FORMWORKFORMWORKFORMWORKFORMWORK
FormworkFormwork
Concrete being plastic material in fresh state, is kept in a
moulds till it gain reasonable strength, this temporary
structure is called “Formwork”.
It is closed from all sides and can carry the hydrostatic load
of fluid concrete, additional load due to vibration, and load
of men and machinery.of men and machinery.
Formwork should be such that it can be easily removed after
hardening of concrete.
Timber, plywood panels or steel sheets are used for
formwork. The initial cost of steel forms may be high but
they can be repeatedly used for a number of times.
ShutteringShuttering
Shuttering is a temporary platform constructed with the help
of wooden planks, wooden logs, steel rods or bamboos over
which formwork is supported and ultimately pouring of
concrete is done.
scaffoldingscaffolding
Scaffolding is a grid of bamboos, wooden planks or circular
steel pipes by which labour can have access to any point of
the structure to be constructed and further formwork and
shuttering can rest over it .
Steel scaffolding is most commonly used as it is easy to
dismantle and reassemble.dismantle and reassemble.
ShoringShoring
Shoring is the temporary support given to the existing
structure for repair purposes. When dismantling any central
building, the surrounding building is also temporarily
supported.
Basic Requirements of a Good
Formwork
Basic Requirements of a Good
Formwork
Formwork must be strong enough.
Formwork should be smooth to get a smooth surface
of the required member.
Formwork should be true.Formwork should be true.
Formwork should be such that it can easily be
removed without damaging the surface.
Deflections is the most important considerations.
Formwork must be water tight.
Formwork should be as economical as possible.
Formwork CostFormwork Cost
Cost of Formwork for RCC
Concrete 35%
Reinforcement 35%
Formwork 30%
The exact proportions of cost are, however, affected be the
following factors:
(i). The simplicity or complexity of the structure.
(ii). The availability of the repeated formwork.
(iii). The specified surface appearance of the concrete.
Formwork CostFormwork Cost
Cost of Formwork for Building Structures
Formwork cost is a major part of the total cost and normally
varies from 30% to 65% for building works; however, for
complicated works or with special surface finishes such as
helical stair cases or for the construction of minars, it mayhelical stair cases or for the construction of minars, it may
increase up to as much as 80%.
Formwork CostFormwork Cost
Cost of Formwork for Huge C.E. Works
The cost of formwork varies from 5% to 25% of the total
cost for bridges, highway, and dam construction, etc.
Such jobs are bigger in magnitude and again lot of money isSuch jobs are bigger in magnitude and again lot of money is
required for formwork necessitating careful design.
Wooden Formwork for R.C.C.
Walls
Wooden Formwork for R.C.C.
Walls
It includes sheathing, studs, wales, ties and braces.
Sheathing is the layer which constitutes the inner surface of
the form and is immediately in contact with the concrete.
If solid timber is used for sheathing, it may be 1", 11/4", 11/2",
2" thick, the opposite sides of the wall form are held in
correct positions by steel form ties, which resist the lateral
pressure of the concrete and serve as spacers to govern
width of the space between the forms.
Wooden Formwork for R.C.C.
Walls
Wooden Formwork for R.C.C.
Walls
The form ties usually have a safe working strength of 3000
lbs.
Sheathing is supported by closely spaced vertical timber
studs which are further supported by the horizontal wales.
The sizes of studs and wales may be 2" x 4", 2" x 6", 3" x 4",The sizes of studs and wales may be 2" x 4", 2" x 6", 3" x 4",
3" x 6" and 4" x 4", etc.
Steel ties are fixed with the help of ties clamps to the wales
and these are cut to remove the formwork when concrete is
hardened.
The form, as a whole, is stabilized by inclined braces
consisting of wooden battens or bamboos etc. Braces are
held rigidly in position by cleats on the form and by properly
driven stacks at the ground.
9’6”
Wall
tie
3/4” plywood sheathing2”x 4”x 10’- 0 “ stud2- 2”x 4”
wale
2”x 4” x 10’- 0”
brace @ 6’- 0”
Concrete Footing
9’6”
2”x 4” sill
25’4”
Side ElevationSection through the Wall
2”x 4”x 3’- 0”
Stake @ 6’- 0”
Pressure on the FormworkPressure on the Formwork
Maximum pressure of fresh concrete on the formwork is
mainly influenced by the following factors.
1) Rate of pouring of concrete which is generally 4 to 5 ft per
hour.
2) Temperature of concrete. If temperature is lower, the2) Temperature of concrete. If temperature is lower, the
concrete will remain in fluid form for longer time.
3) Workability of concrete. Workable concrete will have more
fluidity and hence will exert more pressure.
4) Thickness of concrete wall. Pressure will be lower in thin
walls because of the arching action in the cross-section.
5) Vibration of concrete.
Floor Slab Formwork or Deck
Formwork
Floor Slab Formwork or Deck
Formwork
Following points are important for deck formwork.
1) It should be properly designed to withstand the imposed
loads.
2) Loads are taken directly by plywood/ steel/solid timber
soffit sheathing. The sheathing and joists (secondarysoffit sheathing. The sheathing and joists (secondary
beams) must be water tight to prevent any leakage or
grout.
3) Normally the size of panels used for sheathing is 8 x 4 in.
and these are placed side by side.
4) Plywood sheathing, if used, is normally thick otherwise
thick commercial wooden planks may be used for the deck
formwork.
Floor Slab Formwork or Deck
Formwork
Floor Slab Formwork or Deck
Formwork
5. Soffit sheathing is supported by timber-joists (secondary
beams), which are further supported by more widely
spaced joists (main beams) at right angles to the secondary
beams. Main beams transfer load to adjustable metal props
and then the load is carried to the foundation.
6. It may be designed for a particular surface-finish if
required.
7. Double system of joists allows the vertical props to be
spaced at reasonable distance in-between to carry full load
but, at the same time, to permit the movement of men and
machinery in-between.
8. Lateral and diagonal bracing of props may be provided for
stability, which prevent side sway.
Formwork for Beam & Slab
Floor
Formwork for Beam & Slab
Floor
Formwork for ColumnsFormwork for Columns
This type of form-work consists of two end and two side
planks built in one unit or panel.
The height of each panel is built equal to the storey height
less slab thickness and the floor sheeting.
The two end planks are built in width equal to theThe two end planks are built in width equal to the
dimensions of the column plus twice thickness of the
sheeting. The width of the sheeting will be same as the
dimension of the column.
The yokes will project 20 to 25 cm beyond the sheeting at
each end as shown in fig. The spacing of the yokes will be
same on both the sides. Bolt holes are created in the side
yokes, about 3 mm larger than the size of the bolt, for
passing and tightening the bolts easily.
Formwork failuresFormwork failures
Generally some unexpected event causes one member to fail,
then others become overloaded or misaligned and the entire
formwork structure collapses.
Raft foundation formworkRaft foundation formwork
Raft foundation formworkRaft foundation formwork
TYPESTYPESTYPESTYPES OFOFOFOF CIVILCIVILCIVILCIVIL ENGINEERINGENGINEERINGENGINEERINGENGINEERING CONTRACTSCONTRACTSCONTRACTSCONTRACTS
Some of the commonly used types are explained
below:
1- Bill of Quantities Contract.
This type of contract which includes a BOQ (billThis type of contract which includes a BOQ (bill
of quantities) priced by the contractor is the most
commonly used form of contract for civil
engineering works.
This type of contract is also known as “Item
rate contract”. Bill of quantities greatly assists in
keeping the tender cost as low as possible because
there is maximum competition among the
contractors. 40
2- Scheduled Contract
In this type of contract the client refers to a
schedule of unit rates covering each item of work
and ask the contractors, when tendering, to quote a
percentage above or below the given scheduled
rates
when it is above, it is called premium
and when below, it is called rebate or discount)and when below, it is called rebate or discount)
When a contract includes both scheduled and non-
scheduled items then the contractors are asked to
quote an overall premium on the total cost of
scheduled items but, as regards the non-scheduled
items are concerned, the contractor will mention the
item-rates and no extra premium would be
permissible.
41
3333---- LumpLumpLumpLump SumSumSumSum ContractContractContractContract
In a Lump Sum Contract, the contractor undertakes to execute
certain specified works for a fixed amount of money.
The nature and extent of the work are normally indicated on
drawings
The nature of materials and workmanship are described in
specifications
But no BOQ is provided.
4444---- LabourLabourLabourLabour ContractContractContractContract4444---- LabourLabourLabourLabour ContractContractContractContract
This is a contract where labour is provided by the
contractor but all the materials are supplied by the client.
It is suitable for those cases where an employer is in a
position to buy large quantities of materials at favourable
prices.
The advantage is that the speed of work will be increased
but, at the same time, there will be more wastage of
materials.
Labour rates for the scheduled items are also given in the
42
5555---- CostCostCostCost PlusPlusPlusPlus PercentagePercentagePercentagePercentage ContractContractContractContract
In the cost plus percentage contract, the accounts are
properly maintained by the contractors showing the actual
expenditure on the work.
This is supported by proper receipts and invoices (bills,
cash memos, etc).
The profit of the contractor is decided as a negotiated
percentage, which may vary from 10 to 25% of the
actual cost of contract.
6666---- CostCostCostCost PlusPlusPlusPlus FixedFixedFixedFixed ProfitProfitProfitProfit ContractContractContractContract
This is similar to the previous type of contract with the
difference that the amount of profit is fixed and will not vary
with increase or decrease of actual cost of the work. Proper
maintenance of accounts by the contractor is must. However,
in this category, the contractor will try to complete the work
as early as possible.
Cost plus percentage and cost plus fixed profit contractors are
together called ‘Reimbursement contracts”.
43
7777---- PackagePackagePackagePackage DealDealDealDeal ContractContractContractContract
If a contracting firm is well-reputed and provides both
design and construction facilities, the project as a whole may
be awarded to this firm; the agreement become a “Package
Deal Contract”.
Special type of buildings such as hotels, picture houses,
shopping plazas, etc., may be built on the basis of package
deal contract. However, the success of such a contract mostlydeal contract. However, the success of such a contract mostly
depends upon the reputation and understanding of the firm
with the client.
8888---- SerialSerialSerialSerial ContractContractContractContract
If a contractor is already working on certain contracts at
a construction site and later on more works are planned on the
same site, these works may be awarded to the same
contractor,
Generally at the same rates, depending upon his previous
performance. This becomes a serial contract
44

More Related Content

What's hot

Mat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-CMat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-CMD. Ashif Rayhan Shuvo
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction FormworkAnkit Singhai
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
Classification of buildings
Classification of buildingsClassification of buildings
Classification of buildingsMounika swathi
 
Pointing and finishing
Pointing and finishingPointing and finishing
Pointing and finishingkajal018
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building ConstructionEr.Karan Chauhan
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGVISHNU VIJAYAN
 
6. intro to building materials
6. intro to building materials6. intro to building materials
6. intro to building materialsHamdija Velagic
 
Sequence of general works of building construction
Sequence of general works of building constructionSequence of general works of building construction
Sequence of general works of building constructionChelluri Srihari
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketchesGiri Babu S V
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointingRehmat Kaur
 
Ct2 Precast concrete piles
Ct2 Precast concrete pilesCt2 Precast concrete piles
Ct2 Precast concrete pilesSze Ting Kuek
 
Component of building
Component of buildingComponent of building
Component of buildingkajol panchal
 

What's hot (20)

Foundations
FoundationsFoundations
Foundations
 
Mat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-CMat or Raft Foundation, AUST O29+30 Sec-C
Mat or Raft Foundation, AUST O29+30 Sec-C
 
Details of roofs and floors
Details of roofs and floorsDetails of roofs and floors
Details of roofs and floors
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Classification of buildings
Classification of buildingsClassification of buildings
Classification of buildings
 
Pointing and finishing
Pointing and finishingPointing and finishing
Pointing and finishing
 
Temporary Work in Building Construction
Temporary Work in Building ConstructionTemporary Work in Building Construction
Temporary Work in Building Construction
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
 
6. intro to building materials
6. intro to building materials6. intro to building materials
6. intro to building materials
 
Sequence of general works of building construction
Sequence of general works of building constructionSequence of general works of building construction
Sequence of general works of building construction
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
types of Foundations with animated sketches
types of Foundations with animated sketchestypes of Foundations with animated sketches
types of Foundations with animated sketches
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Types of floor finishes
Types of floor finishesTypes of floor finishes
Types of floor finishes
 
Ct2 Precast concrete piles
Ct2 Precast concrete pilesCt2 Precast concrete piles
Ct2 Precast concrete piles
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
Foundation and its types
Foundation and its typesFoundation and its types
Foundation and its types
 
Component of building
Component of buildingComponent of building
Component of building
 

Similar to From work & shuttering

Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfLiesaStone
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptxMr Amol Ghogare
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabIRJET Journal
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdfFaizanSolanki
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
Atecon product catalogue 2017
Atecon product catalogue 2017Atecon product catalogue 2017
Atecon product catalogue 2017Atecon
 
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxCanberra Institute of technology
 
Formwork-Types and Their Advantages
Formwork-Types and Their AdvantagesFormwork-Types and Their Advantages
Formwork-Types and Their AdvantagesJay1997Singhania
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptxMr Amol Ghogare
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineeringFazal-E- Jalal
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62hlksd
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 

Similar to From work & shuttering (20)

Formwork
FormworkFormwork
Formwork
 
Temporary Works (Form Work)
Temporary Works (Form Work)Temporary Works (Form Work)
Temporary Works (Form Work)
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
Form Work
Form Work Form Work
Form Work
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
 
Experimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor SlabExperimental Investigation on Steel Concrete Composite Floor Slab
Experimental Investigation on Steel Concrete Composite Floor Slab
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Floor and slabs
Floor and slabsFloor and slabs
Floor and slabs
 
Atecon product catalogue 2017
Atecon product catalogue 2017Atecon product catalogue 2017
Atecon product catalogue 2017
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Formwork-Types and Their Advantages
Formwork-Types and Their AdvantagesFormwork-Types and Their Advantages
Formwork-Types and Their Advantages
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Ductile detailing
Ductile detailingDuctile detailing
Ductile detailing
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 

Recently uploaded

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

From work & shuttering

  • 2. FormworkFormwork Concrete being plastic material in fresh state, is kept in a moulds till it gain reasonable strength, this temporary structure is called “Formwork”. It is closed from all sides and can carry the hydrostatic load of fluid concrete, additional load due to vibration, and load of men and machinery.of men and machinery. Formwork should be such that it can be easily removed after hardening of concrete. Timber, plywood panels or steel sheets are used for formwork. The initial cost of steel forms may be high but they can be repeatedly used for a number of times.
  • 3.
  • 4. ShutteringShuttering Shuttering is a temporary platform constructed with the help of wooden planks, wooden logs, steel rods or bamboos over which formwork is supported and ultimately pouring of concrete is done.
  • 5. scaffoldingscaffolding Scaffolding is a grid of bamboos, wooden planks or circular steel pipes by which labour can have access to any point of the structure to be constructed and further formwork and shuttering can rest over it . Steel scaffolding is most commonly used as it is easy to dismantle and reassemble.dismantle and reassemble.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. ShoringShoring Shoring is the temporary support given to the existing structure for repair purposes. When dismantling any central building, the surrounding building is also temporarily supported.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15. Basic Requirements of a Good Formwork Basic Requirements of a Good Formwork Formwork must be strong enough. Formwork should be smooth to get a smooth surface of the required member. Formwork should be true.Formwork should be true. Formwork should be such that it can easily be removed without damaging the surface. Deflections is the most important considerations. Formwork must be water tight. Formwork should be as economical as possible.
  • 16. Formwork CostFormwork Cost Cost of Formwork for RCC Concrete 35% Reinforcement 35% Formwork 30% The exact proportions of cost are, however, affected be the following factors: (i). The simplicity or complexity of the structure. (ii). The availability of the repeated formwork. (iii). The specified surface appearance of the concrete.
  • 17. Formwork CostFormwork Cost Cost of Formwork for Building Structures Formwork cost is a major part of the total cost and normally varies from 30% to 65% for building works; however, for complicated works or with special surface finishes such as helical stair cases or for the construction of minars, it mayhelical stair cases or for the construction of minars, it may increase up to as much as 80%.
  • 18. Formwork CostFormwork Cost Cost of Formwork for Huge C.E. Works The cost of formwork varies from 5% to 25% of the total cost for bridges, highway, and dam construction, etc. Such jobs are bigger in magnitude and again lot of money isSuch jobs are bigger in magnitude and again lot of money is required for formwork necessitating careful design.
  • 19. Wooden Formwork for R.C.C. Walls Wooden Formwork for R.C.C. Walls It includes sheathing, studs, wales, ties and braces. Sheathing is the layer which constitutes the inner surface of the form and is immediately in contact with the concrete. If solid timber is used for sheathing, it may be 1", 11/4", 11/2", 2" thick, the opposite sides of the wall form are held in correct positions by steel form ties, which resist the lateral pressure of the concrete and serve as spacers to govern width of the space between the forms.
  • 20. Wooden Formwork for R.C.C. Walls Wooden Formwork for R.C.C. Walls The form ties usually have a safe working strength of 3000 lbs. Sheathing is supported by closely spaced vertical timber studs which are further supported by the horizontal wales. The sizes of studs and wales may be 2" x 4", 2" x 6", 3" x 4",The sizes of studs and wales may be 2" x 4", 2" x 6", 3" x 4", 3" x 6" and 4" x 4", etc. Steel ties are fixed with the help of ties clamps to the wales and these are cut to remove the formwork when concrete is hardened. The form, as a whole, is stabilized by inclined braces consisting of wooden battens or bamboos etc. Braces are held rigidly in position by cleats on the form and by properly driven stacks at the ground.
  • 21.
  • 22.
  • 23. 9’6” Wall tie 3/4” plywood sheathing2”x 4”x 10’- 0 “ stud2- 2”x 4” wale 2”x 4” x 10’- 0” brace @ 6’- 0” Concrete Footing 9’6” 2”x 4” sill 25’4” Side ElevationSection through the Wall 2”x 4”x 3’- 0” Stake @ 6’- 0”
  • 24.
  • 25.
  • 26. Pressure on the FormworkPressure on the Formwork Maximum pressure of fresh concrete on the formwork is mainly influenced by the following factors. 1) Rate of pouring of concrete which is generally 4 to 5 ft per hour. 2) Temperature of concrete. If temperature is lower, the2) Temperature of concrete. If temperature is lower, the concrete will remain in fluid form for longer time. 3) Workability of concrete. Workable concrete will have more fluidity and hence will exert more pressure. 4) Thickness of concrete wall. Pressure will be lower in thin walls because of the arching action in the cross-section. 5) Vibration of concrete.
  • 27.
  • 28.
  • 29. Floor Slab Formwork or Deck Formwork Floor Slab Formwork or Deck Formwork Following points are important for deck formwork. 1) It should be properly designed to withstand the imposed loads. 2) Loads are taken directly by plywood/ steel/solid timber soffit sheathing. The sheathing and joists (secondarysoffit sheathing. The sheathing and joists (secondary beams) must be water tight to prevent any leakage or grout. 3) Normally the size of panels used for sheathing is 8 x 4 in. and these are placed side by side. 4) Plywood sheathing, if used, is normally thick otherwise thick commercial wooden planks may be used for the deck formwork.
  • 30. Floor Slab Formwork or Deck Formwork Floor Slab Formwork or Deck Formwork 5. Soffit sheathing is supported by timber-joists (secondary beams), which are further supported by more widely spaced joists (main beams) at right angles to the secondary beams. Main beams transfer load to adjustable metal props and then the load is carried to the foundation. 6. It may be designed for a particular surface-finish if required. 7. Double system of joists allows the vertical props to be spaced at reasonable distance in-between to carry full load but, at the same time, to permit the movement of men and machinery in-between. 8. Lateral and diagonal bracing of props may be provided for stability, which prevent side sway.
  • 31.
  • 32. Formwork for Beam & Slab Floor Formwork for Beam & Slab Floor
  • 33. Formwork for ColumnsFormwork for Columns This type of form-work consists of two end and two side planks built in one unit or panel. The height of each panel is built equal to the storey height less slab thickness and the floor sheeting. The two end planks are built in width equal to theThe two end planks are built in width equal to the dimensions of the column plus twice thickness of the sheeting. The width of the sheeting will be same as the dimension of the column. The yokes will project 20 to 25 cm beyond the sheeting at each end as shown in fig. The spacing of the yokes will be same on both the sides. Bolt holes are created in the side yokes, about 3 mm larger than the size of the bolt, for passing and tightening the bolts easily.
  • 34.
  • 35. Formwork failuresFormwork failures Generally some unexpected event causes one member to fail, then others become overloaded or misaligned and the entire formwork structure collapses.
  • 36. Raft foundation formworkRaft foundation formwork
  • 37. Raft foundation formworkRaft foundation formwork
  • 38. TYPESTYPESTYPESTYPES OFOFOFOF CIVILCIVILCIVILCIVIL ENGINEERINGENGINEERINGENGINEERINGENGINEERING CONTRACTSCONTRACTSCONTRACTSCONTRACTS Some of the commonly used types are explained below: 1- Bill of Quantities Contract. This type of contract which includes a BOQ (billThis type of contract which includes a BOQ (bill of quantities) priced by the contractor is the most commonly used form of contract for civil engineering works. This type of contract is also known as “Item rate contract”. Bill of quantities greatly assists in keeping the tender cost as low as possible because there is maximum competition among the contractors. 40
  • 39. 2- Scheduled Contract In this type of contract the client refers to a schedule of unit rates covering each item of work and ask the contractors, when tendering, to quote a percentage above or below the given scheduled rates when it is above, it is called premium and when below, it is called rebate or discount)and when below, it is called rebate or discount) When a contract includes both scheduled and non- scheduled items then the contractors are asked to quote an overall premium on the total cost of scheduled items but, as regards the non-scheduled items are concerned, the contractor will mention the item-rates and no extra premium would be permissible. 41
  • 40. 3333---- LumpLumpLumpLump SumSumSumSum ContractContractContractContract In a Lump Sum Contract, the contractor undertakes to execute certain specified works for a fixed amount of money. The nature and extent of the work are normally indicated on drawings The nature of materials and workmanship are described in specifications But no BOQ is provided. 4444---- LabourLabourLabourLabour ContractContractContractContract4444---- LabourLabourLabourLabour ContractContractContractContract This is a contract where labour is provided by the contractor but all the materials are supplied by the client. It is suitable for those cases where an employer is in a position to buy large quantities of materials at favourable prices. The advantage is that the speed of work will be increased but, at the same time, there will be more wastage of materials. Labour rates for the scheduled items are also given in the 42
  • 41. 5555---- CostCostCostCost PlusPlusPlusPlus PercentagePercentagePercentagePercentage ContractContractContractContract In the cost plus percentage contract, the accounts are properly maintained by the contractors showing the actual expenditure on the work. This is supported by proper receipts and invoices (bills, cash memos, etc). The profit of the contractor is decided as a negotiated percentage, which may vary from 10 to 25% of the actual cost of contract. 6666---- CostCostCostCost PlusPlusPlusPlus FixedFixedFixedFixed ProfitProfitProfitProfit ContractContractContractContract This is similar to the previous type of contract with the difference that the amount of profit is fixed and will not vary with increase or decrease of actual cost of the work. Proper maintenance of accounts by the contractor is must. However, in this category, the contractor will try to complete the work as early as possible. Cost plus percentage and cost plus fixed profit contractors are together called ‘Reimbursement contracts”. 43
  • 42. 7777---- PackagePackagePackagePackage DealDealDealDeal ContractContractContractContract If a contracting firm is well-reputed and provides both design and construction facilities, the project as a whole may be awarded to this firm; the agreement become a “Package Deal Contract”. Special type of buildings such as hotels, picture houses, shopping plazas, etc., may be built on the basis of package deal contract. However, the success of such a contract mostlydeal contract. However, the success of such a contract mostly depends upon the reputation and understanding of the firm with the client. 8888---- SerialSerialSerialSerial ContractContractContractContract If a contractor is already working on certain contracts at a construction site and later on more works are planned on the same site, these works may be awarded to the same contractor, Generally at the same rates, depending upon his previous performance. This becomes a serial contract 44