Name : Yee Algel 
Student Id : 0315890 
Assignment : Site Visit Report 
Lecturer : SR. Ang Fuey Lin 
Ms. Azrina Binti Md Yaakob 
Ms. Myzatul Aishah Binti Kamarazaly 
Submission Date : 28 November 2014
Content 
No Topic Page 
1. Introduction 3 
2 
2. 
Objective 
4 
3. 
Content/ Technical Observations 5-9 
4. 
Learning Outcomes/ Conclusion 
10-11 
5. 
Appendix 
12
Introduction 
21 November 2014, we went to a site visit which was organized by our 
measurement lecturer, Ms Ang. The site is located very near to Taylor’s 
Uni versity Lakeside Campus which is the D’Latour construction site. We 
gathered at the entrance of the site before we get in the site at 9.00am. While all 
the lecturers and students get ready, we went into the site with our safety 
helmets. Then we were briefed by the safety officer of the site about the safety 
precautions in the site. This was essential to ensure our safety. About 10am, we 
started our site visit. During the site visit, Mr Tang who is from Pasukhas 
Construction SDN BHD had briefly explained the building to us. He provided 
many information for us about the building. The whole site visit took us about 
45min. We were only allowed to go to the car park of the building because it was 
safer as the structural work in this level was partially completed. 
This project is consists of 1 block of 27 storey of Duplex Design Soho and 
23 storey of service apartment. Below are the project titles: 
TAJUK PROJEK: CADANGAN MEMBINA 2 BLOK 27 TINGKAT SOHO DAN 28 
TINGKAT PANGSAPRI SERVIS, DIATAS 4 TINGKAT PODIUM SERTA 3 
TINGKAT BASEMEN YANG MENGANDUNGI: 
1. BLOK A – 629 UNIT SOHO DAN BLOK B – 232 UNIT PANGSAPURI 
SERVIS DENGAN “ROOF GARDEN” 
2. DEWAN SERBAGUNA, SURAU GIMNASIUM, CAFÉ, TADIK, BILIK 
PERSALINAN, KOLAM RENANG, ‘HEALTH SUITE’, BILIK BACAAN DAN 
PEJABAT PENGURUSAN DI TINGKAT 4 
3. RUMAH PENGAWAL DI TINGKAT BAWAH 
4. 4RUANG LETAK KERETA DI TINGKAT BAWAH TANAH 1 & 2 
5. RUANG LETAK KERETA DI BAWAH HINGGA TINGKAT 3 
6. RUANG PERNIAGAAN DI TINGKAT BAWAH & TINGKAT MEZZANINE 
7. RUANG MENKENIKAL DI INGKAT BAWAH TANAH 3 DAN JUGA 
TINGKAT DI ATAS LOT PT 344, BANDAR SUNWAY, PJS7, MUKIM 
PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK 
TETUAN DK-MY PROPERTIES SDN. BHD. 
3
Objective 
Below are the objectives of this site visit: 
1. To help us understand the basics of the construction process. 
2. To let us understand the practical aspect of construction techniques in 
comparison to the theory aspect in books and its application on site. 
3. Exposure to actual working environment on site including uncertainty 
4 
circumstances e.g. weather. 
4. Ability to communicate with the construction team members on site and to 
see the importance of teamwork in the building team. 
5. Witness the usage of construction equipment on site including mechanical 
plants. 
6. Explore and identify various types of bui lding materials and technology on 
site. 
7. Awareness of the importance of safety on site and understanding of safety 
problems and site conditions. 
8. Recognize the items measurable for sub-structure and reinforced concrete 
frame works.
Content/ Technical Observations 
When I reach the site, the very first thing I saw is the temporary 
accommodation cabin of workers. Then, we gathered in front of the meeting 
room of the construction site and listen to the safety precaution briefing by En. 
There were quite a number of independent scaffoldings were located outside of 
the building. There was also a temporary staircase made by the scaffolding to 
allow the worker to climb up to the upper floor. Then, we started our site visiting 
by following him into the car park of the building where the structural work of the 
building was completed. Then I saw many types of building materials like 
cements, mortals, bricks and reinforcement bars. Along the journey, he had 
explained to us the structure of the building to us and the cost of the building. 
5 
Figure 1 Beam formwork 
Figure 2 Beam Formwork
Then, we also saw numerous of temporary works (formwork) in the 
building to support incomplete concrete work. There are a few types of formwork 
which include table formwork and beam formwork. The materials of these 
formworks are metals and timbers. 
The benefits of using table formwork are easy and rapid installation on a 
large area. Besides, a good quality of surface finishes also can be made by using 
this type of formwork. Beam formwork has advantages of shock proof and high 
dimensional stability. 
6 
Figure 3 Table Formwork 
Figure 4 Table formwork
Figure 5 Independent Scaffolding Figure 6 Independent Scaffolding 
There was only one type of scaffolding was used in the site which was the 
independent scaffolding. This type of scaffolding does not rely on building for 
support. The scaffolding that we found the site all were made by metal. It can be 
supported by itself. It is durable and can be reused for many times. Besides, it is 
also easy to be set up. 
However, there are a few disadvantages for this type of scaffolding which 
is the initial cost of the scaffolding is high. Besides, it also heavier than other type 
of scaffolding. Moreover, extra cares shall be taken for the poles protected when 
not in use. 
7
Figure 8 Reinforced Concrete Slab and 
column 
Figure 7 Reinforced Concrete Slab Figure 9 Reinforced Concrete Slab and 
Mr Tang told us that this building was built with mainly grade40 concrete. He 
explained to us, mostly high-rise buildings will be using concrete that are with 
higher grade such as grade 30 and above. This is to ensure the concrete is able 
to sustain the loads in building and also the building itself. Grade 40 concrete 
which have a specified characteristic compressive strength of 40N/mm2 at 28 
days. This shows the concrete is a high strength concrete but it is more 
expensive than the concrete with a lower grade. 
Mr Tang who is the engineer of the site states that the concrete that is 
more than grade30 should be sufficient to support the building, I would like to 
suggest grade 35 concrete as an alternative grade of concrete. It could lower the 
cost of the building, yet most importantly it is sufficient to support the building. 
8 
column
Figure 10 Reinforcement bar bend and cut 
working area 
After that, we went outside of the building and have a look on the place of 
the reinforcement bar where it is cut and bend. Finally, our site visit had come to 
the end. 
9
Learning Outcomes/ Conclusion 
First of all, I would like to thank Ms Ang for organizing this site visiting trip. 
It exposes to us the actual surrounding of a construction site to us. This is the 
first time I could grab this opportunity to visit a construction site. From this site 
visit, I gain a lot of informative knowledge that could not be learning from books. I 
had seen numerous of things during the site visit. 
I had seen a lot of building materials and construction technology in the 
building such as like cements, and reinforcement bars, scaffolding and more. 
This let me understood the materials what we always measured in the 
measurement looks like and how the material was used in the construction. I also 
understood that the different type of construction technology that is used in the 
construction site to control the cost of the building. For an example, a different 
type of grade of concrete is used in construction to suit the specification of the 
building. 
Furthermore, I also learnt that safety first is the most important element in 
a construction site. We must always be vigilance and be careful while we walk in 
the site. We must have taken the entire precaution step before entering a site like 
wearing a safety helmet and a pair of covered shoes. The construction site may 
have a lot of sharp left over material could injure our leg. By following the 
precaution steps, this could help to protect us and minimize the threat as at any 
time dangers could be happens in a construction site. 
Apart from that, I also learnt that communication is an essential element in 
construction industry. There were numerous of workers in the construction site. 
To ensure the construction process is smoothly, a good communication skill must 
be indicated. Besides, working as a team also an important moral value should 
be imposed on everyone. A building required plenty of man power to be 
completed. 
10
All in all, this is a very good experience and meaningful site visit which had 
given many benefits to me. Besides, it helps me to get prepared for my future 
career to work in a construction site and also to be a professional and trained 
quantity surveyor. 
11
Appendix 
12 
Figure 12 Project title 
Figure 11 Group Photo 
Figure 13 Overview of the 
Construction site

More Related Content

What's hot

Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site reportw ss
 
Site report
Site reportSite report
Site reportYunshi94
 
CT site visit report
CT site visit report CT site visit report
CT site visit report Yap Xin
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017bee_by
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE  SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE Shourya Puri
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report Batoul Alshamali
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report I'mMiss Lily
 
Site visit report.
Site visit report.Site visit report.
Site visit report.Man Yee
 
Site visit report
Site visit reportSite visit report
Site visit reportJordon Wong
 
Site visit report
Site visit reportSite visit report
Site visit reportDoreen Yeo
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology Ikaiwenyeo
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Reporttianji96
 

What's hot (20)

Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE  SITE VISIT ARCHITECTRE
SITE VISIT ARCHITECTRE
 
Site visit report
Site visit reportSite visit report
Site visit report
 
site report
site reportsite report
site report
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
Site visit report.
Site visit report.Site visit report.
Site visit report.
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology ISite Visit report- Measurement I, Building materials, Construction Technology I
Site Visit report- Measurement I, Building materials, Construction Technology I
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Construction site
Construction siteConstruction site
Construction site
 
Site report
Site reportSite report
Site report
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
 

Viewers also liked

Rose Travel Consulting Newsletter - Juni 2010
Rose Travel Consulting Newsletter - Juni 2010Rose Travel Consulting Newsletter - Juni 2010
Rose Travel Consulting Newsletter - Juni 2010Rose Travel
 
Charity finalized
Charity finalizedCharity finalized
Charity finalizedAlgel Yee
 
Forum pa modellomisu_semp
Forum pa modellomisu_sempForum pa modellomisu_semp
Forum pa modellomisu_sempgiaberna
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)Algel Yee
 
Maths assignment area and volume calculation
Maths assignment area and volume calculationMaths assignment area and volume calculation
Maths assignment area and volume calculationAlgel Yee
 
Pyschology video clip project
Pyschology video clip projectPyschology video clip project
Pyschology video clip projectAlgel Yee
 
Econ research report
Econ research reportEcon research report
Econ research reportAlgel Yee
 
Inner beauty
Inner beautyInner beauty
Inner beautyAlgel Yee
 
Journal assignment
Journal assignmentJournal assignment
Journal assignmentAlgel Yee
 
Maido saloon presentation
Maido saloon presentationMaido saloon presentation
Maido saloon presentationAlgel Yee
 
My daily routine SANDY
My daily routine SANDYMy daily routine SANDY
My daily routine SANDYSandy Nieto
 
Financial ratio analysis final report
Financial ratio analysis final reportFinancial ratio analysis final report
Financial ratio analysis final reportAlgel Yee
 

Viewers also liked (13)

Rose Travel Consulting Newsletter - Juni 2010
Rose Travel Consulting Newsletter - Juni 2010Rose Travel Consulting Newsletter - Juni 2010
Rose Travel Consulting Newsletter - Juni 2010
 
Charity finalized
Charity finalizedCharity finalized
Charity finalized
 
Forum pa modellomisu_semp
Forum pa modellomisu_sempForum pa modellomisu_semp
Forum pa modellomisu_semp
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Maths assignment area and volume calculation
Maths assignment area and volume calculationMaths assignment area and volume calculation
Maths assignment area and volume calculation
 
Pyschology video clip project
Pyschology video clip projectPyschology video clip project
Pyschology video clip project
 
Econ research report
Econ research reportEcon research report
Econ research report
 
Inner beauty
Inner beautyInner beauty
Inner beauty
 
Oferta edukacyjna Uczelni Techniczno-Handlowej im. Heleny Chodkowskiej 2016/17
Oferta edukacyjna Uczelni Techniczno-Handlowej  im. Heleny Chodkowskiej 2016/17Oferta edukacyjna Uczelni Techniczno-Handlowej  im. Heleny Chodkowskiej 2016/17
Oferta edukacyjna Uczelni Techniczno-Handlowej im. Heleny Chodkowskiej 2016/17
 
Journal assignment
Journal assignmentJournal assignment
Journal assignment
 
Maido saloon presentation
Maido saloon presentationMaido saloon presentation
Maido saloon presentation
 
My daily routine SANDY
My daily routine SANDYMy daily routine SANDY
My daily routine SANDY
 
Financial ratio analysis final report
Financial ratio analysis final reportFinancial ratio analysis final report
Financial ratio analysis final report
 

Similar to Site report algel

Site report
Site reportSite report
Site reportvaylu
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShareYung Kai
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit reportMomo Poyi
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit ReportZIyeeTan
 
Measurement assignment site report
Measurement assignment site reportMeasurement assignment site report
Measurement assignment site reportSyafiq Zariful
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)Jia Hong Mui
 
site report
site reportsite report
site reportszelun
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visitPui San
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docxShze Hwa Lee
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement reportKailyn Lee
 

Similar to Site report algel (20)

Site report
Site reportSite report
Site report
 
Site report
Site reportSite report
Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site report
Site reportSite report
Site report
 
Report
ReportReport
Report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Site report
Site reportSite report
Site report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
Site report
Site reportSite report
Site report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Measurement assignment site report
Measurement assignment site reportMeasurement assignment site report
Measurement assignment site report
 
Site report
Site reportSite report
Site report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Site visit report
Site visit reportSite visit report
Site visit report
 
site report
site reportsite report
site report
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
 
Ez
EzEz
Ez
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 

Site report algel

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) 2014 August Intake Construction Technology 1 (BLD60104) BUILDING MATERIALS (BLD62003) Measurement 1 (QSB60104) 1 Name : Yee Algel Student Id : 0315890 Assignment : Site Visit Report Lecturer : SR. Ang Fuey Lin Ms. Azrina Binti Md Yaakob Ms. Myzatul Aishah Binti Kamarazaly Submission Date : 28 November 2014
  • 2. Content No Topic Page 1. Introduction 3 2 2. Objective 4 3. Content/ Technical Observations 5-9 4. Learning Outcomes/ Conclusion 10-11 5. Appendix 12
  • 3. Introduction 21 November 2014, we went to a site visit which was organized by our measurement lecturer, Ms Ang. The site is located very near to Taylor’s Uni versity Lakeside Campus which is the D’Latour construction site. We gathered at the entrance of the site before we get in the site at 9.00am. While all the lecturers and students get ready, we went into the site with our safety helmets. Then we were briefed by the safety officer of the site about the safety precautions in the site. This was essential to ensure our safety. About 10am, we started our site visit. During the site visit, Mr Tang who is from Pasukhas Construction SDN BHD had briefly explained the building to us. He provided many information for us about the building. The whole site visit took us about 45min. We were only allowed to go to the car park of the building because it was safer as the structural work in this level was partially completed. This project is consists of 1 block of 27 storey of Duplex Design Soho and 23 storey of service apartment. Below are the project titles: TAJUK PROJEK: CADANGAN MEMBINA 2 BLOK 27 TINGKAT SOHO DAN 28 TINGKAT PANGSAPRI SERVIS, DIATAS 4 TINGKAT PODIUM SERTA 3 TINGKAT BASEMEN YANG MENGANDUNGI: 1. BLOK A – 629 UNIT SOHO DAN BLOK B – 232 UNIT PANGSAPURI SERVIS DENGAN “ROOF GARDEN” 2. DEWAN SERBAGUNA, SURAU GIMNASIUM, CAFÉ, TADIK, BILIK PERSALINAN, KOLAM RENANG, ‘HEALTH SUITE’, BILIK BACAAN DAN PEJABAT PENGURUSAN DI TINGKAT 4 3. RUMAH PENGAWAL DI TINGKAT BAWAH 4. 4RUANG LETAK KERETA DI TINGKAT BAWAH TANAH 1 & 2 5. RUANG LETAK KERETA DI BAWAH HINGGA TINGKAT 3 6. RUANG PERNIAGAAN DI TINGKAT BAWAH & TINGKAT MEZZANINE 7. RUANG MENKENIKAL DI INGKAT BAWAH TANAH 3 DAN JUGA TINGKAT DI ATAS LOT PT 344, BANDAR SUNWAY, PJS7, MUKIM PETALING, DAERAH PETALING, SELANGOR DARUL EHSAN UNTUK TETUAN DK-MY PROPERTIES SDN. BHD. 3
  • 4. Objective Below are the objectives of this site visit: 1. To help us understand the basics of the construction process. 2. To let us understand the practical aspect of construction techniques in comparison to the theory aspect in books and its application on site. 3. Exposure to actual working environment on site including uncertainty 4 circumstances e.g. weather. 4. Ability to communicate with the construction team members on site and to see the importance of teamwork in the building team. 5. Witness the usage of construction equipment on site including mechanical plants. 6. Explore and identify various types of bui lding materials and technology on site. 7. Awareness of the importance of safety on site and understanding of safety problems and site conditions. 8. Recognize the items measurable for sub-structure and reinforced concrete frame works.
  • 5. Content/ Technical Observations When I reach the site, the very first thing I saw is the temporary accommodation cabin of workers. Then, we gathered in front of the meeting room of the construction site and listen to the safety precaution briefing by En. There were quite a number of independent scaffoldings were located outside of the building. There was also a temporary staircase made by the scaffolding to allow the worker to climb up to the upper floor. Then, we started our site visiting by following him into the car park of the building where the structural work of the building was completed. Then I saw many types of building materials like cements, mortals, bricks and reinforcement bars. Along the journey, he had explained to us the structure of the building to us and the cost of the building. 5 Figure 1 Beam formwork Figure 2 Beam Formwork
  • 6. Then, we also saw numerous of temporary works (formwork) in the building to support incomplete concrete work. There are a few types of formwork which include table formwork and beam formwork. The materials of these formworks are metals and timbers. The benefits of using table formwork are easy and rapid installation on a large area. Besides, a good quality of surface finishes also can be made by using this type of formwork. Beam formwork has advantages of shock proof and high dimensional stability. 6 Figure 3 Table Formwork Figure 4 Table formwork
  • 7. Figure 5 Independent Scaffolding Figure 6 Independent Scaffolding There was only one type of scaffolding was used in the site which was the independent scaffolding. This type of scaffolding does not rely on building for support. The scaffolding that we found the site all were made by metal. It can be supported by itself. It is durable and can be reused for many times. Besides, it is also easy to be set up. However, there are a few disadvantages for this type of scaffolding which is the initial cost of the scaffolding is high. Besides, it also heavier than other type of scaffolding. Moreover, extra cares shall be taken for the poles protected when not in use. 7
  • 8. Figure 8 Reinforced Concrete Slab and column Figure 7 Reinforced Concrete Slab Figure 9 Reinforced Concrete Slab and Mr Tang told us that this building was built with mainly grade40 concrete. He explained to us, mostly high-rise buildings will be using concrete that are with higher grade such as grade 30 and above. This is to ensure the concrete is able to sustain the loads in building and also the building itself. Grade 40 concrete which have a specified characteristic compressive strength of 40N/mm2 at 28 days. This shows the concrete is a high strength concrete but it is more expensive than the concrete with a lower grade. Mr Tang who is the engineer of the site states that the concrete that is more than grade30 should be sufficient to support the building, I would like to suggest grade 35 concrete as an alternative grade of concrete. It could lower the cost of the building, yet most importantly it is sufficient to support the building. 8 column
  • 9. Figure 10 Reinforcement bar bend and cut working area After that, we went outside of the building and have a look on the place of the reinforcement bar where it is cut and bend. Finally, our site visit had come to the end. 9
  • 10. Learning Outcomes/ Conclusion First of all, I would like to thank Ms Ang for organizing this site visiting trip. It exposes to us the actual surrounding of a construction site to us. This is the first time I could grab this opportunity to visit a construction site. From this site visit, I gain a lot of informative knowledge that could not be learning from books. I had seen numerous of things during the site visit. I had seen a lot of building materials and construction technology in the building such as like cements, and reinforcement bars, scaffolding and more. This let me understood the materials what we always measured in the measurement looks like and how the material was used in the construction. I also understood that the different type of construction technology that is used in the construction site to control the cost of the building. For an example, a different type of grade of concrete is used in construction to suit the specification of the building. Furthermore, I also learnt that safety first is the most important element in a construction site. We must always be vigilance and be careful while we walk in the site. We must have taken the entire precaution step before entering a site like wearing a safety helmet and a pair of covered shoes. The construction site may have a lot of sharp left over material could injure our leg. By following the precaution steps, this could help to protect us and minimize the threat as at any time dangers could be happens in a construction site. Apart from that, I also learnt that communication is an essential element in construction industry. There were numerous of workers in the construction site. To ensure the construction process is smoothly, a good communication skill must be indicated. Besides, working as a team also an important moral value should be imposed on everyone. A building required plenty of man power to be completed. 10
  • 11. All in all, this is a very good experience and meaningful site visit which had given many benefits to me. Besides, it helps me to get prepared for my future career to work in a construction site and also to be a professional and trained quantity surveyor. 11
  • 12. Appendix 12 Figure 12 Project title Figure 11 Group Photo Figure 13 Overview of the Construction site