The client was producing 20 MMscf/d of natural gas but several new wells increased production potential by 4 MMscf/d. However, the existing gas gathering and compression system could not accommodate the full increase. GCC performed an audit of the system and modeled pipeline and compressor equipment. This identified modifications to allow production of the new capacity of 30 MMscf/d along with additional future capacity. GCC's redesign of the gathering system and reallocation of compression resources allowed the client to maintain 30 MMscf/d production while reducing annual costs by $800,000.