Hollow Block Slab
Done by : Ahmad Baalbaky
Outline:
 Introduction
 Benefits of rib and block slab
 Pictures from site
 Comparison between different codes
 Types of hollow block slab
 Steps of design
 Solved example
Introduction:
 Hollow block and Ribbed slabs are formed by placing
blocks on the slab and concrete ribs.
 In case of hollow block slab voided blocks are placed to
reduce the total weight of the slab .
 In case of ribbed slab the blocks are not permanent but the
wooden frame is not continuous so its hard to be applied
and expensive.
 The blocks are considered as non-structural element as
they do not contribute to strength of the slab.
 Blocks may be made concrete with lightweight aggregate
or other material as polystyrene ( foam ).
 hollow block slab can be one way or two way slabs .
Ribbed slab
Hollow block slab
Hourdi block different sizes
Benefits of Hollow block slab:
 Improved sound and heat insulation further enhance this system.
 The electrical slab boxes, which are the same size as the concrete slab blocks, allow for down-
lighters anywhere in the slab and the electrical conduits to be positioned correctly. Electrical and
plumbing services can easily be accommodated
 Plastered smooth ceilings with no grooves give a quality finish to your slab
 Easy installation guaranteed! No cranes or formwork needed.
 Reduced cost for labor, installation and very quick to install
 A hollow block system is 30% lighter than a solid cast system on the supporting walls and foundation
Block material Block height in cm
H= 25cm H=20cm H=15cm
Concrete hollow
block
240N 190N 140N
Cement hollow
block
320N 250N 190N
The shape of the hourdi blocks before formwork
Pictures from site
Hourdi block The last block placed on its side Spaces for ribs appear
Column steel bars continue to
the next floor
Preparing beams to be placed Formwork
Comparison between different codes
ACI 318 ECP 203
BS 8110 Euro code 2
 Limitations of Hollow block slabs :
• Net distance between ribs "e" shall not exceed 700 mm.
• Web width "b" shall not be less than 100 mm or one the third of
• depth "t", whichever is greater.
• Compression slab thickness "ts" shall not be less than 50 mm or one Tenth
1/10 of distance "e", whichever is greater.
 Limitations of Ribbed slabs:
• Distance between ribs axes can be increased up to 1.5 m .
• Thickness of upper slab is determined by a value not less than e/12 or 50
mm whichever greater.
• The minimum value of rib width (b) isn't less than 1/4 slab thickness (t) or
100 mm whichever greater, with taking into account requirements of
concrete cover, distance between bars and fire requirements
Egyptian code (ECP 203)
British code (BS 8110)
 Limitations of Hollow block slabs :
• Clear distance between ribs (e) not more than 500
mm , jointed in cement : sand mortar ts is 25
mm.
• Clear distance between ribs (e) not more than 500
mm not jointed in cement : sand mortar ts is 30
mm.
• All other slabs with permanent blocks ts is 40 or
one-tenth 1/10 of clear distance between ribs,
whichever is great
 Limitations of Ribbed slabs:
• Clear distance between ribs not more than 1.5 m
ts is 50 mm or one-tenth of clear distance between
ribs, whichever is greater
b ≤ t/4
e
b
t
Euro code (En2)
 Limitations of Ribbed slabs:
• The rib spacing does not exceed 1500 mm.
• The depth of the rib below the flange does not
exceed 4 times its width.
• The depth of the flange is at least 1/10 of the
clear distance between ribs or 50 mm,
whichever is the greater.
• Transverse ribs are provided at a clear spacing
not exceeding 10 times the overall depth of the
slab.
 Limitations of Hollow block slabs :
• One limitation will change from ribbed slab The minimum
flange thickness of 50 mm may be reduced to 40 mm.
 Limitations of Hollow block slabs & Ribbed slab:
American Concrete Institute (ACI)
• When permanent filling material having a
unit compressive strength at least equal to fc′
in the joists are used ts shall be not less than
1/12 the clear distance between ribs, nor less
than 40 mm.
• Otherwise ts is not to be less than 1/12 the
clear distance between ribs, nor less than 5.0
cm
• Ribs are not to be less than 10 cm in width,
and a depth of not more than 3.5 times the
minimum web width.
• Clear spacing between ribs is not to exceed
75.0 cm
Dimensions of hollow block slab
Types of hollow block slab
Loaddirection
Load direction
Steps of design:
Solved example:
Thank you for listening

More Related Content

What's hot (20)

Diagrid structural system
Diagrid structural systemDiagrid structural system
Diagrid structural system
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
FOLDED PLATES TYPES
FOLDED PLATES TYPES FOLDED PLATES TYPES
FOLDED PLATES TYPES
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
The cables structure system
The cables structure systemThe cables structure system
The cables structure system
 
Long span structures in Concrete and Steel
Long span structures in Concrete and SteelLong span structures in Concrete and Steel
Long span structures in Concrete and Steel
 
PORTAL FRAME- Structural systems
PORTAL FRAME- Structural systemsPORTAL FRAME- Structural systems
PORTAL FRAME- Structural systems
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Flat slab design
Flat slab designFlat slab design
Flat slab design
 
Hollow block and ribbed slabs
Hollow block and ribbed slabsHollow block and ribbed slabs
Hollow block and ribbed slabs
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Long span structure
Long span structureLong span structure
Long span structure
 
Folded plate structure
Folded plate structureFolded plate structure
Folded plate structure
 
Form active structure system (1)
 Form active structure system (1) Form active structure system (1)
Form active structure system (1)
 
Flat slab ppt
Flat slab pptFlat slab ppt
Flat slab ppt
 
HOLLOW CORE SLABS
HOLLOW CORE SLABSHOLLOW CORE SLABS
HOLLOW CORE SLABS
 
Structural System
Structural SystemStructural System
Structural System
 
Tensile structures for architects
Tensile structures for architectsTensile structures for architects
Tensile structures for architects
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
Portal frame by Rhythm Murgai
Portal frame by Rhythm MurgaiPortal frame by Rhythm Murgai
Portal frame by Rhythm Murgai
 

Viewers also liked

MORTAR AND CONCRETE HOLLOW BLOCKS
MORTAR AND CONCRETE HOLLOW BLOCKSMORTAR AND CONCRETE HOLLOW BLOCKS
MORTAR AND CONCRETE HOLLOW BLOCKSCarlo Mendoza
 
Ct block work system.docx
Ct block work system.docxCt block work system.docx
Ct block work system.docxfareezsham
 
Introduction to Blockwork
Introduction to BlockworkIntroduction to Blockwork
Introduction to BlockworkSteve Jarvis
 
Cement Brick & Concrete Block Making
Cement Brick & Concrete Block MakingCement Brick & Concrete Block Making
Cement Brick & Concrete Block MakingMethod Machine Works
 
MMW cement brick & concrete block making
MMW cement brick & concrete block makingMMW cement brick & concrete block making
MMW cement brick & concrete block makingMethod Machine Works
 
Building consTRUCTION
Building consTRUCTIONBuilding consTRUCTION
Building consTRUCTIONsahil saini
 
EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...
EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...
EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...IAEME Publication
 
Concrete Block Walling
Concrete Block WallingConcrete Block Walling
Concrete Block Wallingdoogstone
 
LOW COST HOUSING
LOW COST HOUSING LOW COST HOUSING
LOW COST HOUSING Amol Pawar
 

Viewers also liked (15)

MORTAR AND CONCRETE HOLLOW BLOCKS
MORTAR AND CONCRETE HOLLOW BLOCKSMORTAR AND CONCRETE HOLLOW BLOCKS
MORTAR AND CONCRETE HOLLOW BLOCKS
 
Ct block work system.docx
Ct block work system.docxCt block work system.docx
Ct block work system.docx
 
Introduction to Blockwork
Introduction to BlockworkIntroduction to Blockwork
Introduction to Blockwork
 
Cement Brick & Concrete Block Making
Cement Brick & Concrete Block MakingCement Brick & Concrete Block Making
Cement Brick & Concrete Block Making
 
MMW cement brick & concrete block making
MMW cement brick & concrete block makingMMW cement brick & concrete block making
MMW cement brick & concrete block making
 
Thermoton hollow blocks
Thermoton hollow blocksThermoton hollow blocks
Thermoton hollow blocks
 
Building consTRUCTION
Building consTRUCTIONBuilding consTRUCTION
Building consTRUCTION
 
BT 1: Concrete Hollow Blocks
BT 1: Concrete Hollow BlocksBT 1: Concrete Hollow Blocks
BT 1: Concrete Hollow Blocks
 
EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...
EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...
EXPERIMENTAL INVESTIGATION ON BEHAVIOR OF SHEAR WALL ASSEMBLED WITH INTERLOCK...
 
Concrete block
Concrete blockConcrete block
Concrete block
 
Blockwork
BlockworkBlockwork
Blockwork
 
Cement & concrete blocks
Cement & concrete blocksCement & concrete blocks
Cement & concrete blocks
 
Concrete Block Walling
Concrete Block WallingConcrete Block Walling
Concrete Block Walling
 
LOW COST HOUSING
LOW COST HOUSING LOW COST HOUSING
LOW COST HOUSING
 
Chap16 cbm&cw
Chap16 cbm&cwChap16 cbm&cw
Chap16 cbm&cw
 

Similar to Hollow Block

Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)ahsanrabbani
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slabDC Graphics
 
Bubbleds 170408171346
Bubbleds 170408171346Bubbleds 170408171346
Bubbleds 1704081713461212140039
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced ConcreteCivil Manage
 
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Hossam Shafiq II
 
Exposed Concrete Floors
Exposed Concrete FloorsExposed Concrete Floors
Exposed Concrete FloorsBrian Rich
 
Concrete filled steel tubes
Concrete filled steel tubesConcrete filled steel tubes
Concrete filled steel tubesHarikrishna M.S
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundationsaayush koolwal
 
Design of RCC slab two way continuous supported
Design of RCC slab two way continuous supportedDesign of RCC slab two way continuous supported
Design of RCC slab two way continuous supportedBhavik A Shah
 

Similar to Hollow Block (20)

Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
 
Details of REINFORCEMENT Summary
Details of REINFORCEMENT SummaryDetails of REINFORCEMENT Summary
Details of REINFORCEMENT Summary
 
Composite slab
Composite slabComposite slab
Composite slab
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slab
 
Reinforced concrete covering( bnbc)
Reinforced concrete covering( bnbc)Reinforced concrete covering( bnbc)
Reinforced concrete covering( bnbc)
 
0 ne way slab
0 ne way slab0 ne way slab
0 ne way slab
 
Bubble deck slab ppt
Bubble deck slab pptBubble deck slab ppt
Bubble deck slab ppt
 
Bubbleds 170408171346
Bubbleds 170408171346Bubbleds 170408171346
Bubbleds 170408171346
 
gov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdfgov.bd.bnbc.2012.06.08.pdf
gov.bd.bnbc.2012.06.08.pdf
 
Reinforced Concrete
Reinforced ConcreteReinforced Concrete
Reinforced Concrete
 
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
Lec10 Bond and Development Length (Reinforced Concrete Design I & Prof. Abdel...
 
Exposed Concrete Floors
Exposed Concrete FloorsExposed Concrete Floors
Exposed Concrete Floors
 
Concrete filled steel tubes
Concrete filled steel tubesConcrete filled steel tubes
Concrete filled steel tubes
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundations
 
604.pptx
604.pptx604.pptx
604.pptx
 
Bubble Deck Slab PPT.pptx
Bubble Deck Slab PPT.pptxBubble Deck Slab PPT.pptx
Bubble Deck Slab PPT.pptx
 
Floor and slabs
Floor and slabsFloor and slabs
Floor and slabs
 
Design of RCC slab two way continuous supported
Design of RCC slab two way continuous supportedDesign of RCC slab two way continuous supported
Design of RCC slab two way continuous supported
 
Ductile deatailing
Ductile deatailingDuctile deatailing
Ductile deatailing
 

Recently uploaded

Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........LeaCamillePacle
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayMakMakNepo
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........Atmosphere science 7 quarter 4 .........
Atmosphere science 7 quarter 4 .........
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Quarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up FridayQuarter 4 Peace-education.pptx Catch Up Friday
Quarter 4 Peace-education.pptx Catch Up Friday
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

Hollow Block

  • 1. Hollow Block Slab Done by : Ahmad Baalbaky
  • 2. Outline:  Introduction  Benefits of rib and block slab  Pictures from site  Comparison between different codes  Types of hollow block slab  Steps of design  Solved example
  • 3. Introduction:  Hollow block and Ribbed slabs are formed by placing blocks on the slab and concrete ribs.  In case of hollow block slab voided blocks are placed to reduce the total weight of the slab .  In case of ribbed slab the blocks are not permanent but the wooden frame is not continuous so its hard to be applied and expensive.  The blocks are considered as non-structural element as they do not contribute to strength of the slab.  Blocks may be made concrete with lightweight aggregate or other material as polystyrene ( foam ).  hollow block slab can be one way or two way slabs . Ribbed slab Hollow block slab Hourdi block different sizes
  • 4. Benefits of Hollow block slab:  Improved sound and heat insulation further enhance this system.  The electrical slab boxes, which are the same size as the concrete slab blocks, allow for down- lighters anywhere in the slab and the electrical conduits to be positioned correctly. Electrical and plumbing services can easily be accommodated  Plastered smooth ceilings with no grooves give a quality finish to your slab  Easy installation guaranteed! No cranes or formwork needed.  Reduced cost for labor, installation and very quick to install  A hollow block system is 30% lighter than a solid cast system on the supporting walls and foundation Block material Block height in cm H= 25cm H=20cm H=15cm Concrete hollow block 240N 190N 140N Cement hollow block 320N 250N 190N
  • 5. The shape of the hourdi blocks before formwork
  • 6. Pictures from site Hourdi block The last block placed on its side Spaces for ribs appear Column steel bars continue to the next floor Preparing beams to be placed Formwork
  • 7. Comparison between different codes ACI 318 ECP 203 BS 8110 Euro code 2
  • 8.  Limitations of Hollow block slabs : • Net distance between ribs "e" shall not exceed 700 mm. • Web width "b" shall not be less than 100 mm or one the third of • depth "t", whichever is greater. • Compression slab thickness "ts" shall not be less than 50 mm or one Tenth 1/10 of distance "e", whichever is greater.  Limitations of Ribbed slabs: • Distance between ribs axes can be increased up to 1.5 m . • Thickness of upper slab is determined by a value not less than e/12 or 50 mm whichever greater. • The minimum value of rib width (b) isn't less than 1/4 slab thickness (t) or 100 mm whichever greater, with taking into account requirements of concrete cover, distance between bars and fire requirements Egyptian code (ECP 203)
  • 9. British code (BS 8110)  Limitations of Hollow block slabs : • Clear distance between ribs (e) not more than 500 mm , jointed in cement : sand mortar ts is 25 mm. • Clear distance between ribs (e) not more than 500 mm not jointed in cement : sand mortar ts is 30 mm. • All other slabs with permanent blocks ts is 40 or one-tenth 1/10 of clear distance between ribs, whichever is great  Limitations of Ribbed slabs: • Clear distance between ribs not more than 1.5 m ts is 50 mm or one-tenth of clear distance between ribs, whichever is greater b ≤ t/4 e b t
  • 10. Euro code (En2)  Limitations of Ribbed slabs: • The rib spacing does not exceed 1500 mm. • The depth of the rib below the flange does not exceed 4 times its width. • The depth of the flange is at least 1/10 of the clear distance between ribs or 50 mm, whichever is the greater. • Transverse ribs are provided at a clear spacing not exceeding 10 times the overall depth of the slab.  Limitations of Hollow block slabs : • One limitation will change from ribbed slab The minimum flange thickness of 50 mm may be reduced to 40 mm.
  • 11.  Limitations of Hollow block slabs & Ribbed slab: American Concrete Institute (ACI) • When permanent filling material having a unit compressive strength at least equal to fc′ in the joists are used ts shall be not less than 1/12 the clear distance between ribs, nor less than 40 mm. • Otherwise ts is not to be less than 1/12 the clear distance between ribs, nor less than 5.0 cm • Ribs are not to be less than 10 cm in width, and a depth of not more than 3.5 times the minimum web width. • Clear spacing between ribs is not to exceed 75.0 cm
  • 12. Dimensions of hollow block slab
  • 13. Types of hollow block slab Loaddirection Load direction
  • 14.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26.
  • 27. Thank you for listening