1. RESUME
RAVI.A
Prasanthi Flats,B block,
No:11 , Nagathammankoil street, Ganapathipuram,
Chromepet,Chennai,India–600 044.
Ph : +91-98413 0 7316 (India) E-mail :ravi_a73@yahoo.co.in
Skpe id:ravi.anguraj
A capable,enthusiasticIndustrial EngineeringmajorwithPowerplant fieldexperiences seeksachallengingCo-op.
EXPERIENCE CURRICULAM
11+ years of Mechanical design and piping experience in thermal power plant
PROFILE SUMMARY
Steering diverse initiatives towards accomplishment of organizational goals & vision pertaining
to overall execution of the Projects, Design & Development.
Evaluation of Design and engineering documents with a view to ensure timely accomplishment of
targets within the scope, time and cost parameters in line with customer specification.
PROFILE SUMMARY
B.E Industrial Engineering from Anna University, Main Campus, Guindy, Chennai.
D.M.E Mechanical from V.S.V.N Polytechnic , Virudhunagar.
HYUNDAIENGINEERING CO, SEOUL, SOUTH KOREA JULY 2013 TO JULY 2015 (2 YEARS)
LEAD ENGINEER –MECHANICAL DESIGN - POWER &ENERGY PLANT DIVISION
PROJECT HANDLING
1. 2 x 600 MW SUPER CRITICAL THERMAL POWER PLANT COAL FIRED –SUMSEL9- INDONESIA
2. 2 x 100 MW COAL FIRED THERMAL POWER PLANT – KALSEL1 - INDONESIA
3. 2 x 300 MW COAL FIRED THERMAL POWER PLANT – RPA – SUBIC -PHILIPHINES
4. 1x 150 MW COAL FIRED THERMAL POWER PLANT – TT2 - COLUMBIA
ROLES & RESPONSIBILITIES:
Equipment selection and specification preparation for equipment such as
Raw water pump vertical pump, horizontal centrifugal pump and inclined pumps for raw water system.
Circulating water pumps, closed cooler water pumps for circulating water and closed water system.
2. Auxiliary water pumps and booster for auxiliary water system and cooling water pump for lubrication of
concrete circulating water and Vertical water pumps.
Condensate water pumps , Demineralized water pumps for DM water and condensate water system
Diaphragm and screw pumps for fuel oil system of HFO, LDO oil.
Boiler feed pump and condensate pump
Mechanical Ring Vacuum pump for condenser air evacuation system.
Primary , Secondary and Induced fans for boiler and auxiliary system
Air compressor – Instrument and service air system.
Service water pumps, Drain and storm dewatering pumps.
Ash slurry pumps
Coal handling system as per TEMA code ( For proposal work )
Steam and condensate water system – Condenser, LP Heater , Deaerator , HP heater , Condensate water
pump , Boiler feed pump.
Equipment layout for TG hall and cooling water system.
PREPARATION OF CALCULATION FOR
Water capacity for whole plant – Thermal plant
Heat and Mass Balance Diagram and Water balance diagram
Condenser cooling water capacity
Auxiliary water capacity and CCW ( closed cooler water) capacity
Head load calculation for PHE ( Plate heat Exchanger)
Fuel oil capacity for boiler start up load condition
Air Flow rate for instrument air and service air system
Air Quantity for Primary, Secondary system for boiler.
Condenser heat load calculation
Cooling water for Condenser
Condensate water pump head & motor rating
Deaerator steam requirement
PRDS calculation
Fuel requirement ( Coal and Fuel oil – LDO & HFO)
Boiler feed pump head & motor rating
Steam requirement for HDO oil heating.
Heat transfer for HDO oil tank insulation
Flash tank capacity
Expansion tank capacity for CCW system
DM water & condensate water capacity
3. PREPARATION OF RFQ (Request for quotation)
Raw water system
DM Water system – Reverse Osmosis process
Circulating water , auxiliary water and CCW water system
General service horizontal pumps
HFO and LDO fuel oil system
Air compressor system – Instrument and service air system
Primary fan and Secondary air fan for boiler system
Ash handling water pump system
TECHNICAL OFFER BID EVALUATION FOR
Water system
Air compressor system
Fuel Oil system
GENERAL SERVICE HORIZONTAL PUMPS
PREPARATION OF SYSTEM DESCRIPTION AND DESIGN CRITERIA FOR
Circulating water system
Closed cooling water system
Closed cooling cooler ( plate heat exchanger)
General service horizontal pumps
Fuel Oil system and Air compressor system
PREPARATION OF
Hydraulic calculation of Pressure Head
NPSH , Motor Rating , system resistance curve
Preparation compliance report for sump model and pump model
Cooling tower basin design
Pump Intake channel design as per HIS
Raw water Intake channel design for sea water intake and river water intake
Product water and fire water sump
Ash handling water sump
PFD and P&ID for all water and steam system and air compressor system
Material selection and pipe line sizing
Buried pipe thickness calculation
4. G.A drawing for all water pump house , air compressor and ash handling water system
Debris filter , strainer , Intake facilities
Equipment list and electrical load
BGR ENERGY SYSTEM LTD AN EPC DIVISIONCOMPANY JUNE 2008 TO JUNE 2012 (5 YEARS)
ENGINEER–MECHANICAL DESIGN - POWER PLANT DIVISION
PROJECT HANDLING
5. 1X 600 MW SUB CRITICAL THERMAL POWER PLANT – METTUR - TAMILNADU
6. 2 x 660 MW SUPER CRITICAL THERMAL POWER PLANT – TPCL – ANDHRA PRADESH
7. 1X 500 MW KOTHAGUDEM THERMAL POWER PLANT – APGENCO– ANDHRA PRADESH
8. 1X 500 MW KAKATHYA THERMAL POWER PLANT – APGENCO– ANDHRA PRADESH
Type of boiler: Natural circulation, two pass, opposed wall firing, single reheating, balanced draft, dry bottom,
full steel structure type drum boiler, Tri-regenerative air preheaters are located within the boiler column
9. 2x660MW SOLAPUR SUPER CRITICAL THERMAL POWER PROJECT.
10. 2x660MW MEJA SUPER CRITICAL THERMAL POWER PROJECT.
Type of boiler: Tower type, spiral wall, once through, opposed wall firing, single reheating, balanced draft,
Bi-sector regenerative air preheaters.
ROLES & RESPONSIBILITIES:
Evaluation of HMBD’s, P&ID, Equipment sizing Calculation, System design description for Power
cycle equipment’s such as BFP, CEP and boiler auxiliaries such as safety valves, fans, APH, Auxiliary PRDS etc.
Preparation of Procurement Specification, Mechanical Datasheets, Purchase Requisition, and
technical clarifications with vendors, Review and approval of Vendor Documents, and Coordination with
Clients, Vendors and other engineering disciplines for interface engineering.
Conversant in ASME, IBR, API, GB and relevant standards.
Equipment selection and specification preparation for rotating equipment such as
Raw water, water and waste treatment plant system, Circulating water system, closed water system, fuel oil
system, air compressor system.
Selection of Electro Mechanical equipment for water treat plant such as
5. 1. Pump , blower , Membrane , flow meter , valve , skid , membrane housing
2. Piping material selection and its fitting
3. Selection of pumps – submersible pump , mono block pump and bar screen
4. Water balance diagram
5. Preparation of settling tank as per IS: 10261
Pressure Head calculation of
concrete volute pumps for condenser cooling
ACW (Auxiliary cooling water pump),
vertical type pumps for raw water intake
Horizontal pumps other applications
HFO Pump
HSD Pump
System resistance curve for parallel pump & single operation
Buried pipe thickness calculation
G.A of Raw water pump house , MCW & ACW , DM & PRODUCT WATER pump house as per HIS
Compliance report preparation for MCW , ACW & RW house as per HIS
Technical Offer comparison evaluation preparation
Arranging for vendor meeting and MOM preparation
Technical Evaluation Report preparation
Vendor datasheets/drawings review
P & ID Preparation
for raw water intake system
for MCW & ACW cooling water system
for DM & PRODUCT WATER & SERVICE WATER
for Auxiliary Steam & Condensate .
Bunker Volume calculation preparation
CEP Pump head calculation review
Inter face checking of all equipments
STORAGE STEEL TANKS AS PER API 650 STDS
6. (Vertical & horizontal) calculations & G.A of the tanks & fabricated Drawings. (HFO & LDO Tanks & DM water
, CST tank , Flash Tank, Potable & Service Water Tank).
Fuel Oil System P&ID , LAYOUT
Equipment Layouts for all systems.
Product water & DM water transfer General arrangement drawings
AQUATHERM ENGINEERING CONSULTANTSPVT LTD May 2006 – May 2008 ( 2 YEARS)
MECHANICALENGINEER – 2 YEARS EXPERIENCE
Aquatherm Engineering Consultants is a private limited company licensed by the Government of India , to practice
engineering consulting. Company has completed many domestic and International projects in the past 12 years
and is one of the major engineering consultancy company in the nation.
Project handled
25 MW CAPTIVE POWER PLANT – MALCO – BGR ENERGY - METTUR
10 MW BIOMASS POWERPLANT – SHALIVAHANA – CHANDRAPUR – MAHARASTRA
10 MW BIOMASS POWERPLANT – LAHARI – UTTARPRADESH
10 MW BIOMASS POWERPLANT – ETA – SATTUR – TAMILNADU
10 MW BIOMASS POWERPLANT – VARAM - MAHARASTRA
8 MW BIOMASS POWER PLANT – SESHASAILA – RAIPUR
ROLES & RESPONSIBILITIES:
Preparation of detailed project report
Development of basic engineering
Preparation of technical specification for all packages
Review of Boiler data sheets , Fuel Requirement calculation , PRDS , Primary air and Secondary air fan
equipment review for CFBC boiler , Fluidized bed combustion boiler. (FBC)
PLOT PLAN preparation
P&ID for all systems such as
o Raw water
o CW & ACW
o Steam & condensate
o Instrument & Service air
Layout preparation (TG HALL - Ground floor , Mezzanine & turbine , Deaerater floor)
7. Equipment layout , piping layout , ISO dwg and MTO preparation using ASME 31.1 code.
PRDS calculation preparation
HBD preparation & review ( with heater & without heater)
Water balance diagram
Calculations and technical specification for
o Boiler feed pump
o CEP pump
o Deaerater
o PRDS
o Safety valves
o Coal handling
o Ash handling
o Bunker volume calculation
Plot plant preparation
Co-ordination with clients.
Review of vendor data sheets/drawings
Line Sizing for all systems
Ash Silo calculation
Input preparation for Control Valves
Pipe layout checking
ISO dwg checking
Kick off meeting attending and MOM preparation
Involved in technical proposal team.
PETRO ARALDITE PVT LTD March 2004 – March 2006 (2 Years)
PlantDesigner – 2 Years Experience
Preparation of the modification drawings of P&ID
Preparation of ISO drawings as per modification
Involving in new projects
Preparation layouts for third party
Preparation of structural drawing in the plant
Preparation of accessories, pressure vessels drawings
8. SHIVSU WATER PLANT PVT LTD Jan 2002 – Jan 2004 (2 Years)
JUNIORENGINEER – 2 Years Experience
Involving all activities of manufacturing water purifying machines
Involving in all production planning as per workers available
Preparation of material demand as per worker order
Making drawings in CAD as per clients requirements
Monitoring inventory stock & preparation of ISO documentation
TVR AUTOMOTIVE PVT LTD Nov. 1996 – Nov. 2001 (5 Years)
JUNIORENGINEER
Involving all activities of manufacturing automotive parts
Preparation of product drawings
Preparation of jigs & fixtures for the product
Making drawings in CAD as per clients requirements
Monitoring inventory stock & preparation of ISO documentation
COMPUTER PROFICIENCY
AutoCAD , IMPULSE , STEAMPRO , PDMS, MS OFFICE
EDUCATIONAL QUALIFICATION
B.E (PART TIME) ANNA UNIVERSITYGUINDY
Industrial Engineering CHENNAI
D.M.E V.S.V.NPolytechnic,Virudhunagar
9. PERSONAL INFORMATION
Name : RAVI.A
Date of Birth & Age : 20.12.1973 & 42 Years
Father’s Name : S. Anguraj
Father’s occupation : Retired From Border Security Force
Marital status : Married
Last Salary Drawn : USD 2100 per Month
Expected Salary : As per company rule
Pass port No : L1038876
DECLARATION
I hereby declare that particulars mentioned above are true to my best of knowledge and belief.
REFERENCE
1. Mr. Sowundarapandian , Associate Executive,TANJEDCO,Ennore
2. Mr. S.P. Thiruvadi, Associate Executive, TNEB, Chennai.