Eng. Samir Abdel Fattah 1 Mechanical Engineer
CURRICULUM VITAE (CV)
Date: 10.6.2016
Name: SamirAhmed Abdel Fattah E-mail: samiraafattah@yahoo.com
Mobile: 002 0100 1216181
Current Post: Infrastructure Project Manager / MEP Manager
Name of Firm : Projacs International
ProjectName: City Stars Sharm El SHeikh , Egypt
-----------------------------------------------------------------------------------------------------------------------------------------
Previous PostYear2014: MEP ProjectManager
Name of Firm: SuperStyle Company - UAE
-----------------------------------------------------------------------------------------------------------------------------------------
Previous Post Year 2012 - 2013: Projects Manager
Name of Firm: PICO for Real Estate Investments - Egypt
------------------------------------------------------------------------------------------------------------------------------------------
Previous Post Year2008 -2011 & Related Portfolio: City ManagementP.M. / MEP ProjectManager
Infrastructure & Roads Portfolio
Name of Firm: AFGRE Al-Futtaim Group Real Estate - Egypt
------------------------------------------------------------------------------------------------------------------------------------------
Previous Post Year2006 – 2007& Related Department: Project Manager / ElectromechanicalSupervi
sion Engineer/ Water& Sanitation Specialist-International Operations Department
Name of Firm: Dr. Ahmed Abdel-Warith Consulting Engineers, AAW- Algeria - Mo
rocco - Rwanda - Egypt
------------------------------------------------------------------------------------------------------------------
Previous Post Year2005 : Head of MechanicalCost Estimation Department
Name of Firm: CONTRACK –INTERNATIONAL/ ORASCOM OCI
Group Companies between Contrack International USA and Orascom OCI -
Egypt
--------------------------------------------------------------------------------------------------------------------------------------
PersonalData:
Profession: B.Sc.Mechanical Engineering-Power /CairoUniversity Faculty ofEngineering / July 1990
Date ofBirth: 28th November 1967 Age: 47 years Years of Experiences: More than 25 years
Address: Bldg.142 BeverlyHills Sheikh Zayed - 6 October City / Egypt
Mobile/Tel.: 002 0100 1216181 / 002 38571614 UAE Mobile: 00971 5555 30540
Nationality: Egyptian Marital Status: Married,4 children
Eng. Samir Abdel Fattah 2 Mechanical Engineer
Membership in ProfessionalSocieties: Egyptian SyndicateofProfessional Engineers.
Membership in SocialSocieties : ShootingClub.
Have a Valid UAE driving Licence
Key Qualifications:
Professional Experienceat thefollowingdomains:
Real EstateInfrastructureutilities and networks
Water Treatment Plants (dams stored water,surfacewater,deep well water,desalinated water
R.O.).
WasteWater Treatment Plants (sewage,drainage,reused).
Water Sources and Resources.
Sanitation.
High PressurePump Stations(Potable,sewage).
Water Hammer Protection Systems (waterpipelines,sewageforcemains).
Firefightingsystems and firefightingpump stations systems.
Boiler rooms and heat exchangers for steam generatingand heatingsystems for touristic
villages.
MEP Works for residential and commercial buildings
Electromechanical works for Olympic swimmingpools.
Plumbing,Sanitaryand Environmental works and therelated pipenetworks for potablewater,
sewagenetworks,irrigation networks,firefightingand forcemain lines.
Industrial Manufacturingfor theHigh Pressurevessels applied for Water Hammer protection
reservoirsup to90 m3 capacity and 25 barworkingpressure,Pressurized Sand and Media
Filters for water purification and treatment.
Steel Fabricated compact treatmentplants ,and all steel and stainless steel manufacturing
applications up to30mm thickness,usinghigh technology automatic and semi automatic
weldingtechniques and insulation paintsapplications.
MV and LV Substations, Transformer Rooms and Stand by Generators.
HVAC & Ventilation Works for Residential and Commercial buildings
Education:
ㄱ SchoolEducation, Frere Bab El Look year 1972 – 1983 Primaire et Preparatoire
College de la Salle year1982 – 1985 Secondaire
ㄴ BachelorofScience, CairoUniversity- Faculty ofEngineeringEgypt, June 1990.
Major:Mechanical Engineering Department:Power.
Grade: Good; Projectgrade:Excellent
ㄷ ProfessionalCertificate , AmericanUniversity in Cairo AUC,Egypt 2000
Major:Design and Operation of Water Treatment Plants
Grade: Excellent
ㄹ ProfessionalCertificate , AmericanUniversityin CairoAUC, Egypt 2006
Major: Design and Operation of WasteWater Treatment Plants
Grade: Excellent
ㅁ ProfessionalCertificate , MENA Chapter PMI , Egypt. 2010
Major: Successful Completion of PMP Preparation Exam
MENA Recognition
Eng. Samir Abdel Fattah 3 Mechanical Engineer
Languages:
Language Reading Speaking Writing
Arabic (Mother Tongue)
English Excellent Excellent Excellent
French Excellent Excellent Excellent
Professionalcourses
 AUTOCAD 1996
 PRIMAVERA-P3, 1998.
 Participation Certificatefor theDesign and Construction ofPipingSystems AUC2006.
 Participation Certificatefor theDesign principles for air conditioningsystems ASHRAE
2005.
 Participation Certificatefor theDesign principles for refrigeration systems ASHRAE 2005.
Eng. Samir Abdel Fattah 4 Mechanical Engineer
EmploymentRecord:
February2015 - Current : Projacs International
Post: MEP Manager
Project : City Stars Sharm El Sheikh / Egypt
The projectCity Stars @ Sharm El Sheikh had started, since Jan 2015, MEP & Infrastructure as well
as Finishes and some remaining civil works with cost budgetof 800 Millions L.E.
The projectcivil works, alreadystarted by year 2008, had reached a phase of main utilities and infra
structure with considerable costbudgetthat aimed to be ended within this year. FairmontHotel &
Swiss Otel planned to be renovated and soft opening by mid years 2016 and 2017consecutively. The
projects encounters 4 R.O. desalination plants capacity 4500 cubic meter per day each serving phas
e 1 and 2 as well as 4 sewage treatmentplants capacity of 3000 cubic metres per day each. The infra
structure networks have a massive work for sewage, potable and non potable water, MV and LV el
ectrical cable networks and its related distributors and transformer rooms in addition to low curren
t networks.
Main building and centrallaundry and kitchen in addition to existing hotel rooms and staff accom
modation rooms constitute a massive MEP works for chilled water plants and its networks up to FC
Us and air side related to AHUs, Fire fighting and fire alarm, plumbing and electrical works have
considerable weight.
The projacs projectmanagementand construction managementteam is composed of 6 on site and 6
at head office. Being onsite acting P.M. for budgetof more than 300 Millions L.E. it constitutes a co
nsiderable challenge that I have been successfully reaching almost80% of the required targetprogr
ess within a year.
-------------------------------------------------------------------------------------------------------------------------------------
February2014 - Jan 2015 Super Style Electromechanicalworks L.L.C. UAE
MEP ProjectManager - HVAC / F.F. & F.A. / Plumbing / Electrical & Low Current & BMS
- ManagingMEP works for Shamal School Ras Al Khaimah , with theclient MOP
W, Ministry ofPublic works and Main Contractor Al Nuaimi group
The project main MEP components includethesupply and installations for # 3 Chillers each of cap
acity 200TR and # 12 AHUs and # 2 FAHUs in addition toprimary-secondarychilled water pumps.
Firefightingsystems comprise2500sprinklersin addition to6 hydrants and 18 FHC as well as main F.F.
pump station havingelectrical,diesel and jockey pumps for main duty of 1000GPM@ 10 bar.
GRP Tanks capacities varyingfrom 300 cubic meters till 15 cubic meters weresupplied and installed serv
ing firefightingstoragerequirements as well as Domestic watertransfer pumps and its R.O.and filtratio
n units for water coolers use.
The project electrical load is 2.6 MW supported by twotransformers each ofcapacity 1.5 MW ,and distri
buted electrical loads arefulfilled through low voltagemain distribution boards and 5 MDBs and
10 SMDBs.
It worth mentioningthatchilled water system used pipes wereABS pipes (euro pipe) sizes startingas of
12 inch till feeding theAHUs & FAHUs water sidesizes 3 & 2 inch,thesystem was controlled through
Eng. Samir Abdel Fattah 5 Mechanical Engineer
pressureindependent control valvePICVs and controlled through BMS system tocontrol theflow accor
ding toDP sensors.Air flow is controlled via VAVs,pressureand temperaturesensors.
2012 - 2013 PICO for Real Estate Investments - Egypt : Projects Manager
Responsible for construction supervision of Water Pumping Station 20000 m3/hr and its main l
ine precastconcrete 1000mm diameter.
November2010 – December2011 Al Futtaim Group Real Estate - Cairo Festival City / New Cairo C
ity
Project Manager – City Management
SustainableIntegrated Operations is themain topic thatIwas in chargeduringthe1st pha
se of CFC program.Roles & Responsibilities weredirectlyshaped which weremainly bein direct relati
ons tomanagingOperations for thewhole Infrastructures includingits main Utilities as well as Buildin
gs main MEP works.
Jan 2008 – October2010 Al Futtaim Group Real Estate - Cairo Festival City / New Cairo City
MEP Project Manager – Infrastructure & Roads Portfolio
The project comprises theprovision ofmain infrastructureutilities for CairoFesti
val City Project.ProjectPhaseIwas fulfilled within thelast 2008 quarter and the1
st quarter 2009 and currently thesecond main phasefor Infrastructurecontractare
expedited by theMain Contractor Al Futtaim Carillion tostartthemain Infrastruc
tureprojects as ofJanuary 2010.Theproject is located at NewCairoCity,on a total
area of 700 Feddans.The CairoFestival City Master Plan comprises lifestylearea
of 500 privatevillas phased on 3 phases,and residential buildings;retailarea comp
rises an international brand names mall on 4 levels,as well as a mixed use buildin
gs, and in addition tothat twohotels areplanned.
My main scope comprised thefollowing:
 Modification of gas pipelinediameter of 10 inch and length over 2 km,
through thegovernmental entity PipePetroleum Company.
 Provision ofHDPE water networks diameter of355mm and lengths up to4
kms.
 Provision ofM.V. cableas well as energizingmain distributor room and its
related fivetransformer rooms capacity of16 MVA, cables length of 6 km
loop.
 PotablewaterPump Stations containingmain Water&Irrigation Reservoirs
each of capacity 5000m³/day,withall related electromechanical booster
systems and managementand utilities building.(Amongst City
Management Scope)
 Main SewagePump Station and prospected SewageTreatment Plant.
 Coordination withall related main networks,for sewage,water,irrigation
Eng. Samir Abdel Fattah 6 Mechanical Engineer
 MV electrical networks,as well as telephonenetworkand street lighting
and remainingutilities such as District CoolingPlant and MainElectrical
 Substation.(Amongst City managementScope)
2006 – 2007 Dr. Ahmed Abdel-Warith Consulting Engineers, Egypt
Project Manager / ElectromechanicalSupervision Engineer/ Water & Sanitatio
n Specialist
International Operations Department
Year 2006
Provision ofpotablewater toTlemcen city from Sekkakdam. The project is locate
d at Tlemcen city,West ofAlgeria. The objectiveoftheproject is tosupply potabl
e water toTlemcen city and it includes thefollowingcomponents:
 Water treatmentplantofcapacity 20000 m³/day
 Treated water reservoir 5000 m³/day
 Treated water pumpingstation (SP1)and electric substation
 Operatingbuildings
 Office buildingand laboratory
 Transmission lines (pipelineDiameter 700mm steel)from the intaketothe
water treatmentplant and reservoirand from the reservoirtotheraw water
tank( pipeline Diameter 800mm D.I.) with capacityof1000 and 5000m³;
travel length over 35 km for total transmission lines for thethreehigh
pressurepump stations up tothemain reservoir.
 Water Hammer Protection systems capacities for hydropneumatic tanks
areof 45 m3, 20m3 and 22m3 capacities consecutively.
 Two additional booster stations SP2 and SP3 of capacity 65000 m³/day.Each
booster associated ofone reservoir of1000m³ capacity,pump station
buildingand electric substation and administration building.
Year 2007
 Several ConsultancyMissions havebeen taken placeduringthis year
and for different International standard Clients. i.e.,L office National
de L eau Potable(ONEP) Morocco- actingas General Coordinator for
Huitieme Project BADD alimentation en Eau Potableet
D”assainissement. MINITERE RWANDA actingas Project Manager/
Water &Sanitation SpecialistEngineer for theconsultancy
team(6persons,3 professors and 3 engineers).Besides a lot of
international consultancy Tenders participations (amongthem wasAl-
Futtaim Infrastructure&Roads)as well as project managingdesign
teams for JV Tenders with Orascom for hugeWater & WasteWater
Tenders,one of them was theWater treatmentplantof4Million cubic
meter per day and its main 2000mm pipelines and booster pump
station,a project of500 Million U.S.Dollars, one of thebiggest cost
estimated projectin Egypt.
Eng. Samir Abdel Fattah 7 Mechanical Engineer
Jan 2005 – Dec 2005 CONTRACK –INTERNATIONAL/ ORASCOM OCI
Group Companies betweenContrackInternationalUSAandOrascom OCIEgypt
Head of MechanicalCost Estimation Department
Tender cost estimation for Plumbic and Firefightingand HVAC, as well as
Special Systems such as WTP,WWTP,Fuel systems ,Diesel Electric power suppl
y stations ,Military and Airfield applications etc…
 Study technical and cost estimates for plumbing;pump stations,water
treatmentplants,and firefightingworks,heatingventilation and air
conditioningsystems for projects in Egypt and at Bahrain.
 Describethe design needs requested to be fulfilled by CSG ( Contrack
Stanley Group USA/Egypt)
 Design Review for plumbing,mechanical systems,water hammer
protection systems,firefightingsystems,HVACsystems,water and waste
water treatmentsystemsfor military and aviation projects in Egypt and
abroad.
 Coordination and justification for thetechnical and financial suppliers
offers.
 Development for the technical and financial electromechanical tenders,as
well as coordination with the head office at theUSA for theinternational
submission oftenders.
 Study and preparethematerial listfor procurementissues.
2004 – 2004 Arab Engineering Office/ Ibrahim Adel & Partners
ProjectManager
Responsibilities included:
 Follow up 10 water treatment plants in el Wadi El Gedid ( New Valley ),
capacity of200 and 300 meters cubic per hour;contractof 14 millions L.E.
 Follow up civil and mechanical engineers
 Follow up installationstimeschedule
 Coordinatewith governmental engineers
 One year job fulfilled with high performance
2003 – 2004 QATAR BUILDING ENGINEERING CO. Doha/QATAR
ElectromechanicalDesign Engineer
Responsibilities included:
 Fully responsiblefor Plumbingand firefightingworks for Qatar Petroleum
Central Office at Mesaeed, as well as follows up HVAC subcontractorand
Electrical Tradeand coordinates with civil and architectural trades.
 Prepareshop drawings and Follow up engineers for plumbingand fire
fightingworks.
 Pick up materialsfrom drawings and issuepurchaseorders.
 Follow up Construction and installation for plumbingand networks.
 Coordinatewith QA/QC beforeinstallations.
 PrepareDraft for monthly invoice.
2001 – 2003 Arab Engineering Office/ Ibrahim Adel & Partners
Eng. Samir Abdel Fattah 8 Mechanical Engineer
Deputy GeneralManager
 PreparingCost analysis for tender offers as well as preparingplanning
phases for project procedures accordingtotimescheduleand resource
scheduleagainst cash flow charts (budget range500 000 L.E. up to 15
Millions L.E).
 Supervision &follow up projects technically,financiallyand coordinating
with financial manager,siteengineers and my general manager,as well as
follow up issuanceof monthly invoices and comparingdeviations from the
 planned cash flow and updatingdeviations (budget range30 Millions L.E.).
 Attendingmanagerial and technical meetings with clientsand project
managers for reviewingproject status,makingagreementsfor material
supplies,technical decisions as well any related timescheduleplans and
clarifications).
 Follow up technical office department for preparingand issuingtheshop
drawings for theconcerned projects as well as themanufacturingshop
drawings and makingsurethat thedrawings areaccordingtocodes
technically as well as approvingthedrawings good for construction and/or
manufacturing.
 Designing special topics such as:
 Water Hammer Protection Systems.
 SewageTreatment Plants.
 Water Treatment Plants.
 Boiler Room for special uses.
 Electric StorageHeaters and Steam StorageHeaters.
 SwimmingPools Olympic as well as ArtificialLakes.
 Domestic water pump station And firefightingpump station.
 PlumbingSystemsincludingall related topics and networks.
1999 – 2001 Arab Engineering Office/ Ibrahim Adel &Partners
ProjectManagementDepartmentManager
Scope of work:
 Preparingand PlanningProject TimeSchedules,material listcost
estimation,cash flow charts for Plumbing&mechanical contractproject
Holliday Inn (Crown Plaza)Sharm El Sheikh Touristic Beach Resort
Capacity of450 guest rooms (budget of 6.5 Millions L.E. & 510 000 $ as
well as 2.5 Millions L.E. Variation Orders and Extra Works).Handed Over
October 2001.
 Preparingand PlanningProject TimeSchedules,material listcost
estimation,cash flow charts for Plumbing& mechanical contractproject
Sol Elite (Coral Melia) Touristic Beach Resort Capacity of350 guest rooms
(budget of 6 Millions L.E. & 610 000 $ ). WorkContract Progressof50%.
Postponed by client sinceJuly 2000.
 Procurement ConsultantApproval &Purchasingorders for all equipments
and materials locallyand imported supplied.
 In chargeof issuingshop drawings for all plumbingand mechanical works.
 Follow up workprogress on siteduringperiodic visits and attending
Eng. Samir Abdel Fattah 9 Mechanical Engineer
monthly and technical meetings.As well as attendingcoordination
meetings at theconsultant head officeto coordinatewith other trades.
 Detail of tasks duringthis period :
First Phase:
 Employment of engineers,trainingthem for appropriatetasks such as
technical officeengineer as well as employment of siteengineers.
 Study of contract conditions and specifications and drawings and bill of
quantities.
 Planningand preparingWorkTimeSchedule for all activities by using
 PrimaveraSoftwareProgram.
 Planningand preparingmaterial List Technical Submittals.
 Planningand preparingShop Drawings.
Second Phase:
 Preparingtechnical data and catalogues for all materials.
 Procurement consultant approval for material technical data.
 Preparingand issuingshop drawings for all plumbingand mechanical
works.
 Procurement consultant approval for shop drawings.
 Attendingtechnical meetings and coordination meetings as well as
monthly sitemeetings
Third phase:
 Issuingpurchaseorders for imported materials and follow up opening
letter of credits for foreign supplies.
 Follow up workprogress on siteand visitingthesites Sharm El Sheikh
periodically as well as someother projects at different places.
 Preparingmonthlyforecastschedules.
 Issuingand follow up purchaseorders for local material supplies.
 Coordinate,with theowner project manager and his engineers,thescope
and progress of works.
 Coordinate,with theowner consultant officeand his representatives,the
technical procedures for installation,commissioningand handingover.
 Issuingand follow up monthly workcertificates.
1997 – 1999 ARAB ENGINEERING OFFICE
Cost Estimator and Technical Office Manager
During this Period I had successfully managetoincreasetender offers acceptance
budget up to 20 Millions L.E., as well as follow up workbudget of 5 Millions L.E.
Scope of work:
 In chargeof study technical specificationsand design drawings and
preparingand pricingbill ofquantities for tender offers.
 In chargeof discussingand attendingtender procurements.
 Follow up the suppliers offer prices.
 In chargefor follow up shop drawings and all projectstechnical data.
 In chargefor follow up and monitoringtimescheduleand workprogress
for all thecompany projects.
Eng. Samir Abdel Fattah 10 Mechanical Engineer
1995 – 1997 Abou Youssef Contracting & Trading Office (Swim. Pools and Jacuzzi agent)
ProjectManager
Scope of work:
Supply and install and testing,commissioning,and startup all electromechanical
works for Olympic SwimmingPools – Ahly National Club atMadinatNasr (budg
et of 4 Millions L.E).
1994 – 1955 Saad Hanna Sons Contracting and Trading Co.
SeniorSite Executive Engineer
Scope of work:
 In chargeof installations and testingfor all plumbingand firefighting
works includingmain networks for INTERCOTINENTAL SHARM EL
SHEIKH, capacity of250 guest rooms (budget of 1.5Millions L.E.).
 In chargeof attendingtechnical sitemeetings and issuingmonthly
certificates.
 In chargeof studyingany variation orders,and issuingmonthlywork
invoicecertificates.
 In chargeof studyingany variation orders and issuingsitedrawings for
approval.
1993 – 1994 Sinai Company for Touristic Development
SHEIKH COAST SHARM EL SHEIKH/Seconded from Crown Home Consulta
nt Eng. Ahmed Tag
Plumbing & Mechanical& HVAC Supervision Engineer
Scope of work:
 Supervision Engineer for all Plumbing&Mechanical & HVAC works for
SHEIKH COAST BEACH RESORT Phase1 at sharm el sheikh,capacity of
58 suites and 250 chalets and 500 guest rooms and 36 privatevillas (budget
of 30 Millions L.E.).
 Details of my personal tasks,duties,responsibilities and activities within
this period:
 In chargeof coordinatingPlumbingand Mechanical and HVAC trades with
all other trades (i.e. electrical and civil works and landscape).
 Sitesupervision for electromechanical works tobecopingtheconsultant
specifications and standard codes.
 In chargeof approvingor rejectingworktestsheld on siteon daily basis.
 In chargeof revisingmonthlypayment certificateand signingas first
signature.
 In chargeof attendingtechnical sitemeetings.
 In surplus totheabove-mentioned tasks,Ihad theopportunitytosupervise
theItalian contractors for thespecial works such as Desalination Plant
Capacity of600m³/d as well as SewageTreatmentPlantcapacityof
900m³/d.
Eng. Samir Abdel Fattah 11 Mechanical Engineer
1990 – 1993 Arab Engineering Office Electro-mechanical contractor
ProjectSite Engineer
My scope of workwithin this period wasthefollowingprojects:
 Plumbingand mechanical works for Touristic VillagePALMARIVA
HURGHADA (SOFITEL NOWADAYS), capacity of312 guest rooms,
package lump sum contract budget of4 Millions L.E. & 500 000 $.
 Mechanical works for Crazy Water entertainment water city at six October
city.
 Mechanical works for domestic booster pump station and sewage
treatmentplant athighly secured prison at AbouZaabal.

More Related Content

What's hot

Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerMuhammed Salahuddeen
 
Nisanth April 2015
Nisanth April 2015Nisanth April 2015
Nisanth April 2015Nisanth K N
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar El-Sanafawey
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.docmohamed saleh
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHesham Fathy, PMP
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons
 
Maintanance supervisor
Maintanance supervisorMaintanance supervisor
Maintanance supervisorMohamed Oweda
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVEben van Dyk
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015???? ?????
 

What's hot (20)

Saw Qualification1
Saw Qualification1Saw Qualification1
Saw Qualification1
 
Salah Salem CV
Salah Salem CVSalah Salem CV
Salah Salem CV
 
Resume
ResumeResume
Resume
 
CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016CV-SEENI MOHAMED-2016
CV-SEENI MOHAMED-2016
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 
Updated CV Azimuddin
Updated CV AzimuddinUpdated CV Azimuddin
Updated CV Azimuddin
 
CV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection EngineerCV Muhammed Salahuddeen, Fire Protection Engineer
CV Muhammed Salahuddeen, Fire Protection Engineer
 
Nisanth April 2015
Nisanth April 2015Nisanth April 2015
Nisanth April 2015
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
Mohamed Saleh fathy final cv.doc
Mohamed Saleh fathy  final cv.docMohamed Saleh fathy  final cv.doc
Mohamed Saleh fathy final cv.doc
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
CV Yasin
CV YasinCV Yasin
CV Yasin
 
Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_Mike Koons - Resume_Linkedin 2016_
Mike Koons - Resume_Linkedin 2016_
 
Maintanance supervisor
Maintanance supervisorMaintanance supervisor
Maintanance supervisor
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
 
Ahmed.Hassan_CV
Ahmed.Hassan_CVAhmed.Hassan_CV
Ahmed.Hassan_CV
 
Ahmed Hussein
Ahmed HusseinAhmed Hussein
Ahmed Hussein
 
Ahmed El- Kholy CV
Ahmed El- Kholy CVAhmed El- Kholy CV
Ahmed El- Kholy CV
 
Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15Ayman El Messlamy CV, RE-Updated 4-10-15
Ayman El Messlamy CV, RE-Updated 4-10-15
 
Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015Mohamed Ahmed Zeyada, Dec. 2015
Mohamed Ahmed Zeyada, Dec. 2015
 

Similar to 2016 Samir A. Fattah CV

Similar to 2016 Samir A. Fattah CV (20)

Islam's CV.pdf
Islam's CV.pdfIslam's CV.pdf
Islam's CV.pdf
 
mohamed moustafa resume
mohamed moustafa resumemohamed moustafa resume
mohamed moustafa resume
 
COMPANY PRESENTATION
COMPANY PRESENTATIONCOMPANY PRESENTATION
COMPANY PRESENTATION
 
mohamed alaa C V
mohamed alaa C Vmohamed alaa C V
mohamed alaa C V
 
c.v. abdooo
c.v. abdoooc.v. abdooo
c.v. abdooo
 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsman
 
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali GhalyCV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
CV Alaa Eldin Ahmed Mohamed Anwar Ali Ghaly
 
CV mohamed
CV mohamedCV mohamed
CV mohamed
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Cv Rafee
Cv Rafee Cv Rafee
Cv Rafee
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
Ahmed El_Nashar
Ahmed El_NasharAhmed El_Nashar
Ahmed El_Nashar
 
CV_Rr(2)
CV_Rr(2)CV_Rr(2)
CV_Rr(2)
 
Resume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed ZaherResume Mech. Eng-Mohamed Zaher
Resume Mech. Eng-Mohamed Zaher
 
Amarjeet Copy
Amarjeet   CopyAmarjeet   Copy
Amarjeet Copy
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0CV Mech Eng IBRAHIM ANWER 0
CV Mech Eng IBRAHIM ANWER 0
 
Mpe. muhammad elkhatib
Mpe. muhammad elkhatibMpe. muhammad elkhatib
Mpe. muhammad elkhatib
 

2016 Samir A. Fattah CV

  • 1. Eng. Samir Abdel Fattah 1 Mechanical Engineer CURRICULUM VITAE (CV) Date: 10.6.2016 Name: SamirAhmed Abdel Fattah E-mail: samiraafattah@yahoo.com Mobile: 002 0100 1216181 Current Post: Infrastructure Project Manager / MEP Manager Name of Firm : Projacs International ProjectName: City Stars Sharm El SHeikh , Egypt ----------------------------------------------------------------------------------------------------------------------------------------- Previous PostYear2014: MEP ProjectManager Name of Firm: SuperStyle Company - UAE ----------------------------------------------------------------------------------------------------------------------------------------- Previous Post Year 2012 - 2013: Projects Manager Name of Firm: PICO for Real Estate Investments - Egypt ------------------------------------------------------------------------------------------------------------------------------------------ Previous Post Year2008 -2011 & Related Portfolio: City ManagementP.M. / MEP ProjectManager Infrastructure & Roads Portfolio Name of Firm: AFGRE Al-Futtaim Group Real Estate - Egypt ------------------------------------------------------------------------------------------------------------------------------------------ Previous Post Year2006 – 2007& Related Department: Project Manager / ElectromechanicalSupervi sion Engineer/ Water& Sanitation Specialist-International Operations Department Name of Firm: Dr. Ahmed Abdel-Warith Consulting Engineers, AAW- Algeria - Mo rocco - Rwanda - Egypt ------------------------------------------------------------------------------------------------------------------ Previous Post Year2005 : Head of MechanicalCost Estimation Department Name of Firm: CONTRACK –INTERNATIONAL/ ORASCOM OCI Group Companies between Contrack International USA and Orascom OCI - Egypt -------------------------------------------------------------------------------------------------------------------------------------- PersonalData: Profession: B.Sc.Mechanical Engineering-Power /CairoUniversity Faculty ofEngineering / July 1990 Date ofBirth: 28th November 1967 Age: 47 years Years of Experiences: More than 25 years Address: Bldg.142 BeverlyHills Sheikh Zayed - 6 October City / Egypt Mobile/Tel.: 002 0100 1216181 / 002 38571614 UAE Mobile: 00971 5555 30540 Nationality: Egyptian Marital Status: Married,4 children
  • 2. Eng. Samir Abdel Fattah 2 Mechanical Engineer Membership in ProfessionalSocieties: Egyptian SyndicateofProfessional Engineers. Membership in SocialSocieties : ShootingClub. Have a Valid UAE driving Licence Key Qualifications: Professional Experienceat thefollowingdomains: Real EstateInfrastructureutilities and networks Water Treatment Plants (dams stored water,surfacewater,deep well water,desalinated water R.O.). WasteWater Treatment Plants (sewage,drainage,reused). Water Sources and Resources. Sanitation. High PressurePump Stations(Potable,sewage). Water Hammer Protection Systems (waterpipelines,sewageforcemains). Firefightingsystems and firefightingpump stations systems. Boiler rooms and heat exchangers for steam generatingand heatingsystems for touristic villages. MEP Works for residential and commercial buildings Electromechanical works for Olympic swimmingpools. Plumbing,Sanitaryand Environmental works and therelated pipenetworks for potablewater, sewagenetworks,irrigation networks,firefightingand forcemain lines. Industrial Manufacturingfor theHigh Pressurevessels applied for Water Hammer protection reservoirsup to90 m3 capacity and 25 barworkingpressure,Pressurized Sand and Media Filters for water purification and treatment. Steel Fabricated compact treatmentplants ,and all steel and stainless steel manufacturing applications up to30mm thickness,usinghigh technology automatic and semi automatic weldingtechniques and insulation paintsapplications. MV and LV Substations, Transformer Rooms and Stand by Generators. HVAC & Ventilation Works for Residential and Commercial buildings Education: ㄱ SchoolEducation, Frere Bab El Look year 1972 – 1983 Primaire et Preparatoire College de la Salle year1982 – 1985 Secondaire ㄴ BachelorofScience, CairoUniversity- Faculty ofEngineeringEgypt, June 1990. Major:Mechanical Engineering Department:Power. Grade: Good; Projectgrade:Excellent ㄷ ProfessionalCertificate , AmericanUniversity in Cairo AUC,Egypt 2000 Major:Design and Operation of Water Treatment Plants Grade: Excellent ㄹ ProfessionalCertificate , AmericanUniversityin CairoAUC, Egypt 2006 Major: Design and Operation of WasteWater Treatment Plants Grade: Excellent ㅁ ProfessionalCertificate , MENA Chapter PMI , Egypt. 2010 Major: Successful Completion of PMP Preparation Exam MENA Recognition
  • 3. Eng. Samir Abdel Fattah 3 Mechanical Engineer Languages: Language Reading Speaking Writing Arabic (Mother Tongue) English Excellent Excellent Excellent French Excellent Excellent Excellent Professionalcourses  AUTOCAD 1996  PRIMAVERA-P3, 1998.  Participation Certificatefor theDesign and Construction ofPipingSystems AUC2006.  Participation Certificatefor theDesign principles for air conditioningsystems ASHRAE 2005.  Participation Certificatefor theDesign principles for refrigeration systems ASHRAE 2005.
  • 4. Eng. Samir Abdel Fattah 4 Mechanical Engineer EmploymentRecord: February2015 - Current : Projacs International Post: MEP Manager Project : City Stars Sharm El Sheikh / Egypt The projectCity Stars @ Sharm El Sheikh had started, since Jan 2015, MEP & Infrastructure as well as Finishes and some remaining civil works with cost budgetof 800 Millions L.E. The projectcivil works, alreadystarted by year 2008, had reached a phase of main utilities and infra structure with considerable costbudgetthat aimed to be ended within this year. FairmontHotel & Swiss Otel planned to be renovated and soft opening by mid years 2016 and 2017consecutively. The projects encounters 4 R.O. desalination plants capacity 4500 cubic meter per day each serving phas e 1 and 2 as well as 4 sewage treatmentplants capacity of 3000 cubic metres per day each. The infra structure networks have a massive work for sewage, potable and non potable water, MV and LV el ectrical cable networks and its related distributors and transformer rooms in addition to low curren t networks. Main building and centrallaundry and kitchen in addition to existing hotel rooms and staff accom modation rooms constitute a massive MEP works for chilled water plants and its networks up to FC Us and air side related to AHUs, Fire fighting and fire alarm, plumbing and electrical works have considerable weight. The projacs projectmanagementand construction managementteam is composed of 6 on site and 6 at head office. Being onsite acting P.M. for budgetof more than 300 Millions L.E. it constitutes a co nsiderable challenge that I have been successfully reaching almost80% of the required targetprogr ess within a year. ------------------------------------------------------------------------------------------------------------------------------------- February2014 - Jan 2015 Super Style Electromechanicalworks L.L.C. UAE MEP ProjectManager - HVAC / F.F. & F.A. / Plumbing / Electrical & Low Current & BMS - ManagingMEP works for Shamal School Ras Al Khaimah , with theclient MOP W, Ministry ofPublic works and Main Contractor Al Nuaimi group The project main MEP components includethesupply and installations for # 3 Chillers each of cap acity 200TR and # 12 AHUs and # 2 FAHUs in addition toprimary-secondarychilled water pumps. Firefightingsystems comprise2500sprinklersin addition to6 hydrants and 18 FHC as well as main F.F. pump station havingelectrical,diesel and jockey pumps for main duty of 1000GPM@ 10 bar. GRP Tanks capacities varyingfrom 300 cubic meters till 15 cubic meters weresupplied and installed serv ing firefightingstoragerequirements as well as Domestic watertransfer pumps and its R.O.and filtratio n units for water coolers use. The project electrical load is 2.6 MW supported by twotransformers each ofcapacity 1.5 MW ,and distri buted electrical loads arefulfilled through low voltagemain distribution boards and 5 MDBs and 10 SMDBs. It worth mentioningthatchilled water system used pipes wereABS pipes (euro pipe) sizes startingas of 12 inch till feeding theAHUs & FAHUs water sidesizes 3 & 2 inch,thesystem was controlled through
  • 5. Eng. Samir Abdel Fattah 5 Mechanical Engineer pressureindependent control valvePICVs and controlled through BMS system tocontrol theflow accor ding toDP sensors.Air flow is controlled via VAVs,pressureand temperaturesensors. 2012 - 2013 PICO for Real Estate Investments - Egypt : Projects Manager Responsible for construction supervision of Water Pumping Station 20000 m3/hr and its main l ine precastconcrete 1000mm diameter. November2010 – December2011 Al Futtaim Group Real Estate - Cairo Festival City / New Cairo C ity Project Manager – City Management SustainableIntegrated Operations is themain topic thatIwas in chargeduringthe1st pha se of CFC program.Roles & Responsibilities weredirectlyshaped which weremainly bein direct relati ons tomanagingOperations for thewhole Infrastructures includingits main Utilities as well as Buildin gs main MEP works. Jan 2008 – October2010 Al Futtaim Group Real Estate - Cairo Festival City / New Cairo City MEP Project Manager – Infrastructure & Roads Portfolio The project comprises theprovision ofmain infrastructureutilities for CairoFesti val City Project.ProjectPhaseIwas fulfilled within thelast 2008 quarter and the1 st quarter 2009 and currently thesecond main phasefor Infrastructurecontractare expedited by theMain Contractor Al Futtaim Carillion tostartthemain Infrastruc tureprojects as ofJanuary 2010.Theproject is located at NewCairoCity,on a total area of 700 Feddans.The CairoFestival City Master Plan comprises lifestylearea of 500 privatevillas phased on 3 phases,and residential buildings;retailarea comp rises an international brand names mall on 4 levels,as well as a mixed use buildin gs, and in addition tothat twohotels areplanned. My main scope comprised thefollowing:  Modification of gas pipelinediameter of 10 inch and length over 2 km, through thegovernmental entity PipePetroleum Company.  Provision ofHDPE water networks diameter of355mm and lengths up to4 kms.  Provision ofM.V. cableas well as energizingmain distributor room and its related fivetransformer rooms capacity of16 MVA, cables length of 6 km loop.  PotablewaterPump Stations containingmain Water&Irrigation Reservoirs each of capacity 5000m³/day,withall related electromechanical booster systems and managementand utilities building.(Amongst City Management Scope)  Main SewagePump Station and prospected SewageTreatment Plant.  Coordination withall related main networks,for sewage,water,irrigation
  • 6. Eng. Samir Abdel Fattah 6 Mechanical Engineer  MV electrical networks,as well as telephonenetworkand street lighting and remainingutilities such as District CoolingPlant and MainElectrical  Substation.(Amongst City managementScope) 2006 – 2007 Dr. Ahmed Abdel-Warith Consulting Engineers, Egypt Project Manager / ElectromechanicalSupervision Engineer/ Water & Sanitatio n Specialist International Operations Department Year 2006 Provision ofpotablewater toTlemcen city from Sekkakdam. The project is locate d at Tlemcen city,West ofAlgeria. The objectiveoftheproject is tosupply potabl e water toTlemcen city and it includes thefollowingcomponents:  Water treatmentplantofcapacity 20000 m³/day  Treated water reservoir 5000 m³/day  Treated water pumpingstation (SP1)and electric substation  Operatingbuildings  Office buildingand laboratory  Transmission lines (pipelineDiameter 700mm steel)from the intaketothe water treatmentplant and reservoirand from the reservoirtotheraw water tank( pipeline Diameter 800mm D.I.) with capacityof1000 and 5000m³; travel length over 35 km for total transmission lines for thethreehigh pressurepump stations up tothemain reservoir.  Water Hammer Protection systems capacities for hydropneumatic tanks areof 45 m3, 20m3 and 22m3 capacities consecutively.  Two additional booster stations SP2 and SP3 of capacity 65000 m³/day.Each booster associated ofone reservoir of1000m³ capacity,pump station buildingand electric substation and administration building. Year 2007  Several ConsultancyMissions havebeen taken placeduringthis year and for different International standard Clients. i.e.,L office National de L eau Potable(ONEP) Morocco- actingas General Coordinator for Huitieme Project BADD alimentation en Eau Potableet D”assainissement. MINITERE RWANDA actingas Project Manager/ Water &Sanitation SpecialistEngineer for theconsultancy team(6persons,3 professors and 3 engineers).Besides a lot of international consultancy Tenders participations (amongthem wasAl- Futtaim Infrastructure&Roads)as well as project managingdesign teams for JV Tenders with Orascom for hugeWater & WasteWater Tenders,one of them was theWater treatmentplantof4Million cubic meter per day and its main 2000mm pipelines and booster pump station,a project of500 Million U.S.Dollars, one of thebiggest cost estimated projectin Egypt.
  • 7. Eng. Samir Abdel Fattah 7 Mechanical Engineer Jan 2005 – Dec 2005 CONTRACK –INTERNATIONAL/ ORASCOM OCI Group Companies betweenContrackInternationalUSAandOrascom OCIEgypt Head of MechanicalCost Estimation Department Tender cost estimation for Plumbic and Firefightingand HVAC, as well as Special Systems such as WTP,WWTP,Fuel systems ,Diesel Electric power suppl y stations ,Military and Airfield applications etc…  Study technical and cost estimates for plumbing;pump stations,water treatmentplants,and firefightingworks,heatingventilation and air conditioningsystems for projects in Egypt and at Bahrain.  Describethe design needs requested to be fulfilled by CSG ( Contrack Stanley Group USA/Egypt)  Design Review for plumbing,mechanical systems,water hammer protection systems,firefightingsystems,HVACsystems,water and waste water treatmentsystemsfor military and aviation projects in Egypt and abroad.  Coordination and justification for thetechnical and financial suppliers offers.  Development for the technical and financial electromechanical tenders,as well as coordination with the head office at theUSA for theinternational submission oftenders.  Study and preparethematerial listfor procurementissues. 2004 – 2004 Arab Engineering Office/ Ibrahim Adel & Partners ProjectManager Responsibilities included:  Follow up 10 water treatment plants in el Wadi El Gedid ( New Valley ), capacity of200 and 300 meters cubic per hour;contractof 14 millions L.E.  Follow up civil and mechanical engineers  Follow up installationstimeschedule  Coordinatewith governmental engineers  One year job fulfilled with high performance 2003 – 2004 QATAR BUILDING ENGINEERING CO. Doha/QATAR ElectromechanicalDesign Engineer Responsibilities included:  Fully responsiblefor Plumbingand firefightingworks for Qatar Petroleum Central Office at Mesaeed, as well as follows up HVAC subcontractorand Electrical Tradeand coordinates with civil and architectural trades.  Prepareshop drawings and Follow up engineers for plumbingand fire fightingworks.  Pick up materialsfrom drawings and issuepurchaseorders.  Follow up Construction and installation for plumbingand networks.  Coordinatewith QA/QC beforeinstallations.  PrepareDraft for monthly invoice. 2001 – 2003 Arab Engineering Office/ Ibrahim Adel & Partners
  • 8. Eng. Samir Abdel Fattah 8 Mechanical Engineer Deputy GeneralManager  PreparingCost analysis for tender offers as well as preparingplanning phases for project procedures accordingtotimescheduleand resource scheduleagainst cash flow charts (budget range500 000 L.E. up to 15 Millions L.E).  Supervision &follow up projects technically,financiallyand coordinating with financial manager,siteengineers and my general manager,as well as follow up issuanceof monthly invoices and comparingdeviations from the  planned cash flow and updatingdeviations (budget range30 Millions L.E.).  Attendingmanagerial and technical meetings with clientsand project managers for reviewingproject status,makingagreementsfor material supplies,technical decisions as well any related timescheduleplans and clarifications).  Follow up technical office department for preparingand issuingtheshop drawings for theconcerned projects as well as themanufacturingshop drawings and makingsurethat thedrawings areaccordingtocodes technically as well as approvingthedrawings good for construction and/or manufacturing.  Designing special topics such as:  Water Hammer Protection Systems.  SewageTreatment Plants.  Water Treatment Plants.  Boiler Room for special uses.  Electric StorageHeaters and Steam StorageHeaters.  SwimmingPools Olympic as well as ArtificialLakes.  Domestic water pump station And firefightingpump station.  PlumbingSystemsincludingall related topics and networks. 1999 – 2001 Arab Engineering Office/ Ibrahim Adel &Partners ProjectManagementDepartmentManager Scope of work:  Preparingand PlanningProject TimeSchedules,material listcost estimation,cash flow charts for Plumbing&mechanical contractproject Holliday Inn (Crown Plaza)Sharm El Sheikh Touristic Beach Resort Capacity of450 guest rooms (budget of 6.5 Millions L.E. & 510 000 $ as well as 2.5 Millions L.E. Variation Orders and Extra Works).Handed Over October 2001.  Preparingand PlanningProject TimeSchedules,material listcost estimation,cash flow charts for Plumbing& mechanical contractproject Sol Elite (Coral Melia) Touristic Beach Resort Capacity of350 guest rooms (budget of 6 Millions L.E. & 610 000 $ ). WorkContract Progressof50%. Postponed by client sinceJuly 2000.  Procurement ConsultantApproval &Purchasingorders for all equipments and materials locallyand imported supplied.  In chargeof issuingshop drawings for all plumbingand mechanical works.  Follow up workprogress on siteduringperiodic visits and attending
  • 9. Eng. Samir Abdel Fattah 9 Mechanical Engineer monthly and technical meetings.As well as attendingcoordination meetings at theconsultant head officeto coordinatewith other trades.  Detail of tasks duringthis period : First Phase:  Employment of engineers,trainingthem for appropriatetasks such as technical officeengineer as well as employment of siteengineers.  Study of contract conditions and specifications and drawings and bill of quantities.  Planningand preparingWorkTimeSchedule for all activities by using  PrimaveraSoftwareProgram.  Planningand preparingmaterial List Technical Submittals.  Planningand preparingShop Drawings. Second Phase:  Preparingtechnical data and catalogues for all materials.  Procurement consultant approval for material technical data.  Preparingand issuingshop drawings for all plumbingand mechanical works.  Procurement consultant approval for shop drawings.  Attendingtechnical meetings and coordination meetings as well as monthly sitemeetings Third phase:  Issuingpurchaseorders for imported materials and follow up opening letter of credits for foreign supplies.  Follow up workprogress on siteand visitingthesites Sharm El Sheikh periodically as well as someother projects at different places.  Preparingmonthlyforecastschedules.  Issuingand follow up purchaseorders for local material supplies.  Coordinate,with theowner project manager and his engineers,thescope and progress of works.  Coordinate,with theowner consultant officeand his representatives,the technical procedures for installation,commissioningand handingover.  Issuingand follow up monthly workcertificates. 1997 – 1999 ARAB ENGINEERING OFFICE Cost Estimator and Technical Office Manager During this Period I had successfully managetoincreasetender offers acceptance budget up to 20 Millions L.E., as well as follow up workbudget of 5 Millions L.E. Scope of work:  In chargeof study technical specificationsand design drawings and preparingand pricingbill ofquantities for tender offers.  In chargeof discussingand attendingtender procurements.  Follow up the suppliers offer prices.  In chargefor follow up shop drawings and all projectstechnical data.  In chargefor follow up and monitoringtimescheduleand workprogress for all thecompany projects.
  • 10. Eng. Samir Abdel Fattah 10 Mechanical Engineer 1995 – 1997 Abou Youssef Contracting & Trading Office (Swim. Pools and Jacuzzi agent) ProjectManager Scope of work: Supply and install and testing,commissioning,and startup all electromechanical works for Olympic SwimmingPools – Ahly National Club atMadinatNasr (budg et of 4 Millions L.E). 1994 – 1955 Saad Hanna Sons Contracting and Trading Co. SeniorSite Executive Engineer Scope of work:  In chargeof installations and testingfor all plumbingand firefighting works includingmain networks for INTERCOTINENTAL SHARM EL SHEIKH, capacity of250 guest rooms (budget of 1.5Millions L.E.).  In chargeof attendingtechnical sitemeetings and issuingmonthly certificates.  In chargeof studyingany variation orders,and issuingmonthlywork invoicecertificates.  In chargeof studyingany variation orders and issuingsitedrawings for approval. 1993 – 1994 Sinai Company for Touristic Development SHEIKH COAST SHARM EL SHEIKH/Seconded from Crown Home Consulta nt Eng. Ahmed Tag Plumbing & Mechanical& HVAC Supervision Engineer Scope of work:  Supervision Engineer for all Plumbing&Mechanical & HVAC works for SHEIKH COAST BEACH RESORT Phase1 at sharm el sheikh,capacity of 58 suites and 250 chalets and 500 guest rooms and 36 privatevillas (budget of 30 Millions L.E.).  Details of my personal tasks,duties,responsibilities and activities within this period:  In chargeof coordinatingPlumbingand Mechanical and HVAC trades with all other trades (i.e. electrical and civil works and landscape).  Sitesupervision for electromechanical works tobecopingtheconsultant specifications and standard codes.  In chargeof approvingor rejectingworktestsheld on siteon daily basis.  In chargeof revisingmonthlypayment certificateand signingas first signature.  In chargeof attendingtechnical sitemeetings.  In surplus totheabove-mentioned tasks,Ihad theopportunitytosupervise theItalian contractors for thespecial works such as Desalination Plant Capacity of600m³/d as well as SewageTreatmentPlantcapacityof 900m³/d.
  • 11. Eng. Samir Abdel Fattah 11 Mechanical Engineer 1990 – 1993 Arab Engineering Office Electro-mechanical contractor ProjectSite Engineer My scope of workwithin this period wasthefollowingprojects:  Plumbingand mechanical works for Touristic VillagePALMARIVA HURGHADA (SOFITEL NOWADAYS), capacity of312 guest rooms, package lump sum contract budget of4 Millions L.E. & 500 000 $.  Mechanical works for Crazy Water entertainment water city at six October city.  Mechanical works for domestic booster pump station and sewage treatmentplant athighly secured prison at AbouZaabal.