1. Date of Birth:
Addrerss:
Mob:
Email:
Linkedln:
19th
of May 1977
Doha , Qatar
+974 (66527010)
mickhalil@yahoo.com
https://WWW.linkedin.com/profile/view?
id=364241016
Michael Khalil Zaki
Personal Attributes
Professional Architect with Proven track record on Projects & Planning – Excellent analytical skills-
Ability to work under pressure – Comprehensive understanding & experience of purchasing strategies
– Regularly achieving cost saving targets –Ability to manage multiple priorities – Results orientated –
Attention to detail – Handling critical issues – Problem solving.
Education
Sept. 2008: International – Associate Value Specialist – AVS – 2008.
June 2000: BSc in Architectural Engineering, Ain Shams University, EGYPT.
Employment Summary
005/2015 – Present
07/2008 – 04/2015
Construction Manager
Senior Project Engineer
(Acting Construction Manager)
Projacs International Co /
Qatar Olympic Committee
Projacs International Co /
Qatar Olympic Committee
01/2007- 07/2008 Finishing Construction
Manager
Ahmadiah Contracting Co. /
360 Kuwait Project
11/2005- 12/2006 Section Manager Depa Hotels and Interiors Co. /
Holiday Inn Hotel, City Stars
03/2005- 11/2005 Senior site engineer Samsung Samcrete JV Co. /
American University new campus
05/2004- 03/2005 Site Manager Alico Egypt, Aluminum construction Co. /
Smart Village
01/2003- 04/2004 Site Engineer CCC Orascom JV Co. /
City Stars Mall
02/2001- 12/2002 Site Engineer Besix Orascom JV Co. /
Royal Meridien Hotel
07/2000- 02/2001 Technical office Engineer Samcrete Egypt Co. /
International Cairo Airport development
Page 1 / 8 Printed on 20.05.15
2. Project
Employment History
Job Title: Construction Manager
Employer: Projacs International Co.
Client: Qatar Olympic Committee (QOC)
Industry: Sports / Events
Period: Jul. 2008 – up to present
References: Mr. Abdulhakeem Abdulla projects Director
Reporting to: Director of PSD
Key Responsibilities
• Planned control and managed all aspects of various Maintenance Projects including
procurement strategies for equipment and services.
• Chaired regular Project Meetings with End Users and other Directorates within Qatar Olympic
Committee .
• Order Placement Timing, Supply / Demand Alignment, Material Replenishment and Supplier
Performance.
• Develop, process and implement procurement and requisition policies and procedures for
Sports and Event related equipment.
• Devlop Designs and Drawings in relation to the Project.
• Locate vendors of materials, equipment or supplies.
• Review, evaluate, and approve specifications and requirements for issuing and awarding
quotations and proposals including but not limited to tender preparation and monitoring.
• Preparing high quality Tender Documentation.
• Oversee the Tendering and / or procurement process for Equipment and Services.
• Direct the Technical and Commercial Evaluation of Bids.
• Recommendations, Reviews, Modifications and Additions to the existing contracted
and service agreement policies, procedures and systems.
• Control the Award, Execution and Close Out of the Agreement.
• Monitor transaction compliance (milestones, deliverables, invoicing etc).
• Resolve vendor or contractor grievances, and claims against suppliers.
• Develop operational programs for Installation, Dismantle and Storage of supplied
equipment.
• Develop proposals for legacy and / or disposal of surplus materials.
• Constantly monitor and report on progress of the project to all stakeholders.
• Responsible of all projects at PSD department, service and preparation section as followed:
1- Supply, Installation and Maintenance for all sport flooring (Vinyl, Tartan, Acrylic &
Rubber).
2- Supply, Installation and Maintenance for all sport equipment.
3- Supply, Installation and Maintenance for all Gym equipment.
4- Supply, Installation and Maintenance for all light weight construction.
5- Supply, Installation and Maintenance for all FF&E requirements.
Key Achievements
• Delivering Significant Cost Savings for the Committee.
• Developing QOC specification in terms of (Sport equipment, sport flooring, gym equipment,
electrical equipment, signage and Furniture).
Page 2 / 8 Printed on 20.05.15
3. Job Title: Finishing Construction Manager
Employer: Ahmadiah Contracting Co.
Client: 360 Kuwait Mall Project
Industry: Retail Shooping
Period: Jan. 2007 - Jul. 2008
References: Mr. Elie Hany (Projects Director)
Reporting to: Project Manager
Key Responsibilities
Responsible for all day to day activities for finishing contractors on site ensuring that project is
delivered to the Client to the required quality standards and within agreed timescales.
Major areas taking care of as followed:
• Responsible of all Finishing works at 360 Kuwait Mall including all trades but not limited
to ( Huge façade structure and stone cladding, block work, plaster work, painting work,
granite cladding and flooring, handrails, bulkheads, false ceiling …. etc).
1. Project Delivery
• Co-ordination between all finishing trades and electromechanical trades.
• Achieve agreed Environmental targets.
• Supervise Procurement schedules completion in line with project requirements.
• Deliver the project within agreed programme timescales.
2. Health & Safety
• Control Safery of Works and create a accident free working environemnt.
3. Quality
• Zero defects from Finishing contractors at handover.
• Achieve agreed Timelines.
• Secure Compliance of all finishing trades.
4. Administration
• Direct a team of employees, designed their time schedule and allotted daily and weekly tasks
within the overall project objectives.
• Conduct one on one session with the clients to assess client needs and expectations and ensure
project delivery within deadline.
• Maintained record of all production activities.
• Monitor and report on progress of the project to all stakeholders.
Job Title: Section Manager
Employer: Depa Hotels and Interiors Co.
Client: Holiday Inn Hotel, City Stars
Industry: Hotels
Period: Nov. 2005 - Dec. 2006
References: Mr. Walid Negm (Projects Manager)
Reporting to: Project Manager
Page 3 / 8 Printed on 20.05.15
4. Key Responsibilities
Responsible for all day to day activities for finishing contractors on site ensuring that project is
delivered to the Client to the required quality standards and within agreed timescales.
Major areas taking care of as followed:
• Responsible of all Finishing works at half of the guest area of the project, leading a team
composed of six junior engineers.
• Responsible of some Structural elements at the project.
• Responsible of Checking of all shopdrawings concerning the guest area.
• Responsible of preparing some of the project methods of statement.
• Responsible of Following up some of the Materials approval.
• Responsible of the hotel swimming pool area.
• Responsible of the sub contractors payments.
1. Project Delivery
• Co-ordination between all finishing trades and electromechanical trades.
• Achieve agreed Environmental targets.
• Supervise Procurement schedules completion in line with project requirements.
• Deliver the project within agreed programme timescales.
2. Health & Safety
• Control Safery of Works and create a accident free working environemnt.
3. Quality
• Zero defects from Finishing contractors at handover.
• Achieve agreed Timelines.
• Secure Compliance of all finishing trades.
4. Administration
• Direct a team of employees, designed their time schedule and allotted daily and weekly tasks
within the overall project objectives.
• Conduct one on one session with the clients to assess client needs and expectations and ensure
project delivery within deadline.
• Maintained record of all production activities.
• Monitor and report on progress of the project to all stakeholders.
Job Title: Senior Site Engineer
Employer: Samsung Samcrete JV Co.
Client: American University new campus
Industry: Public buildings
Period: March 2005 - Nov. 2005
References: Mr. Nabil Shafiek (Projects Manager)
Reporting to: Construction Manager
Key Responsibilities
Responsible for all day to day activities for civil and finishing trades on site ensuring that project
is delivered to the Client to the required quality standards and within agreed timescales.
Page 4 / 8 Printed on 20.05.15
5. Major areas taking care of as followed:
• Responsible of all civil works at the administration building for the new campus.
• Responsible of Checking of some shopdrawings.
• Coordination of multi-discipline finishing activities such as: marble & granite,block work,
ceramic tiling, installation of expansion joint assembly, installation of door hardware &
ironmongery, plastering, rendering, painting, millwork , steel structure, screed, suspended
ceiling & gypsum partitions .
• Responsible of the sub contractors payments.
Job Title: Site Manager
Employer: Alico Egypy, Aluminum construction Co.
Client: Smart Village
Industry: Public buildings
Period: May 2004 - March 2005
References: Mr. Essam Swilam (Projects Manager)
Reporting to: Projects Manager
Key Responsibilities
Totaly Responsible for two projects @ Egypt Smart Village
• First for the Residintial building of the ministry of comunication
-All outer and inner Curtain Walls.
-All Flashing of Curtain Walls.
-Clading for Columns.
-Main Space frame Glass Clading.
-Sky lights .
-Aluminium Loovers.
-Aluminium Doors and Windows.
-Aluminium Gutter system.
• Second For Pavilion Builbing
-Main Spider Façade.
-Inner Curtain Wall.
-Aluminium Doors and Windows.
-Handrails.
-External Loovers.
Key Responsibilities
• Direct a team of employees, designed their time schedule and allotted daily and weekly tasks
within the overall project objectives.
• Conduct one on one session with the clients to assess client needs and expectations and ensure
project delivery within deadline.
• Maintained record of all production activities.
• Monitor and report on progress of the project to all stakeholders.
Job Title: Site Engineer
Employer: CCC, Orascom JV Co.
Page 5 / 8 Printed on 20.05.15
6. Client: City Stars Mall
Industry: Retail Shooping
Period: Jan. 2003 - April 2004
References: Mr. Hazzem Kayyali (Project Manager)
Reporting to: Project Manager
Key Responsibilities
• Direct & close monitoring of multi-discipline finishing activities such as: marble & granite
cladding, bricks & ceramic tiling, installation of expansion joint assembly, installation of
door hardware & ironmongery, plastering, rendering, painting, millwork.
• Supervising several major subcontractors for the following activities: Marble & Granite,
Aluminum, Millwork, Steel & Wood doors, Mirrors and E/M works.
• Dealing with Marble & Granite Supplies, which involved preparation of material orders,
follow up the deliveries, monitor the fabrication progress via factory visits and ensuring
that the quality of the finished product is complying with the project specification.
• Follow up attendance to punch list items in some parts of the project.
• Reviewing the as built drawings related to the areas / activities under my supervision
Job Title: Site Engineer
Employer: Besix, Orascom JV Co.
Client: Le Royal Meridien
Industry: Hotels
Period: Feb. 2001 – Dec. 2002
References: Mr. Alfred Rayniers (Project Manager)
Reporting to: Project Manager
Key Responsibilities
Site FF&E Engineer:
• FF&E Engineer department (Fitting, Furnishing and Equipment) responsible for
coordination of Furniture Vendors (Wooden Furniture, Light Fixture, Artwork, and
Signage) and SOE (Glass Ware, Cutlery, Silver Ware, Linen, etc.)
• In charge of follow-up the installation of the above mentioned items.
• Inspecting furniture at factories and reporting to the Client.
• Following up the quantities delivered.
• Supervising the finishing in rooms and public areas till final handing over.
• Quantity control and comparing the deliveries with contract BOQ and purchase orders.
• Dealing with Contract Terms & Conditions.
• Monitoring and certifying SOE (Small Operating Equipment) handing over to the
Operator.
• Dealing with Contract Terms & Conditions of Marble Subcontractor & Responsible of its
Quality Controle and Installation.
• Dealing with All The Change Variation Orders Concerning The above mentioned subjects.
• Issuing and follow-up of weekly delivery schedules for vendors.
Page 6 / 8 Printed on 20.05.15
7. • Follow-up of desnagging of FF&E works.
Technical office Engineer:
• Preparing electrical as built drawings.
• Preparingmechanical as built drawings.
• Preparing laundry as built drawings.
• Preparing kitchen as built drawings.
Site Engineer :
• Following up the punch list.
• Following up all the finishing at the guarenty period.
Job Title: Technical Office Engineer
Employer: Samcrete Egypt Co.
Client: Cairo International Airport Developement
Industry: Developement
Period: July 2000 – Feb. 2001
References: Mr. Tareq Fahim (Project Manager)
Reporting to: Technical Office Manager
Key Responsibilities
• Responsible for shop-drawing preparation of:
1- Service Buildings.
2- Gates.
3- Parking Areas.
4- Roods and General Layouts.
Language Skills
Arabic: Native Speaker
English: Excellent
French: Good
Computer Skills
WINDOWS / OFFICE: ALL VERSIONS
ARCHTIECT: AUTOCAD
Courses
PMP introduction course (Certified hours from PMI)
Page 7 / 8 Printed on 20.05.15