 The temporary structure is the structure which is temporary required in
building construction
 To supporting the laying of concrete till it gets matured ,such as
formwork or shuttering for supporting the material an Labour for
execution of some construction work
Stringers
JoistJoist Joist
Shores
 1. Easy removal
 2. Economy
 3. Strength
 4. Rigidity
 5. Less leakage
 6. Smooth surface
 7. Light weight
 8. Quality
 9. Supports
 1. Timber formwork
 2. Steel formwork
 3. Aluminum sheet formwork
 4. Fiberglass sheet formwork
 5. Plywood formwork
 It should be well seasoned.
 It should be light in weight.
 It should be easily workable with nails without splitting.
 It should be free from knots.
 The steel forms can be put sufficiently larger number of re-uses.
 There is no danger of the formwork absorbing water from the
concrete and hence the chances of honeycombing are minimized.
 The quality of exposed concrete surface obtained by use of steel
form is excellent.
 Steel forms are stronger and having long life.
 It is possible to have perfectly plain and smooth surface by
use of plywood shuttering.
 By use of large size panels it is possible to effect saving in the
labour cost of fixing and dismantling.
 Number of re-uses are more as compared with timber
shuttering.
The formwork for R.C.C. wall consists of sheets, studs , braces,
wedges, M.S. tie bars , sole plate, stakes etc.
 The sheets are supported by vertical studs and horizontal Wales.
 The ties are provided to maintain the distance between the sheets
and to resist the bursting action of concrete.
 The small pieces of timber knows as spacers may be used and they
are to be removed as the concrete reaches that level.
 In addition the wire ties and bolts may be also provide.
 If bolts are used, they are to be provided with grease so as to make
their removal easy after 2 to 3 days of pouring concrete.
 The decking consists of plywood or
timber planks.
 The decking is supported on wooden
joists which are properly spaced
depending upon the loads to be borne
within permissible deflection limits.
 The maximum spacing of vertical
posts or shores deepened upon the
strength of stringers or the capacity of
shores to bear the loads.
 The vertical posts ,lateral supports,
shore braces, steel base plants and
wooden wedges , provide a strong
centering to beam and slab floor to
bear all the loads due to them.
 The details of formwork for
an R.C.C. beam which is
usually constructed
monolithically with slab.
 The boxes for beam consist
of two sides and one bottom
supported on vertical posts.
 These boxes are shaped to
the exact dimension of the
rib of the R.C.C. floor.
 Column box consists of two ends and two sides ,
each built as panel of planks sheeting. At top, cuts
are made if column is to receive girder or beam.
 The height of each panel is equal to the storey
height minus the slab thickness and the floor
sheeting.
 The width between two opposite panels is kept
equal to the actual dimension of the column plus
twice the thickness of sheeting.
 Yokes are equally spaced on both the sides and
ends. They project at both the ends by about 25
cm.
 Formwork components for any column are
require to be designed properly to resist high
pressure resulting from the quick filling of the
concrete.
 Slip form technique is a special technique of placing concrete.
 This technique is useful for vertical construction as well as horizontal
construction.
 In case of vertical construction like chimneys and silos, using slip formwork,
concrete is continuously placed, compacted and formwork is pulled up by
hydraulic jacks , giving reaction against main reinforcements. the rate of concrete
to withstand without the support of formwork. This technique is suitable for
uniform shaped structures.
 This technique was adopted for the core construction of Bombay stock exchange
building having irregular shape and may opening. This core of 380 feet tall
structure was completed in 38 days with formwork slipping rate of about 12.5 cm
per hour.
 The slip form paving method was first time adopted delhi-mathura concrete road
construction in1990.
 In the Mumbai- Pune six lane express highway construction and Ahmedabad-
baroda express highway construction slip form pavers were used.
Temporary Works (Form Work)

More Related Content

What's hot (20)

Composite slab
Composite slabComposite slab
Composite slab
 
Formwork
FormworkFormwork
Formwork
 
Types of construction
Types of constructionTypes of construction
Types of construction
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
Fromwork
FromworkFromwork
Fromwork
 
FormWork
FormWork FormWork
FormWork
 
Blockwork
BlockworkBlockwork
Blockwork
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Costruction ppt
Costruction pptCostruction ppt
Costruction ppt
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
 
Hollow Block
Hollow Block Hollow Block
Hollow Block
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffolding
 
From work & shuttering
From work & shutteringFrom work & shuttering
From work & shuttering
 
Floor and slabs
Floor and slabsFloor and slabs
Floor and slabs
 
Roofing members
Roofing membersRoofing members
Roofing members
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
field study of rcc structures
field study of rcc structuresfield study of rcc structures
field study of rcc structures
 

Similar to Temporary Works (Form Work)

form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities Pradumn Suryakar
 
04. superstructure
04. superstructure04. superstructure
04. superstructureThien Hee
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptxMr Amol Ghogare
 
Formwork by chakamba john
Formwork by chakamba johnFormwork by chakamba john
Formwork by chakamba johnJohn Chakamba
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building Yasir Hussain
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation EmHetchMaidabino
 
Reinforced Concrete Structure and Detailing Module
Reinforced Concrete Structure and Detailing ModuleReinforced Concrete Structure and Detailing Module
Reinforced Concrete Structure and Detailing ModuleBahzad5
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptxMr Amol Ghogare
 
Construction-methods-and-techniques.pptx
Construction-methods-and-techniques.pptxConstruction-methods-and-techniques.pptx
Construction-methods-and-techniques.pptxLyrittSazellebb
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdfFaizanSolanki
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 
Formwork
FormworkFormwork
FormworkRahul
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxVinayak247538
 

Similar to Temporary Works (Form Work) (20)

Control joints
Control jointsControl joints
Control joints
 
Form Work
Form Work Form Work
Form Work
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
04. superstructure
04. superstructure04. superstructure
04. superstructure
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
 
Formwork by chakamba john
Formwork by chakamba johnFormwork by chakamba john
Formwork by chakamba john
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation
 
Reinforced Concrete Structure and Detailing Module
Reinforced Concrete Structure and Detailing ModuleReinforced Concrete Structure and Detailing Module
Reinforced Concrete Structure and Detailing Module
 
Formwork
FormworkFormwork
Formwork
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Construction-methods-and-techniques.pptx
Construction-methods-and-techniques.pptxConstruction-methods-and-techniques.pptx
Construction-methods-and-techniques.pptx
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 

More from Sujith Velloor Sudarsanakumar Nair

More from Sujith Velloor Sudarsanakumar Nair (20)

Modern Equipment's in Survey Works
Modern Equipment's in Survey WorksModern Equipment's in Survey Works
Modern Equipment's in Survey Works
 
Theory of Errors
Theory of ErrorsTheory of Errors
Theory of Errors
 
Design of Industrial Building
Design of Industrial BuildingDesign of Industrial Building
Design of Industrial Building
 
Plastic Analysis
Plastic AnalysisPlastic Analysis
Plastic Analysis
 
Foot Over Bridge
Foot Over BridgeFoot Over Bridge
Foot Over Bridge
 
Water treatment process
Water treatment processWater treatment process
Water treatment process
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Physical Treatment for waste water
Physical Treatment for waste waterPhysical Treatment for waste water
Physical Treatment for waste water
 
Biological Treatment for Waste Water
Biological Treatment for Waste WaterBiological Treatment for Waste Water
Biological Treatment for Waste Water
 
Plastic Analysis
Plastic AnalysisPlastic Analysis
Plastic Analysis
 
Design of Industrial Building
Design of Industrial BuildingDesign of Industrial Building
Design of Industrial Building
 
Water disribution system
Water disribution systemWater disribution system
Water disribution system
 
Computation of Area and volume
Computation of Area and volume Computation of Area and volume
Computation of Area and volume
 
Plane Table Surveying
Plane Table SurveyingPlane Table Surveying
Plane Table Surveying
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
Port amenities
Port amenitiesPort amenities
Port amenities
 
Poster presentation with models
Poster presentation with modelsPoster presentation with models
Poster presentation with models
 
Gpsc study material
Gpsc study materialGpsc study material
Gpsc study material
 
Special structure
Special structureSpecial structure
Special structure
 
Excavating equipments (ACE)
Excavating equipments (ACE)Excavating equipments (ACE)
Excavating equipments (ACE)
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Temporary Works (Form Work)

  • 1.
  • 2.  The temporary structure is the structure which is temporary required in building construction  To supporting the laying of concrete till it gets matured ,such as formwork or shuttering for supporting the material an Labour for execution of some construction work Stringers JoistJoist Joist Shores
  • 3.  1. Easy removal  2. Economy  3. Strength  4. Rigidity  5. Less leakage  6. Smooth surface  7. Light weight  8. Quality  9. Supports
  • 4.  1. Timber formwork  2. Steel formwork  3. Aluminum sheet formwork  4. Fiberglass sheet formwork  5. Plywood formwork
  • 5.  It should be well seasoned.  It should be light in weight.  It should be easily workable with nails without splitting.  It should be free from knots.
  • 6.  The steel forms can be put sufficiently larger number of re-uses.  There is no danger of the formwork absorbing water from the concrete and hence the chances of honeycombing are minimized.  The quality of exposed concrete surface obtained by use of steel form is excellent.  Steel forms are stronger and having long life.
  • 7.  It is possible to have perfectly plain and smooth surface by use of plywood shuttering.  By use of large size panels it is possible to effect saving in the labour cost of fixing and dismantling.  Number of re-uses are more as compared with timber shuttering.
  • 8. The formwork for R.C.C. wall consists of sheets, studs , braces, wedges, M.S. tie bars , sole plate, stakes etc.
  • 9.  The sheets are supported by vertical studs and horizontal Wales.  The ties are provided to maintain the distance between the sheets and to resist the bursting action of concrete.  The small pieces of timber knows as spacers may be used and they are to be removed as the concrete reaches that level.  In addition the wire ties and bolts may be also provide.  If bolts are used, they are to be provided with grease so as to make their removal easy after 2 to 3 days of pouring concrete.
  • 10.  The decking consists of plywood or timber planks.  The decking is supported on wooden joists which are properly spaced depending upon the loads to be borne within permissible deflection limits.  The maximum spacing of vertical posts or shores deepened upon the strength of stringers or the capacity of shores to bear the loads.  The vertical posts ,lateral supports, shore braces, steel base plants and wooden wedges , provide a strong centering to beam and slab floor to bear all the loads due to them.
  • 11.  The details of formwork for an R.C.C. beam which is usually constructed monolithically with slab.  The boxes for beam consist of two sides and one bottom supported on vertical posts.  These boxes are shaped to the exact dimension of the rib of the R.C.C. floor.
  • 12.  Column box consists of two ends and two sides , each built as panel of planks sheeting. At top, cuts are made if column is to receive girder or beam.  The height of each panel is equal to the storey height minus the slab thickness and the floor sheeting.  The width between two opposite panels is kept equal to the actual dimension of the column plus twice the thickness of sheeting.  Yokes are equally spaced on both the sides and ends. They project at both the ends by about 25 cm.  Formwork components for any column are require to be designed properly to resist high pressure resulting from the quick filling of the concrete.
  • 13.
  • 14.  Slip form technique is a special technique of placing concrete.  This technique is useful for vertical construction as well as horizontal construction.  In case of vertical construction like chimneys and silos, using slip formwork, concrete is continuously placed, compacted and formwork is pulled up by hydraulic jacks , giving reaction against main reinforcements. the rate of concrete to withstand without the support of formwork. This technique is suitable for uniform shaped structures.  This technique was adopted for the core construction of Bombay stock exchange building having irregular shape and may opening. This core of 380 feet tall structure was completed in 38 days with formwork slipping rate of about 12.5 cm per hour.  The slip form paving method was first time adopted delhi-mathura concrete road construction in1990.  In the Mumbai- Pune six lane express highway construction and Ahmedabad- baroda express highway construction slip form pavers were used.