SlideShare a Scribd company logo
1 of 6
Download to read offline
Mohamed Hamza C.V.
Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com
Name : Mohamed Hamza
Nationality: Egyptian / Canadian
Work Experience: 13 Years In Egypt.- 6 years in Canada- 1 Year in KSA
Religion : Muslim
Military status: Exempted
Date of Birth: 01 may 1973
Marital status: Married and having (4) children
Residence area: KSA
Cell: 010-1744-2210
Tel.: 002-3386-4446
Skype: mamhamza1973
Mohamed Hamza C.V.
Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com
Alredwan Contracting Company (KSA) 2014- 2015
Key Responsibilities:
As an As Electromechanical Department Manager responsible for gathering and analyzing business requirements working with customers and other internal
parties to define solution scope to meet business requirements including design of electrical systems, the development of project proposals, specifications, and
all related project documentation to meet our clients need.
Makka Projects
Qatari Mosque Total Budget 450,000,000 SR MEP Budget 120,000,000 SR
Elmaha Hotel Total Budget 120,000,000 SR MEP Budget 42,000,000 SR
Canadian Power Tech. Contractor (Egypt) 2005- 2014
Key Responsibilities:
As an As Electromechanical Projects Manager responsible for gathering and analyzing business requirements working with customers and other internal
parties to define solution scope to meet business requirements including design of electrical systems, the development of project proposals, specifications, and
all related project documentation to meet our clients need.
Duties & Responsibilities:
 Lead an Excutive team to achieve technical goals within required budget and schedule.
 Purchase All equipment within lowest price and highest quality
 Ensure all installations are compliance with all client specifications,
 Effectively liaise with clients, vendors
 Assist in the development and maintenance of engineering design and analysis standards, policies, techniques, and procedures.
 Perform electrical upgrades design activities as required.
 Responsible for the development and the implementation of all technical documentation but not limited to drawings, specifications, budget,
sketches, change orders, deficiency reports, final reports, memos, generated by design team.
 Assist in the development of electrical upgrades work estimates in support of company new business opportunities.
 Make recommendations as to improve processes and efficiency.
Part Of Projects
El-Malkiea Resort 800 Gust Rooms - Egypt MEP Budget 36,000,000 EP
Gardenia Sharm Resort 750 Gust Rooms –Egypt MEP Budget 25,000,000 EP
yramids Heights Mobinile Data Center Building –Egypt Elec Budget 8,000,000 EP
Mercedes Benz Egypt Natco Show Room and Maintenance Services –Egypt Elec Budget 9,500,000 EP
MCC Chemical plant –Egypt Elec Budget 3,500,000 EP
Contact Group Building –Egypt Elec Budget 2,500,000 EP
ELsalam International hospital –Egypt Elec Budget 2,000,000 EP
Building management crisis airport –Egypt Elec Budget 8,500,000 EP
Aton Building -Egypt MEP Budget 5,500,000 EP
Mentor Grafik Building –Egypt Elec Budget 4,000,000 EP
United Sugar of Egypt Plant in Sokhna Port – Egypt Elec Budget 2,000,000 EP
Biovail Incorporation Head office – Canada Elec Budget 30,000,000 USD
Microsoft Head office - Canada Elec Budget 25,000,000 USD
Centennial college- Scarborough – Canada Elec Budget 18,000,000 USD
Pegasys System Installation – Canada Elec Budget 90,000X200Site USD
Ontario Royal Museum –Toronto - Canada Total Budget 650,000,000 Elec Budget 45,000,000 USD
Art Gallery Ontario –Canada Elec Budget 18,000,000 USD
McGregor Library-Scarborough -Canada Elec Budget 1,200,000 USD
Operational Efficiency
 Lead the various stages of projects – preparation, execution and ensuring that these are carried out in an integrated manner, consistent with the
operation’s goals and objectives.
 Monitoring technology changes and their impact on the operations’ productivity and quality.
 Managing personal and other team members and ensuring adherence to health and safety requirements.
Mohamed Hamza C.V.
Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com
Quality Management & Process Improvement
 Introducing process improvement initiatives to increase productivity and continually reviewing all aspects of the operations in an effort to control
and reduce costs.
 Ensuring that quality control measures are in place and implemented.
 Provide leadership and assistance to operations to ensure effective support to clients needs, which include:
-Acting as a liaison between consultant and clients.
-Creating client presentations/ produce client related materials/ Developing presentation graphics.
-Editing of documents; heavy proofing.
-Backing up team members.
Technical Qulification
 BMS (Building Management System)
 Sanitary System (portable water, sewage, individual pumping stations, drainage, storm water
 HVAC System (ventilation and air ducts, grills, chilled water Pumps, fans and condensing system
 Fire fitting System
 Fire alarm system
 Elevators and controls
 Electrical system (medium voltage , switchgears, elec. Panels, generators system installation)
 Access systems
 CCTV
 Grounding System
 Lightening System
 TV system
 Landscape external lighting
 Network Cabling system
 Data Cabling System
 UPS system
Electrical Network Engineering Services Limited (Canada) March 2004- 2005
Key Responsibilities:
As an ELECTRICAL SENIOR DESIGN ENGINEER will be responsible for gathering and analyzing business requirements working with customers and
other internal parties to define solution scope to meet business requirements including design of electrical systems, the development of project proposals,
specifications, and all related project documentation to meet our clients need.
Duties & Responsibilities:
 Lead an effective electrical design team to achieve technical goals within required budget and schedule.
 Coordinate with the Ops manager the development of all project proposals.
 Create Project plans/schedules for technical projects as required; facilitate and participate in integrated planning with other project delivery teams
(i.e. people, process and communications); coordinate, facilitate and manage planning sessions; work closely with the team in creation of estimates;
initiates and or supports projects or programs by developing detailed business cases, building effective project/program organizations and teams.
 Ensure all design and installations are compliance with all client specifications, local, provincial and federal codes and regulations and with
company design and airworthiness process standards.
 Effectively liaise with clients, vendors and other company departments.
 Assist in the development and maintenance of engineering design and analysis standards, policies, techniques, and procedures.
 Perform electrical upgrades design activities as required.
 Responsible for the development and the implementation of all technical documentation but not limited to drawings, specifications, budget,
sketches, change orders, deficiency reports, final reports, memos, generated by design team.
 Assist in the development of electrical upgrades work estimates in support of company new business opportunities.
 Make recommendations as to improve processes and efficiency.
Mulvey and Banani International Incorporation (Canada)
Position: Electrical Engineer June 2001-2004
Major Projects Developed for Mulvey and Banani International Incorporation
Biovail Incorporation Head office
June 2001-Present
 Reviewing the electrical budget
 Designing lighting, power, and fire alarm systems
 Designing the rough-in conduits and cable trays for data, telephone, TV, sound, and broadcast systems
 Coordinating electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, IT, Broadcast, and Civil)
 Preparing project specification and tender form
Mohamed Hamza C.V.
Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com
Microsoft Head office
“Design Stage” June 2001- February 2002
 Reviewed the electrical budget
 Incorporated the principal electrical requirements base
 Designed lighting, power, and fire alarm systems
 Designed the rough-in conduits and cable trays for data, telephone, TV, sound, and broadcast systems
 Coordinated electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, IT, Broadcast, and Civil)
 Prepared project specification and tender forms
“Construction Stage” September 2002-Present
 Inspecting installation of electrical work
 Preparing contemplated change notice and site instructions
 Evaluating monthly progress draws
 Reviewing shop drawings
Centennial college- Scarborough
June 2002-Present
 Incorporated the principal electrical requirements
 Designed lighting, power, and fire alarm systems
 Designed the rough-in conduits and cable trays for data, telephone, TV, sound, and broadcast systems
 Coordinated electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, IT, Broadcast, and Civil)
Pegasys System Installation
July 2002-Present
 Design the metering system for (25) Bell Mobility Buildings to monitor electrical data to Head Office in Montreal
 Doing Site Survey to pick up all electrical equipment
 Reviewed the electrical budget and tender pricing.
 Construction review.
 Review the start up and commissioning up procedure.
 Progress draws review and approval..
Ontario Royal Museum –Toronto
June 2002-Present.
 Designed lighting, power and fire alarm systems
 Designed the rough-in conduits and cable trays for telephone, TV, and data systems
 Coordinating electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, and Civil)
 Site survey to pick up all existing electrical equipment.
Art Gallery Ontario
January 2003- Present
 Designed lighting, power and fire alarm systems
 Designed the rough-in conduits and cable trays for telephone, TV, and data systems
 Coordinating electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, and Civil)
 Site survey to pick up all existing electrical equipment.
McGregor Library-Scarborough
January 2003-Present
 Designed power, and fire alarm systems
 Designed the rough-in conduits and cable trays for telephone, TV, and data systems
 Coordinating electrical power and systems designs with other consultants designs (Mechanical and Architecture)
 Site survey to pick up all existing electrical equipment.
Apotex Inc .
Canada’s Pharmaceutical Company December 2002-Present
 Doing site survey to pick up all 600V electrical equipment.
 Doing complete electrical data sheets and electrical manual equipment.
 Create maintenance manual for each electrical equipment.
 Review and correct the electrical as built drawing.
Mohamed Hamza C.V.
Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com
Crossey Engineering limited (Canada, Ontario ) May 2000- June 2001
Position: Electrical designer
 Coordinated electrical power and systems designs with other disciplines (Mechanical, Architecture, Interior Design, Landscape, and Civil)
 Procured all equipment related to electrical systems (switchboards, bus ways, lighting fixtures, dimmers, cables, sound system racks, MFAP, detectors,
telephone PABX)
Major Project Developed for Crossey Engineering LTD.
Detroit Orchestra Hall Symphony
Electrical designer. May 2000- June 2001
 Designed and supervised shop drawings of lighting, power, fire alarm, telephone, TV, and sound systems
 Procured all equipment related to electrical systems (switchboards, bus ways, lighting fixtures, dimmers, cables, conduits, sound system racks, MFAP,
detectors, Telephone PABX)
Petrojet the Petroleum Projects and Technical Consultation Co. (Egypt)
One of the Egyptian Petroleum Cooperation Companies July1997-April1999
Position: Design Engineer
Major Project Developed for Petrojet the Petroleum Projects and Technical Consultation Co.
 Ras Ghareb Camp (Oil field camp).
 Midor building (Big head office for Midor oil company, Egypt)
 Ministry of Petroleum building (Cairo, Egypt)
Job description
 Designed the lighting and power systems
 Drafted the project drawings
 Analysis of utilities rates and application.
 Building evaluation for metering alternatives.
 Power factor correction.
 Load factor analysis, and the application of demand devices and techniques.
 Design and application on computer controlled buildings.
 Implementation of updated energy saving equipment with payback calculations
General Works and supplies (EGS)
Marketing and Technical Support Engineer November 1995-June1997
Major Project Developed for General Works and supplies (EGS)
Sheraton Hotel Sinai (Sinai, Egypt).
Omar Afandi (one of the biggest series shop store in Egypt)
Job description.
 Supervision of Electrical construction works such as lighting, power and fire alarm systems.
 Estimation of tender price.
 Certify and verify all electrical systems.
 Preparing the progress draw.
 Drafting as built drawing using AutoCAD R14.
Mohamed Hamza C.V.
Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com
EDUCATION
Bachelor of Science Degree in Electrical Power and Machine Engineering July 1995
Faculty of Engineering - Cairo University, Egypt
Graduation Project Programmable Logic Control PLC.
Diploma of higher studies in Electrical power engineering December1999
The studies for this diploma covers a period of two academic years
Protecting metal building from rusting. December1997
Design of Cathodic Protection Systems October1997
Modern Automatic Control December 2000
University Of Toronto, Toronto
Lighting design concept (IESNA-100) June 2003
Philips Research Center. Toronto.
AFILITIATIONS
1- Professional Engineers Ontario. Member of PEO Association. (Canada)
2- Professional Engineers Egypt. Member of Egyptian Engineers Association. (Egypt)

More Related Content

What's hot

Elv project engineer
Elv project engineerElv project engineer
Elv project engineerFahim Mohamed
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latestArun Das
 
C&c construction group
C&c construction groupC&c construction group
C&c construction groupBob Galarneau
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) BriefSally Al-Gazzar
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerTerence Anderson (BSEE & MBA)
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar El-Sanafawey
 
C&c construction group social media
C&c construction group social mediaC&c construction group social media
C&c construction group social mediaBob Galarneau
 
C.V Resume Muimu Daniel.doc (110916)
C.V Resume Muimu Daniel.doc (110916)C.V Resume Muimu Daniel.doc (110916)
C.V Resume Muimu Daniel.doc (110916)Daniel Muimu
 
Chief maintenance engineering/Supervision & implementation on an Executive ME...
Chief maintenance engineering/Supervision & implementation on an Executive ME...Chief maintenance engineering/Supervision & implementation on an Executive ME...
Chief maintenance engineering/Supervision & implementation on an Executive ME...Qahtan Adnan
 

What's hot (20)

Elv project engineer
Elv project engineerElv project engineer
Elv project engineer
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
 
C&c construction group
C&c construction groupC&c construction group
C&c construction group
 
Abdelmouizz Mahfouz
Abdelmouizz MahfouzAbdelmouizz Mahfouz
Abdelmouizz Mahfouz
 
EJP CV_January2016
EJP CV_January2016EJP CV_January2016
EJP CV_January2016
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
Sally CV 15 Aprl2012(Docx) Brief
Sally CV 15 Aprl2012(Docx)   BriefSally CV 15 Aprl2012(Docx)   Brief
Sally CV 15 Aprl2012(Docx) Brief
 
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project ManagerResume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
Resume TERENCE ANDERSON Sr. Electrical Engineer & Project Manager
 
Resume (S.Saravanan)
Resume (S.Saravanan)Resume (S.Saravanan)
Resume (S.Saravanan)
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
C&c construction group social media
C&c construction group social mediaC&c construction group social media
C&c construction group social media
 
Resume
ResumeResume
Resume
 
C.V Resume Muimu Daniel.doc (110916)
C.V Resume Muimu Daniel.doc (110916)C.V Resume Muimu Daniel.doc (110916)
C.V Resume Muimu Daniel.doc (110916)
 
Chief maintenance engineering/Supervision & implementation on an Executive ME...
Chief maintenance engineering/Supervision & implementation on an Executive ME...Chief maintenance engineering/Supervision & implementation on an Executive ME...
Chief maintenance engineering/Supervision & implementation on an Executive ME...
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
ARNOLD BUSTAMANTE - RESUME
ARNOLD BUSTAMANTE - RESUMEARNOLD BUSTAMANTE - RESUME
ARNOLD BUSTAMANTE - RESUME
 
Isagani M Porcina14
Isagani M  Porcina14Isagani M  Porcina14
Isagani M Porcina14
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 

Similar to CV-M.Hamza-KSA..

Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cnAmr elmasry
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammedahmed ali
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan Mohamed
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)Nageshwar Sharma
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)Shiraz khan
 
Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)DIWAN KUMAR
 

Similar to CV-M.Hamza-KSA.. (20)

Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cn
 
Eberri Kennedy CV
Eberri Kennedy CVEberri Kennedy CV
Eberri Kennedy CV
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016Hassan mohamed resume 08 06-2016
Hassan mohamed resume 08 06-2016
 
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
 
E Bringas Resume
E Bringas ResumeE Bringas Resume
E Bringas Resume
 
CV-Farhan Mushtaq
CV-Farhan MushtaqCV-Farhan Mushtaq
CV-Farhan Mushtaq
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
Rehan_Afzal_new[1] 2-2 (2)
Rehan_Afzal_new[1] 2-2 (2)Rehan_Afzal_new[1] 2-2 (2)
Rehan_Afzal_new[1] 2-2 (2)
 
Navaneeth New CV
Navaneeth New CVNavaneeth New CV
Navaneeth New CV
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Profile (1).pdf
Profile (1).pdfProfile (1).pdf
Profile (1).pdf
 
Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)Cv of nageshwar sharma 2019 (ce)
Cv of nageshwar sharma 2019 (ce)
 
VikramShete_New-1
VikramShete_New-1VikramShete_New-1
VikramShete_New-1
 
tal3at cv
tal3at cvtal3at cv
tal3at cv
 
CV UPDATED Aug 2015 (1)
CV UPDATED Aug  2015 (1)CV UPDATED Aug  2015 (1)
CV UPDATED Aug 2015 (1)
 
Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)Electrical Engineer with 4yrs experience (Projects & Estimation)
Electrical Engineer with 4yrs experience (Projects & Estimation)
 

CV-M.Hamza-KSA..

  • 1. Mohamed Hamza C.V. Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com Name : Mohamed Hamza Nationality: Egyptian / Canadian Work Experience: 13 Years In Egypt.- 6 years in Canada- 1 Year in KSA Religion : Muslim Military status: Exempted Date of Birth: 01 may 1973 Marital status: Married and having (4) children Residence area: KSA Cell: 010-1744-2210 Tel.: 002-3386-4446 Skype: mamhamza1973
  • 2. Mohamed Hamza C.V. Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com Alredwan Contracting Company (KSA) 2014- 2015 Key Responsibilities: As an As Electromechanical Department Manager responsible for gathering and analyzing business requirements working with customers and other internal parties to define solution scope to meet business requirements including design of electrical systems, the development of project proposals, specifications, and all related project documentation to meet our clients need. Makka Projects Qatari Mosque Total Budget 450,000,000 SR MEP Budget 120,000,000 SR Elmaha Hotel Total Budget 120,000,000 SR MEP Budget 42,000,000 SR Canadian Power Tech. Contractor (Egypt) 2005- 2014 Key Responsibilities: As an As Electromechanical Projects Manager responsible for gathering and analyzing business requirements working with customers and other internal parties to define solution scope to meet business requirements including design of electrical systems, the development of project proposals, specifications, and all related project documentation to meet our clients need. Duties & Responsibilities:  Lead an Excutive team to achieve technical goals within required budget and schedule.  Purchase All equipment within lowest price and highest quality  Ensure all installations are compliance with all client specifications,  Effectively liaise with clients, vendors  Assist in the development and maintenance of engineering design and analysis standards, policies, techniques, and procedures.  Perform electrical upgrades design activities as required.  Responsible for the development and the implementation of all technical documentation but not limited to drawings, specifications, budget, sketches, change orders, deficiency reports, final reports, memos, generated by design team.  Assist in the development of electrical upgrades work estimates in support of company new business opportunities.  Make recommendations as to improve processes and efficiency. Part Of Projects El-Malkiea Resort 800 Gust Rooms - Egypt MEP Budget 36,000,000 EP Gardenia Sharm Resort 750 Gust Rooms –Egypt MEP Budget 25,000,000 EP yramids Heights Mobinile Data Center Building –Egypt Elec Budget 8,000,000 EP Mercedes Benz Egypt Natco Show Room and Maintenance Services –Egypt Elec Budget 9,500,000 EP MCC Chemical plant –Egypt Elec Budget 3,500,000 EP Contact Group Building –Egypt Elec Budget 2,500,000 EP ELsalam International hospital –Egypt Elec Budget 2,000,000 EP Building management crisis airport –Egypt Elec Budget 8,500,000 EP Aton Building -Egypt MEP Budget 5,500,000 EP Mentor Grafik Building –Egypt Elec Budget 4,000,000 EP United Sugar of Egypt Plant in Sokhna Port – Egypt Elec Budget 2,000,000 EP Biovail Incorporation Head office – Canada Elec Budget 30,000,000 USD Microsoft Head office - Canada Elec Budget 25,000,000 USD Centennial college- Scarborough – Canada Elec Budget 18,000,000 USD Pegasys System Installation – Canada Elec Budget 90,000X200Site USD Ontario Royal Museum –Toronto - Canada Total Budget 650,000,000 Elec Budget 45,000,000 USD Art Gallery Ontario –Canada Elec Budget 18,000,000 USD McGregor Library-Scarborough -Canada Elec Budget 1,200,000 USD Operational Efficiency  Lead the various stages of projects – preparation, execution and ensuring that these are carried out in an integrated manner, consistent with the operation’s goals and objectives.  Monitoring technology changes and their impact on the operations’ productivity and quality.  Managing personal and other team members and ensuring adherence to health and safety requirements.
  • 3. Mohamed Hamza C.V. Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com Quality Management & Process Improvement  Introducing process improvement initiatives to increase productivity and continually reviewing all aspects of the operations in an effort to control and reduce costs.  Ensuring that quality control measures are in place and implemented.  Provide leadership and assistance to operations to ensure effective support to clients needs, which include: -Acting as a liaison between consultant and clients. -Creating client presentations/ produce client related materials/ Developing presentation graphics. -Editing of documents; heavy proofing. -Backing up team members. Technical Qulification  BMS (Building Management System)  Sanitary System (portable water, sewage, individual pumping stations, drainage, storm water  HVAC System (ventilation and air ducts, grills, chilled water Pumps, fans and condensing system  Fire fitting System  Fire alarm system  Elevators and controls  Electrical system (medium voltage , switchgears, elec. Panels, generators system installation)  Access systems  CCTV  Grounding System  Lightening System  TV system  Landscape external lighting  Network Cabling system  Data Cabling System  UPS system Electrical Network Engineering Services Limited (Canada) March 2004- 2005 Key Responsibilities: As an ELECTRICAL SENIOR DESIGN ENGINEER will be responsible for gathering and analyzing business requirements working with customers and other internal parties to define solution scope to meet business requirements including design of electrical systems, the development of project proposals, specifications, and all related project documentation to meet our clients need. Duties & Responsibilities:  Lead an effective electrical design team to achieve technical goals within required budget and schedule.  Coordinate with the Ops manager the development of all project proposals.  Create Project plans/schedules for technical projects as required; facilitate and participate in integrated planning with other project delivery teams (i.e. people, process and communications); coordinate, facilitate and manage planning sessions; work closely with the team in creation of estimates; initiates and or supports projects or programs by developing detailed business cases, building effective project/program organizations and teams.  Ensure all design and installations are compliance with all client specifications, local, provincial and federal codes and regulations and with company design and airworthiness process standards.  Effectively liaise with clients, vendors and other company departments.  Assist in the development and maintenance of engineering design and analysis standards, policies, techniques, and procedures.  Perform electrical upgrades design activities as required.  Responsible for the development and the implementation of all technical documentation but not limited to drawings, specifications, budget, sketches, change orders, deficiency reports, final reports, memos, generated by design team.  Assist in the development of electrical upgrades work estimates in support of company new business opportunities.  Make recommendations as to improve processes and efficiency. Mulvey and Banani International Incorporation (Canada) Position: Electrical Engineer June 2001-2004 Major Projects Developed for Mulvey and Banani International Incorporation Biovail Incorporation Head office June 2001-Present  Reviewing the electrical budget  Designing lighting, power, and fire alarm systems  Designing the rough-in conduits and cable trays for data, telephone, TV, sound, and broadcast systems  Coordinating electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, IT, Broadcast, and Civil)  Preparing project specification and tender form
  • 4. Mohamed Hamza C.V. Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com Microsoft Head office “Design Stage” June 2001- February 2002  Reviewed the electrical budget  Incorporated the principal electrical requirements base  Designed lighting, power, and fire alarm systems  Designed the rough-in conduits and cable trays for data, telephone, TV, sound, and broadcast systems  Coordinated electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, IT, Broadcast, and Civil)  Prepared project specification and tender forms “Construction Stage” September 2002-Present  Inspecting installation of electrical work  Preparing contemplated change notice and site instructions  Evaluating monthly progress draws  Reviewing shop drawings Centennial college- Scarborough June 2002-Present  Incorporated the principal electrical requirements  Designed lighting, power, and fire alarm systems  Designed the rough-in conduits and cable trays for data, telephone, TV, sound, and broadcast systems  Coordinated electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, IT, Broadcast, and Civil) Pegasys System Installation July 2002-Present  Design the metering system for (25) Bell Mobility Buildings to monitor electrical data to Head Office in Montreal  Doing Site Survey to pick up all electrical equipment  Reviewed the electrical budget and tender pricing.  Construction review.  Review the start up and commissioning up procedure.  Progress draws review and approval.. Ontario Royal Museum –Toronto June 2002-Present.  Designed lighting, power and fire alarm systems  Designed the rough-in conduits and cable trays for telephone, TV, and data systems  Coordinating electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, and Civil)  Site survey to pick up all existing electrical equipment. Art Gallery Ontario January 2003- Present  Designed lighting, power and fire alarm systems  Designed the rough-in conduits and cable trays for telephone, TV, and data systems  Coordinating electrical power and systems designs with disciplines (Mechanical, Architecture, Landscape, and Civil)  Site survey to pick up all existing electrical equipment. McGregor Library-Scarborough January 2003-Present  Designed power, and fire alarm systems  Designed the rough-in conduits and cable trays for telephone, TV, and data systems  Coordinating electrical power and systems designs with other consultants designs (Mechanical and Architecture)  Site survey to pick up all existing electrical equipment. Apotex Inc . Canada’s Pharmaceutical Company December 2002-Present  Doing site survey to pick up all 600V electrical equipment.  Doing complete electrical data sheets and electrical manual equipment.  Create maintenance manual for each electrical equipment.  Review and correct the electrical as built drawing.
  • 5. Mohamed Hamza C.V. Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com Crossey Engineering limited (Canada, Ontario ) May 2000- June 2001 Position: Electrical designer  Coordinated electrical power and systems designs with other disciplines (Mechanical, Architecture, Interior Design, Landscape, and Civil)  Procured all equipment related to electrical systems (switchboards, bus ways, lighting fixtures, dimmers, cables, sound system racks, MFAP, detectors, telephone PABX) Major Project Developed for Crossey Engineering LTD. Detroit Orchestra Hall Symphony Electrical designer. May 2000- June 2001  Designed and supervised shop drawings of lighting, power, fire alarm, telephone, TV, and sound systems  Procured all equipment related to electrical systems (switchboards, bus ways, lighting fixtures, dimmers, cables, conduits, sound system racks, MFAP, detectors, Telephone PABX) Petrojet the Petroleum Projects and Technical Consultation Co. (Egypt) One of the Egyptian Petroleum Cooperation Companies July1997-April1999 Position: Design Engineer Major Project Developed for Petrojet the Petroleum Projects and Technical Consultation Co.  Ras Ghareb Camp (Oil field camp).  Midor building (Big head office for Midor oil company, Egypt)  Ministry of Petroleum building (Cairo, Egypt) Job description  Designed the lighting and power systems  Drafted the project drawings  Analysis of utilities rates and application.  Building evaluation for metering alternatives.  Power factor correction.  Load factor analysis, and the application of demand devices and techniques.  Design and application on computer controlled buildings.  Implementation of updated energy saving equipment with payback calculations General Works and supplies (EGS) Marketing and Technical Support Engineer November 1995-June1997 Major Project Developed for General Works and supplies (EGS) Sheraton Hotel Sinai (Sinai, Egypt). Omar Afandi (one of the biggest series shop store in Egypt) Job description.  Supervision of Electrical construction works such as lighting, power and fire alarm systems.  Estimation of tender price.  Certify and verify all electrical systems.  Preparing the progress draw.  Drafting as built drawing using AutoCAD R14.
  • 6. Mohamed Hamza C.V. Cell: 010-1744-2210 Home: 02-3386-4446 mamhamza2008@gmail.com EDUCATION Bachelor of Science Degree in Electrical Power and Machine Engineering July 1995 Faculty of Engineering - Cairo University, Egypt Graduation Project Programmable Logic Control PLC. Diploma of higher studies in Electrical power engineering December1999 The studies for this diploma covers a period of two academic years Protecting metal building from rusting. December1997 Design of Cathodic Protection Systems October1997 Modern Automatic Control December 2000 University Of Toronto, Toronto Lighting design concept (IESNA-100) June 2003 Philips Research Center. Toronto. AFILITIATIONS 1- Professional Engineers Ontario. Member of PEO Association. (Canada) 2- Professional Engineers Egypt. Member of Egyptian Engineers Association. (Egypt)