JV as a Sr. Electrical Engineer Key Result Areas:-  T.B.M in ITD-ITD CEM JV, Kolkata Metro Project  Installation of 1010kva D.G. in ITD-ITD CEM JV  Installation and maintenance of 2000kva transformer in ITD-ITD CEM JV  Installation of grout plant in ITD-ITD CEM JV Project Handling:- Project Name: - Delhi Metro Rail Project CC-32 Duration: - Jan’14- Till Date Project Details: - Working with two 6.66 diameter Tunnel Boring Machines (E.P.B. type) Herrenknechet made S-615 & S-616. Assembly, commissioning and troubleshooting of all the TBM systems and site related equipment (cooling towers, grout plant, ventilation system, DG sync panel and HV transformers). Managing TBM initial drive and main drive conversion activities. Applying & inspecting periodic (daily, weekly, monthly, quarterly) basis preventive maintenance of TBM and other equipment. Control and supervision electrical team for site activities. Prepare site related documentations. Project Name: - Kolkata Metro Rail Project UG-2 Duration: - Feb’12- Jan’14 Project Details: -Managing Installation and commissioning of 6.66 meter diameter Tunnel Boring Machine (E.P.B. type) Herrenknechet made(S-616) in initial drive & main drive as well as taking care of operation & maintenance of same. Handling installation & commissioning of D.G. Sync. Panel & 1010Kva D.G. sets, 2000kva transformers. Involve in distribution of power supply and site activities. March 2011 to February 2012 with LEROY INFRA PVT LTD as an Electrical Engineer.
  • 2. Key Result Areas:-  Handled maintenance & operation of Batching Plant,  Crusher Plant, DGS, motors & other equipment in Conventional Tunnel Project of Northern Frontier Railway in Manipur (2.80km long); involve in power distribution at site,  Laying of power cable, selection of proper switchgears & maintaining safety norms. March 2010 to February 2011 with CONTROL AUTOMATION & SERVICES as an Automation Engineer. Key Result Areas:-  Developed Control philosophy of the process and HMI Pages for various projects like Iron Ore washing plant,  Chemical Factory and hand on experience on Rockwell (Micrologix, SLC5), Siemens(S7-300) & Drives(MM420,MM430)  ABB Drives. Efficiently handled Micrologix, Panel View 400 & 400+, and S7 300 & OP 77A.  Participated in installation, erection, commissioning & servicing of field instrumentation system, press machines. Handled calibration of instruments as per schemes/ interface with systems like hydraulic pumps of Rexroth and parker with variable flow and pressure. August 2006 to June 2009 with PREMIER INFRASTRUCTURE as an Electrical Engineer Key Result Areas:-  Deftly handled Infra Work, Site excavation, tower foundation, tower erection, shelter erection for BTS sites. Managed Erection & Commissioning of Electrical & Electronics Equipments like SMPS, UPS, Power Plant,  Battery Bank (Up to 600 AH), PIU (Up to30 KVA), DG (Up to 30 KVA), and their maintenance. Requested for Quotations (RFQs), Price Evaluation & Negotiation,  Vendor allocation for Infra/EB. Maintained communication with Govt Organization to get EB connections in proper time. February 2006 to August 2006 with ASTER TELESERVICE PVT LTD as a Maintenance Engineer. Key Result Areas:-  Designing maintenance strategies, procedures and methods;  Carrying out routine scheduled maintenance work and responding to equipment faults;  Diagnosing breakdown problems;  Fitting new parts and making sure equipment is working correctly;  Carrying out quality inspections on jobs;  Liaising with client departments, customers and other engineering and production colleagues;  Arranging specialist procurement of fixtures, fittings or components;  Controlling maintenance tools, stores and equipment;  Monitoring and controlling maintenance costs;  Dealing with emergencies, unplanned problems and repairs;  Improving health and safety policies and procedures;  Working with specialist equipment, such as programmable logic controllers (PLC), which control machinery on factory assembly lines;  Writing maintenance strategies to help with installation and commissioning guidelines;  Ensuring there is continuous cover of the machinery and equipment in case of breakdowns. August 2004 to February 2006 with Bisco Sponge Iron Private Limited as a Shift In charge. Key Result Areas:-  Effectively handling project planning, scheduling and handling the projects on time also monitoring & followed up with customer, vendors and different internal departments for step-by-step activities getting done during execution of project.  Managing operation and maintenance of all major electrical equipments and ensuring maximum operational availability thereof.  Handling preventive and predictive maintenance of all major equipment; carrying out failure analysis and troubleshooting.  Monitoring and analyzing the equipments to avoid unexpected breakdown and efficiently handle breakdown & modification by applying various efforts.  Ensuring materials management and inventory control to maintain smooth flow of materials with minimum inventory holding.  Executing cost saving techniques and modifications to achieve substantial reduction in various expenditures.
  • 3.  Responsible for Erection, Testing & Commissioning of electrical system and handling projects which includes designing of all system, testing client inspection, commissioning, servicing and Fault finding.  Interacting with the Electricity Board for round the clock grid availability at site  Maintaining stores for necessary spare and accessories. Ensured Housekeeping & Daily inspections for all the equipments  Ensuring adherence to safety standards in all functional areas and implementing measures for enhancing safety levels  Accountable for order finalization equipments, BOQ finalization, documentation of all Electrical equipments.  Ensuring records are maintained across the entire course of project execution and also handling documentation of Drawings, LOIs, Operation and maintenance manuals.  Responsible for scheduling and monitoring continuous power supply to all critical equipments; effectively working on different level of distribution systems  Handling the processes of techno-commercial bid preparation/evaluation, vendor development, negotiations, inventory management. Training Handling:-  Industrial safety on electrical equipments; Kolkata Port Trust (Haldia Dock Complex)  PLC, SCADA, AC/DC Drives; Institute of Automation and Technology, Kolkata ACADEMIC DETAILS:- 2004 Diploma in Electrical Engineering from Iswar Chandra Vidyasagar Polytechnic (Govt.) IT SKILLS:- Well versed with Oracle, basic knowledge of MS-Office (Word, Excel, PowerPoint) PERSONAL DETAILS:- Date of Birth 26 August 1980 Sex Male Marital Status Married Permanent Address Ranapur, Nimtala (Ghatal), District West Midnapore 721212, West Bengal, India Declaration: I hereby declare that above mentioned information is true and fair to the best of my knowledge and belief. Date: - 07/08/2015 Place: Kolkata (Barun Dutta)