SlideShare a Scribd company logo
1 of 7
1
Curriculum vitae
MOHAMED MAHMUD ELSAADANI
MBA
CERTIFIEDPMP ENGINEER (PMP NO: 1539761)
UPDA(Grade A)
PMI MEMBER (NO: 1836570)
Doha mob +974 - 55369802
Egypt: Mobile +2 -0114628158
Home Telephone +974 44989340 & +202 3838931
E-mail :mhmdsaadany@yahoo.com
◙ Personal Data
Date of Birth December, 22, 1976.
Place of Birth Giza,ArabRepublic of Egypt
Marital Status married
National Service Exempted
Nationality Egyptian
◙ Education
- Degree of Bachelor in Civil Engineering Department zagazig university,
specialist construction and financial project management,( graduated with
excellent degree in management project about fulfilling san Stefano complex
project in Alexandria by a German company (Pauer).)
- Certified PMP Engineer (project management professional), member of PMI
2
◙ Objective
To apply for a job that challenges my qualifications, and help me to build my
career and gives me a chance that I am an asset to the job I am applying for,by
applying scientifically methods.
● Study the build strategy/client specification/Contract and prepare
MasterProjectPlan for the project.
● Participate inBuild Strategy preparationat the initial stage and also during the
course of Project. Will be able to manage large teams and motivate them to
achieve targets.
● Ensures compliance with all corporate commercial practices and
standards.Custodian of sound project management practices & procedures.
●Senior focal point for all customer contact including all customer requests,
queries & concerns throughout contract life
● Ensure Project milestones and commercial controls are achieved byeffective
planning including logistics and execution.
● Coordinate with various parties involved in project in such a way that the
overall risk of failure is eliminated.
● Determine and implement the exact needs of the Client as per Contract &
Specification. Leads project team through a regular system of contract reviews
to identify & manage risks, monitor operational performance against the agreed
timescales, and instigates corrective action where appropriate.
● Identify risks at an early stage in the project thus avoiding delays in schedule.
Periodic Project Reporting to Senior Management and Client.
● Close out documentation. Plan and implement continual improvement in
safety, quality and productivity.
● Training subordinates in the tasks of Project Management.
3
◙ Area of Experience
* Project planning and management
*Construction management
*Major constructions (Hotels, resorts, compounds,
underground car parks, Infra structure , High way )
◙ Work Experience
◘ Section Engineer
QDVC Company (AUGUST 2015 )CP01 Project
Managing infra-structure works at A12 road for my section area, as
of (main storm water 2000 mm, secondary storm 1200 mm , potable
water , irrigation network, pneumatic wastage control , gas lines,
SSD , ELV , electric cables, data networks, traffic signals lines ,……
-finishing works, curbstones,granite slab, cobble stones,
- Traffic signal installation, road works, sub grade, sub base,
wearing course.
◘ Car Park Manager
QDVC Company (May2013 ) LUCP Project
- The project is located at Lusail City, consists of 4 underground car parks 3
stories each. (50,000m2)project (budget to date)1.87 Billion Qatari Riyal
- Managing project Zone, planning project control, risk assessments, mitigation
plans, quality assurance, technical issue log, critical method statement,
coordination different departments.
-Following day today activities, finishing works, landscaping.Repairing works.
Dewatering wheels
4
◘ Project Manager
Gulf united company real state ltd in Doha ( 2006 – April
2013 )
_ Incharge of finishing our company projects ( 80 villas, club house in
Abouhamour Ruby, Diamond & Sapphire _ EWAAN Compound 40 villas in
west bay lagoon _ head quarters building _ 24 villas in old air port area pearl
gardens _ hotel at C ring road – ALCAT RMC plant – Industrial area park
( 215,000 m2 ware houses and labor accommodations) - 6 Palaces at umm
selal)
- Total projects cost exceeded 1,150 M QR.
- My responsibility is to get the project done in best management procedures
and quality with respect to time frame and budget cost can be briefed as
follow :-
Explaining design concepts and purposes & usage of the projects to designing
consultants , Reviewing designing stages and making revision for designed
drawings – preparing tenders for general contractors’ _ choosing contractors
and supervision consultant offices _ following up all project stages, super
vision ,technical and appointed meetings with projects stakeholders , quality
control and assuranceobserving and monitoring progress compared to time
schedules _ handling and coordinate any sudden problems, project
documentation.,Working closely with the site workforce once building is
underway,making sure the work meets legal requirements and Building
Regulations.
- Managing team of construction engineers staff to have full control of the
projects.
- managing maintenance engineers staff to keep our properties as new all the
time and offer good services to the tenants .
- preparing both construction manual and maintenance manual to control our
projects in an easy and professional way ,
applying all management applications ( initiation , planning ,execution ,
monitoring &control and closing ) to the projects areaduring the project life cycle
(integration ,scope ,time ,cost, quality ,human resources ,communication, risk
and procurement )
5
◘Consultant project manager ( 2002 – 2006 )
Working as a consultant and project manager with consulting and designing
office (Eng. Sherif El Swifi for Engineering consulting and Designing) in charge
designing and supervision of fulfilling Hauza Hotel (5 stars 450 room hotel
insharm el sheikh) and Regency plaza Hotel (5 stars 690 room hotel in Sharm
el Sheikh)
Job Description
 General coordinator for all project activities
 Incharge to follow up electromechanical works :-
- Gas station ( L.P.G ) tanks, piping ,vaporizer , compressor room ,
regulators
- Electrical stations medium tension ( ring main unit – transformer ) , low
tension ( main distribution board – main emergency distribution board
-generators )
- Pump stations ( up left sewage water )
- Water tanks with pumps room.
- Water treatment, station.
- Boiler room
- Laundry
- Swimming pool ,artificial lakes and water falls mechanical rooms
- Control room ( central –satellite system – fire alarm system – net work
system – sound system )
 Activities work description for both staff engineer and contractors.
 Handling project activities combination problems with discussionwith
electro mechanical consultants.
 Preparing reports for the needed amount of materials and activities
contractors.
 Study technical and financial tenders for different activities.
 Making weekly meeting with Engineers’ staff, explaining the aims and
the goals for the next week and evaluation of last week achievements
according to the time schedule
6
◘ site Engineer ( 1999 - 2002 )training
For building up a Zouara**** 4 stars hotel in Sharm El Sheikh owned by el
khaligia company.
Job Duties
In charge in the following:-
1 Study bids and tenders for suitable kind of contracting. In charge in
construction works, Topographic works with sets - all infra structures
2 project planning :-
Planning (time scheduling- independency of activities - bar charts and line
of balance - sources management - updating data - updating planning and
resources - financial control and cash flow)
3 Previewing construction and architect techniques with consultant offices, in
charge of all processes of project fulfilling.
4 Electro mechanical works ( water pipelines and pumping - low voltage lines
and electrical boards - light current lines - air conditioning systems central, split,
concealed. )
5 quantities survey for ( needed amounts of materials- sub contractors works
-preparing bill of quantity )
6 handling relations with sub-contractors and material suppliers
◘Site Engineer (1998 – 1999)training
Working as a project Engineer in fulfilling (Sinai view) a four star hotel in Sharm
El Sheikh, owned by ( NescoMisr ) a Saudi Company in Egypt .
Job Duties
1- In charge in construction works :-
Topographic works with sets - all infra structures
2- project planning :-
Planning (time scheduling- independency of activities - bar charts and line
of balance - sources management - updating data - updating planning and
resources - financial control and cash flow)
3- Swimming pool proofing techniques and finishing - landscaping
4- Electro mechanical works (water pipelines and pumping - low voltage
lines and electrical boards - light current lines - air conditioning systems
central, split, concealed.)
5- quantities survey for ( needed amounts of materials- sub contractors
works -preparing bill of quantity )
7
◙ Computer Skills
Microsoft office- AutoCAD –primavera(P3&P6) – MS Project - 3D MAX –
forteran.
◙ Additional Skills
* MBA
* Certified PMP Engineer, PMP NO: 1539761
* PMI Member, PMI NO: 1836570
* CertifiedFire Warden
* Certified BLS First Aid
* Certified A live on site
◙ Personal qualification
-Managing in high efficiency and team spirit
-Working under pressure
-Managing the constructionstaff
- Self - motivated and energetic
-problem solving techniques
◙ contacts
QDVC Mr.Vincent(Projectmanager)tornado tower :55011100
Gulf united company at Doha;
Tel; + 974 4355502 fax:4355504P.OBox3805
SHERIF swaify consultantoffice Cairo
Eng / SHERIF mob: +20123410545
◙ Languages
Arabic: Mother tongue
English : Well spoken & written
French : Progressing
◙ References
Available upon request
Thank you,
M.M.Elsaadani

More Related Content

What's hot (19)

Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016Maged_Ahmed_Ali_CV_10-2016
Maged_Ahmed_Ali_CV_10-2016
 
Khaled Naguib
Khaled NaguibKhaled Naguib
Khaled Naguib
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015
 
Survey Engr
Survey EngrSurvey Engr
Survey Engr
 
OMRAN CV
OMRAN CVOMRAN CV
OMRAN CV
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
CV 2014 WEB UPLOAD
CV 2014 WEB UPLOADCV 2014 WEB UPLOAD
CV 2014 WEB UPLOAD
 
CV Eng Qasim A Irshid 8 Feb 2016
CV Eng Qasim A Irshid 8 Feb 2016CV Eng Qasim A Irshid 8 Feb 2016
CV Eng Qasim A Irshid 8 Feb 2016
 
Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
Mohamed Abdelaal cv
Mohamed Abdelaal cvMohamed Abdelaal cv
Mohamed Abdelaal cv
 
modified cv khaled
modified  cv khaledmodified  cv khaled
modified cv khaled
 
hassan assamy - TO
hassan assamy  - TOhassan assamy  - TO
hassan assamy - TO
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2Omar Kalamchi-CV-Rev2
Omar Kalamchi-CV-Rev2
 
CV MZ
CV MZCV MZ
CV MZ
 

Viewers also liked

Martin's MMUP_Qatar Ministry certificate
Martin's MMUP_Qatar Ministry certificateMartin's MMUP_Qatar Ministry certificate
Martin's MMUP_Qatar Ministry certificateThomas Vaz
 
Ahmed Mohamed Saleh- CV- 2016
Ahmed Mohamed Saleh- CV- 2016Ahmed Mohamed Saleh- CV- 2016
Ahmed Mohamed Saleh- CV- 2016Ahmed Saleh
 
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib, PMP, PMI-RMP
 

Viewers also liked (7)

150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 
Martin's MMUP_Qatar Ministry certificate
Martin's MMUP_Qatar Ministry certificateMartin's MMUP_Qatar Ministry certificate
Martin's MMUP_Qatar Ministry certificate
 
tal3at cv
tal3at cvtal3at cv
tal3at cv
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Ahmed Mohamed Saleh- CV- 2016
Ahmed Mohamed Saleh- CV- 2016Ahmed Mohamed Saleh- CV- 2016
Ahmed Mohamed Saleh- CV- 2016
 
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
Mohammed Labib - SeniorEngineer- Projects Control (Planning and Cost Control)
 

Similar to CV mohamed

Similar to CV mohamed (20)

Ayman Fathy Mohamed
Ayman Fathy MohamedAyman Fathy Mohamed
Ayman Fathy Mohamed
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Ahmed-shawky
Ahmed-shawkyAhmed-shawky
Ahmed-shawky
 
C.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCMC.V mr.srdc@yahoo.com DCM
C.V mr.srdc@yahoo.com DCM
 
CV
CVCV
CV
 
hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
Hisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.MHisham C.V December 2014 C.C.M
Hisham C.V December 2014 C.C.M
 
Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.Eng. Ayman Mitkees Cv.
Eng. Ayman Mitkees Cv.
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
Amr El-Metwally CV
Amr El-Metwally CVAmr El-Metwally CV
Amr El-Metwally CV
 
ALAA ABBAS
ALAA ABBASALAA ABBAS
ALAA ABBAS
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager Resume of Islam M. Elshora MEP Technical Office & BIM Manager
Resume of Islam M. Elshora MEP Technical Office & BIM Manager
 
M Sahar CV-Updated
M Sahar CV-UpdatedM Sahar CV-Updated
M Sahar CV-Updated
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 

CV mohamed

  • 1. 1 Curriculum vitae MOHAMED MAHMUD ELSAADANI MBA CERTIFIEDPMP ENGINEER (PMP NO: 1539761) UPDA(Grade A) PMI MEMBER (NO: 1836570) Doha mob +974 - 55369802 Egypt: Mobile +2 -0114628158 Home Telephone +974 44989340 & +202 3838931 E-mail :mhmdsaadany@yahoo.com ◙ Personal Data Date of Birth December, 22, 1976. Place of Birth Giza,ArabRepublic of Egypt Marital Status married National Service Exempted Nationality Egyptian ◙ Education - Degree of Bachelor in Civil Engineering Department zagazig university, specialist construction and financial project management,( graduated with excellent degree in management project about fulfilling san Stefano complex project in Alexandria by a German company (Pauer).) - Certified PMP Engineer (project management professional), member of PMI
  • 2. 2 ◙ Objective To apply for a job that challenges my qualifications, and help me to build my career and gives me a chance that I am an asset to the job I am applying for,by applying scientifically methods. ● Study the build strategy/client specification/Contract and prepare MasterProjectPlan for the project. ● Participate inBuild Strategy preparationat the initial stage and also during the course of Project. Will be able to manage large teams and motivate them to achieve targets. ● Ensures compliance with all corporate commercial practices and standards.Custodian of sound project management practices & procedures. ●Senior focal point for all customer contact including all customer requests, queries & concerns throughout contract life ● Ensure Project milestones and commercial controls are achieved byeffective planning including logistics and execution. ● Coordinate with various parties involved in project in such a way that the overall risk of failure is eliminated. ● Determine and implement the exact needs of the Client as per Contract & Specification. Leads project team through a regular system of contract reviews to identify & manage risks, monitor operational performance against the agreed timescales, and instigates corrective action where appropriate. ● Identify risks at an early stage in the project thus avoiding delays in schedule. Periodic Project Reporting to Senior Management and Client. ● Close out documentation. Plan and implement continual improvement in safety, quality and productivity. ● Training subordinates in the tasks of Project Management.
  • 3. 3 ◙ Area of Experience * Project planning and management *Construction management *Major constructions (Hotels, resorts, compounds, underground car parks, Infra structure , High way ) ◙ Work Experience ◘ Section Engineer QDVC Company (AUGUST 2015 )CP01 Project Managing infra-structure works at A12 road for my section area, as of (main storm water 2000 mm, secondary storm 1200 mm , potable water , irrigation network, pneumatic wastage control , gas lines, SSD , ELV , electric cables, data networks, traffic signals lines ,…… -finishing works, curbstones,granite slab, cobble stones, - Traffic signal installation, road works, sub grade, sub base, wearing course. ◘ Car Park Manager QDVC Company (May2013 ) LUCP Project - The project is located at Lusail City, consists of 4 underground car parks 3 stories each. (50,000m2)project (budget to date)1.87 Billion Qatari Riyal - Managing project Zone, planning project control, risk assessments, mitigation plans, quality assurance, technical issue log, critical method statement, coordination different departments. -Following day today activities, finishing works, landscaping.Repairing works. Dewatering wheels
  • 4. 4 ◘ Project Manager Gulf united company real state ltd in Doha ( 2006 – April 2013 ) _ Incharge of finishing our company projects ( 80 villas, club house in Abouhamour Ruby, Diamond & Sapphire _ EWAAN Compound 40 villas in west bay lagoon _ head quarters building _ 24 villas in old air port area pearl gardens _ hotel at C ring road – ALCAT RMC plant – Industrial area park ( 215,000 m2 ware houses and labor accommodations) - 6 Palaces at umm selal) - Total projects cost exceeded 1,150 M QR. - My responsibility is to get the project done in best management procedures and quality with respect to time frame and budget cost can be briefed as follow :- Explaining design concepts and purposes & usage of the projects to designing consultants , Reviewing designing stages and making revision for designed drawings – preparing tenders for general contractors’ _ choosing contractors and supervision consultant offices _ following up all project stages, super vision ,technical and appointed meetings with projects stakeholders , quality control and assuranceobserving and monitoring progress compared to time schedules _ handling and coordinate any sudden problems, project documentation.,Working closely with the site workforce once building is underway,making sure the work meets legal requirements and Building Regulations. - Managing team of construction engineers staff to have full control of the projects. - managing maintenance engineers staff to keep our properties as new all the time and offer good services to the tenants . - preparing both construction manual and maintenance manual to control our projects in an easy and professional way , applying all management applications ( initiation , planning ,execution , monitoring &control and closing ) to the projects areaduring the project life cycle (integration ,scope ,time ,cost, quality ,human resources ,communication, risk and procurement )
  • 5. 5 ◘Consultant project manager ( 2002 – 2006 ) Working as a consultant and project manager with consulting and designing office (Eng. Sherif El Swifi for Engineering consulting and Designing) in charge designing and supervision of fulfilling Hauza Hotel (5 stars 450 room hotel insharm el sheikh) and Regency plaza Hotel (5 stars 690 room hotel in Sharm el Sheikh) Job Description  General coordinator for all project activities  Incharge to follow up electromechanical works :- - Gas station ( L.P.G ) tanks, piping ,vaporizer , compressor room , regulators - Electrical stations medium tension ( ring main unit – transformer ) , low tension ( main distribution board – main emergency distribution board -generators ) - Pump stations ( up left sewage water ) - Water tanks with pumps room. - Water treatment, station. - Boiler room - Laundry - Swimming pool ,artificial lakes and water falls mechanical rooms - Control room ( central –satellite system – fire alarm system – net work system – sound system )  Activities work description for both staff engineer and contractors.  Handling project activities combination problems with discussionwith electro mechanical consultants.  Preparing reports for the needed amount of materials and activities contractors.  Study technical and financial tenders for different activities.  Making weekly meeting with Engineers’ staff, explaining the aims and the goals for the next week and evaluation of last week achievements according to the time schedule
  • 6. 6 ◘ site Engineer ( 1999 - 2002 )training For building up a Zouara**** 4 stars hotel in Sharm El Sheikh owned by el khaligia company. Job Duties In charge in the following:- 1 Study bids and tenders for suitable kind of contracting. In charge in construction works, Topographic works with sets - all infra structures 2 project planning :- Planning (time scheduling- independency of activities - bar charts and line of balance - sources management - updating data - updating planning and resources - financial control and cash flow) 3 Previewing construction and architect techniques with consultant offices, in charge of all processes of project fulfilling. 4 Electro mechanical works ( water pipelines and pumping - low voltage lines and electrical boards - light current lines - air conditioning systems central, split, concealed. ) 5 quantities survey for ( needed amounts of materials- sub contractors works -preparing bill of quantity ) 6 handling relations with sub-contractors and material suppliers ◘Site Engineer (1998 – 1999)training Working as a project Engineer in fulfilling (Sinai view) a four star hotel in Sharm El Sheikh, owned by ( NescoMisr ) a Saudi Company in Egypt . Job Duties 1- In charge in construction works :- Topographic works with sets - all infra structures 2- project planning :- Planning (time scheduling- independency of activities - bar charts and line of balance - sources management - updating data - updating planning and resources - financial control and cash flow) 3- Swimming pool proofing techniques and finishing - landscaping 4- Electro mechanical works (water pipelines and pumping - low voltage lines and electrical boards - light current lines - air conditioning systems central, split, concealed.) 5- quantities survey for ( needed amounts of materials- sub contractors works -preparing bill of quantity )
  • 7. 7 ◙ Computer Skills Microsoft office- AutoCAD –primavera(P3&P6) – MS Project - 3D MAX – forteran. ◙ Additional Skills * MBA * Certified PMP Engineer, PMP NO: 1539761 * PMI Member, PMI NO: 1836570 * CertifiedFire Warden * Certified BLS First Aid * Certified A live on site ◙ Personal qualification -Managing in high efficiency and team spirit -Working under pressure -Managing the constructionstaff - Self - motivated and energetic -problem solving techniques ◙ contacts QDVC Mr.Vincent(Projectmanager)tornado tower :55011100 Gulf united company at Doha; Tel; + 974 4355502 fax:4355504P.OBox3805 SHERIF swaify consultantoffice Cairo Eng / SHERIF mob: +20123410545 ◙ Languages Arabic: Mother tongue English : Well spoken & written French : Progressing ◙ References Available upon request Thank you, M.M.Elsaadani