1. Rig Name : BENNEVIS JSA Number :DR 047 Person Approving JSA
Work Activity (Job): Confined space entry Date Raised :
Work Team (Crew Members): Driil /deck/ maintenance 3 rd party inspection Date Last Amended :
Sequence of Basic Job Steps Potential Accidents or Hazards
Recommendation to Eliminate or Reduce Potential
Hazards
Who?
Initials
Have a management meeting. Raise permits Discuss & record it on paper
Open tank May be full of fluid ,gas or low on oxygen Lid may be blown off. Stand clear when undoing last few nuts, have fresh air
blowing over worksite
Erect barrier & purge tank People falling in hole before barrier complete, purge gases may
be toxic
Have barrier in place if possible before opening tank. Test air
coming out & be prepared for foul air/ fluid
Trained & competent assistant Person being given another job, wandering off, not being trained
Entering the tank to assist/rescue
Should wear a waistcoat, labeled fire watcher etc, Prejob
training reinforced by the person entering the tank
Test air/ gases Unfamiliar with safe levels of O2/Gases /misreading, faulty
calibration
Person should read permit if unsure consult PIC, check
calibration date & do check calibration
Entering the tank Falling while climbing a ladder, trip on debris inside space Fall protection, good lighting
Start the work you agreed to do in the time
you also agreed on
Another job may be necessary Have another meeting check the permit, keep the man
outside fully informed
Complete the task , remove all equipment Job not completed, equipment left in the space Double check what was agreed on, inform supervisor if job
incomplete. Check list of tools retained by watcher
Secure tank, close permit Next crew may not be fully aware of what is happening Stick to permits conditions & times
Uncontrolled When Printed Page 1 of 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
2. Safety Equipment To Do This Job
Hard Hats (
Cotton Gloves ( Face Shield ( Fire Extinguishers (
Safety Boots (
Work Vest ( Goggles ( Lockout/Tagout (
Safety Glasses ( Safety Harness ( Barricades ( Work Permit Required (
Uncontrolled When Printed Page 2 of 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2